Loading...
HomeMy WebLinkAboutDecision - 1160 GREAT POND ROAD WSP 3/21/2017 { r 3 Town of North Andover 'R CI V • l Office o the Plan Department CLERK'S i.f Community Development and Services Iv2017-MAR,-22 120 Main Street 4M11* 47 North Andover,Massachusetts 01845 'N io- NORTH A � R NOTICE OFDECISION MASS SETTS .. WATERSHED I ISTM T SPECIAL PERI T 'This is "*Cy that fin# 20)days Any appeal shall be wed have elapsed*om date of decWon,Ved wiftui ling of are appeal.within(20)days after the a &C1117 1 date of filing this notice In joy ,Smdshaw Tewn Chwk the office of the Town Clerk I Date: March 21,2017 Date of Public Hearing: February 21,2017, March 7,2017,March 21,2017 .''0 zv 6 P:g 17 3 9 IL 6 2 Petition Brooks School it 1 —I S— 1 1160 Great fond Road �. .� � ��,�� ,��' �-5 Forth Andover,MA 0 1945 Premises Affected: Brooks School—Arts Center 1160 Great Pond Road Forth Andover,MA o 1845 Referring to the above petition for Review of a Watershed Special Permit, according to the requirements f the forth Andover Zoning Bylaw, Sections .l , l . ,and 10.31 and MGL C-40A,Sec. So as to allow the reconstruction of existing developed areas of the gooks School Campus consisting of the demolition and removing of buildings and the constructing of an art center building with associated access wars,utilities,field and landscaped areas.The majority of the proposed work is wi&in the General Zone with small portion of reconstruction of walks,parking and 1ardscapin u the outer edge of the Non-Discharge Zone and re-grading of an existing soccer Meld within the Non-Discharge and Non-Disturbance Zones. The project is acted In the Residential 1 R-1 Zone. After a public hearing given on the above date, and upon a motion by Lynne Rudnicki and a 2�d by Peter Boynton, to APPROVE, as amended, a Watershed Special Permit with the following conditions imposed on the project by a vote of 4 in favor and 0 against. n behalf the North Addover Planning Board . I John Simons,,Chairman Lynne Rudnici Lora McSh,erry { ', Deter Doynton kx Town clerli x ' 4 r Bk 15046 P 1 4 #9162 } The.Public He&dng ors the above referenced application was opened on February 21, 2017 closed by the North Andover Planning Board on Larch 21,201 `.' n .March 21, 2017, upon a ruction made 'by Lynne Rndnicki and seconded by Peter Boynton to APPROVE, as amended, a watershed Special Permit to allow the reconstruction of existing developed areas of the Brooks School Campus consisting of the demolition and removing of buildings and the constructing of an art center building with associated access ways, utilities, Meld and landscaped areas. The majority of the proposed work is within the General Zone with a small portion of reconstruction of walks, parking and la�ndsc ping on the outer edge of the Non-Discharge Zone and re-grading of are existing soccer Meld within the Non-Discharge and Non-Disturbance Zones. The project is located in the Residential 1 (R-1) Zane. This Special Permit was requested y Brooks School, 1160 Great Pond Road, North Andover, MA 0 1845 on January 17,2017. The Applicant submitted a complete application,which was noticed and reviewed in accordance with Section 4.136, 8.3, 1 .3, and 1 . 1 of the Town of North Andover ,honing Bylaw and MGL Chapter 40A., Section 9. The motion to approve was subject to the FINDINGS OF PACTS and SPECIAL CONDITIONS set forth in this decision, The Planning Board.vote was unanimous. A special permit issued by the special permit granting authority requires a vote of at least four members of a five-member board. The Applicant is hereby noted that should the Applicant disagree with this decision,the Applicant has the right, under MGL Chapter 40A, Sermon 17, to appeal to this decision within twenty days after the date this decision has been filed with the Tovm Clerk. In accordance with 4.136 the Planning Board makes the frndixg that the Intent of the Bylaw, as well as its specific criteria are met. This decision spe ifiWly stated by the Planning Board makes the following FLINGS OF FACT.0 1 The project is located within are extremely environmental sensitive area and in close proximity to Lake Cochichewick, the Town's sole drft&ing water supply; however, the final design includes the implementation of Best Management Practices that reflect extensive discussions between the Town. and Applicant to ensure floe continued protection of Lake Cochichewick and the safety and welfare of the residents of North Andover. 2 The majority of the proposed work is within the General Zane with a small portion of reconstruction of was, parking and landscaping on the outer edge of the Non-Discharge Zone and re-grading of existing soccer field within the Non Discharge and Non-Disturbance Zones. The project has been reviewed by theTown's Stormwater Review consultant, Eggleston Environmental, and with the application of erosion control measures and modifications to the drainage and st rmwater rnanagem xt designs, the consultant concluded that there will not be significant degradation to the duality or quantity of water in or entering Lake Cochichewick. The site drainage system and stormwater management design are designed in a eo danee with the Town Bylaw requirements and Best Engineering and Management Prances. (See email correspondence from L.Eggleston dated March 6,2017.) 3 The Applicant sued the soil disposal for the excavation for the proposed development that is anticipated to generate approximately 6,200 cubic yards of excess excavated material consis ng of the existing fUl and natural soils will be -used wither the school proms at the existing soccer field for r regrading. McPhail Associates will be rimed to continuously monitor the excavation and segregation of materials daring the construction period. In the event that any excavated soils which are malodorous, or which exhibit visual anchor olfactory evidence of petroleum or any other suspicious materials become evident they will be segregated and stockpiled separately from other soils. These soils will then be sent to an off- site laboratory for tesfing and analyses.(See memo from McPhail Associates dated I aa-ch 1,2017.) Brooks School—Arta Center Watershed Special Permit March 2 1',20 11 Page 2 of Bk 1504 Pg175 # 1 2 a 4 The specific Site is an appropriate location for the proposed use and structure. 5 Because of the unique characteristics of the Site the use as developed will not adversely affect the neighborhood.The overall impact(traffic,noise, generation of pollution)of the proposed development is very mihnal. 6 There will be no nuisance or serious hazard to vehicles or pedestrians. The proposed development provides for clear separation of pedestrian and vehicular traffic and will not create a hazard for either. Proper signage and vehicle controls.(curbs, roadways and parking areas) will be provided. Specific safety mechanisms (signs, striping and surfacing) will be installed where pedestrian and vehicular traffic coincides. 7 Adequate and appropriate facilities are provided for the proper project. 8) There is no Treasonable alternative location outside the General,Non-Disturbance,and the Non-Discharge Zones for any discharge,structure or activity. The Plannffig Board also makes a speck fmding that the use is in harmony with the general purpose and intent of the Forth Andover Zoning Bylaw.Upon reaching the above findings,the Planning Board approves this Special Permit based upon the following SP CUL CO DMONS. 9 Permit Defmitions. a The"Locus"or"Site"refers to the approximately 1.66 acre parcel of land on a portion of Assessors Map 103,Parcels 28 and 90C also known as 1160 Great Fond Road,North Andover,Massachusetts. b The"Flans"refer to the plans prepared by Whitman &Bingham Associates, A.T. Leonard Associates and AmiBeha Architects entitled "Brooks School Center for the Arts 1160 Great Pond Road, North Andover, b A 1 4 ", dated January 13, 2017 and revised February 2, 2017,February 7,2017 and March 1,2017. c The "Projeet" refers to the reconstruction of existing developed areas of the Brooks School Canopus consisting of the demolition and removing of buildings and the constructing of an art center building with associated access ways, utilities, field and landscaped areas. The majority of the proposed work is within the General Zone with a small portion of reconstruction of walks, parking and landscaping on the outer edge of the Non-Discharge Zone and re-grading of an existing soccer field wriffiin the lion-Discharge and Non- Disturbance Zones.The project is located in the Residential 1 -1 Zone. d The "Applicant" refers to Brooks School, the applicant for the Watershed District Special Permit. e The "Project Ownee" refers to the person or entity holding the free Merest to the title to the Locus from time to time,which can include but is not limited to the applicant, developer,and owner 1 The A plicant shaU make sure the fffl being removed from the Site is non-hazardous and follow all Federal,State ad local regulations if there is any hazardous fill found on the Site. 11 Throughout ah lands,tree cutting shall be kept to a minimum m order to minunize erosion and preserve the natuml features of the site. 1 The Planting Plan shah include all native species. Brooks School-Arts Center Watershed Special Permit March 21,2017 Page 3 of } Bk 15046 Pg176 #9162 1 The soil that is removed from the construction site for the regrading of the soccer field and the process of establishing vegetation shall be by way of organic or slow release nitrogen feftilizers.Any new lawn and landscaped areas should be constructed in such a manner as to -...inimi a the maintenance that is required, . e.g.the soil should be well aerated,it should have a mm' m` um of 6-inches oftopsoil and,where possible, native vegetation should be planted to nu'nimize the need for fertilizer and watering. 1 The Planning Director shall approve awny changes made to these plans. Any changes deemed substantial by the Planning Director would require a Public Hearing and Modification by the Planning Board. 'RID .To ISSUANCE OF A BIDING PERMIT 1 A performance guarantee bond of four thousand dollars , 00. o made out to the Town of forth Andover must be posted t insure that the constriction,erosion control, measures, and performance f any other condition contained herein will take place in accordance with the plans and the conditions of this decision and to ensure that the as-built plans wifl be submitted. 16 No construction activities authorized by this Decision shall be conunenced until the Applicant has received a Height Variance from the Town of North Andover Zoning Board of Appeals and the 20 Day Appeal Period has ended, as required by the Town of forth Andover's Zoning Bylaw Table 2 Bury of Dimensional Requirements specific to the height of the proposed building. A recorded copy of the approved Zoning Board of Appeals Decision shall be provided to the Planning Department. 1' consultation with the Planning Director,the Applicant shall designate are independent construction monitor. The monitor shall read, sign, and return to the Town planner the Letter of Agreement for Independent Monitors. Upon the start of site work the monitor shad make weekly inspections of the project(any suspension in monitoring due to inactivity on the site shall be pre-approved by the Town Plamner), provide monthly reports to the Planning Department, and detail any areas of non- compliance and corrective actions.The monitor will also provide reports following heavy rain events. The monitor must also be available upon notice to inspect the site accompanying a Planning Department designated official. 1 All erosion control measms as shown on the plan must be in place and reviewed by the Planni� Director. 1 Fertilizers are limited to those which are either organic or slow-release nit-ogen and phosphorous-fim, non.-orgac pesticides and herbicides use are prohibited,and the use of coal tar-based pavement sealants is prohibited. In addition to the Covenant that was previously recorded in 2004, the Applicant s� incorporate this condition as a deed restriction and a copy of the recorded ded deed shag be submitted to the Plante Department and Included in the Me. PRIOR To RIELEASE of PERFORMANCE BOND 0 The Applicant must submit a letter from the architect and engineer of the project stating that the building, landscaping,lighting and Site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board.The Applicant must also submit a letter from a professional engineer ce .ifying that there are no illicit connections to the stogy drainage system. 21 The Planning Board mast by a majority vote make a finding that the Site is in cortfirrmance with the approved plain. Brooks School—Arts Center Watershed Special Permit March 21,2017 Page 4 of 4 Bk 1504 Pg177 #9162 GENERAL CONDMONS 22 No open burning shall be done except as is permitted wring bum ng season under the Fire Department regulations. 23 The Contractor shall contact Dig Safe at least 72 hours prior to commenemg excavation. 24 -The provisions of this conditional approval shall apply to and be binding upon the A.pplicarit, its employees and all successors and assigns in Merest or control. 2 Pursuant to the North Andover Zoning Bylaw Section 1 .31.3 this Special Permit approval shall be. deemed to have lapsed March 21, 201 (two years from, the date of issuance) exclusive of the tine required to pursue or await determination of any appeals, unless substantial use or construction has commenced Within said two-year period. Substantial use or construction will be determined by a majority vote of the Planning Board. 2 This decision must be filed with the North Essex Registry of Deeds. The following information i included as part of this decision: Plan tiled: Brooks School Center for the Arts 1160 Great Pond Road North Andover,Massachusetts 0184 Prepared for: Brooks School 1160 Great Pond road Forth Andover,MA 0 1845 Prepared by: Whitrnan&Bingham,Associates,A.T.Leonard&Associates axed AnnB h Architects 33 Kingston Street Boston,NSA 0211 Scale: 1'_20" Date: January 13,2017 and revised February 2,2017,February 7,2017 and March 1, 17 Plan titled: Brooks School Center for the Arts(Exterior Elevations) 1160 Great Pond Road North Andover,Massachusetts 0 184 Prepared for: Brooks School 1160 Great Fond Road Mort.Andover,NLA 1845 Prepared by: AnnBeha Architects 33 Kingston Street Boston,MA 0211 Date: December 2 1,2 I tormr ester Anaysi Prepared for: Brooks School Prepared by: Vlhit pan&B Associates,LLC Dated: January 13,2017 Soil Dipos4d Recommendations McPhail Associates Memo Dates March 1,201 cc: Applicant Abutters Broods School—Arts Center Watershed Special Permit March 21,2017 Page