HomeMy WebLinkAbout2019-06-04 Civil Review 5/1/2010 Town of North Andover Mail-Enterprise Bank
of()h ANOOVEA Monica Gregoire <mgregoire@northandoverma.gov>
Massaclru��lt� s� ,�
era°
Enterprise Bank
1 message
Peter Ellison <PEIIison@theengineeringcorp.com> Wed, May 1, 2019 at 2:15 PM
To: "Monica Gregoire (ingregoire@northandovenna.gov)° <rngregoire@norihandoverma.gov>
Hi Monica,
TEC has performed a 2nd peer review of the revised Site Plans and response letter, prepared by MHF, and all TEC
comments are addressed at this time.
Thank you,
Peter
Peter F. Ellison, P.E., Civil Engineer
T 978.794.1792 x1036 I C 978.815.0958
pel-,lmson@theengiriee��ii igcoi°F.corii<mailto:pe8lison@tlieeng neesirigco-p,co�iri>
[New TEC logo 1x2 high res 300dpi]<hrttp,//www.iheerigirier rir,igcorp,(,ron�/> [FB Blue Logo]
pages/i"'EC••gnaa/4532340747'43565> [LI Blue Logo] <f.�ttp�//www.Hi ik.d. r�.co� -r)/coriipany/tec-�'rrc °/trk-rorrrl)arro7._.ioto>
[Twitter Logo 3] <https://twitter.r,rai°r°t/tecinc;3> [YouTube Blue Logo 4] <ilttpS,//�Nvava.yOrrtL be.corri/channe I
R,.ICctzk3F[ IPS6fs8tlf(Szg8l/t>
5 attachments
TEUimage001.jpg
o 3K
f I rak f^dyy,'yS�+paea`dri�,��"°xp,e
image002.png
3K
image003.png
3K
lmage004.png
1K
u"r image005.png
3K
https://mall.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permthid=thread-f°/a3A1632354441206666730&simpl=msg-f%3A16323544412... 1/1
�a
44 Stiles Road ° Suite One•Salem, New Hampshire 03079
TEL (603) 893-0720 - FAX (603) 893-0733
MHF Design Consultants, Inc. www.mhfdesign.com
April 25,2019
North Andover Planning Board
Town of North Andover
120 Main Street
North Andover,MA 01845
Attu.Ms.Monica Gregoire,Staff Planner
Re: Enterprise Bank
247 Chickering Road
North Andover,MA
Sub: Fire Department Response to
Comments
Dear Ms, Gregoire:
On behalf of our client, Enterprise Batik,we are providing the following;responses to the Fire
Department review email,dated March 21,2019,
1. A truck turn plan has been added to the plan set showing the turning movement of the North
Andover Fire Truck. This plan shows that a fire truck can maneuver safely throughout the
site.
2. Note 1.6 on Sheet 4 of I I has been added to the plans indicating the need for a Knox Box.
3. Note 17 on Sheet 4 of I 1 has been added to the plan referencing;527 CMR Ch 16 and NFPA
241.
4. Note 18 on Sheet 4 of I 1 has been added to the plans requiring afire alarm system.
5. An automatic fire sprinkler system is not proposed for this development.
Please review the attached revised information and should you have any questions,please feel free to
call our office at your convenience.
Sincerely yours,
WW3-pes' n Consultants,Inc.
6 Chr/Kwnla
Project Manager
CR 457019
cc: IA.Michael Beirne,NAFD
Luke Bouchard,Enterprise Bank
\\MFS\Cotnpatiy_Data\Projects\Eng`457019\4570-TEC Response Letter.doex
ENGINEERS 0 PLANNERS 0 SURVEYORS
5/16/2019 Town of North Andover Mail-247 Chickering Road-Department Review
IJOI ' Monica Gregoire <rngregoire@northandoverrna.gov>
Massachus lls i
247 Chickering Road - Department Review
Mike Beirne <mbeirne@northandoverma.gov> Thu,Apr 25, 2019 at 4:11 PM
To: Monica Gregoire<mgrego"ire@northandovenna.gov>, William McCarthy<wmccarthy@northandoverma.gov>
Monica,
Thanks for taking care of that. The FD is satisfied with the response and has no objection to the project moving forward.
[Quoted text hidden]
Lt Michael Beirne
North Andover FD
95 Chickering Rd.
ioilh Andover Ma, 01845
978-688-9590
https:/Irnail.google.com/mail/u/0?ik=dadd l 872e7&view=pt&search-all&permmsgid=msg-f%3A1631818183163660453&simpl=msg-f%43A16318181831... 1/1
MWMW
wow A NNW WON
4 Stiles Toad°SLifte One- Salem, New Hampshire 0 070
_.. � ....m.-- -::.... f EL (ta0 ) g -072 (00 t3I-07
MHF Design Consultants, Inc. w✓ww .mhfdesign.corn
April 24, 2019
North Andover Planning Board
Town of North Andover
120 Main Street
North Andover, MA 01845
Attn. Ms. Monica Gregoire, Staff Planner 1
Re: Enterprise Bank.
247 Chickering Road J
North Andover, MA 1
i
Sub: TEC Peer Review#I
Response to Comments
Dear Ms Gregoire:
Please find enclosed a revised set of plans and supporting documentation regarding the
above referenced project located at 247 Chickering Road. The plans have been revised to
address the comments in the TLC review letter, dated March 29, 2019. Based on those
comments we offer the following:
I
1. Comment acknowledged, variances were granted by the North Andover ZBA on
April 9, 2019.
I
2. Comment acknowledged, the project is currently in the review process with the North
Andover Conservation Commission. t
3. The proposed limit of work is generally the entire site up to the property lines and
within the ROW along the pavement sawcut lines. Additionally, we are engaged in
discussions with the Conservation Commission to determine limits of work associated
with some restoration work within the buffer zone.
4. The angle of the proposed parking spaces has been added to the plans.
5. The curb radius at the exiting driveway has been revised to 15' as suggested.
6. Landscaping requirements based on Section 8.18.1)(1) have been added to the
I.,andscape Plan outlining the number of required and provided parking lot perimeter
trees.
I
7. Comment acknowledged.
ENGINEERS PLANNERS SURVEYORS
I
i
TEC Response Comtents
April 24,2019
Page 2 of 2
MHF Design Consultants, Inc.
8. Comment acknowledged.
9. The Existing Conditions Plan has been revised showing a;coning district of General
Business.
10. Existing utilities were shown based on field marking and available record plans. A
note is shown on the plan,Note 6, indicating other utilities may be present. An
additional note has been added to the Demolition Plan regarding the disconnection of
the water and sewer and need for MassDOT permits for said disconnections within
the ROW.
1.1. A truck turn plan has been added to the plan set showing the turning movement of the
North Andover Dire Truck. This plan shows that a fire truck can maneuver safely
throughout the site which also indicates that a smaller trash truck or delivery vehicles
can also safely maneuver throughout the site.
12. Comments as received from the Town Fire Dept. dated 3/21 f 19 have been addressed
with notes and information added to the plans.
Please review the attached revised information and should you have any questions, please
Feel free to call our office at your convenience.
Sincerely yours,
Mfl,F' a 'gn Consultants,Inc.
Chris Tymula
Protect Manager
CR 457019
cc: Peter F. Ellison, PE, TEC
Luke Bouchard, Enterprise Bank
\\MFS\Company_Data\Projects\Eng\457019\4570-I'EC Response Letter.docx
w�•�r .f �r w .rww �
44 Stiles Road• Suite One• Salem, New Hampshire 03079
TEL (603) 893-0720 • FAX (603) 893-0733
MHF Design Consultants, Inc. www.mhfdesign.com
April 24, 2019
North Andover Planning Board
Town of North Andover
120 Main Street
North Andover, MA 01845
Attn. Ms. Monica Gregoire, Staff Planner
Re: Enterprise Bank
247 Chickering Road
North Andover, MA
Sub: TEC Peer Review#1
Response to Comments
Dear Ms Gregoire:
Please find enclosed a revised set of plans and supporting documentation regarding the
above referenced project located at 247 Chickering Road. The plans have been revised to
address the comments in the TEC review letter, dated March 29, 2019. Based on those
comments we offer the following:
1. Comment acknowledged, variances were granted by the North Andover ZBA on
April 9, 2019.
2. Comment acknowledged, the project is currently in the review process with the North
Andover Conservation Commission.
3. The proposed limit of work is generally the entire site up to the property lines and
within the ROW along the pavement sawcut lines. Additionally, we are engaged in
discussions with the Conservation Commission to determine limits of work associated
with some restoration work within the buffer zone.
4. The angle of the proposed parking spaces has been added to the plans.
5. The curb radius at the exiting driveway has been revised to 15' as suggested.
6. Landscaping requirements based on Section 8.18.D(1)have been added to the
Landscape Plan outlining the number of required and provided parking lot perimeter
trees.
7. Comment acknowledged.
ENGINEERS PLANNERS SURVEYORS
TEC Response Comments
April 24,2019
Page 2 of 2
MHF Design Consultants, Inc.
8. Comment acknowledged.
9. The Existing Conditions Plan has been revised showing a zoning district of General
Business.
10. Existing utilities were shown based on field marking and available record plans. A
note is shown on the plan,Note 6, indicating other utilities may be present. An
additional note has been added to the Demolition Plan regarding the disconnection of
the water and sewer and need for MassDOT permits for said disconnections within
the ROW.
11. A truck turn plan has been added to the plan set showing the turning movement of the
North Andover Fire Truck. This plan shows that a fire truck can maneuver safely
throughout the site which also indicates that a smaller trash truck or delivery vehicles
can also safely maneuver throughout the site.
12. Comments as received from the Town Fire Dept. dated 3/21/19 have been addressed
with notes and information added to the plans.
Please review the attached revised information and should you have any questions,please
feel free to call our office at your convenience.
Sincerely yours,
M es'gn Consultants,Inc.
Chris Tymula
Project Manager
CR 457019
cc: Peter F. Ellison, PE, TEC
-Luke Bouchard,Enterprise Bank
11MFS1Company DatalProjectslEng145701914570-TEC Response Letter.docx
146 Dascomb Road
Andover,NIA 01810
978.794,1792
The EngineeringCorp.com
Cmate, �Design hpmovate,
TEC,
Vie n Meeting Cor
Ms. Monica Gregoire March 29, 2019
Staff Planner
Town of North Andover
Planning Department
120 Main Street
North Andover, MA 01845
Ref. T0758.05
Re: Peer Review#1
Site Plan Review Application
247 Chickering Road, North Andover, MA
Dear Ms. Gregoire:
On behalf of the Town of North Andover, TEC, Inc. conducted a technical review of the March,
2019 Special Permit Application for the proposed project to be located at 247 Chickering Road.
Enterprise Bank ("Applicant') submitted the following documents, which TEC reviewed for
conformance with the Town of the North Andover Zoning Bylaws and generally accepted
industry standards:
• Site Plan Set, 247 Chickering Road, North Andover, MA, prepared by MHF Design
Consultants, Inc. dated March 13, 2019;
• Special Permit—Site Plan Review Application, 247 Chickering Road, North Andover„
MA, prepared by Enterprise Bank, dated March 18, 2019;
Under review of the documents and plans, TEC has compiled the following comments for the
Board's consideration:
1. The project will require review by the Zoning Board of Appeals for several variance
requests, as indicated on the Site Plans.
2. The project will also require review by the Conservation Commission as a portion of the
site is within 100-feet of wetland resource areas.
3. The Applicant should provide and label a limit of work on sheets 3-8 of the Site Plan.
4. Section 8.5.a-The Applicant should provide the angle of the proposed parking spaces.
5. Section 8.5.C(3)-The Applicant should adjust the 12-foot curb radius on the exit
driveway to be 15-feet (minimum).
6. Section 8.18.D(1)-The Applicant should confirm that at least one tree for every 30 linear
feet is to be planted along the rear and side landscaped areas.
7. The proposed monument sign will require a review by the Building Inspector for
conformance with Section 6 of the Zoning Bylaw.
T:\T0758\T0758.05\Dots\Letters\T0758.05_
Peer Review#1.docx
TEC
8. Section 4.12 of the Zoning Bylaw does not list a "drive through" as a permitted use in the
General Business district, however it may be considered an accessory use. Planning
Board should confirm.
9. The Existing Conditions Plan should be revised to label the zoning district as "General
Business", not Central Business.
10. The Existing Conditions Plan should provide the location of existing utilities including
sewer, gas, electric, cable, etc. Existing utilities may need to be cut and capped at their
respective mains, or as required by the Town Department of Public Works.
11. The Applicant should provide truck turning templates for delivery, trash, and fire trucks to
prove that adequate traffic circulation is provided.
12. The Applicant should coordinate with the Town Fire Department to prove the site is
acceptable from an emergency response perspective.
Please do not hesitate to contact me directly if you have any questions concerning our
comments at (978) 794-1792. Thank you for your consideration.
Sincerely,
TEC, Inc.
"The Engineering Corporation"
Peter F. Ellison, P.E.
Civil Engineer