HomeMy WebLinkAbout20170321 Monitoring Reports 1160 GPR Perf Arts Ctr SPR WSP North Andover Planning Board
INDEPENDENT CONST RUCTION/S1"C)RIi�I WATER MONITOR
. ...........
Le�`ter of�4greement
Project Address Date
nc,Af-> L-- r� �
Independent Monitor Name Monitoring Type(s)
U Construction
❑ Stormwater
Monitor Contact Phone Monitor E-mail To
s � b j�- To Gt�--SS�' fJ v 0r
This Letter of Agreement is between the the above named Independent Monitor and the North Andover Planning
Board for monitoring services to be provided at the above mentioned Project Address and in accordance with
the conditions and restrictions stated by the Planning Board in it's Decision dated A4/Lec i 2 �� Z� 1�, a
copy of-that Decision has been provided to the Independent Monitor. a2�2: _ (Initials of Independent
Monitor) By initiating, the Independent Monitor acknowledges receipt of the Decision and an understanding of
the conditions/restrictions set by the North Andover Planning Board.
The Independent Monitor also acknowledges and agrees that he/she is providing monitoring services for the
benefit of the Town of North Andover and is not the project owner or applicant, and does not have a financial or
personal interest in the project. Further, the Independent Monitor understands that she/he may not act as the
project owner's agent, representative, partner, employee or joint-ventu rer on this project.
The Independent Monitor agrees to immediately report to the North Andover Planning Board,via the Town
Planner, any violations of the terms of the Decision listed above, as soon as observed or otherwise become
known to the Independent Monitor. This report is in addition to regularly scheduled monitoring reports.
The Independent Monitor understands that the failure to perform under this Letter of Agreement,to the
reasonable satisfaction of the North Andover Planning Board, will be grounds for said Independent Monitor to be
excluded in this role for any future projects which are within the jurisdiction of the North Andover Planning Board.
Independent Monitor [Signature] Date
// -7
By signing this Letter of Agreement,I indicate that f have read and understand the terms included herein.
Town Planner[Signature] Date
.............................
......................................
� 1
���a:R�'���..�,.: W�^"`���"',.,=��'�Y`^%,�'`�_✓'1.���� �.���-�-��.•�'n�l Y-,✓' .•-' %.✓ rwF•'m?,wv'?-�✓�.�,..j.�^w�v^'�r�.S„�ruu-..;w�v,�"-trw--�%y`"� ,,w� .F,,,�v-%-�,F+w✓Cas'.w 5>" .ate"-+r. .;i^5%'
.,.0� '"'�"y,,' w-H:` � ✓'N�F^,"' ...✓v„.y`�,?'rvw,- �✓,/��..x«-""';�,r✓-'" k�' �'lj''.,-.yi' IT�F"�,,,r �'`a�' '
MEW
"� ,.�.✓ 6'� �$� '� � �:� �'�` ��,'a-������ �� r "��° �a �ye�a say � �� _���' �d�' .�#�,�.� �� a'�°¢' � �a'✓eel" n a",�, ,�.
FIELD REPORT# 1.8
Client: Town of North Andover
Project Name: Brooks School Arts Center
GLLC Project No: 8-2017
Inspectors: John A. Galanis
Inspection Date: 11/2J18
Arrival Time: 1:00PM Departure Time: 4:00PM
Weather: 62 degrees—cloudy/partial
Photos Taken: Yes
Personnel on Site 11/2/18: Reference Plan:
Norman d_Gren_ier__-Brooks-School_-On_site.........Brooks School Center for Arts
1160 Great Pond Road, No.
Andover, MA 01845
Construction Documents-- by
Joe_Napolitano-Consigli_Construction--------------------- Whitman & Bingham Assoc.,A.T.L
-----------------
Assoc and Ann Beha Assoc.
Date:January 13, 2017
Last Revised: March 1, 2017
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Work Underway:
Erosion Control Installation Utilities installation
Clearing/Grubbing/Demo ❑ Water(thermal hot& cold) ❑
Excavation/ Fill/Compaction Gas ❑
Road Subbase Installation Electric/Telephone ❑
Pavement/Binder Installation Drainage
Sidewalk Construction ❑x Wastewater ❑
Final Grading El Other
Surface Stabilization ❑ Building Footings/Foundation: No
Monument Installation ❑ Building Steel Frame NO
Cleanup ❑
General Notes/Comments:
This report covers weekly site visits,as well as site visits conducted as a part of Item 22 of the Site Plan
Review Order of Conditions item 22 requiring reporting of heavy rain events;as well as Item 17 of the
Watershed Special Permit dated March 21,2017
Site tours of the project were conducted on the following dates due to rain events of.25"over a 24 hour
period:
10/1/18 to 10/2/18=.29"
® 10/10/18 to 10/11/18=1.14"
a 10/26/18 to 10/27/18--.38»
10/27/18 to 10/28/18-.90
0 10/29/18 to 10/30/18=.36"
The straw waddles,silt fence, and construction fence are in good condition along the work limit perimeter.
Extra straw waddles,silt fence,and construction fencing are stockpiled on site at the"Sugar Shack"Consigli
Office area of the site. A second set of bales and stakes is located at the Boys 3rd JV Soccer Field Area of the
site. Coordination this month with Brooks Grounds Department for maintenance at JV Soccer taking place.
Weekly grass mowing by Brooks Grounds Department in October. Field in use by students. Substantial
growth established. Recommend silt fence and straw waddles be removed at this time in order to provide
final established condition.
• Silt sacks inspected at all catch basins on site prior to OAC
Meetings. Confirmation of cleaning provided.
• A construction fence entrance has been installed according to plans at the"Sugar Shack"driveway area of the
site. This gated entrance has a stone track pad as shown on the project documents.
Reviewed the work limit perimeter and erosion controls at the"Boys JV 3rd Field". Erosion controls and
sediment control materials(straw waddles and silt fence)have been properly installed along the work limit
perimeter. Lawn cutting taking place as required. Students using field as substantial growth is
established.
Noted for this Monthly Report were meetings held on site on
October 3,2018;October 10,2018;October 17, 2018;October 25,
2018 between Brooks School;Ann Beha Associates;GLLC;
Consigli Construction;that included the following topics
discussed:
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Final Painting
Punch List on Electrical Work
Punch List on Pipe Insulation work
Barbizon installing theater lighting
Inspections:
0 10/1/18 State Elevator Inspection and acceptance
a 10/3/18 Town of North Andover Electrical Final Inspection and acceptance
0 10/4/18 Town of North Andover Fire Department Final Inspection and acceptance
0 10/5/18 Paul Hutchins North Andover Building Inspection for Certificate of Occupancy process
a 10/12/18 Paul Hutchins and Monica Gregoire of Planning Department on site for Certificate of
Occupancy tour
0 10/19/18 Temporary Certificate of Occupancy issued by Town of North Andover
® 10/22/18 Savanah Mclnvale of Town of North Andover Conservation Commission Field Agent
on site for tour of project with Normand Grenier,and John Galanis. Tour of the JV Boys Field on
foot,and then drove around the perimeter of the Arts Building. Savanah subsequently issued
an email this day indicating that Brooks can now remove all of the silt fence,stakes,and straw
waddles at both JV Boys and at the Stevens Site. She indicated that she has been to the Stevens
site several times with Conservation Administrator Jennifer Hughes and did not need to visit that
site. She indicated that the Arts Building project can probably remove the silt socks in the catch
basins. However,she asked that we verify that scope with the Planning Board as it is in their
jurisdiction. When we receive Ms Mclnvale's email later today describing today's tour, Brooks
circulated to Consigh,ATLA,and Whitman and Bingham in order to advise all of the team
members the status. Email sent to the Planning Board Staff Planner, Monica
Gregoire indicating that we toured with Ms. Mclnvale and we request to remove the silt socks.
a 10/22/18 Savanah Mclnvale forward photos of our site walk. As indicated on site, Savanah
Mclnvale indicated that the stabilization looks great. Brooks may remove the erosion controls
and seed the area. This was an RDA filling,and does not require a Certificate Of Compliance.
0 The former solar filling(DEP 242-1578)has been issued a CDC and was closed out.A new order
of conditions was issued for the solar project(DEP 242-1740).
0 Savanah Mclnvale indicated that the catch basin inlet is acceptable to have removal of silt
controls after Planning Board approves.
0 10/26/18 Monica Gregoire of Planning Board Department issues approval to remove silt socks in
catch basins of the project,and erosion controls.
® 11/2/18 Site visit by Town of North Andover Fire Department Graham Rowe, and Bob Bonnefant
Action Items:
• Monitor erosion controls before and after storm events--especially in areas where soils remain exposed and
un-stabilized. Repair and replace erosion control materials as necessary to maintain compliance with the
erosion control plan and the storm water pollution prevention plan (SWPPP).
• Regularly sweep sediment(as per SWPPP)to avoid tracking onto public roads.
• Contractor to provide GLLC 48 hours'notice prior to project milestones that may require additional
inspections.
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Photos from Site Visit:
Fine Grading on south side of site
.............
.:..: ...:.:
.:.........
:...........::.
f
"
}. a: -
ter..............�,
I;
u
Sig r
r.
Ali
i+ I
I,
�I
ilp
li
^.j✓r
j>r
n s%
Sod installed on South side of site
_. _M"..,._..
.. ...Y... .......... .:........:.........:..: ....,.:.�:.. .....:...,.....�.....:.:`...::....\...:�✓ '^'^wit^/"
..:.::.:.....
r'�
::...........
.......... .............. .....r .. ,.
.r. .........,.. ....,......... �y -___.. _-.
.::.::.:.:
..,:r ..........:::�..:.:.,:.:.,.:.
i.
}} �M
....:.:::.:.........
�:..
s 3....
::::-:.
.: 33�•,, d.-
q
....:..,......
<s: i..::..._.
r..
:
:
......;:::::
......,...:.
a.
T 7 ..... r..:....... 4.
{ 3
...:...:.:....
i::l:::::..........�..............'............:.
.... ..............
yy i I
�f
=':
W'
Oil!1
Yr'>�
:<
�° ;�,;.....:.gip:,• -�-�� �.. ,� :�,
�w°'�=;�M-s� �^� a •'�a�''';`" ,:•� s. fix:...'
.�'•'.s, Jam'r
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Theater
:a
3 1
' M —
i
i
axe.
A
rny'i.
i
� r
fir
t
M�
r. =rc
rr
..
. .........
•:E q ^,$ fir.
..a
..,.�-/ice
tiw
it
mow^ `:%.,
i..
ir.• x
r--
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Arts Street Painted
N
WN
w^++'
✓�Cw
YI
i..
...�r
W�r
w.I?:
y„
.a--'w.,::,,",.,„;•.,.:,..".•.�.,,..,,,...,:.,,,..._:.........,::...'�. ..'..,.c,:. err.
........::::.::
..:..........:.
..,rw,„.... ...................... ............... .„�...
......
i
...........::..:...:..
,✓rrr
ir..
li ..r
r:�� g
1
I m1.. ,%•w.
y
r r,,, wwrrar-s,.
..w
/
'p/'.rr..- aa..-�-�,:',�".r._-.•r., .,-.,.N�,cwF•:�,
r. /
..
......
....
Photo of JV Boys 3rd Field taken by Conservation Commission Field Agent 10122/18 savanah McInvale
y,
Photo of JV Boys 3rd Field taken by Conservation Commission Field Agent 10/22/18 savanah Mc[nvale
r✓ rW
�k.!
�r
y
s
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Photo of JV Boys 3" Field taken by Conservation Commission Field Agent 10/22/18 Savanah McInvale
.... . ........
..
..,w
^ati.':
[:
C
s:'i;.::
f
.. �-•.?.�y�,•�F.�"w:.'.-.fin•;
Distribution:
Town: Jean Enright jenright@northandoverma.gov
Monica Gregoire m re airs c orthar do errr a. o
Jennifer Hughes ihu hes northandoermap o
Brooks School: John Galanis uaaniseschool,or
Paul Griffin rifin@brooksschooldor
Normand Grenier ngrenier@brooksschool.org
Contractors: Ken Drolette kdrolette@consigli.com
Eric Thiboutot ethiboutot consi li.corn
Joe Napolitano na oiitano canal licom
Landscape Architect Andrew Leonard atl@atleonard.com
Geo--technical Engineer Fatima Babic-Konjic FBK@mcphailgeo.com
Civil Engineer Anthony Cleaves
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
. �»v C��.«:",',�„-�' �"- NQ' ..:s.�FY.,r-:�':��:�y,:: ��-''�,'"..�� .«� -F',�„w ,r -.��w�.snr-•- N,w".�'��zss'n. - ,-..,�� �-`�` -w+ ••.a
FIELD REPORT## 18
Client: Town of North Andover
Project Name: Brooks School Arts Center
G LLC Project No: B-2017
Inspectors: John A. Galanis
Inspection Date: 11/2/18
Arrival Time: 1:OOPM Departure Time: 4:OOPM
Weather: 02 degrees--cloudy/partial
Photos Taken: Yes
Personnel on Site 11/2118: Reference Plan:
Normand-Gren_ier-_Brooks-School_.. ..... -On_site._______Brooks School Center for Arts
1160 Great Pond Road, No.
------------------------------------------- __-------___ w. Andover, MA 01845
Construction Documents— by
Joe.Napolitane_Consigli_Construction-__-_-w-------------- Whitman& Bingham Assoc.,A.T.L
Assoc and Ann Beha Assoc.
Date:January 13, 2017
-w--------------W_..__________w-..M__-------.-w--------------.-~-.Last Revised. March 1, 2017
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
Work Underway:
Erosion Control Installation Utilities Installation
Clearing/Grubbing/Demo Water(thermal hot& cold) ❑
Excavation/ Fill/Compaction Gas ❑
Road Subbase Installation Electric/Telephone �]
Pavement/Binder Installation Drainage
Sidewalk Construction FX1 Wastewater ❑
Final Grading 0 Other
Surface Stabilization ❑ Building Footings/Foundation: No
Monument Installation Cl Building Steel Frame No
Cleanup Cl
General Notes/Comments:
• This report covers weekly site visits,as well as site visits conducted as a part of Item 22 of the Site Plan
Review Order of Conditions item 22 requiring reporting of heavy rain events;as well as Item 17 of the
Watershed Special Permit dated March 21,2017
• Site tours of the project were conducted on the following dates due to rain events of.25"over a 24 hour
period:
0 10/1/18 to 10/2/18=.29')
a 10/10/18 to 10/11/18=1.14"
a 10/26/18 to 10/27/18=.3811
r 10/27/18 to 10/28/18=.90"
0 10/29/18 to 10/30/18-.35"
The straw waddles,silt fence, and construction fence are in good condition along the work limit perimeter.
Extra straw waddles,silt fence,and construction fencing are stockpiled on site at the"Sugar Shack"Consigh
Office area of the site. A second set of bales and stakes is located at the Boys 3rd JV Soccer Field Area of the
site. Coordination this month with Brooks Grounds Department for maintenance at JV Soccer taking place.
Weekly grass mowing by Brooks Grounds Department in October. Field in use by students. Substantial
growth established. Recommend silt fence and straw waddles be removed at this time in order to provide
final established condition.
Silt sacks inspected at all catch basins on site prior to OAC
Meetings. Confirmation of cleaning provided.
A construction fence entrance has been installed according to plans at the"Sugar Shack"driveway area of the
site. This gated entrance has a stone track pad as shown on the project documents.
Reviewed the work limit perimeter and erosion controls at the"Boys JV 3rd Field". Erosion controls and
sediment control materials(straw waddles and silt fence)have been properly installed along the work limit
perimeter. Lawn cutting taking place as required. Students using field as substantial growth is
established.
Noted for this Monthly Report were meetings held on site on
October 3,2018;October 10,2018;October 17,2018;October 25,
2018 between Brooks School;Ann Beha Associates; GLLC;
Consigli Construction;that included the following topics
discussed:
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938
® Final Painting
Punch List on Electrical Work
• Punch List on Pipe Insulation work
• Barbizon installing theater lighting
0
Inspections:
10/1/18 State Elevator Inspection and acceptance
10/3/18 Town of North Andover Electrical Final Inspection and acceptance
10/4/18 Town of North Andover Fire Department Final Inspection and acceptance
10/5/18 Paul Hutchins North Andover Building Inspection for Certificate of Occupancy process
10/12/18 Paul Hutchins and Monica Gregoire of Planning Department on site for Certificate of
Occupancy tour
10/19/18 Temporary Certificate of Occupancy issued by Town of North Andover
10/22/18 Savanah Mclnvale of Town of North Andover Conservation Commission Field Agent
on site for tour of project with Normand Grenier,and John Galanis. Tour of the JV Boys Field on
foot,and then drove around the perimeter of the Arts Building. Savanah subsequently issued
an email this day indicating that Brooks can now remove all of the silt fence,stakes,and straw
waddles at both JV Boys and at the Stevens Site. She indicated that she has been to the Stevens
site several times with Conservation Administrator Jennifer Hughes and did not need to visit that
site. She indicated that the Arts Building project can probably remove the silt socks in the catch
basins. However,she asked that we verify that scope with the Planning Board as it is in their
jurisdiction. When we receive Ms Mclnvale's email later today describing today's tour, Brooks
circulated to Consigli,ATLA,and Whitman and Bingham in order to advise all of the team
members the status. Email sent to the Planning Board Staff Planner, Monica
Gregoire indicating that we toured with Ms. Mclnvale and we request to remove the silt socks.
a 10/22/18 Savanah Mclnvale forward photos of our site walk. As indicated on site, Savanah
Mclnvale indicated that the stabilization looks great. Brooks may remove the erosion controls
and seed the area. This was an RDA filling,and does not require a Certificate Of Compliance.
0 The former solar filling(DEP 242-1578)has been issued a COC and was closed out.A new order
of conditions was issued for the solar project(DEP 242--1740).
i Savanah Mclnvale indicated that the catch basin inlet is acceptable to have removal of silt
controls after Planning Board approves.
0 10/26/18 Monica Gregoire of Planning Board Department issues approval to remove silt socks in
catch basins of the project,and erosion controls.
0 11/2/18 Site visit by Town of North Andover Fire Department Graham Rowe, and Bob Bonnefant
Action Items:
Monitor erosion controls before and after storm events—especially in areas where soils remain exposed and
un-stabilized. Repair and replace erosion control materials as necessary to maintain compliance with the
erosion control plan and the storm water pollution prevention plan (SWPPP).
Regularly sweep sediment(as per SWPPP)to avoid tracking onto public roads.
® Contractor to provide GLLC 48 hours' notice prior to project milestones that may require additional
inspections.
Galanis Consulting, LLC
One Lillian Drive
Ipswich, MA 01938