Loading...
HomeMy WebLinkAboutHistory of Property - 303 Chestnut Street - Miscellaneous - 303 CHESTNUT STREET 8/27/2020 RECENT HISTORY OF PROPERTY CIRCA 1950 July 2016: The Busby cape was situated on 3 separately divided parcels of land with two additional structures that were used as garages DECEMBER 17, 2015 The North Andover Planning Board approves a plan changing three (3) lots into two (2) lots shown on plan of land recorded as Plan No. 17375 JANUARY 2016 Busby deeds Lot 2 as shown on Plan No 17375 to Norman and Janet Wallace APRIL 13, 2016 Conservation Commission issues an Order of Conditions DEP # 242-1676 for Lot 1 and DEP # 242-1675 for Lot 2 requiring applicant to do approximately $50,000 of improvements and inspections. JUNE 16, 2016 frame, insulation and final inspection signed by Paul Hutchins JULY 20, 2016 Town of North Andover issues a Building Permit to DEMO existing house on 303 Chestnut Street (Lot 1) Building inspector told Phil Busby not necessary to have one wall standing as the size and dimension of Lot 1 do not require the lot to be Obviously, the house would not have been taken down if there was any possibility of losing a house lot. AUGUST 14, 2017 Road, signed by Paul Hutchins JANUARY 12, 2017 Busby deeds Lot 1 Hillside Road to Winslow Drive Realty Group, LLC from Plan 17375. Same plan that was used to deed for Lot 2 to Wallace one year earlier AUGUST 27, 2020 Application for Building Permit denied for Lot 1