Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2020-01-07 As-Built Plan
RTF 1. SUBJECT PROPERTY RECORDED IN E.N.D,R.D. BK 85 PC 92 2.-SUBJECT PROPERTY SHOWN AS TL 12 ON ASSESSORS MAP 63. 3. SlTE IS SUBJECT TO ORDER OF CONDITIONS ISSUED JANUARY 14. 2020, UEP FlLE #242-1777, i i STORE AND NCRTAR WALL N �?p�E sTRAW wmllj � �1Eyl FRMOK CONTROL RAM ER �J MOM SER T -msTwo (+w�t+'ox a ) PECK / cRcw tRia (AarRox iD LOCATION) ?" PLmfT" ♦ v � 25W CAL NLW DECK; CREASE TRAP WO CAL PLANTKo$ .. --( $ POPP CHAMl (APPfiO1C.I.00ATiON) O, :1. - _•�;._ ASSESSORS : MAP 64 LOT 6 4< ' AREA=819,000 S.F.f NORTH AHWYER�OWMTRY wTa •1' •/:.,•[ti, `--— `/- '-C S C,q PA"B= x PATIO UEARWr IL N T GREAT POND ROAD AS'BUILT PLAN Z , NORTH ANDOVW? MASSACHUS'ETTS Iff PRPPARPI3 FVR O NORTH ANDOVER COUNTRY CLUB 600 GREAT P'OjVD ROAD, © NORTH AffMVM M=.?ACHUSP`,W ? z EL 0 0` DAM NOWAMER 24, 2020 ~ IDWIR L. SCALE; i"=2D' ce NEAfCHFHOK Ir IV 2W 4o Isv Q MER.RIMACK ENGINEERING SERVICES 88 PARK STREET. 3 ANDOVE4 MASSACHUSE W 01010 P110 (078) 476-3556 PAX; (078) 475-14.4B a F,M M- 1NEf kBWG®AOL,COM ILIMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 8A — Request for Certificate of Compliance 242-1777 Massachusetts Wetlands Protection Act M.G.L. c, 131, §40 Provided by DEP A. Project Information(cont.) & Did the,Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? M Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any,exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions(OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Nearing Final Decision, submit this request to the appropriate DEP Regional Office (see htt ://www.mass. ov/eea/a encies/massde /about/contacts/find-the-massde -re ional-office- for- our-cit -or-town.html). wpeformBa_doe--rev.5rWU Page 2 of 2