Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2019-08-20 Application WSP NEVER ENACTED 62 Saile Way i
J
R r:(., `;'i ,/E'.: a
2019 JUN I I PM 3: 50
PLANNING DEPARTMENT
Community& Economic Development Division
Special Permit — Watershed Permit Application
Please type or print clearly.
1. Petitioner: Maria & Anthony DeMarco
Petitioner's Address: 62 Saile Way, North Andover MA 01845
Telephone number&email: 978-688-3304 dmrcmrs@yahoo.com
2. Owners of the Land: Maria & Anthony Demarco
Address: 62 saile Way, North Andover MA 01845
Number of years of ownership: 1 Year, 7 Months
3.Year lot was created: 1994
4. Is the lot currently on septic or sewer?
Sewer
If on sewer, please provide date the sewer connection was
completed: October 10, 2000
5.Description of Proposed Project: To install an inground swimming pool and paver
patio within the Non-Discharge Buffer Zone within the Watershed Protection
District.
6. Description of Premises: single Family Residential Lot
7.Address of Property Being Affected: 62 wile Way
Zoning District: Residential 1 & Watershed Protection
Assessors Map: 63 Lot#: 46
Registry of Deeds: Book#: 15258 Page#: 346
8. Existing Lot:
Lot Area(Sq. Ft): 87,185 Building Height: 29'
Street Frontage: 175' Side Setbacks: 36.2'
Front Setback: 235.7' Rear Setback: 59.8'
Floor Area Ratio: Lot Coverage: 13%;
9.Proposed Lot(if applicable):
Lot Area(Sq. Ft): N/A Building Height:
Street Frontage: Side Setbacks:
Page 1 of 2
120 Main Street,Planning Dept., North Andover,Massachusetts 01845
Phone 978.688.9535 Fax 978.688.9542 Web .no0and K fflrja&(LV
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage:
10. Required Lot(as required by Zoning Bylaw):
Lot Area (Sq. Ft): 87,120 Building Height: 35'
Street Frontage: 175 Side Setbacks: 30'
Front Setback: 30' Rear Setback: 30,
Floor Area Ratio: N/A Lot Coverage: N/A
11. Existing Building(if applicable):
Ground Floor(Sq. Ft.): N/A #of Floors:
Total Sq. Ft.: Height:
Use: Type of Construction:
12. Proposed Building:
Ground Floor(Sq. Ft.): N/A #of Floors:
Total Sq. Ft. Height:
Use: Type of Construction:
13.Has there been a previous application for a Special Permit from the Planning Board on these
premises? Yes If so,when and for what type of construction? 2/2/1993
14.Section of Zoning Bylaw that Special Permit Is Being
Requested section 195-4.19 B.
15. Petitioner and Landowner signature(s):
Every application for a Special Permit shall be made on this form, which is the official form of the
Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the
responsibility of the petitioner to furnish all supporting documentation with this application. The
dated copy of this application received by the Town Clerk or Planning Office does not absolve the
applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and
legal notification. Failure to comply with application requirements, as cited herein and in the
Planning Board Rules and Regulations may result in a dismissal by the Planning Board of this
application as incomplete.
Petitioner's Signature: L r--,
Print or type name here: Mari,,:�-�,DeMarco
Owner's Signature: �U77z-�77
Print or type name here: marla Demarco
16. Please list title of plans and documents you will be attaching to this application.
Site Plan, 62 wile Way, North Andover, MA, Scale: I" = 20' , Dated May 14, 2019
Page 2 of 2
120 Main Street, Planning Dept., North Andover, Massachusetts 01845
Phone 978.688.9535 Fax 978.688.9542 Web www,northando L govenng.goy
May 16, 2019 WILLIAMS
SPARAGES
North Andover Planning Board cc ENGINEERS , PLANNERS . SURVEYORS
Attn: Monica Gregoire
120 Main Street T
North Andover, MA 01845 S
North Andover Zoning Board of Appeals
Attn: Valerie Cinseruli
120 Main Street
North Andover, MA 01845
Re: Proposed Swimming Pool - 62 Saile Way
Zoning Variance Application & Watershed Special Permit Application
Dear Monica & Valerie:
Our office was hired to assist Maria &Anthony DeMarco with the permitting required to install
an in-ground swimming pool and paver patio at their property at the above referenced address.
The entire property is within the Residential-I District as well as the Watershed Protection
District. The subject property is part of the "Great Pond Estates" development that was
permitted in the early 90's. The subject lot was created in November of 1994 and is currently
developed with a single family dwelling.
The project is proposed within the "Non-Discharge Buffer Zone" from an isolated vegetated
wetland located in the front of the subject property. The closest point of the patio to the wetland
is 196'+/-. The entire project is located outside of the 400 foot"Non-Discharge Zone"measured
from the annual high water mark of Lake Cochichewick. Section 195-4.19B. of the North
Andover Zoning Bylaw allows the construction of new permanent structures only after a
variance has been granted by the Zoning Board of Appeals. Unfortunately there is nowhere on
the property where a swimming pool could be proposed that would avoid a Variance from the
Zoning Board of Appeals and a Watershed Special Permit.
The swimming pool is proposed as far away from the resource areas as possible and is being
proposed in an area that is currently maintained as lawn and/or landscaped areas. The location of
the existing rooftop infiltration system limits the available options for siting the swimming pool.
As mitigation for the slight increase in impervious surface a 12-inch wide, 2-foot deep
infiltration trench is proposed. The infiltration trench will allow stormwater to infiltrate into the
ground during storm events, An Operation& Maintenance Plan (O&M) has been prepared to
help insure the success of the infiltration trench. The O&M requires the infiltration trench to be
inspected and cleaned every six months and after every major storm event of 0,5 inches in a 24-
hour period, (see attached). In addition the swimming pool will be equipped with a non-
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 ® www.wsengineers.com
backwash filtration system. The soils on site are mapped as (411 Q Sutton fine sandy loam,
which are classified as moderately well drained. There should not be any significant degradation
of the quality or quantity of water in or entering Lake Cochichewick as a result of this project.
If you should have any questions regarding this information or require any additional
information, please do not hesitate to contact our office, We look forward to presenting this
information to both Boards at the next scheduled public hearing.
Sincerely,
WILLIAMS & SPARAGES LLC
�L—
Greg J. Hochmuth, RS, CWS, PWS
Project Manager
cc: Maria & Anthony DeMarco
2
Inspection and Maintenance Form
Refer to Section above for frequency of inspection
Inspector: Date:
Inspector Title:
Days since last rainfall: Amount of last rainfall:
Structural Controls: Infiltration Trench
Structure Installed at Filter Fabric Sediment Overall
Identification Location propaodseed Installed buildup (in,) condition
12" Wide Poor
2'Deep AIong paver Yes/No Yes/No Fair
Stone Trench patio for pool Good
Maintenance required
To be performed by: On or before:
Operation&Maintenance Plan
62 Saile Way, North Andover MA
This Operation&Maintenance Plan has been prepared to comply with the provisions
set forth in the Massachusetts Department of Environmental Protection (DEP)
Stormwater Management Standards.
Structural Best Management Practices (BMPs) require periodic maintenance to ensure
proper function and efficiency in pollutant removal from stormwater discharges that
would otherwise reach wetland resource areas unheated. Maintenance schedules
found below are as recommended in Department of Environmental Protection's
Massachusetts Stormwater Handbook and as recommended in the manufacturer's
specifications.
The stormwater management system owner and the party responsible for
maintenance of the stormwater management system shall be the property owner and
their designated employees.
Inf iltration Trench
Inspect and clean every six months and after every major storm event of 0.5 inches in a 24-hour
period
Remove accumulated sediment, trash, debris,leaves and grass clippings.
Remove tree seedlings before they become firmly established.
Inspect the trench 24 hours or several days after a rain event to look for ponded water. If there
is ponded water at the surface of the trench,it is likely that the trench surface is clogged.
To address surface clogging, remove and replace the first layer of stone aggregate and filter
fabric. If the water is ponded inside the trench,it may indicate that the bottom of the trench has
failed.
To rehabilitate a failed trench, all accumulated sediment must be stripped from the bottom, the
bottom of the trench must be scarified and tilled to induce infiltration, and all of the stone
aggregate and filter fabric or media must be removed and replaced.
TOWN OF NORTH ANDOVER
ABUTTER LIST
REQUIREMENT:
MGL 40A,Section 11 states in part"Parties in Interest as used in this chaptershall mean the petitloner,
abutters,owners of land directly opposite an any public or private way,and abutters to abutters within
three hundred(300)feet of the property tine of the petitioner as they appear on the most recent applicable
tax list not withstandingthat the land of any such owner is located in another city or town,the planning
board of the city or town,and the planning board of every abutting city or town.'
SUBJECT PARCEL ID LOCATION OWNER OWNER ADDRESS CITY STATE 21P
MAP.63PARCEL:46 62SAILEWAY AN HONYDEM,4RCO 62-WLEWAY NORTHANDOVER MA 01845
PARCEL ID LOLA77ON OWAIER OWNERADDRESS CITY STATE 71P
M:63 P3 $1 SAILE WAY EIGHT MEADOWS REALTYTUST PO BOX 249 NORTH ANDOVER MA 01845
M:63 P:11 660 GREAT POND ROAD SO NE UNITED METHODIST CHURCH PO BOX 249 LAWRENCE MA. 01842
M:63 PAS 38 SAKE WAY JAY SHEPPARD 38 SA1l E WAY NORTH ANDOVER MA 01845
M:63 P:47 80 SAILE WAY SR RUSSELL REALTY TRUST 80 SAILE WAY BOSTON MA 01845
M:63 P;47 55 SAILE WAY KONSTANTINO SKRIVANOS 55 SAILE WAY BOSTON MA 01845
M:63 P:49 415AILE WAY AUCE DOLBEN 41 SAILE WAY NORTH ANDOVER MA 01945
This certifies that the names appearing on the
rscnrds of the Ass^essars 0
J,7ce as of
x
Certrfied by
o.
r ti✓�rr ```.—u.'x�f1_'!' �r ....n�� rat k �i� � �,. .\w �d
Ld
O
it a
III ' � � � Y "' .- � 4; � � ✓ �$ 7�/�4i�r•1" t � r'
it +i 117'I i"
i-6s�ien=.
IVr 8, i n fnnnxY rn m
RN
lit
It
f
p p tl
q
G?
PLANNING DEPARTMENT
Building Conservation Health Planning Stevens Estate Zoning
Certification of Payment of Municipal Taxes, Fees, Assessments,
Betterments and tither Municipal Charges
The Town of North Andover General Bylaw Chapter 129-1, provides that any application for a
permit or license may be denied, suspended or revoked if the holder thereof has failed or
refused to pay any taxes, fees, assessments, betterments or other municipal charges. By
signing this application, the applicant represents that he or she has paid all such taxes and fees.
Maria DeMarco certify under the penalties of perjury that to the
best of my knowledge and belief, I have not neglected or refused to pay any municipal taxes,
fees, assessments, betterments or any other municipal charge including amounts assessed
under the provisions of section twenty-one D, or am not applying for a license or permit with
respect to any activity, event or other matter which is the subject of such license or permit and
which activity, event or matter is carried out or exercised or is to be carried out or exercised on
or about real estate whose owner has neglected or refused to pay any local taxes, fees,
assessments, betterments or any other municipal charge.
Signed under oath:
Name
62 Saile Way, North Andover, MA 01645
Address
Does the Property Owner own any additional property in North Andover(Yes or No)?
N (Y/N).
If yes, please list the property address of any additional property.
Property Address:
r
North Andover Tax Collector Signature
Name
Date