Loading...
HomeMy WebLinkAbout2016-07-05 Space Needs Assessment Application SPR DPW 384 Osgood St PROJECT: IMPROVEMENTS TO THE, SPACE NEEDS ASSESSMENT PUBLIC WORKS BUILDING,NORTH ANDOVER,MA 4 March 2016 i CATEGORY E715 PROPOSED Space People SF Area people SF Area TOTAL First Floor Vestibule/Entry Lobby 0 165 0 250 Meetin 1 Break Room 40 713 0 0 DPW Reception 1 176 0 175 Facilities Directors Office 1 176 0 170 Public Toilets/Unisex HP 0 112 0 45 Toilets with Shower 0 110 0 300 Stairs 0 125 0 145 Halls 0 100 0 250 Sub-Totals 2 qf32 0 1335 Second Floor DPW Admin.Assistant 1 0 170 DPW Directors Office 1 0 450 SewerNVater 2 0 350 Engineering Senior Foreman 2 360 0 300 Drafting Staff/Engineers 2 150 0 100 Operations Manager 1 200 0 300 Assistant to O erations Mana er 1 100 0 100 Vault 0 56 0 100 Storage 0 150 0 250 Supplies 0 160 0 200 File Storage 0 210 0 0 Dead Stora a(Plans) 0 100 0 200 Duct Space/Plumbing Chase 0 30 0 50 Unisex Toilet 0 80 0 50 Stairs 0—:_ 163 0 130 Halls 0 110 0 150 Sub-Totals 12 2595 0 2900 Interior Walls 0 124 0 300 Exterior Walls 0 Y 290 0 400 II Sub-Totals 0 414 0 700 g Proposed for Break Room with Kitchen 0 0 0 275 New Addition Conference Room 1 0 0 0 500 Conference Room 2 0 0 0 280 IT/Tel Room 0 0 0 100 Additional Men's Toilet 0 0 0 110 Additional Women's Toilet 0 0 0 110 DPW Convenience Toilet 0 0 0 20 Mechl El.Room 0 0 0 180 Janitors Closet 0 0 0 50 Elevator/Machine Room 0 0 0 80 Plant Coy 0 0 0 180 Future 0 0 3 180 "2-story Bldg.only Sub-Totals 0 03 ]72065] Total Existing 4686 SF t Total Proposed 7000 SF t Page 1 of 1