Loading...
HomeMy WebLinkAbout2019-08-20 O & M Plan WSP NEVER ENACTED 62 Saile Way August 19, 2019 62 Salle Way ( North Andover, MA Operation & Maintenance Plan Operation & Maintenance Ilan 62 wile Way, North Andover MA This Operation & Maintenance Flan has been prepared to comply with the provisions set forth in the Massachusetts Department of Environmental Protection (DEP) Stormwater Management Standards. Structural hest Management Practices (BMPs) require periodic maintenance to ensure proper function and efficiency in pollutant removal from stornixvater discharges that would other rise reach wetland resource areas untreated. Maintenance schedules found below are as reconunended in Department of Enviroinnental Protections Massachusetts Stormnvater Handbook and as recommended in the manufacturer's specifications. The stormwater management system owner and the party responsible for maintenance of the stormwater management system shall be the property owner and their designated employees. In-Ground Swimming Pool • Swfinnulg pool shall be equipped with a non-backwash filtration system ® The property owner shall engage a water hauling company to pump the water and truck the water offsite anytime the pool needs to be drained. Final disposal of the water by the water hauling company shall be in accordance with all federal and State regulations • Pool water shall be pumped into a dry-well or into the existing rooftop ffifiltration system during normal dewaterit-.g following storm events. • fool chemicals shall be properly stored according to manufacturers' labels in an enclosed shed or garage to ensure proper contaiinnent of any spills or drips Infiltration Trench • Inspect and clean every six months and after every major storm event of 0.5 inches in a 24-hour period ® Remove accumulated sediment, trash, debris, leaves and grass clippings. • Remove tree seedlings before they become firmly established. • Inspect the trench 24 hours or several days after a rain event to look for ponded water. If there is ponded water at the surface of the trench, it is likely that the trench surface is clogged. Williams&Sparages I Engineers • Planners • Surveyors 189 North Main Street I Suite 1011 Middleton, MA Page 1 T S August 19, 2019 62 Salle Way I North Andover, MA Operation & Maintenance Plan To address surface clogging, remove and replace the first layer of stone aggregate and filter fabric. If the water is ponded inside the trench, it may indicate that the bottom of the trench has failed. To rehabilitate a failed trench, all accumulated sediment must be stripped from the bottom, the bottom of the trench must be scarified and tilled to induce infiltration, and all of the stone aggregate and filter fabric or media must be removed and replaced. Williams&Sparages I Engineers- Planners - Surveyors 189 North Main Street I Suite 1011 Middleton, MA Page 12 T S Inspection and Maintenance Form Defer to Section above for frequency of inspection Inspector: Date; Inspector Title: Days since last rainfall: Amount of last rainfall. Structural Controls: Infiltration Trench Structure Installed at Filter Fabric Sediment Overall Identification Location ade proposed installed buildup (in.) condition ar 12" Wide Poor 2'Deep Alongpaver Yes/No Yes/No Fair Stone Trench ` °for pool Good Maintenance required To he performed by: On or before. Williams&Sparages I Engineers - Planners . Surveyors 189 North Main Street I Suite 1011 Middleton, MA Page 3 T S