2016-07-05 Monitoring Reports (A) 384 Osgood St
Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in Noah Andover, Massachusetts submitted by Hill International (1-11), covers activities from November 27, 2017 to December 10, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LID Russo most recent critical path schedule is dated October 11, 2017. Key items accomplished during the report period are: • Lawn seeded, plantings installed • Sidewalks concrete placement completed Pavement marking and line striping completed Toilet accessories and partitions installed Stair handrails at walls installed Painting completed Expansion Joints installed • Window treatments installed • OH coiling door delivered to the site • Weather stripping partially completed at garage doors • Ceramic plumbing fixture install completed Is HVAC systems start up performed Key items to be performed over the next two weeks include: • Punch list work completion • Final keying installation • Elevator punch list completion &Inspection • Metal panel insulation, frame &panel install • Roof fascia installation • Roof accessories installation • OH coiling door install • CW exterior trim installation • Complete weather stripping at garage doors ® Signage installation Salt shed substantial completion: September 29, 2017 Project substantial completion: TBD Bi-Weekly Report November 27, 2017 to December 10,2017 Town of North Andover I"Itt Improvements to the Public Works Building Hill International *T8D pending completion of all life safety systems, accessibility/ADA components and Elevator completion and Inspection; Punch list or Incomplete Work Items Requiring deferment until Spring: • Site clean up and final grade after equipment damage ® Re-Seed lawn areas due to cold weather placement • Replace plantings due to incorrect sizes ® Install missing ADA tactile warning panel at Osgood St sidewalk • Correct ponding at Osgood St curb cut and interior parking lot catch basin Construction Photos Below are photos representative of the construction pro ress during the report period Insulation &Metal Panel @ entry— 12/6/2017 Bathroom partitions installed—12/6/2017 Lawn seeded and plantings installed—1216/2017 Breakroom casework&furniture— 12/6/2017 Bi-Weekly Report 2 November 27, 2017 to December 10,2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (1-11), covers activities from November 13, 2017 to November 26, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo most recent critical path schedule is dated October 11, 2017. II Key items accomplished during the report period are: • Spread Loam • Sidewalks formed &prepped for concrete • Resilient flooring installed • Ceiling tile installation completed ® Painting continued Ceramic tile completed w/exception of punch list Casework, chair rails installed Metal panel install continued, corrective material on order Panels completed at existing garage Ceramic plumbing fixture install completed HVAC systems start up performed Key items to be performed over the next two weeks include: • Sidewalk concrete placement • Complete loam and seed, plantings • Install pavement markings&striping • Elevator punch list completion & Inspection Metal panel insulation, frame& panel install continues Toilet Accessories &partitions Install wall handrails at stairs Window treatment install Signage installation Salt shed substantial completion: September 29, 2017 Project substantial completion: *TBD *Tl3D pending completion of all life safety systems, accessibility/ADA components and Elevator completion and Inspection; Bi-Weekly Report 1 November 13, 2017 to November 26, 2017 Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period Insulation & Metal Panel t@3i entry—11/21/2017 Bathroom Tile & Fixtures, 1st Floor— 11/21/2017 Loam Seed Area&Sidewalk forms—11/21/2017 Reception Counter— 11/21/2017 Bi-Weekly Report 2 {November 13, 2017 to November 26, 2017 Town of North Andover In I IL IL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from October 16, 2017 to October 29, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo most recent critical path schedule is dated October 11, 2017, Key items accomplished during the report period are: • Construction trailer removed from site • Curbing installed between new bldg. and garage • Bituminous pavement patch at Garage parking areas installed • Loam partially spread • Electrical Lighting fixture installation • Ceiling tile installation commenced Painting completed at exterior, Interior continues Ceramic wall &floor tile commenced Ceiling grid completed Temp heat installed Elevator Installation completed pending final checklist&inspection Metal panel flashing, framing and insulation install commenced Installation of Spandrel panels at Curtain Wall& Garage Bldg Key items to be performed over the next two weeks include: Sidewalk preparation and installation Curb cut remedial work at Osgood Street • Complete loam and seed, plantings • Complete bituminous pavement at existing DPW entrance ® Generator Start-up ® Metal panel delivery to site • Mtl panel flashing, insulate,frame continues, panel install to start • Toilet Accessories&partitions • Casework installation • Ceramic;floor and wall the continues at first floor • Resilient flooring to commence • HVAC finish installation to commence Bi-weekly Report October 16, 2017 to October 29, 2017 Town of North Andover Improvements to the Public Works Building Hill International Salt shed substantial completion: September 29, 2017 Project substantial completion: November 20,2017 Construction Photos Below are photos representative of the construction progress during the report period ! r Entry elevation—10/26/2017 East elevation with insulations installed—10/26/2017 We- All i Ceramic tile at 2nd floor Corridor—10/2612017 Asphalt patch, utility trench at Garage— 10/26/2017 Bi-Weekly Report 2 October 16, 2017 to October 29, 2017 Town of North Andover MILIL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from September 4, 2017 to September 17,2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated August 29, 2017. Key items accomplished during the report period are: • Ongoing HVAC/Controls Rough-in • Ongoing Electrical Rough-in • Ongoing GWB install&finish • Temp roofing installed at connector&entry canopy • Abatement Contractor 10 day notification for Existing Bldg submitted m Emergency Generator arrived on site and was set on pad Soil remova► paperwork for Pile"J"completed by SAK Stub-in at gas service in DPW breakroom completed Prep of subgrade at front parking area commenced Key items to be performed over the next two weeks include: • Ongoing HVAC,installation • Ongoing Electrical installation ® Electrical tie in of permanent power at new building • Ongoing Gypsum Board installation &finishing • Corner glazing replacement delivery&installation • ACM abatement at existing DPW building interface m Removal of soil stockpile"J" Subgrade preparation at front parking area Binder pavement installation Salt shed substantial completion: September 29, 2017 Project substantial completion: November 10, 2017 Bi-weekly Report September 3, 2017 to September 17, 2017 Town of North Andover MILIL Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period; i i i Entry Elevation—9/13/2017 Drywall finishing in progress—9/15/2017 �f. KO J h l f�j tY} Natural Gas Stub-in Installed—9/16/2017 Generator installed on concrete pad—9/11/2017 Bi-Weekly Report 2 September 3, 2017 to September 17, 2017 Town of North Andover I"NUL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from August 21, 2017 to September 3, 2017, The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LID Russo presented an updated critical path schedule dated August 8, 2017, Key items accomplished during the report period are: • Ongoing HVAC installation m Ongoing Plumbing Rough-in & Insulation • Ongoing Electrical Rough-in m Ongoing GWB install&finish • Building storm drains insulated • Exterior glazing arrived on site, partial installation completed m High roof membrane installation (membrane only) ® Removal of soil stockpile"H"completed • Final Subgrade prepared at pavement areas at Salt Shed areas Key items to be performed over the next two weeks include: • Ongoing HVAC installation • Ongoing Electrical installation • Generator delivery&set in place • Electrical tie in of new building to existing • Ongoing Gypsum Board installation&finishing • Corner glazing replacement delivery&installation • Removal of contaminated soil Salt shed substantial completion: September 29, 2017 Project substantial completion: November 10,2017 Bi-weekly Report August 21, 2017 to September 3, 2017 Town of North Andover I"111 IL Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period: I I i�di�41t4�r �lil �r and hill �i - /1, Stockpile Soil Removal of Pile"H"—8/22/2017 Refrigeration piping at BC-1 1sa Floor—9/1/2017 r , i r r rr Roof drain insulation—9/1/2017 Prep for Concrete Pad for generator—9/1/2017 Bi-weekly Report 2 August 21, 2017 to September 3,2017 Town of North Andover MILIL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from June 26,2017 to July 9,2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated April 4, 2017. Key items accomplished during the report period are: • Ongoing Drainage Structures adjacent to the Salt Shed • Ongoing Garage siding installation m Ongoing HVAC installation • Ongoing Plumbing Rough-in • Ongoing Electrical Rough-in • Complete Generator and Condenser pad installation ® Completed domestic water pressure test Key items to be performed over the next two weeks include: Ongoing metal panel trim installation at the garage Ongoing HVAC installation Plumbing connections for HVAC units Ongoing Electrical Rough-in Complete Drainage Structures adjacent to the Salt Shed Install DensGIass in select interior locations Project Substantial Completion is scheduled for early November 2017. Bi-Weekly Report June 26, 2017 to July 9,2017 i Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period: r iw. y pr Storm Drain Interceptor—6/29/2017 Generator Pad—7/5/2017 i9{ i rr 1 Ife f ,I R 4 e Vim........... Garage Trim—7/6/2017 Fan Coil—7/7/2017 Bi-Weekly Report 2 June 26, 2017 to July 9,2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from May 29, 2017 to June 11, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the Current DPW property, CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated April 4, 2017. Key items accomplished during the report period are: W Complete Salt Shed Foundation installation Ongoing metal stud installation Ongoing Sheathing installation Ongoing Garage siding installation ar Ongoing Roof installation Ongoing Plumbing Rough-in Metal Door Frame Installation Key items to be performed over the next two weeks include: • Weather-tight building openings • Gypsum board installation • Ongoing metal panel installation at the garage • Backfill solt at Salt Shed • HVAC installation Project Substantial Completion is scheduled for early November 2017. Bi-Weekly Report May 29, 2017 to June 11, 2017 UL Town of North Andover ., Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. I ia, I i d Salt Shed Foundation—5/31/2017 Interior Door Frames—5131/2017 mi f m»n fir 'w i � r r i r Rough Plumbing—6/7/2017 Garage Siding—6/9/2017 RI-Weekly Report 2 May 29, 2017 to June 11, 2017 Town of North Andover 111111LIL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from April 17,2017 to April 30, 201T The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated April 4, 2017, Key items accomplished during the report period are: Hazardous Soil Removal Interior Stair installation Metal Stud Installation Salt Shed excavation Geo pile installation at Salt Shed Key items to be performed over the next two weeks include: 11 Hazardous Soil Removal Metal Stud Installation Salt Shed Footings Roof Installation Utility connections at the street Project Substantial Completion is scheduled for early November 2017. BI-Weekly Report April 17, 2017 to April 30, 2017 MILIL Town of North Andover M� Improvements to the Public Works Building Hill Wernati©nal Construction Photos Below are photos representative of the construction progress during the report period. M p y /fi n vu Y Restoration of Silt Fence-4/19/2017 Stair Installation-4/21/2017 Iv I G� ryo Metal Framing-4/24/2017 Salt Shed Footing Prep-4/24/2017 Bi-Weekly Report 2 April 17,2017 to April 30, 2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (1-11), covers activities from April 3,2017 to April 16, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D, Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated April 4, 2017. Key items accomplished during the report period are: • Completion of Underslab Utilities • Concrete Slab& Deck Pour • Salt Shed environmental remediation • Salt Shed Demolition m Installation of concrete blocks at the west end of the site • Restoration of erosion control from winter damage on the north side Key items to be performed over the next two weeks include: • Soil Removal • Interior Stair installation • Metal Stud Installation • Salt Shed excavation • Geo pile installation at Salt Shed Abatement and Demolition was complete as of April 14,2017. Project Substantial Completion is scheduled for early November 2017. BI-Weekly Report April 3,2017 to April 16,2017 Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. 91a�9Nla ��& � lyf f �./^W o� W,� M��if � .%: a �'r��l,�r������1 dK � �✓. `�ri�. p Underslab Preparation—4/3/2017 Salt Shed—4/10/2017 / n /t � fil� l o C)r � , G,f✓ � x N 1 P Salt Shed Demolition—4/12/2017 South Perimeter Blocks 4/14/2017 Bi-Weekly Report 2 April 3,2017 to April 16, 2017 Town of North Andover 11"11LIL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from February 20, 2017 to March 5,2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated February 8, 2017. Key items accomplished during the report period are: • Elevator Shaft CMU Wall Construction • Masonry Demobilization • Backfill&Compaction for on-grade slab • Salt Shed environmental investigation &report Key items to be performed over the next two weeks include: • Structural Steel arrival, staging, &erection • Structural Steel welding/connection detailing • Maintenance Garage replacement siding installation • Salt Shed environmental remediation Demolition of the existing Salt Shed is scheduled for April 3, 2017. Project Substantial Completion is scheduled for early November 2017. Bi-Weekly Report February 20,2017 to March 5, 2017 Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. J View of sample location 4 Existing Salt Shed--2/24/2017 SAK Environmental Report-3/1/2017 ik f 4 View of sample locations 15/1 SAK Environmental Report-311/2017 Slab-on-grade Base-3/3/2017 Bi-Weekly Report 2 February 20,2017 to March 5, 2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (1-11), covers activities from February 6, 2017 to February 19,2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D, Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated February 8, 2017. Key items accomplished during the report period are: " Elevator Shaft CMU Wall Construction Is Elevator Shaft Steel Beam placement Key items to be performed over the next two weeks include: • Complete masonry demobiliza5on • Structural Steel arrival, staging, &erection Demolition of the existing Salt Shed is scheduled for April 3,2017. Project Substantial Completion is scheduled for early November 2017. Bi-weekly Report February 6, 2017 to February 19, 2017 Town of North Andover In 111 IL Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. m ' // f Elevator Shaft Construction—2/6/2017 Masonry Grout Mixing —2/6/2017 I l iia Masonry Shaft Construction—2/10/2017 Elevator Shaft—2/17/2017 Bi-Weekly Report 2 February 6, 2017 to February 19, 2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from January 23, 2017 to February 5, 2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated January 4, 2017. Key items completed during the report period are: • Test pit excavation at Salt Shed • Protection of soil stockpiles • Preparation for elevator masonry shaft work a Elevator Shaft CMU Wall Construction ® Survey of in-place foundation Key items to be accomplished over the next two weeks include: a Continue Elevator Shaft CMU Wall Construction Demolition of the existing Salt Shed is scheduled for April 3,2017. Project Substantial Completion is scheduled for early November 2017. Bi-Weekly Report January 23, 2017 to February 5, 2017 Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. r� it A r IioO mry a, % fSSI%% rrr 17 i �, N Stockpile Protection— 1/2 712 0 1 7 Masonry Grout Mixers— 1/27/2017 x ff 81 r IrJ 11 r I r a, / �, r o' Masonry Enclosure—2/1/2017 Elevator Shaft Construction —2/3/2017 BI-Weekly Report 2 January 23, 2017 to February 5, 2017 Town of North Andover MILIL Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (HI), covers activities from January 9, 2016 to January 22,2017. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented an updated critical path schedule dated January 4, 2017. Key items completed during the report period are: • Foundation Wall Installation • Baseplate grouting • Backfill • Elevator pit waterproofing Key items to be accomplished over the next two weeks include: * Complete Foundation Wall Installation * Backfill * Elevator Shaft CMU Walls Demolition of the existing Salt Shed is scheduled for April 3,2017, Project Substantial Completion is scheduled for early November 2017. Bi-Weekly Report 1 January 9, 2017 to January 22, 2017 Town of North Andover 1� Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. Off r p. a . H .t i c „ Foundation Formwork-1/9/2017 Foundation View-- 1/13/2017 0 yb a e r F `4 dt 6 Foundation View- 1/16/2017 Site View- 1/18/2017 Bi-Weekly Report 2 January 9, 2017 to January 22, 2017 Town of North Andover Improvements to the Public Works Building Hill International Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (1-11), covers activities from December 12, 2016 to December 25, 2016. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property. CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented a critical path schedule dated November 29, 2016. Key items completed during the report period are: • Mobilization • Pile Installation • Pile Load Testing • Begin Foundation Excavation Key items to be accomplished over the next two weeks include: • Complete Foundation Excavation • Foundation Installation Foundation Waterproofing Backfill Bi-Weekly Report December 12,2016 to December 25,2016 Town of North Andover MILIL Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. W i� 1 i 5� ,&00 , � Q I .,L v <, q9 0 e r Field Office on Site— 12/12/2016 Project Site— 12/12/2016 r xa w p" F,4 Geo Pier Installation 12/19/2016 Foundation Excavation—12/21/2016 Bi-Weekly Report 2 December 12, 2016 to December 25,2016 Town of North Andover 111111111 Improvements to the Public Works Building Hill International DEC 19 ?010 Summary This Biweekly Report for the Improvements to the DPW Building project, in North Andover, Massachusetts submitted by Hill International (1-11), covers activities from November 28, 2016 to December 11, 2016. The Improvements to the DPW Building Project includes the design and construction of new office and support facilities for the current DPW property, CSS Architects, Inc. was selected by the Town to provide design services for the project; L.D. Russo is the General Contractor for construction. Schedule LD Russo presented a critical path schedule dated November 29, 2016. Key items completed during the report period are: • Mobilization • Installation of temporary construction fence. Erosion Control Site Demolition Pile location Survey Key items to be accomplished over the next two weeks include: a Pile Installation a Foundation Excavation Bi-Weekly Report I November 28,2016 to December 11,2016 Town of North Andover Improvements to the Public Works Building Hill International Construction Photos Below are photos representative of the construction progress during the report period. f / wv,:f Project Site—12/02/2016 Erosion Control—1210212016 w 0 �I�f'& I� I I ';'�Illld i{�II I I' � I u %' ✓ e I I i Project Site—12/0512016 Site Entrance—12/0512016 Bi-weekly Report 2 November 28, 2016 to December 11,2016