Loading...
HomeMy WebLinkAbout2019-06-04 Insubstantial Change (10-1-19) ' lJ , Town of North Andover %ram Office of the Planning Depart nf ��EIV C Community Development Divisio "10 ("'LERK's OFFICE 120 Main Street 9���� OCT � � lit North Andover, Massachusetts 01i 52 NOTICE OF DECISION(INSUBSTANTIAL, �fl) Date of Decision: October 1,2019 Petition of: Enterprise Bank 222 Merrimack Street Lowell,MA 01852 Premises Affected: 247 Chickering Road Noah Andover,MA 01.845 BACKGROUND On June 4,2019 the Planning Board approved a Site Plan Review Special.Permit(Special Permit) so as to allow for the construction of a 3,250 sq. ft.batik branch office with a drive-up window with associated landscaping,parking spaces, stormwater management facilities,signage and other improvements located on 24,952-+/- sq. ft. of land on a currently developed parcel. The property is located in the General Business (GB) zoning district. On September 24, 2019, the Petitioner requested an Insubstantial Change determination so as to allow for the following modifications: • Modify Condition 37 of the Notice of Decision Site Plan Review Special Permit dated June 4, 2019 to allow for demolition of the existing building and installation of the proposed building foundation prior to submission of an approved Category I Vehicular Access Permit for proposed modification to existing driveways serving the subject property; a Non-Vehicular Access Permit for the purpose of constructing a water service connection and a sewer service connection to the subject property within the State highway Layout; and a Drainage Access Permit for the purpose of constructing a drainage connection within the State Highway Layout to MassDOT's proposed drainage system. FINDINGS OF FACTS The letter to Enterprise Batik from Robert J.Michaud,P.I .,Managing Principal,MDM Transportation Consultants, Inc. letter dated September 23,2019, RE: Proposed Enterprise Batik,247 Chickering Road (Route 125),North Andover, MA 01845 details the status of the requirements and anticipated timelines for Non-Vehicular and.Category I Vehicular Access Permits from MassDOT and provides certification from a Professional Engineer that the information in the letter is true and correct, after due inquiry. After discussion at the October 1,2019 Planning Board meeting, and upon a motion by Peter Boynton, seconded by Aaron Preston,the Planning Board voted to approve the Insubstantial Change request for Enterprise Bank. The vote was 5-0, unanimous in favor. CONDITIONS The Petitioner shall comply with all existing conditions rendered in the Site Plan Review Special issued June 4,2019. The bond referenced in Condition 33 of the Notice of Decision Site Plan Review Special Permit dated June 4,2019 shall be posted prior to the Issuance of Site Work,Demolition Permit,Foundation Permit or Building Permit. Insubstantial Change 247 Chickering Road Enterprise Bank Page 2 of 2 This Insubstantial Change approval is applicable only to a demolition permit and a foundation permit. Letter dated September 23,2019 by Robert J.Michaud,P.E.,Managing Principal, MDM Transportation Consultants,Inc. is considered an attachment to this Notice of Decision. hua V Jean Enright,Planning Director On Behalf of the North Andover Planning Board �j� �{f TRANSPORTATION CONSULTANTS,INC. ]j_/J��y�Jl. Planners&Engineers PRINCIPALS Robert J.Michaud,P.R. 17aniel J.Mills,P.>w.,1'I'Ul`s TRAFFIC ENGINEER'S CERTIFICATE S1tOFy,� To: Enterprise Bank o' ROBERT J. �y. MICHAUDCIVIL Re: Proposed Enterprise Bank, 247 Chickering Road (Route 125) " No. 38101 ZZ. North Andover,Massachusetts Dated: September 23,2019 S The undersigned, Robert J. Michaud, P.E. of MDM Transportation onsultants, Inc., understands that Enterprise Bank is pursuing construction of a new bank branch on land located at 247 Chickering Road in North Andover, MA (the "Project"), This Engineers Certificate is issued to outline requirements and anticipated timelines for Non-Vehicular and Category I Vehicular Access Permits from MassDOT. The entire Project consists of demolition of the existing commercial building on the subject property and construction of a new 3,250 sf Enterprise Bank branch with dual drive-through lanes and approximately 21 surface parking spaces. The subject property borders Chickering Road (Route 125), a State Highway under the jurisdiction of the Massachusetts Department of Transportation(MassDOT). Access/egress to the Site is proposed to remain via two existing curb cuts along Chickering Road; the southern driveway will remain an enter-only driveway and the northern driveway will remain an exit-only driveway. These driveways will be modified for conformance with current MassDOT commercial driveways standards and for consistency with planned roadway improvements by MassDOT along the Chickering Road corridor. The undersigned hereby states as follows,based on its professional and personal knowledge and belief: 1. The Project will require Access Permits under M.G.L. Ch. 81, Section .21, as amended, MassDOT regulations. Specifically, these include a Category 1 Vehicular Access Permit for proposed modification to existing driveways serving the subject property; a Non-Vehicular Access Permit for the purpose of constructing a water service connection and a sewer service connection to the subject property within the State Highway Layout; and a Drainage Access Permit for purpose of constructing a drainage connection within the State Highway Layout to MassDOT's proposed drainage system. 28 Lord Road,Suite 280•Marlborough,Massachusetts 01752 Phone(508)303-0370•Fax(508)303-0371 -www.mdmtrans.com 2. A Category I Vehicular Access Permit will be filed with MassDOT on behalf of Enterprise Bank within the next 15 business days. Under this Category I Vehicle Access Permit application, physical changes to the driveway intersections with Chickering Road are proposed that are substantially consistent with the Approved Site Plans for the subject property and that are consistent with MassDOT's Chickering Road improvement project. MassDOT is fully informed of the Project as discussed in meetings held at District 4 office on March 25, 2019 and at a pre- construction meeting held at District 4 for the Chickering Road improvement project on September 11, 2019. The Category I Vehicular Access Permit should issue in the normal course, which is anticipated to occur within approximately 90 days of initial application. 3. MDM Transportation Consultants,Inc.has conducted a pre-filing consultation with MassDOT District 4 staff on March 25, 2019 and September 11, 2019 in preparation for a Category I Vehicular Access Permit filing. During this consultation, a detailed discussion of Permit requirements relative to the Category I Vehicular Access Permit ensued including compliance with MassDOT's Standard Operating Procedure (S.O.P.)No. HMD-02-02-2-000"Connection or Discharge to any MassDOT Drainage System". Provisions under this S.O.P. cite the need for a Non-Vehicular Access Permit for purposes of connecting the Site to the MassDOT drainage system, and which seines as a prerequisite to issuance of a Category I Vehicular Access Permit. MassDOT S.O.P No. HMD-02-02-2-000 specifically states "As defined in 720 CMR 13.00 and MassDOT's S.O.P. No. HMD-60-02-3- 000, any connection to or discharge to any MassDOT drainage system (in cases where it can be shown that no practical alternative exists), requires the issuance of a Non-vehicular Access Permit." Upon review of the Site Plans and associated drainage mitigation summary prepared by GPI and dated August 16, 2019 (submitted herewith)and as discussed with MassDOT District 4 staff on September 11, 2019 we anticipate that sufficient evidence is provided in the Application to demonstrate that"no practical alternative exists"for this drainage connection. The GPI drainage mitigation summary indicates that storm water features for the Site result in a reduction in peak runoff rates relative to existing levels,increases on-site recharge rates from roof drains,improves on-site water quality, and is subject to an operation and management plan. 4. MDM will concurrently file the requisite Non-Vehicular Access Permit Applications for the proposed drainage connection to MassDOT's Chickering Road system and proposed water/sewer connections and anticipates the Non-Vehicular and Category I Vehicular Access Permit will issue in the normal course, which is anticipated to occur within approximately 90 days of initial application. S. I know of no reason why the above described Category I Vehicular Access Permit would not be issued. I also know of no reason why the above described Non- Vehicular Access Permit would not be issued. 2 MDM I hereby certify to Enterprise Ba at t ea e information is true and correc aft due inquiry, Name: Robert I Michaud,P.E. Title: Managing Principal MDM Transportation Consultants, Inc. Date: 2 3 ' L9 3 MDM GPUFR Oes�a�MiJpntz�M—» Engineering E Design Planning Construction Management August 16,2019 Robert J.Michaud,P.E. MDM Transportation Consultants, Inc. 28 Lord Road, Suite 280 Marlborough, MA 01752 Re: Drainage Mitigation Summary Proposed Enterprise Bank 247 Chlckering Road North Andover, MA Dear Bob: On behalf of our client, Enterprise Bank, the following information is provided in response to the request by MassDOT District 4 regarding the stormwater mitigation proposed for the above referenced project. The existing parcel of land is 24,952-sf in size, fully developed with paved parking areas and currently occupied by the BulgerAnlmal Hospital. The site is bounded by Chickering Road(Route 125)to the west,the 99's restaurant and parking lot to the north and east and wooded land and wetlands to the south. No stormwater controls currently exist onsite, all runoff drains as sheet and shallow concentrated flow to the Chlckering Road closed drainage system. Enterprise Bank Is proposing to construct a 3,260-sf single story bank building with drive-up services and a parking lot with 20 spaces. The redevelopment of this site will result In a decrease in Impervious cover,from 87.3% existing to 68.6% proposed. In accordance with both Town and State requirements, an on-site stormwater management system was designed to treat the stormwater runoff and mitigate the post-development peak rate and volume of runoff. A standard closed drainage system consisting of deep sump, hooded catch basins connecting to a First Defense hydrodynamic separator is proposed within the northern portion of the site to collect runoff from the parking lot and drive-up lanes.This system is designed to capture and pretreat runoff prior to discharge Into the Chickering Road closed drainage system. Along the southern portion of the site,two Filterra tree box filters are proposed to collect and treat the runoff from the remaining parking lot areas. In front of the building, an underground roof infiltration system consisting of arch chambers will provide groundwater recharge of the rooftop runoff. Prior to the design of the onsite stormwater system, test pits were performed to determine the depth to seasonal high water and soil conditions, Based on the results of the test pits along with the proposed site grades and available space around the site,the only feasible location for groundwater recharge is in front of the building. Where the existing grade rises towards the back of the property,we cannot meet the groundwater separation required for stormwater infiltration practices. A Stormwater Management Report was prepared (copy attached) and includes a pre-and post-development drainage analysis. The results of that analysis indicate that for the 2, 10 and 100-year storms there will be a decrease in the peak rate of runoff going to the Chickering Road closed drainage system. Greenman-Pedersen,Inc. 44 Stiles Road,Suite One Salem,NH 03079 p 603-893-0720 An Equal Opportunity Employer Drainage Mitigation Summary Enterprise Bank, 247 Chickering Road North Andover, MA August 16,2019 Page 2 Design Storm Pre-Development Post-Development Change (peak runoff rate (peak runoff rate DESIGN PAINT#'I (Chickering Rd/Route 126 2- ear 2.1 1.6 -0.6 10- ear 3.4 3.1 -0.3 100- ear 6.5 6.1 -0.4 (All values shown are peak rates in CI=S,cubic feet per second) In addition, by reducing the on-site Impervious cover and providing groundwater recharge of the roof runoff, there will also be a reduction in the volume of runoff leaving the site. Design Storm Pre»Development Post-Development Change runoff volume runoff volume DESIGN POINT#1 (Chickering RdlRoute.'126 2-year 6,809 5,962 -847 13% 10- ear 11,277 10,290 -987 9% 100- ear 22,269 21,133 -1,136 5o/a (All values shown are peak rates in CF,cubic feet) As requested by MassDOT, altemative drainage discharge/tie-in locations were investigated. Site grades make discharge to the wooded area to the south of the site infeasible, plus,this is within close proximity to a wetland. There is a closed drainage system within the 99 Restaurant parking lot however, a connection to that system was deemed infeasible. Representatives of the 99 expressed concerns to Enterprise Bank over the age of their system(approximately 25-yrs old),belief that there is no available additional capacity to handle additional runoff from the Enterprise Bank development, and the fact that the 99 parking lot was just paved for the first time In 25 years. In summary, we believe that based on the Inability to connect to the 99 Restaurant's drainage system, the limited capacity to provide onsite stormwater recharge,the significant improvement to the onsite drainage design through the BMP's that have been implemented, and the reduction in peak rate and volume of runoff to the Chickering Road drainage system, that all steps that could be taken, have been taken to mitigate the impact that the stormwater runoff will have on the MassDOT drainage system. Sincerely, Greenman-Pedersen,Inc. David R. Jordan, P.E., P.L.S., LEED AP Senior Project Manager .PJR1