North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 181 Johnny Cake Street MAP: 107A LOT: 190
INSTALLER: Peter Nardone
DESIGNER: Derek Fullerton
PLAN DATE: 3/31/21
BOH APPROVAL DATE ON PLAN:
INSPECTIONS
TANK INSPECTION: Steve Casey – 4.26.2021 @10 am
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION: May 18, 2021
DATE OF FINAL GRADE INSPECTION: 5/24/2021 B. LaGrasse
SITE CONDITIONS
Contractor reports any changes to design plan
Existing septic tank properly abandoned, if
present
Internal plumbing all to one building sewer
Topography not appreciably altered
Comments: 5/18/21 – Contractor reports ledge on edge of overdig and on side of
tank hole, was discussed with health inspector previously
SEPTIC TANK
Building sewer in continuous grade, on
compacted firm base
Cleanouts per plan
Bottom of tank hole has 6” stone base
Tank size and loading per plan
Monolithic tank construction / 2-piece
(circle one)
If monolithic, water tightness of tank has been
achieved by visual testing
If 2-piece, water tightness of tank has been
achieved by water / vacuum test (circle one)
Inlet tee installed, centered under access port
Outlet tee installed, centered under access port
Gas baffle / effluent filter installed (circle one)
If effluent filter, riser to finished grade over filter
Riser with cover to within 6” of finish grade
installed over one access port
Manhole and riser minimum 20 inch diameter
Pipe penetrations appear watertight using
rubber boots / hydraulic cement (circle one)
Comments: 5/18/21 – Effluent filter at first compartment, riser with cover to
grade. Tank empty but visually appears to be a smooth concrete pour.
Contractor to put firm stable base beneath building sewer.
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Even distribution observed
Schedule 40 PVC Pipe
Comments: 5/18/21 – Contractor to put risers on to within 6” of finished grade
SOIL ABSORPTION SYSTEM (General)
Bottom of SAS excavated down to specified
soil layer, as provided on plan
Size of SAS excavated as per plan
Sand installed, if specified on plan
Sand displays few fines when handled
40 Mil HDPE barrier installed, if specified on
design plan
Laterals installed and ends capped or
connected to header (and vented if impervious
material above)
Retaining wall material, location and height if
specified on plan
Comments: 5/18/21 – Inspection ports to be raised to finished grade, filter fabric
over leach stone on site and to be installed.
FINAL GRADE
Final cover as per plan
Loamed
Seeded
Comments:
DOCUMENTS NEEDED
Certification of Installation Form submitted
by designer and signed and dated by
designer and installer
As-Built Plan by designer
BM =
HR =
HI = 179.55
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Building Sewer OUT 6.00 173.22 173.38
Septic Tank IN 6.11 173.11 173.03
Septic Tank OUT 6.39 172.83 172.78
Distribution Box IN 6.64 172.58 172.61
Distribution Box OUT 6.78 172.44 172.44
Lateral 1 BEGINNING 6.85 172.37 172.44
Lateral 1 END 7.09 172.13 172.27
Lateral 2 BEGINNING 6.85 172.37 172.44
Lateral 2 END 7.05 172.17 172.27
Lateral 3 BEGINNING 6.85 172.37 172.44
Lateral 3 END 7.08 172.14 172.27
Lateral 4 BEGINNING 6.85 172.37 172.44
Lateral 4 END 7.08 172.14 172.27
5/18/21 – Installer reports SAS was dropped slightly in order to make pitch from
distribution box. He reports he coordinated this with designer who reports this is
acceptable due to lack of water table offset at this location.