Loading...
HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 160 CARLTON LANE 3/22/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 160 Carlton Lane MAP: 107.A LOT: 0192 INSTALLER: Peter Nardone – Nardone Septic Inc 781-953-2720 DESIGNER: Thorsen Akerley, R.S. Williams & Sprages, LLC 978-539-8088 PLAN DATE: 06/06/2019 revision 7/10/2019 BOH APPROVAL DATE ON PLAN: 08/09/2019 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 9/5/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 9/30/2019 – B. LaGrasse DATE OF FINAL GRADE INSPECTION: 9/30/2019 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 9/20/19 – Contractor reports over-dig is smaller, septic tank was not replaced per plan SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle/effluent filter) 24_____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: 9/20/19 – Inlet baffle confirmed to be intact. Outlet pipe penetration was not water-tight. 09/27/2019 - Water Tight – B. LaGrasse DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 9/20/19 – One distribution box outlet was not water-tight 09/27/2019 – Water Tight – B. LaGrasse SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = __172.06___ HR = __1.70____ HI = __173.76___ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Septic Tank OUT 2.08 171.35 171.16 Distribution Box IN 2.82 170.61 170.58 Distribution Box OUT 3.06/3.01 170.37/170.42 170.41 Lateral 1 Beg 3.14 170.29 170.35 Lateral 1 End 3.42 170.01 170.00 Lateral 2 Beg 3.10 170.33 170.35 Lateral 2 End 3.42 170.01 170.00