Loading...
HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 116 OGUNQUIT ROAD 4/20/2021 • w, o, North Andover Health Department (ommunity and Economic Development Division April 20, 2021. John M. Morin, P.E. The Morin-(. rrieron Group, Inc. 66l-lnr Stree-t, Danvers, MA 01923 Re: SSDS Plan fin- 116 O una uit Road (Map 90t A Lot 73 and Map 105A Lot 3 Dear Mr. Morin: The proposed wastewater system design plan 4br the above site dated January 12, 2021, revised. revised April 9, 2021 has been reviewed. This plan has been approved. The design has been approved l"r►r use in the construction ol'a new on-site septic system for a - bedroorn (mav:inrum 11 room) home. This design plan approval is valid until April 20, 2021 During this time, as licensed septic system installer mars( obtain as permit and complete this work, and a Certificate of C"orrrpliance he endorsed by the installer, designer and the Town of North Andover. This approval is also subJect to the following conditions: 1. Prior to the issuance of'the Disposal '',,Forks (,'onstruction Permit, the applicant must submit a foundation as-built at the same scale as tile approved plaan. 2. Prior to the issuance rat"the Disposal Works Construction Permit, the applicant must submit the floor playas of`the proposed dwelling showing;no greater than 5 bedrooms or a total of 11 rooms. 3. If site conditions are 16urrd in the field to be different I'ronr (]lose ina:licaated oil the design plan and/or snail evaluation, the originally issued Disposal `system Construction Permit is void, installation shall stop, and the applicant shall reapply for a flew Disposal Systems Construction Permit (3 10 C'1411 . 15.020(1)). Page 1 of 2 North Andover l le alth Departrrrent, l own l laall, 121) Main Street, North Andover, MA 01845 Plaone: 97 .688,9540 leap.: 978,688. 9542 4. It is the responsibility ofthe applicant and/or the applicant's septic systems designer, septic systern installer or other representative to ensure that all other state and municipal requireinents are met. These rnay include review by the Conservation C,ornmission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or L"lectrical Inspector, The issuance ot a Disposal Systern ('.onstruction Permit shall not construe and/or imply compliance with any of the alorementimied requirements, please ficel free to contact the office with any questions you niay have. We look forward to working with you to obtain a wastewater treatii-ient and dispersal system which will cornply with all regulations and assure protection cif public health and the environment ol'North Andover. Sincerely, S p te he Casey Public Health Inspector cc: Owner File Page 2 of"2 No rth Andover Health Department, Town hall, 120 Main Street, North Andover, MA 0184 Phone: 978,688.9540 Fax: 8.688, 9542