Loading...
HomeMy WebLinkAboutDecision - 1160 GREAT POND ROAD SPR 3/21/2017 f r RECEIVED Town of North Andover TOWN CLERKS OFFICE • Office of the Planning Department Community Development and Services iii� .:120 Main Street = s .47 k :. AM I I North Andover,lftssac iuset s 01845 TOWN OF - NORTH ANDOVER NOTICE )DECISION SS S Sf'E PLAN REVIIEW Any appeal shall be fded This is Lo"WY fat t"flr 0 days witbin(20)days after the hM alaPad*OM date of dslon,filed ftu4 Ung of are appeal, • date.of filing this notice in Dam Eel the office of the Town n Clerk %k))W- t 8mdsha Date: March 21,2017 1 Date of Public Hearing; February 2 1,2017, March 7,2017,Marcy 21,2017 Date oecfa:larch 2112017 Petition of: Brooks Sohool 1160 meat Pond Road Now Andover,MA 0 1845 P, IL Co Premises.erected: Brooks School—Axts Ce wr 0 -— — 01? a 1160 Qreat Pond Road North Andover,MA 0184 Refening to the above petition for Site Flan Review, wording to the requirements of the North Andover Zoning Bylaw,Sections 8.3, 1 103,and 10.31 and MGL C.40A, See. So as to allow the reconstruction of exi ng developed areas of the Brooks School Campus consisfing of the F demolition and removing of building's and the o art tag of an art outer building with associated amass ways,utilities,field and landsoaped areas.The majority oft the proposed work is within the General Zone with small potion of reconstruction of vaW, pang and landscaping on the outer edge of the Non-Discharge Zane and re-grading of as exisfing soar field Nvithin the Non-Discha g and Non-Distance Zones. 'h rojed is located 1n tie Residenflal 1(R"1)Zone* After a public ing given ven on the above date, and upon a motion by Peter Boynton and a 2�4 by Lie l udrioki,to APPROVE, as amended, Site Plan Review Special Permit with the following ndition imposed on the projed by a vote of 4 in favor and 0 against. 0o bb f of the North Andover Phoning Board John Simons,Chan Lynne R d icki Lora MeS erry Y 4 Peter Boynton � 4 F w, e- +'. * + Y y l. 9 -V9163 The P1g Board herein APPROVES, a amended, a Site Flan Review Special Pert to allow for� reconstruction of existing developed mvu of the Brooks School Corpus consisting of the demolWon and removing of buildings wd the constmoting of an a t center building with associated a cows ways, utilitios, field and landseap d areas. The majority of the proposed work is vim the General Zone with a small portion of reconstruefion of va s,pang and landscaping on the outer edge of the Non- lse ar a Zono and re gad g of an existing soceer field withW the Noy-Discharge and Ion-bane Zones.The project is located the Residential I (RA Zone.The public hearing on the above referenced application was opened on February 21,2017, closed by the Nordi Andover Planning Board on March 21,2017. The applicant submitted an ap lion, which was noticed and reviewed in accordance with Section 4.136, 8.3, 10.3, and 10-31 of the Town of Now Andover Zoning Bylaw and MGL C. 0A,-See. 9. The motion to approve w subject to the FDIDINGS of FACTS and S ECUL CoNDM NS set forth in this decbfom The Plomning Board vote was unanimous. A special permit issued by the special permit granting authority requires a vote of at least four members of a five-member board. The Applicants hereby notified that should the Applicant disagm with this decision, the Applicant has the. right, under MGL Chapter 40A, Sermon 17,to appeal to this decision within twenty days after the date this, decision has been wed w6 the Town Clerk. In accordance with 4.136 the Planning Board maker,the ceding that the intent of the Bylaw, as weft as its specific crlter'i ► are met. This declslo . speed all r sad by the Planning Board makes the f0owing FINDINGS OF FACT$ 1) The specific:site is an appropriate location for the pro"ect as it is located are the existing Brooks School campus 'in the Residential I (R-1)Zon g District and consists of construction of an ad center building with associated aceess ways, utilities, field and landscaped areas, and with associated drainage and site improvements, 2 The majority of the proposed work is within the General Zone with a small portion of reconstruction of walks,parking and landscaping on the outer edge of the Non-Discharge Zone and re,gra g of an existing soccer field within the Non-Diseharge and Nora-Disturbance Zones,The Applicant has filed for a Watershed Special Permit; 3) The Appllat has applied for a Height Variance from the North Andover Zoning Board of Appeals. 4) The use as developed will not adversely affect the neighborhood as the aew arts center has been simated in a location that will have the least mount ofvisual 'impact on the neigAborhood as possible. The building will he located in the center of the existing campus, close to Dining Hall and Student Center and the Danforth Squash and Rowing buildwgs and will not be visible from most abutting properties. 5 There will be no nuisance or serious bawd to vehicles or pedestrians. The overall layout of the site has been designed to be M* Corporated into the existing school campus, and will utilize existing parking as well as traffic entrances and exits to the site. 6 Adequate and apprpate facilities will be provided for the proper operation of the proposed use. The building is candy serviced by town water and sewer. 7) A notice of the public hearing was sent to all abutters wig 300 feet o -the project. The Applicant Brooks School—Axm Center Site Play.Review March 21,2017 Page 2 of 6 i I BIC IbU46 PgIUU91 . 4 ! � presented the project at the publio hearing and answered all questions and addressed all issues raised y the Plying Board. 8) The stonnwater management plan has been reviewed by the 'o 's outside stormwater peer review cowulting engineer, Eggleston Environmental, (See email correspondence from L. Eggleston dated March 6.2017.) 9) The Applicant stated the soli disposal for the excavation for the proposed development that is anticipated to generate approximately 6,200 cubic yards of excess excavated material consisting of the existing fill and natural soils will be re-used within the school property at the existing soccer field for regrading. McPhail Associates will be retained to continuously monitor the excavation and segregation of materials d in g the construction pe od, In the event that any excavated soils which are malodorous, or which exhibit visual and/or olfactory evidence of petroleum or any other suspicious materials become evident they will be segregated and stockpiled separately from other soils.These soils will then he sent to an off-site laboratory for testing and analyses, (See memo from Mcaid Associates dated March 1,2017) 1 The "Lakeview Fps =V% hilt in 1971, a 100 year old structure will follow the demolition , process as set forth in the Town Bylaw and carded out by the Building Commissioner and Historic District Com i si nt 11 The Awp licani t will ffle and Request for Determination of Applicability (RDA) with the Conservation Commissi on,eoneen ng the regrading of the soccer field which is within 100 feet of a wetland. i 2 The North Andover Police Department have reviewed the project and flmds that there are no concern other than the possible need for a Construction Detail if heavy traffic entails. (See email correspondence fun Lt,Lanen dated January 31,2017. 1 The Fire Department has reviewed the proposed project and the tum analysis and stated that they will do a field oh�ok prior to installation of any ourb g. (See email corres onde .ce from Chief McCoy dated February 22,2017) 1Department of Public works and the Engineering Department have no concerns with respect to water and sewer and enweer g. (See email from'fie Willett and John l orgesi dated February 21,2017. Finally the lane' Board ids that this project generally complies wM the Town of forth Andover Zoning Bylaw requirements listed a Section 8.3.5, but refixes conditions in order t e foilin compliance. The PImming Board hereby grants an approval to the applicant provided the following conditions are met. SPECS COND IONS ROW DEFEKMONS, a The"Locus"o "%W refe s to the approximately 166 acre pareei of land on a portion of Assessors lap t ,Parcels 28 and 90C also known as 1160 Great Fond Toad,Mort Andover,Massachusetts. b) The"Plans"refer to the plans prepared by Whitman&Bingharn Associates,A.T.Leonard� Associates and Are a Architects entitled"Brooks School Center for the Axts 1160 Great Pond Road,North Andover,MA 0 1 ",slated January 13,2 017 and revised February 2, 2017,Fabntary 7,2017 and March I,2017, c The." rojeeV refers to the r000nstraction of existing developed areas of the Brooks Soh of Campus consisting of the demolition and removing of buildings and the constructing of an art Brooks School—Arts Center Site Plan Review March 21,201 Page 3 of center buildg with associated access gays, utilities, "geld and landscaped areas. The majonty of the proposed work 's within the General Zone with a small portion of reconstruction of walks, parking and landscaping on the outer edge of the Non-Discharge Zone and re-grading of an existing soccer field th ra the Non-Discharge and Non- isturhanoe Zones.The project is located in the Residential I Zone. d The:" pplican 'refers to Brooks School,the applicant for the Site Plan Review. e The "Pro,eot vm ',refers to the person or entity hold" the fee interest to the tit1c to the Locus from time to time, which can ix ei de but is not limited to the applicant, developer,and oer. 1 The AppRoant shall make sure the fill being removed from the Site is non-hazardous and follow all Federal, State and local regulations if there is any hamdous fill found on the Site. 1 The soil that is removed from the coast ction site for the regrading of the soccer field and the process of establishing vegetation shall be by way of organic or slow release nitrogen fertilizers. Any now lam and landsoaped areas should be constructed in such a m=ner as to minimize the maintenance that i required, e.g, the soil should be well aerated, it should have a minimum of - i c es of topsoil and, where possible, taati a vegetation should be plauited to xa mnftbi a the need for fertilizer and watering. PRIORTO ISSUANCE OF A BUMDING PERMT 17)No construefion activities authored by this Decision shall be commenced until the Applicant has 'eceived a Height variance from the Town of North Andover Zoning Board of Appeals and the 20 Day Appeal Period has ended,as required by the Tovm of Forth Andover's Zoning rlaw Table 2 Summary of Dimensional Requirements specific to the height of the proposed building. recorded copy of the approved Zen g Board ofAppeals Decision shall be provided to the Plug Department. 1 The developer shall provide the Planning Department with copies of po-%r nits,plans and decisions received from all Forth Andover Land-Use Boards, l The Applicant will get the appropriate approvals from the Building Commissioner and the Historic.District Commission in terms of the demolition of the 4"Lakeview Farms Barn". 2 Two 2 copies of the signed, recorded puns and decision must be delivered to the Planning Department. 21 performance guarauto bond of ten thousand dollars $1 , . made out to the Town of North Andover must be posted to i�um that the conmc ion, erosion control, measures, and performance of any other condition contained herein will take place in accordance with the plans and the conditions of this decision and to ensure that the as-built plans will be,submitted. 22 In consultation with the lam g Departrnen the A.pplimt shall designate ata independent construction monitor.The monitor shall read,sign,,and reWm to the is -d g Deparftnent the Utter ofAgreement for Jndependent Monitors.The monitor shall make e ld-y inspections of the project provide money reports to the Plug Department and detail any areas of non-compliance and corrective actions.The monitor will also provide reports followm' g heavy rain events.The monitor Kraut also be available upon notice to inspect the Site accompanying a Planning D epee t designated official. 3) Ferdlizers are meted to those which are either organic or slow-release nitrogen and phosphorous- free,non-orgy io pesticides and herbicides use are prohibited,and the use of coal tar-based pavement Brooks School—Arts Center site Man Re March 21,2017 Page 4 of a # s sealants is prohibited.In addition to the Covenant that was previously recorded'n 2004,the A pha►t shah incorporate this condition,as a deed restriction and a copy of the recorded deed shaH he submitted W the PlanWng Department and included in the fie. DEG-CONSTRUCTION 24 Dust mitigation must be performed weeldy, or more frequently as ducted by the Director-of Plannin&throughout the construction process. 2 Any stoc pilh g of materials (dam wood, constmetlon material, etc.) must be shown-on a plan a�d reviewed and approved by the ftmning Sty'. Any approved piles must remain covered at all tomes and fenced off to rn'nm" iw any dust problems that may occur with adjacent properties. 26) It shW1 be the respon ib i y of the Project Owner to assure that no erosion from the eonstmetion she shall occur which Will cause deposition of soil or sediment upon adjacent properties or public ways, except as normally ancillary to off-site serer or other off-site eon i n. Off-site erosion will be a basis for the Planning Board making a ceding that the project is not in complianoe with the plan; provided, however, that the Planning Board shall give the developer mitten notice of any such mding and three 3)days to cure sa"d condition. . 2 an effort to reduce none levels, the developer shah keep in optimum working order, through regular mMaWnanoe,any and ah equipment that shall emanate sounds from the stmotares or site. 4 2 A detailed constmetion schedule shall be submitted to the Plying Staff for the purpose of traoking the construction and informing the public of anticipated activities on the site. 2 All applicable erosion control measures must be in place and reviewed and approved by the Plug ep�et. PRIOR TO RELEASE of TBE PERFORMANCE BOND 3 0 The Applicant must submit a letter from the architect and engineer of the project Ming that the building, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. 3 A final as-built plan sh r x final topographer,the location of all on- site utilities, stmdures and drainage facilities must be submitted to the Planning Department. ment. 32 'the Planning Board must by a majority vote make a fording that the Site is in conformance with the approved plan. GENERAL CONDMONS 3 The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 34) Gas, Telephone, Cable and Electric utilities shall be installed underground as s eoified by the respective utility companies. 35) The hours for conduction shall be limited to between 7:00 a.m. and ; o p.m. Monday through gh Friday and between : 0 a*m.and 5: 0 p.m,on Saturday. 3 No open burning shall be done a eept as is pennit ed during b`ming season under the Fire epartiftent regulations, 3 )No underground fuel storage shad be installed except as may be allowed by Town Regulations. 3 The provisions of this conditional approval shad apply to and be binding-upon the applicant its employees and all successors and assigns in interest or control. Brooks School Arts Center Site Plan Review March 2 t,2017 Page 5 of 6 Bk 15046 Pg182A #9163 39 Any action by a Town Board, Commission, or Depattment,which requires changes in the plan or* design of the building, as presented to the Amming Board, may be subject to modification by the Planning Board. 40)Any revisions shall be submitted to the Director of Planning for review. If these revisions-are deemed substaatial,the developer must submit revised plans to the Planning Board for approval. 1 Pursuant to tho North Andover Zo 'ng Bylaw Section 10.3 1.3,this Special Permit shall be, deemed to have lapsed after March 21,2019{two years ftom the date the permit is granted), exclusive of the time required to pursue or await determination of any appeals,unless substantial use or construction has commenced within said two-year period or for good cause as determined by the Planning Board. 2 The 'ollowing information shall be deemed part of the decision: Plan titled: Brooks School Centex for the Arts 1160 Get Pond Road North Andover,Massaehuseft o 1845 'repared for: gooks School 1160 Q at Pond Road Nosh Andover,MA 01845 Prepared : V&tman&Bm" Shwn Associates,A.T.Leonard&Associates and As h A.reWtec 33 Kingston Street Boston,MA 0211 s wee V- " Date: January 13,2017 and revised Februtay 2,2017,Febmwy 7,2017 and March 11 2017 Plan titled Brooks School Center for the Arts(Exterior Elevations) 110 Qvat Pond Road North Andover,Massachusetts 01 4 Prepared for# Brooks School 1160 meat Pond Road Forth Andover,MA 1845 ire ed : AnnBeha Architects 3 Kingston.Street ] osW ,MA 0211 Date; December 21,201 Storm rat r Analysis Prepared for, Brooks School Prepared : WNt .an&Bingham Associates,LLC Dates: January 13,2017 Soil Dispomd Recommendations McPhail Associates Memo Dates March 1,201 CO." Applicant Abutters Brooks School—Arts Center Site Play.Review March 2112017 Page 6 of 6