Loading...
HomeMy WebLinkAboutContract #: 1139 - From: 10-01-2018 To: 09-30-2019 - Ambient Temperature Corporation - TOWN of NORTH ANDOVER CONTRACT CONTRACT# DATE; 09 _c90-- d0J (P _ This Contract is entered 'into on,, or as of,this date by and between the Town of North Andover (the "Town"), and Contractor: Ambient Temperature Corporation Address: 14 Graf Road Nc bur port, MA o 1950 Telephone Number: 97 -646-06 0 Fax Number: 978-646-0661 1. This is a Contract for the procurement of the following: HVAC maintenance services for all municipal and school buildings for the period of October 1, 2018 through September 30, 2019 (with two additional one-year renewals solely at the discretion of the Town) in accordance with the Invitation for Bids dated ,August 15, 01 . The Contract price to be paid to the Contractor by the Town of forth Andover is: Regular business hours $117.00 per hour Non-business hours $164.00 per hour Material./Supplies 1 }0% markup 3. Payment will be glade as follows; Upon performance of services and receipt of invoice (net 30) 4. Definitions t 4.1 Ace e Lance: All Contracts require proper acceptance of the described goods or - services by the Town of North Andover. proper acceptance shall be understood to r include inspection of goods and certification of acceptable performance for services by (Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page i authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, general Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. f 1'he Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party'} to any Contract with the Town. This terns shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term `Contractor'} shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance. The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 Subcontractor: Whose having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both, 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before Scptember 30, 2019, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated 'n the Contract documents are of the essence of the Contract, 6. uN e t to pro nation Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. (Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 2 r a 2 i 2 7. Perrnits and vats Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default .1 without Cause. The Town may terminate this Contract on seven (7) calendar days' notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular nail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be: in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days' notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract; 1 any material misrepresentation made by the Contractor to the Town; ) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within theContractor's reasonable control, (Ili) failure to perform this Contract in a manner reasonably satisfactory to the Town, iv) failure to promptly re-perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or effoneous, (v) discontinuance of the services for reasons not beyond the Contractor's Treasonable control, (vi) failure to comply with a material terra of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw anal/or regulations. 9. The Contractor's Breach and the Tomas Remedies Failure of the Contractor to comply with any of the tarns or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and (Rev 5-2007)Contract by and between'rown of North Andover and Ambient Temperature Corporation Page 3 y 3 { f 's speeiic performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may beep the whole or any pail of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance 10.1 This Contract will he construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated b reference into this Contract, including,but not limited to, the following: General Laws Chapter 30B—Procurement of Goods and Services. General Laws Chapter 30, See. 39, et seq: - Public Worhs Contracts. General Laws Chapter 149, Section 44A, et see: Public Buildings Contracts. 10.2 wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such laAv or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations hearing on the perfortnance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall beep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the worl�, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. 1t shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its club appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree, (Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 4 11. Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 8A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. ,Certification of Tax Compliance This Contract must include a ceftification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will cam out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 1 1 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time he amended. 1 . Assignment Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 1 5. Condition of Enforceability Against the Town This Contrad is only binding upon, and enforceable against, the Town if: 1 the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form, 16. Col orate Contractor If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter IS 1, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a. power of Attorney and duly authenticated copies of its (Rev 5.2007)Contract by and between Town of North Andover and Ambient Temperature Corpotation Page 5 • i Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Li ability of public Officials To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indenuiffication The Contractor shall indemnify, defend and save harmless the Tern, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) t-hat may arise in whole or in part out of or in connection with the work being performed or to be perfornned, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party 'Indemnified hereunder. The Contractor fui then agrees to reimburse the Town for damage to its property caused by the Contractor its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. workers Compensation Insurance The Contractor shall provide by insurance for the payment of compensation and the f mishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto} except if specifically waived by the Town. o. Documents Materials etc. Any materials, reports, information, data., etc. given, to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the (Rev 5-2007)Contract by and between Town of North Andover and Ambi-ent Temperature Corporation Page 6 Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in pail under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country, The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other doc'umentatioll or product paid for by the Town shall vest 1n the Town at the termination of this Contract. The Contractor shall at all tines, during or after termination of this Contract, obtain the prier written approval of the Town before making any statement bearing on the work, performed or data collected under this Contract to the press or issues any material for publication through any medium. 21, Audit Inspection and l ecordkee in At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and ether data relating to all matters covered by this Agreement:. . pyxnent The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work- completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by lave, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any fot-n or manner by a party shall not be construed as a waiver, nog' in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. (Rev 5- 007)Contract by and between Town of North Andover and Ambient'remperature Corporation Page 7 24. For i m and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject natter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 5. Notices Any notice peiTnitted or required under the provisions of this Contract to be given or served b either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or sei-ving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a ceilifted or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 ruin Street,Forth Andover, Massachusetts o 1845. 6. Binding on successors This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors ill interest(and where not corporate, the heirs and cstate of the Contractor). 7. CoMplete Contract This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements otber than those incorporated herein. . Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of Notth Andover shall be a party. one of the following "Supplements" must be "checked' as applicable to this Contract, shalt be attached hereto, and shall in any evert apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract; CONSTRUCTION SUPPLEMENT �� � Applicable to Contracts for Construction (Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 8 IN WiTNESS, WHEREOF the parti"es, have hereto and to two other identical 'Instruments set forth their,liands the day and,year first above-written. THE TOWN THE CONTR ACTOR Ole Ambient Temperature,, Corporat-ion Divi IUD/�e artment Head Company 'am �01 0000 yp................. /12 18 0 S i.g ip, Date To`,An Manager Date �na Russell H,, Stiles I,, President Print Name & Title Federal. Identification No.. 04-354-2600 APPROVED AS TO FORM: TY, )wn Counsel Date 41�/111? CERTI IFICATION AS TO AVAILABILITY OF FUNDS-. T 4A nan ZE oVM c "utt Date L/ (Rev 5-2007)contract,by and.between Town of North Andover and,Anibient Temperature Corporation Page 9 SUPPLEMENT ;V'5 CONSTRUCTION SUPPLEMENT`C"-Applicable to Contracts for the construction of: (1)Public Buidi and Public works (governed by the provisions of General Laws Chapter 3 0B); (2)Public Bui ldiUs (governed by the provisions of General Laws Chapter 1 4.9, 44A, et seq.); and (3)Public works (governed by the provisions of General Laws Chapter 30, 9M, et seq) This fon-n supplements the Town of Noah Andover"Contract and GeneralConditions"and applies only to contracts for the construction,reconstruction, alteration,remodeling or repair of public...works or public buildings, 2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an of iginal thereof to the Town prior to the commencement of performance. 3. Equality: 3J. In the ease of a closed Specification written for a specific item or items to be furnished Under the Base Bid,such specifications shall,as applicable,be in compliance with the Massachusetts Gencral Laws,Chapter 3 0, Section 3 9M and Chapter 149, See.44A et seq. 3.2. where the name of an item,material or manufacturer is mentioned in the Specifications or on the Drawings,except as above noted,the intent is to establish a standard and hi no way should be construed to exclude any item or manufacturer net mentioned by name,but whose product meets the Specifications as to design,utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 3 0B may not increase the quantity of goods or services provided by more than twenty-five(25%)per cent, in compliance with See. 13 of Chapter 30B. . The Contractor will earry out the obligations of this oontract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 15 1, See. 1,et seq.(M't1itnum wage Law)and any executive orders,rules,regulations,and requirements of the Commonwealth of Massachusetts as they may fi-om time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D(Prevailing Wage),as shall be in force and as amended. 6, The Contractor shall continuously maintain adequate proteetion of all work from damage and shall protect the property of the Town and others, including adjacent-property,from injury or loss arising (Rev 5-2007)Supplement"C"to Contract'between the Town of North Andover Page t and Ambient Temperature Corporation r in connection with the Contract. The Contractor shall snake good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town,or due to causes beyond the Contractor's control and not theContractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work,and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on,about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all tirnes,as required by the Conditions and progress of the work,all necessary safeguards for the protection ofworkers and the public,shall post danger sighs warning against the hazards created by such Features of constnietion such as pits, protruding nails,hosts,well holes,elevator hatchways,scaffolding,window openings,stairways and falling materials;and shall designate a responsible member of its organization on the work,whose duty shall be the prevention of accidents. 8'. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. . The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sore discretion determines that the construction superintendent,foreman,or assistants are unacceptable to the Town,then upon seven days notice from the Town,the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work,using its best shill and attention. The Contractor shall carefully study and compare the drawings,specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this respoiisihility shall be supervision of all od<-performed by subcontractons on the work. 11. if the Contractor should neglect to-prosecute the work properly,or fail to perform the contract or any of its provisions,the Town,upon three days written notice,may,without prejudice to any other remedy it may have,male good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection b the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may male periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project representative will not be required to make exhaustive or continuous on--site inspections to cheep the quality or quantity of the work, and will not be responsible for the Contractor's failure to cart'out the constr ction work in accordance with the CoDtract Documents. During such visits and on the basis of these observations while at the site,the Project Representative will beep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural Ivork as failing to conform to the Contract Documents_ The Project Representative shall have authority to act on behalf ofthe Town only to the extent expressly delegated by the Town,which shall be shown to the Contractor,and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 2 and Ambient Temperature Corporation ti 1 In connection with the wo k,the Project Representative shall not be responsNe for construction methods,means,techniques,sequences or procedures employed by the Contractor or the Contractor's safety programs,requirements,regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall,within a reasonable time,make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision,in matters relating to the project,shall be final,if within the terms of the Contract Documents. 13.3. if,however,the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Prof ect Representative renders a decision after such remedies have commenced,such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or peti-n i t any part of the struetti re to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times beep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work"broom-clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors} as the Town shall determine to be j u st. 16. Riaht to Terminate If the Contractor should(1)be adjudged a bankrupt, (2)make a general assignment for the benefit of creditors, (3)have a receiver appointed on account of its insolvency, (4)persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, 5)fall to make prompt payment to subcontractors or to providers of materials or labor, (6)persistently disregard laws and regulations or lawful directives of the Town, or(7)be guilty of a substantial violationof any provision of the Contract,then the Town-may, without prejudice to any other right or remedy and after giving the Contractor(or any surety)seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of al l materials,tools and appliances thereon and finish the worl-C by whatever method it deems appropriate. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 3 and Ambient Temperature Corporation In such cases,the Contractor shall not be entitled to receive any further payment until the work is Finished. rf the unpaid amount owed to the Contractor for work already completed shall exceed the expense of Finishing the work, including compensation for additional architectural, managerial, legal and administrative sc14vicesa such excess shall be paid to the Contractor. if such expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town. The Contractor-shall not be relieved of liability to the Town by virtue of any termination of this contrast, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder•. Notwithstanding any other provision of this Agreement,the Town reserves the right at any time in its absolute discretion to suspend or terminate this agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the ob I igation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination slate. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall} before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sure of the Contract, divided so as to facilitate payments to Subcontractors,made out in such form as the Town and the Contractor may agree upon, and., if required, supported by such evidence as to its correctness. This schedule, when approved. by the Town, shall be used as a basis for payment,unless it is found to be in error. 1f applying for payments,the Contractor shall submit a statement based upon this schedule. 18. withholding of Pgy ents 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town oforlh Andover from lass on account of: 18.1.1. Defective work not remedied. 19.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007)Supplement"C"to Contract between the Town of Forth Andover Fag 4 and Ambient Temperature Corporation 18. . Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims bv Contractor and Liabilit of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven 7)calendar days after the event or the first appearance of the circumstances causing the claiin. The claim shall set forth in detail all known facts and circumstances supporting the claim, The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims, The limit of liability of the Town under this Agreement is liralted to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 0. Liquidated Dana es; Because both parties recognize 1 that the tine for completion of this Contract is of the essence, (2)that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract,and 3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated darnages representing an estimate of delay damages, not as a penalty,the suite of One Thousand Dollars($1,000)per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person, The Town's right to impose liquidated damages shall in no way prohibit or restrict the Towri's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages,then the Contractor shall pay the amount due. 1. The Contractor's' Mutual Res on s ib i li Should the Contractor cause dainage to any separate subcontractor on the work,the Contractor agrees,upon due notice,to settle with such contractor by agreement, or by recourse to remedies provided by later or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shal l defend such p roce ed ings at th e Town's expense and, if any j u€lgment against the Town arises therefrom,the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts. 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execration of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor,the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5. 007)Supplement"'C"'to Contract between the'rown of North Andover Page 5 and Ambient Temperature Corporation v L } L } } } } } } 2 } 3 E 5 of the other contractor's work as fit and proper for the reception of its work except as to f defects which may develop in the other contractor's work after the execution of its work. 5 t t t 22.3. To insure the proper execution of its subsequent work,the Contractor shall measure wog{ c re oit to the Town an discrepancy scre anc between the � already�� place and shall at once p � � executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 3.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by then, as it is for the acts and omissions of persons directly employed by it. 3.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 4. Contractors-Subcontractor Relations; The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement,the General Conditions of the Contract,the Supplementary General Conditions., the Drawings and Specifications, as far as applicable to its work, including the provisions-of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 1, The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and i udginents of ever nature and description(including reasonable attorneys' fees) brought or recovered against there that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder.The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct..The existence of insurance skull in no way limit the scope of theContractor's indemnification under this Contract. 5.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor,anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable,the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007)Supplement"C"to Contract between the Town of Forth Andover Page 6 and Ambient Temperature Corporation i any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other einployee benefit acts. 253. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. however, it shall be the Contractor"s responsibility to purchase and malatain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. . TheContractor's Ynsuranec: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 2 .1.1. Claims under Worker's Compensation,disability benefit and other similar employee benefit acts; 26.1.2. i aims for damages because of bodily injury, occupational sickness or disease,or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. laims for damage because of bodily injury, sickness or disease, or death of any person other than its employees,and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 6. .1. worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability..insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and operations, owners and Contractor's protective, Products and Completed operations,and Owned,Non--owned and Hired Motor vehicles. All such insurance shall be written for not less than any limits of liability requited by law, unless otherwise provided in the contract documents, or the following limits,whichever are greater: (Rev 5-2007)Supplement"Cap to Contract between the Torn of North Andover Page 7 and Ambient Temperature Corporation a Comprehensive General Liability Insurance (Broad Form) Bodily It-ijury $1,000,000 per person ,000,000 aggregate Property Damage $1,1000,000 per occurrence ,000,000 aggregate Automobile Liability Insurance $5 0 0,0 oo per person $1.000,000 per occurrence Excess Liability(Umbrella) $ 1,000,000 26.3. The above insurance policies shall also be subject to the following requirements: 6.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under paragraph entitled"Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten(10) days prior to the expiration date of required policies. 26.3.3. o insuraliee coverage shall be Subject to eancella.tion WithOLIt at least thirty(30) days prior written notice forwarded by registered or certified mail to the Town. The Town slial l also be notified of the attachment of any restrictive amendments to the policies. 6.3,4, All Certificates of Insurance shall be on the`M11-A"or"ACORM Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper office`of the Insurer,evidencing in particular those insured, the extent of coverage,the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. l l premium costs shall be included in the Contractor's bid. 6.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 7. Protective Liability _Insurance: 7.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 8 and Ambient Temperature Corporation r ' z 7. . The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non--Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing theContractor's General Liability Policy. 7.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 8. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract,or receipts in full in lieu thereof and, if required in either case,an affidavit that as fay`as it has knowledge or information,the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 aild 14 as amended as a minimum requirement). 29. Guarantees: 9.1. The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken,that the product of such labor will yield only first-class results,that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the work will be of good quality, free from faults and defects and in strict conformance with this Conti-act. All work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terns of this contract shall in the opinion of the Town Manager require:repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to nuke the required. repairs. If the Contractor shall negleet to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch,then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient,the Contraetor shall be obligated to pay the balance thereof. 9.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page and Ambient Temperature Corporation 0 obligation to coiTect work is in addition to, tad not in substitution of, such guarantees o,'i'l* 1 -warranties as may be requirect m,the various ,sections of the SpecIfi ratio n.S., This Agreement is I'llitended to take eff6et as a seated in,strument. Witness our hands and seats hereto: Dated: /00 /1/ OF '010100,10"00 l" elall .....q ThContratorby: ole uttionzed V� The Town of North Andover,by: '00OL/.o Town Klanager Del ItIm Division Head OW11 COUIrlSel Approved as,to Form TO 11 Xle t untant Certified as to Appropriation (Rev 5-2007)SuppItment""C"''to Contract between the Town of North Andover Page 10 and Aambient"Tem-peralure Corporation THE COMMONWEALTH OF I ASSA HUSETTS E E UTIVE OFFICE OF LABOR.AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing wage Rates CHARLES D.BAKER As determined by the Director under the provisions of the ROSALIN ACOSTA Secretary ❑overnar Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D aic r N;Y KARYN E.POLITO Director Lt,Governor Awarding Authority: Town of North Andover Contract Number: Cityffown: NORTH A HO ER Description of Work: Perform preventative service and as--creed repairs of the HVAC units located in all municipal and school buildings Job Location: Various locations Information about Prevailing wage Schedules for Awarding Authorities and Contractors } This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number"on all pages of this schedule. An Awarding Authority must request an updated wage schedule from the Department of Labor Standards(",DL ' if it has not opened bids or selected a contractor within 90 days of the date of issuartee of the wage schedule. For CND AT RISK projects(bid pursuant to G.L. c.149A),the earlier of: (a)the execution date of the GMP Amendment,or(b)the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. { The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, §27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project its accordance withM.G.L. c. 149 §27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prune contractor,a filed sub-bidder, or any sub-contractor. } All apprentices working on the prQ j ect are regt ir-ed to be registered with the Massachusetts Department of Labor Standards}Division of Apprentice Standards DL /DA ). apprentice must beep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with LEAS inay be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with ILLS/DAS rega-rdtess of wh ether or not they are registered with any other federal,state,Kcal,or private agency must he paid the journey worker's rate for the trade, • The wage rates will remain in effect for the duration of the project,except in the case of muhi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeps before the anniversary of the date the contract was executed by the awarding authority and the general contractor.For multi-year CM AT RISK projects,awarding authority must request an annual update no later than two weeps before the anniversary date,determined as the earlier of: (a) the execution date of the GW Amendment,or b)the execution date of the first amendment to perm it procurement of construction services,Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 2 7F"rental of equiprnent"'contracts. ip Every contractor or subcontractor which performs construction work on the project is required to submit weedy payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep there on file for three years. Each weekly payroll report trust contain; the employee's name,address,occupational classification,hours worked,and wages paid. Do not submit weekly payroll reports to DL . A sample of a payroll reporting foiTn may be obtained at 11ttp;f/ww.niass.govfdols/pw. • Contractors with questions about the wage Fates or classifications included on the wage schedule have an affirmative obligation to inquire with ILLS at(617)626-6953. 4F Employees not receiving the prevailing wage rate set forth on the wage schedule iray report the violation to the Fair Labor Division of the office of the Attorney General at(617)7 7-3465, Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and Issue Date: 08107/20l 8 wage Request Number: 201 80807-059 Classlfleation Effective Date Base Wage Health Pension Supplemental Total Rafe Uneinvloyment Construction (2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 TF,AA1STER S J0.hVT C0UJVC1L N0. 1 O ZONE B (3 AXLE)DRIVER-EQLUMENT 12/01/2016 $32.22 $10.91 $1 U9 $0.00 $54.02 TEAMSTERS JOINT COUNCIL NO ]p ZONE}3 (4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 TE,,l STF-RS JOINT Co UNCIL NO, 10 ZONE B ADS/SUBMERSIBLE PILOT 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 081011201 9 $102.78 $9,90 $2 1.1 5 $0.00 $133.83 For apprentice rates see"Apprentice-FI LE DRIVER" AIR TRACK OPERATOR 06/01/2018 $34.00 $7.70 $14.02 $0.00 $55.72 LriBORERS-ZONE 2 2/01/2018 $34.84 $7,70 $14.02 $0.00 $56.56 06/01/2019 $3 5.71 $7.70 $14.02 $0.00 $57.43 12/01/2019 $3 .57 $7.70 $14.02 $0.00 $58.29 06/01/2020 $37.46 $7.70 $14.02 $0.00 $59.18 12/01/2020 $3 8.3 5 $7.70 $14.02 $0.00 $60.07 06/01/2021 $39.27 $7.70 $14.02 $0.00 $60.99 12/0112021 $40.18 $7.70 $14.02 $0.00 $61.90 For apprentice rates see"Apprentice-LABORF R" ASBESTOS REMOVER-PIPE 71ECH.EQUIFT. 06/01/2018 $36.90 $11.50 $7.10 $0.00 $5 5.50 1 /01/201 8 $37.90 $11.50 VA0 $0.00 $56.50 06/0112019 $3 8.90 $11.50 $7.10 $0.00 $57.50 12/01/2019 $39.90 $11.50 $7.10 $0.00 $58.50 06/01/2020 $40.90 $11.50 $7.10 $0.00 $59.50 12/01/2020 $41.90 $11.50 $7.10 $0.00 $60.50 ASPHALT RAKER 06/01/2019 $33.50 $7.70 $14.02 $0.00 $55.22 LABORERS-ZONE 2 12/01/2019 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $35.21 $7.70 $14.02 $0.00 $56.93 12101/ 019 $36.07 $170 $14.02 $0.00 $57.79 06/01/2020 $36. 6 $7.70 $14.02 $0.00 $58.68 12/01/2020 $37.55 $7.70 $14.02 $0.00 $59.57 06/01/2021 $3 8.77 $7.70 $14.02 $0.00 $60.49 12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ASPHALT/CONCRETE/ RUS1 R PLANT-ON SITE 06/01/2019 $47.09 $11.00 $15.50 $0.00 $73.5 8 OPETING ENG INEERS L 0 CA L 4 12/01/2019 $49.23 $11.00 $15.50 $0.00 $74.73 06/01/2019 $49.3 3 $11.00 $15.50 $0.00 $75.83 12/01/2019 $50.49 $11.00 $15,50 $0.00 $76,99 06/01/2020 $51.59 $11.00 $15.50 $0.00 $75.08 12/01/2020 $52.73 $11.00 $15.50 $0.00 $79.23 06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.3 3 12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.48 For appren#ice rates see"Apprentice-OPEPAT NG ENG€NEER5" Issue Date: 08/07/2018 Wage Request Number 20180807-059 Page 2 of 42 C1assilicatiolt rrppxemenfid Total Rate E�#'ee#ire Date Base age Health Pensron nern 1a rrrent BAC 1OE/FRONT-END LOADED 06/01/2018 $47.08 $11.00 $15.50 $0.00 $73.58 06/01/2019 $49,3 3 $11.00 $15.50 $0.00 $75.83 1 270 1 720 1 9 $50.49 $1 i m $15.50 $0.00 $76.98 06/01/2020 $5 L58 s i 1.00 $15,50 $0.00 $78,08 12101/2020 $52.73 $i im $15.50 $0.00 $79.23 0 /01/2021 $53.83 $11,00 $t5.50 $0.00 $80.33 12/01/ 021 $54. 8 $11.00 $tS.50 $0.00 $81.48 For apprentice rates sec"Apprenticc-GPERAUNG ENGINEERS" BA CO-TYPE JUMPTNG TAMPER 06/01/2019 $33.50 $7,70 $14,02 $0.00 $55.22 12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $35a21 $7.70 $t 4.02 $0.00 $56.93 12701/ 019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14,02 $0.00 $58.68 12/01/20 0 $37.85 $7.70 $14,02 $0.00 $59.57 06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49 1270 t/2021 $3 9.68 $7.70 $t 4.02 $0.00 $61.40 For apprentice rates sec"Apprentice-LABORER" BLOCK PAVER,RA MER 1 CURB SETTER 06/01/ 01 S $34.00 $7.70 $14,02 $0.00 $55.72 LABORERS-ZONE 2 12/01/2018 $34.84 $7.70 $14,02 $0.00 $56.56 06/01/201 J $3 5.71 $7.70 $14,02 .$0.00 $57.43 12/01/2019 $36.5 7 $7.70 $14.02 $0.00 $58.29 06/01/2020 $37.46 $7.70 $14.02 $0.00 $59.18 12/01/2020 $39.35 $7.70 $14.02 $0.00 $60.07 06 01 f 2021 L$39.27 $7.70 $14.02 $0.00 1$60.99 12/01/2021 $40,19 $7.70 $14.02 $0.00 $61.90 For apprentice rates sec"Apprentice-LABOREW BOILER DER 01/01I 017 $41 2 $6.97 $16,21 $0.00 $66.10 14011,RR?WAKERS LOCAL 29 Apprentice- BOILERMAKER-Local 29 Effective Date-- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $27.90 $6.97 $10.54 $0.00 $45.41 2 65 $27.90 $6.97 $10.54 $0.00 $45.41 3 70 $30.04 $6.97 $11.35 $0.00 $48.36 4 +75 $32.19 $6,97 $12.16 $0.00 $51.32 5 80 $34.34 $6.97 $12.97 $0.00 $54.28 6 85 $36.48 $6.97 $13.78 $0.00 $57.23 7 90 $38.63 $6.97 $14,59 $0,00 $60.19 9 95 $40.77 $6.97 $15.40 $0.00 $63*14 .... ... - .............. .............. .. ---------- ...... ............. 3 Dotes. E(3 Y 1 ...:'..::ti ....... ............ ..... -- -:-:-:.::•.:•a •..-...-..-. i. .! ............f ............� ............ .........- ........._ ... .. ...�... nnwxxx.n r.vi ir.nv� ........ ..... -'--' -• __.___.- .�--..-. .. .... ...1.� .......L .............. ....-.. Apprentice to Jou meywo3rker Ratio:1.5 Issue Date: 08/07/ 018 Wage Request Number, 20180807-059 Rage 3 of 42 Classification E ft'edive Dale Base Wage Health Pelasi011 uppleitmital Total Rate »ueniploy1neut BRICK/STONE/ARTIFICIAL MASONRY(fNCL.MASONRY 08/01/2018 $5 .91 $10.75 $20.66 $0.00 $84.32 WATERPROOFING) 02/01/2019 $53.55 $10,75 $20, 6 $0.00 $84.96 Bk[CKj r#]'EI S LOCA L 3(L YNN) 08/01/2019 $54.90 $10.75 $20.90 $0.00 $86.45 02/01/20 0 $55.54 $10.75 $20.80 $0.00 $87.09 09/01/20 0 $56.89 $10.75 $20.95 $0,00 $88.59 02/01/ 021 $57.53 $10.75 $20.95 $0.00 $8 .23 09/01/2021 $58.93 $10,+75 $21.11 $0.00 $90.79 02/01/2022 $59.52 $10.75 $21.11 $0.00 $91.38 Apprentice- MCKI LASTS CEME T AYA SON-Local 3 Lynn Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.46 $10.75 $20.66 $0.00 $5'7.87 2 60 $31.75 $10.75 $20.66 $0.00 $63,16 3 70 $37.04 $1 U5 $20.66 $0.00 $68.45 4 80 $42.33 $10.75 $20.66 $0.00 $73.74 5 90 $47.62 $10.75 $20.66 $0.00 $79.03 Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension unelnployrne�n( Total Rate 1 50 $2 .78 $10.75 l$M66 $0.00 $5 8■19 2 60 $3 .13 $10.75 $20.66 $0.00 $63.54 3 70 $37.49 $10.75 L$20.66 $0.00 $68.90 5 90 $48.20 $10.75 $20.66 $0.00 $79.61 Notes: y e a .- -' ---- -------- --....--. ................ ------ -------- ----.. ,, .. ,.........,.. ,,...,..t -.- ..--- --..--..- -.... ........... ........ ... ----- -...- ...- ----------- pprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 06/01/2018 $46.61 $11.00 $15,5 0 $0.00 $73.1 I 1 2I011201 8 $47.75 $l 1.00 $15.50 $0.00 $74. 5 06/01/ 019 $48.84 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $7 7.56 12/01/2020 $52.20 $11.00 $15.50 $0.00 $78,70 06/01/2021 $5 3.29 $11.00 $15.50 $0.00 $79.79 12/01/2021 $54.43 $11.00 $15.50 $0.00 $90.93 For apprentice rates see"Appwntive-OPERATING ENGFMEERS" Issue Date: 08/07/ 018 Wage Request Number: 20180807-059 Page 4 of42 classification E ffective Date Base image HealthPensionsupplemental Total Rate Unem icy rneat CAfSSON&UNDERPINNlNG BOTTOM MAN 06/01/2018 $39.10 $7.70 $15.40 $0.00 $62.20 06/01/2019 $41.05 $7.70 $15.40 $0.00 $04.15 12/01/2019 $42.05 $7.70 $15.40 $0.00 $65.15 06/01/2020 $43.04 $7.70 $15.40 $0.00 $66.14 12/01/2020 $44.02 $7.70 $15.40 $0.00 $67.12 06/01/2021 $45.04 $7.70 $15.40 $0.00 $ 8.14 12/01/20 1 $46.05 $7.70 $15.40 $0.00 $69.15 For apprentice rates see"Apprentice.-LABORER" CAISSON&UNDERPINNTNG LABORER 06/0112018 $3 7.95 $7.70 $15.40 $0.00 $61.05 12/01/2019 $3$.90 $7.70 $15.40 $0.00 $62.00 06/01/2019 $39.90 $7.70 $15.40 $0.00 $63.00 12/01/2019 $40.90 $7.70 $15.40 $0.00 $64.00 06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99 12/0112020 $42.87 $7.70 $15.40 $0.00 $65.97 06/01/2021 $43.99 $7.70 $15.40 $0.00 $66. 9 12/01/ 021 $44.90 $7.70 $15.40 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" CAISSON&UNDE' I1�l��yTI��I{G}TOP MAN 06/01/2018 $3'7,95 $7.70 $15.40 $0.00 $61.05 .++4B�liLr��'�f L!Lft ii�A 1 ILfN AN+--�AR NE YL.a 1 2101l20 1 8 $3 S.90 $7.70 $15.40 $0.00 $62.00 06/01/ 019 $39.90 $7.70 $15.40 $0.00 $63.00 12/01/2019 $40.90 $7.70 $15.40 $0.00 $64.00 06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99 12/01/2020 $42.87 $7.70 $15.40 $0.00 $65,97 06/0.1/2021 $43.89 $7,70 $15.40 $0.00 $66.99 1210 1120 1 $44.90 $7.70 $15.40 $0.00 $65.00 For apprentice Fates see"Apprentice-LABORER" CARBIDE CORE DRILL OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22 LABORERS-ZONE,2 12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06 0610 1/20 1 9 $35.21 $7.70 $14.02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68 t 2/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57 06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49 12/0112021 $3 .,6 9 $7.70 $14.02 $0.00 $61,40 For apprentice rates see"Apprentice-LABORER" CARPENTER 03/01/2018 $40.28 $9.90 $17.50 $0.00 $67.68 CARPENTERS-ZONE 2(Emlern Massachusetts) 091011201 8 $41.32 $9.90 $17.50 $0.00 $68.72 03/01/2019 $4 .35 $9.90 $17.50 $0.00 $69.75 Issue Date: 08/07/2018 Wage Request Number: 20180807-059 Page 5 of 42 � Classification Effective Date -Base Wage Health Pension Supplemental Total Rate Unexn Plo- ntent Apprentice- CARPENTER--Zane 2 Ea.vtem M4 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.14 $9.90 $1.73 $0.00 $31.77 60 $24.17 $9.90 $1.73 $0.00 $35.80 3 70 $28.20 $9.90 $12.31 $0.00 $50.41 4 7 $30.21 $9.90 $12,31 $0.00 $52.4 5 g0 $32.22 $9.90 $14.04 $0.00 $56.16 6 s0 $32.22 $9.90 $14.04 $0.00 $56.16 7 90 $36.25 $9.90 $15.77 $0.00 $61.9 9 90 $36.25 $9,90 $15.77 $0.00 $61.92 iltteetive Date- 09101/2018 -Supplemental Step percent ,Apprentice,Base Wage Health pension Unemployment Total Rate 1 50 $20.66 $9.90 $1.73 $0.00 $3 .29 2 60 $24.79 $9.90 $1.73 $0.00 $36.42 3 70 $29.92 $9.90 $12,31 $0.00 $51.13 4 75 $30,99 $9.90 $12.31 $0.00 $53.20 5 80 $33.06 $9.90 $14.04 $0.00 $57.00 6 so $33.06 $9.90 $14.04 $0.00 $57.00 7 90 $37.1 9 $9.90 $15.77 $0.00 $62,86 8 90 $37.19 $9.90 $15.77 $0.00 $62.86 �Notes.- %Indentured After 10/1/17;4 l45/55/55n0I7O/80/80 Step 1 2$2 .76/3&4$35,4515&6$52.1417&8$57.89 - n---- . ... _ :.-....-.. App1`entiee to Juu rneyworker Ratio:1:5 CARPENTER WOOD FRAME 04/01/2018 $ 6.67 $7.07 $7,86 $0.00 $41.60 CARPENTERS-ZONE 2(Wood Fraine) 107011201 9 $27.09 $7.07 $7.86 $0.00 $42.02 04/01/2019 $27-52 $7.07 $7.86 $0.00 $42.45 10/01/2019 $27.95 $7.07 $7.96 $0.00 $42.98 As of9/1M9 Carpentry work on wood-frame WEATBE R I ZATION priojeets shall be paid the WOOD FRAMF,CARPENTER rate. Issue Date: 08/07/2019 Wage Request umber: 20180907-059 Page 6 of 42 Classification Effective Date Base wage Health Pension Supplemental Total Rate Unemploment Appi-entice- CARPENTER(Woad Fi-ante)-Zone 2 Effective Date- 04/0 t/ 0 t 8 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.00 $7.07 $0.00 $0.00 $23.07 60 $t 6.00 $7.07 ,$0.00 $0.00 $23.07 3 65 $17.34 $7.07 $7.86 $0.00 $3 .27 4 70 $18.67 $7.07 $7.86 $0.00 $33.60 5 75 $20.00 $7.07 $7.86 $0.00 $34.93 6 80 $21.34 $7.07 $7.86 $0.00 $36,27 7 85 $22.67 $7.07 $7.86 $0.00 $3T60 8 90 $24.00 $7.07 $7.86 $0.00 $3 9.93 ffective)date- t 0/01/ 018 SLIpptelneltt-R1 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16. 5 $7.07 $0.00 $0.00 $23.32 2 60 $16. 5 $7.07 $0.00 $0.00 $23.32 3 65 $17.61 $7.07 $7.86 $0.00 $32.54 4 70 $18.96 $7.07 $7.86 $0.00 $33.8 5 75 $20,32 $7.07 $7.86 $0.00 $35.25 6 80 $21.67 $7.07 $7.86 $0.00 $3 .60 7 85 $23.03 $7.07 $7.86 $0.00 $37.96 8 90 $24.3 8 $7.07 $7.86 $0.00 L$39.31 'Notes: %Indentured After 1011/17a 45/45/5 5/5 5/7 0/70/80/80 Step1 2$19......... ..... ----- Y...... -_ ____-r ............ .......:-..... n...:... • __=r== m..... _.._-r .ti.. .---_- _ -__ ....... Apprentice to Journeyworker Ratio:1:5 CARPENTER WOOD FRAME(All Other Work) 06101f2016 $25.32 $9.80 $16.82 $0.00 $5 t.94 CARPENTERS-ZONE 2(Wood Frame) CEMENT MASONRY/PLASTERING 0710 t72018 $46.20 $12.42 $22.41 $0.30 $81.33 01101/2019 $47.58 $12.42 $22.41 $0.30 $82.71 07/01/2019 $48.32 $12.42 $22.41 $0.30 $83.45 01/01/2020 $49.72 $12.42 $22,41 $0.30 $84.85 YSsILe Date- 09/07/2018 Wage Request Number: 20180807-059 Page 7 of 42 Classification Effective late Base Wage Health peltslart Sltpplealwit#al Total date Unewplovment Apprentice- CEMENTAVSONRYIPL4STERING-Eastern Mass(Lynn) Effective Date- 07/01/2019 suppler wntal Step percent Apprentice Ease Wage Health pension Unemployment Total Date 1 50 $23.10 $12,42 $15.41 $0.00 $50.93 2 60 $27.72 $12_42 $17.41 $0.30 $57.85 3 65 $30.03 $12.42 $19.41 $0.30 $61.16 4 70 $32.34 $12.42 $19.41 $0.30 $64.47 5 75 $34.65 $12.42 $20.41 $0.30 $67.78 6 SO $36.96 $12.42 $21.41 $0.30 $71.09 7 90 $41.58 $12.42 $22.41 $0.30 $76.71 Effective Date, 01/01/2019 5rIpplemental Step percent Apprentice Base Wage Health pension I Tti emp I oyrne nt Total Rate 1 50 $23.79 $12.42 $15.41 $0.00 $51.62 2 60 $28.55 $12.42 $17.41 $0.30 $58.68 3 65 $30.93 $12.42 $18.41 $0.30 $62.06 4 70 $33.31 $12.42 $19.41 $0.30 $65.44 5 75 $35.69 $12.42 $20.41 $0.30 $68.92 6 80 $38.06 $12.42 $21.41 $0.30 $72.19 7 90 $4 .82 $12.42 $22.41 $030 $77.95 .... _.. ........... ----- ..z - .... , .......... . Notes Steps 3,4 are 500 hrs.All other steps are 1,000 hrs. ----------- Appi•entice to Journeyworker Ratio:1:3 CHArN SAW OPERATOR 06701/2019 $33.50 $7.70 $14.02 $0.00 $55+ 2 LABORERS-ZONE 2 12/01/2019 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $3 5.21 $7.70 $14.02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68 12/01/2020 4$37.85 `i.7.70 $14.02 l$0.00 4$59.57 06/01/2021 $3 8.77 $7.70 $14,02 $0.00 $60.49 12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40 For apprentice rates see"Apprentice,-LABOREW CLAM SHELLS/SLURRY BUCKETS[HEA DING MACHINES 12/01/2017 $47,63 $10.50 $15.50 $0.00 $73.63 OPERA TING ENGMEERS L0CAL 4 For apprentice rates see"Apprentice-OFERATIN0 ENGINEERS" COMPRESSOR OPERATOR 06/01/2019 $31.90 $11.00 $15.50 $0.00 $58.40 1270112018 $32.68 $11.00 $15.50 $0.00 $59.18 06/01/2019 $33.43 $11.00 $15.50 $0.00 $5 .93 12/01/2019 $34.22 $11.00 $15,50 $0.00 $60.72 06/01/2020 $34.97 $11.06 $15.50 $0.00 $61.47 12/01/2020 $35.75 $1 1.00 $15.50 $0.00 $62.25 06/01/2021 $36.50 $11.00 $15.50 $0.00 $63.00 12/01/2021 $37. 9 $11.00 $15.50 $0.00 $63.79 Issue Date: 08107/2018 Wage Request Number: 20180807-059 Page 8 of 42 Classification Effective Date Rase Wage Health Pension Supplemental 'Taal bate Unemployment For apprentice rates see"Apprentice-OPERA,ri'mG ENGINEERS" DELrEADER(BRIDGE) 07/01/201 S $50.01 $8.15 $20.15 $0.00 $78.31 01/01/2019 $50.36 W 15 $20.85 $0.00 $79.36 07/01/2019 $51.46 $8.15 $20.85 $0.00 $50.4 01/01/2020 $52.56 $8.15 $20.85 $0.00 $8 1.56 07/01/2020 $53.66 $8.15 $20.85 $0.00 $82.66 01/01/2021 $54.76 $9.15 $20.95 $0.00 $83.76 Apprentice- PATNTER Local 35 -BRIDGESITANKS Effective Date- 0710 1 120 1 8 supplemp'ntal Step percent Apprentice Base Wage Health Pension Unemployment (Total Rate 1 50 $25.01 $9,15 $0,00 $0,00 $33.1 2 55 $27,51 $8.15 $5.34 $0.00 $41.00 3 60 $30.01 $8,15 $5.92 $0.00 $43.98 4 65 $32.51 $8.15 $6.31 $0.00 $4 .97 5 70 $3 5.01 $8.15 $17,24 $0.00 $60.40 6 75 $37.51 $8.15 $17.73 $0,00 $63,39 7 90 $40.01 $8.15 $19.21 $0,00 $6 .37 8 90 $45.01 $8.15 $19.18 $0,00 $72.34 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Untrnploy:nent Total Rate 1 s0 $25.19 $8.15 $0.00 $0.00 $3 3.3 3 2 55 $27,70 $8.15 $5.64 $0.00 $41,49 3 60 $30.22 $8.15 $6.15 $0.00 $44.52 4 65 $32.73 $8,15 $6.66 $0,00 $47.54 5 70 $3 5.25 $8.15 $17.75 $0.00 $61.18 6 75 $37.77 $9,15 $18.29 $0,00 $64.21 7 80 $40.29 $8.15 $18.90 $0.00 $67,24 9 90 $45.32 $8.15 $19.83 $0,00 $73.30 'Notes: Steps are 750 hrs. 3 l Apprentice to Journey-wo rker Ratio:1:1 DEMO:ADZEMAI 06/01/2018 $3 8.15 $7.70 $15.20 $0.00 $6 l,05 12/0 t/2019 $39.10 $7.70 $t 5.20 $0.00 $62.00 06101/20 t 9 $40.10 $7.70 $15,20 $0.00 $63.00 12/01/20 t 9 $41.10 $7.70 $1;5,20 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DEMO:BAC HOE L OADEWHAM EFL OPERATOR 06701/20 I 8 $39.15 $7.70 $15.20 $0.00 $62.05 12/01/2018 $40.10 $7.70 $15.20 W00 $63.00 06/01/2019 $41.10 $7.70 $15.20 $0.00 $64,00 12/01/2019 $4110 $7.70 $15.20 $0.00 $65.00 For apprentice rates see"Apprcn ice-LABORER" Issue Date: 08/07/201 S Wage Regnest Number: 20180907-059 Page 9 of 42 lf i #ia�� Effective Date Base Wage Healt�� Pension Supplemental '�'�fat Rate L]nem pIoyrrtent DEMO:BURNERS 06101/ 018 $3 8.90 $7.70 $15.20 $0.00 $61.80 12/0112018 $39.85 $7.70 $15.20 $0.00 62.75 06/01/2019 $40.95 $7.70 $15.20 $0.0 $6175 1270 112019 $41.85 $7.70 $15.20 $0.00 $64.75 For apprentice ra#es see"Apprentice,-LABORER" DEMO:CONCRETE CUTTER/SABER 06701/2018 $39.15 $7.70 $15.20 $0.00 $62.05 LABORERS-ZONE-2 127017 018 $40.10 $7.70 $15.20 $0.00 $63.00 06/01/2019 $41.10 $7.70 $15.20 $0.00 $64.00 12/01/2019 $42.10 $7,70 $15.20 $0.00 $65.00 For apprentice rates see"Apprentice-LABORS,R" DEMO:JACKHAMMER OPERATOR 06101/2018 $3 8.90 $7.70 $15.20 $0.00 $61.80 12/01/2018 $3 9.85 $7.70 $15.20 $0.00 $62.75 06/01/2019 $40.85 $7.70 $15.20 $0.00 $63.75 12/01/2019 $41.85 $7.70 $15,20 $0.00 $64.75 ror apprctitice rates see"Apprentice--LABO ER" DEMO;WRECKING LABORER 06/01/2018 $38.15 $7.70 $15.20 $0.00 $ 1.05 LABORERS-ZONE 2 2701/2018 $3 9.10 $7.70 $15.20 $0.00 $62.00 06/01/2019 $40.10 $7.70 $15.20 $0.00 $63.00 12/01/2019 $41.10 $7.70 $15.20 $0.00 $64.00 For apprentice rates see"}Apprentice-LABO EW DIRECTIONAL DRILL MACFENE OPERATOR 06/01/2019 $46.61 $11.00 $15.50 $0,00 $73.11 OPERA TING ENGINEERS LOCAL 4 12/01/2019 $47.75 $11.00 $15.50 $0,00 $74.2 5 06/01/2019 $48.84 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49.98 $11.00 $15.50 $0.€10 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56 12/01/2020 $52.20 $11.00 $15.50 $0.00 $?&70 1 2f 0 1 1 202 1 $ T.1 3 $11.00 11.00 $15.50 0.00 $80. 3 For apprentice rates see"Apprentice-OPERArI WO ENGINEERS" DIVED 08/01/2018 $65.20 $9.90 $21.15 $0.00 $96.25 08701/201 9 $69.52 $9.90 $2 1.15 $0.00 $99.57 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.6 For apprentice rates sec"Apprentice-PI LE DRIVER" R" DIVER TENDER(EFFLUENT) 08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91 PILE D R I VE,R L 0 CAL 5 6(7,ONE 1) rr1 f{�[f��i1 If{■e y11 ,1���y} {�}f $21.15 f� f[ +[F 7/�f1. a�f���i.e 1J 1� �'��i!1 V'�4J� i.e�.i� $0.00 L�}i��.1 For apprentice rates see"Apprentice-FILE OR]VER"t DIVER/SLURRY(EFFLUENT)Li ENT) 08101! 01 8 $9 f.90 9,90 $21.15 $0.00 4 128.85 09/0112019 $10178 $9.90 $21,15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" DRAWBRIDGE OPERATOR(Construction) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 ELECTRICIANS LOCAL 103 09/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.5 3 $13.00 $17.93 $0.00 $83.46 For apprentice rates see 'Apprentice-ELF-Ur CIAN" Issue Date: 08/07/2018 Wage Request Number. 20180807-059 Page 10 of 42 �las��f ic�tio�t ��#'��1ive��t� Base ��� Health Pension Supplemental Total Rate U ttentpt2yntent .-------- ELECTF1C1A 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81..00 09/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17. 3 $0.00 $83.46 Apprentice- ELECTPJCIAN-Local 103 Effective Nato- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension liner pluymeffl Total Rate 1 40 $20.06 $13.00 $0.60 $0.00 $3 3.66 2 40 $20.06 $13.00 $0.60 $0.00 $3 3. 6 3 45 $22.57 $13.00 $13.61 $0.00 $49.18 4 45 $22.57 $13.00 $13.6 1 $0.00 $49.1 8 5 50 $25.08 $13.00 $13.99 $0.00 $52.07 55 $27.5 9 $13.00 $14.3 9 $0.00 $54.96 7 60 $30.09 $13,00 $14.76 $0.00 $57.8S S 65 $32.60 $13.00 $15.15 $0.00 $60.75 9 70 $35.11 $13.00 $15.53 $0.00 $63.64 10 +75 $37.61 $13.00 $15.93 $0.00 $66.54 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $20.54 $13.00 $0.62 $0.00 $34.16 2 40 $20.54 $13.00 $0.62 $0.00 $34.16 3 45 $23.10 $13.00 $13.62 $0.00 $49.72 4 45 $23.10 S 13.00 $1.3.62 $0.00 $49.72 5 50 $25.67 $13.00 $14.01 $0.00 $52.68 6 55 $28.24 $13.00 $14.40 $0.00 $55.64 7 60 $30.80 $13.00 $14-79 $0.00 $58.5 9 8 65 $33.37 $13.00 $15.1 7 $0.00 $6 1.54 9 70 $3 5.94 $13.00 $15.56 $0.00 $64.50 10 75 $3 5.51 $13.00 $15.96 $0.00 $6 7.47 Notes: App Prior 11V03-30/35/40/45/50/55/65/70/75/80 � Apprentice to Jonrue vorke r Ratio;2:3*** ELEVATOR CONSTRUCTOR 01/01/ 019 $57. 2 $15.43 $16.61 $0.00 $89.66 01701/2019 $59.47 $15.58 $17.5 i $0.00 $92.56 01/01/2020 $61.42 $15.73 $18.41 $0.00 $95.56 01/01/2021 $63.47 $15.88 $19.31 $0.00 $99.66 01/01/2022 $65.62 $16.03 $20.21 $0.00 $101.86 Issue Date:...08/07/2019 Wage Request Number: 20180807-059 Page 11 of 42 Classifeation Effective Date Base Wage Health Pension Supplemental Total mate Uizem plovnient Apprentice- ELEVATOR CO TR UCTOP-Local Effective Date-- 01/01/201 S Supplemental Step pet-cent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $28.81 $15.43 $0.00 $0.00 $44.24 2 55 $31.69 $15.43 $16.61 $0.00 $63.73 3 65 $37.45 $15.43 $16,61 $0.00 $69.49 4 70 $40.33 $15.43 $16.61 $0.00 $72.37 :5 80 $4 .10 $15.43 $16.61 $0.00 $79.14 Effective Date_ 01I0112019 supplcmental Step Percent Apprentice Base Wage -Health Pension Unemployment Total Rate 1 50 $29.74 $15.59 $0.00 $0.00 $45.32 2 55 $32.71 $15.58 $17.51 $0.00 $65.80 3 65 $35.66 $15.58 $17.51 $0.00 $71.75 4 70 $41.63 $15.58 $17.51 $0.00 $74.72 5 80 $47.58 $15.58 $17.51 $0.00 $80.67 Notes: t p 1- •e teas.;St �s 3--5 are X year Lk€ F Apprentice to.bourn eyworker Ratio F1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2019 $40.33 $15.43 $16. 1 $0.00 $72.37 017011201 9 $41.63 $15.58 $17.51 $0.00 $74.72 01/01/2020 $42.99 L$15.73 $18.41 $0.00 $77.[3 01/01/2021 $44.43 $15.58 $19.31 $0,00 $79.62 01/01/2022 $45.93 $16.03 $20.21 $0.00 $82.I7 For apprentice rates see"Apprentice-ELEVA'm CONSTRucrOR" FENCE&GUARD RAIL ERECTOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22 12/01/201 S $34.34 $7.70 $14,02 $0.00 $56.0 06/01/2019 $35.21 $7.70 $14,02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $3 .96 $7.70 $14,02 $0.00 $58.68 12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57 06701/2021 $3 9.77 $7.70 $14.02 $0.00 $60.49 12/01/2021 $39. 8 $7.70 $14.02 $0.00 $61.40 For appr-mice rates see"Apprentice-LABORER" FIELD E {-r.INST.PERSON-BLD ,SITErHVY[ffWY 05#01/2018 $4 .84 $10.50 $15.50 $0.00 $68.84 Op EFU TING ENGINEER S L0CAL 4 For apprentice rates see"Apprentice-OPERATINd ENGINEERS F" FIELD ENVY.PARTY CHIEF--BLDG, 1TE,HVY/H_WY 05/01/2019 $44.31 $10.5 0 $15.50 $0.00 $70,31 OPERATING ENGINEER'LOCAL 4 For apprentieo rates see"Apprentice-OPERATING ENGINEERS" FIELD ENCIROD PERSON-BLD ,S1TE}HVYIHWY 05/01/2019 $22.51 $10.50 $15,50 $0.00 $48.51 OPERA TING EIVGI EE,R S L OCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" Issue Date: 09/07/201 S Wage Request Number: 201 SOS07-059 Page 12 of 42 Classification L4 ffeetive Date Base Wage Health Pension Supplemental Total Rate Unemployment FIRE ALARM INSTAL LER 03/01/ 018 $50.15 $13.00 $17.85 $0.00 $81.00 09/01I 018 $51.34 $13.00 $1 f7.89 $0.00 $82. 3 03/01/ 019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN' FIRE ALARM REPAIR MMNTENANCE 0370 1/20 1 8 $3 7.61 $13.00 $15 t93 $0.00 $66.54 l C OAS SIO1 NG ELECT1 ICIA 5 09701/2019 $3 8.51 $13.00 $15.96 $0.00 $6 7.47 LOCAL 103 03/01/2019 $39.40 $13.00 $15.98 $0.00 $69.39 For apprentice rates see"Apprentice-TEL'ECONMUNICA.TION S TECFIr CIAN" FIREMAN(A SST.ENGINEER) 06/01/2018 $3 .83 $11.00 $15.50 $0.00 $65.33 1 2I01/201 8 $39.78 $11,00 $15.50 $0.00 $66.28 06I0 112019 $40.69 $11.00 $15.50 $0.00 $6 7.19 12/01/2019 $41.64 $11.00 $15.50 $0.00 $68.14 06/01/2020 $42.55 $11.00 $15.50 $0.00 $69.05 12/01/2020 $43.50 $11.00 $15.50 $0.00 V0.00 06/01/2021 $44.41 $11.00 $15.50 $0.00 $70. 1 12/0112021 $45.36 $11.00 $15.50 $0.00 $71.86 For apprentice rates see"Apprentice-OPERATrNG ENGINEERS" FL,AGGER&SIGNALER 06/01/ 018 $21.50 $7.70 $14.02 $0.00 $43.2 12/01/2018 $22.50 $7.70 $14.02 $0.00 $44.2 06/01/2019 $22.50 $7.70 $14.02 $0.00 $44.22 12/01 f 2019 $23.50 $7.70 $14.02 $0.00 $45.22 06/01/2020 $ 3.50 $7.70 $14.02 $0.00 $45.22 12701/ 020 $24.50 $7.70 $14,02 $0.00 $46.22 06101/2021 $24.50 $7.70 $14.02 $0.00 $46.22 12/01/ 021 $24.50 $7.70 $14.02 $0.00 L$46.22 For appreiiiice rates see"Apprentice-LAI OPC EIV FL OOR OVERER 03/01/2016 $4 .13 $9.80 $17.62 $0.00 $69.5 5 Apprentice- FL OO COVER R-Local 2168 Zone I Effective Date-- 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Ununpinyment Total Rate 1 50 $21.07 $9.90 $1.79 $0.00 $3 .66 2 55 $ 3.1'7' $9.90 $1.79 $0.00 $34.76 3 60 $25.29 $9.80 $12.25 $0.00 $47,33 4 65 $27.38 $9.90 $12.25 $0.00 $49.43 5 70 $29.49 $9.80 $14.04 $0.00 $53.33 6 75 $31.60 $9.90 $14.04 $0.00 $55.44 7 90 $33.70 $9.80 $15.83 $0.00 $59.33 8 85 $3 5.81 $9.80 $15.83 $0.00 $61.44 Notes; Steps are 750 ors, %After 09/1717;45145/55/55nO/70/90/80(1500hr Steps) Step 1&2$30.55/3&4$3 .497 5&6$53.33/7&8$5 .33 _ - .- - _ Apprentice to Journeyworker Ratio:1:1 Issue mate: 08/07/2018 Wage Request Number; 20180807-059 Page 13 of 42 Classification Effective Date Rase Wage Health Pension Supplemental Total date Unemployment FORD LIFT/CHERRY PICKER 06101/2018 $47.08 $11.00 $15.50 $0.00 $73.58 1 2/0 1/20 1 9 $48.23 $11.00 $15.50 $0.00 $74.73 06/01I2019 $49.33 $11.00 $15.50 $0.00 $75.83 12/01/ 019 $50.48 $11.00 $15.50 $0.00 $76.98 06/01/2020 $51.58 $11.00 $15.50 $0.00 $78.08 12101I2020 $52.73 $11.00 $15.50 $0.00 $79.23 06/01I2021 $53.83 $11.()o $15.50 $0.00 $80.33 12/01120 1 $54.98 $11.00 $15.50 $0.00 $81.48 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OENERATOI IGHTING PLA Tff-rEATER 06/0 1120 1 8 $31.90 $11.00 $15.50 $0.00 $5 8.40 1 2I01120 1 8 $3 2.68 $11.00 $15.50 $0.00 $5 9.1<8 06/01/2019 $33.43 $11.00 $15.50 $0.00 $59.93 12/01/2019 $3 4. 2 $11.00 $15.50 $0.00 S%72 06/01/2020 $3 4.97 $11.00 $15.50 $0.00 $61.47 12/01/2020 $35.75 $11.00 $15.50 $0.00 $62. 5 06/01/2021 $36.50 $11.00 $15,50 $0.00 $63.00 12I01/2021 $37.29 $11.00 $15.50 $0.00 $63.79 For apprfm ice rates see"Apprentice-OPERA'rmi ENGFNEERS" GLAZIER(GLASS PLANK/AIR BARRIER/TNTERIOR 07/01/2018 $3 9.51 $8,15 $20.15 $0.00 $67.81 SYSTEMS) 01/01/2019 $39.86 $8.15 $20.85 $0.00 $68.86 GLAZIERS 1.,0CAL 35(ZONE 2) 0710 1/20 1 9 $40.96 $8.15 $20.85 $0.00 $69.96 01/01/2020 $42.06 $8.15 $20.85 $0.00 $71.06 07/01/2020 $43.16 $8.15 $20.85 $0.00 $72.16 01/01/2021 $44.26 $8.15 $20.85 $0.00 $73.26 Issuea Date: 08/07/2019 Wage Request Number: 20190807-059 Page 14 of 42 Supplemental Total Rate Pension t I 3 l l UixeniploYinertt Apprentice- GLAZIER-Local 35 Zone Effective Date- 07/01/20 i 9 Siipplemenlal Step percent Apprentice Base Wage Health Pension Unemployment Total Tate 1 50 $19.76 $9.15 $0.00 $0.00 $27.91 2 5 $21.23 $8.15 $5.34 $0.00 $35.22 3 60 $23.71 $8.15 $5.82 $0.00 $37.68 4 65 $25. 8 $8.15 $6.31 $0.00 $40.14 5 70 $27.66 $8.15 $17.24 $0.00 $53.05 6 75 $29.63 $8.15 317.73 $0.00 $55.51 7 80 $31.61 $8.15 $18. 1 $0.00 $57.97 8 90 $3 5.56 $8.15 $19.18 $0.00 $62.8 9 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.93 $8.15 $0.00 $0.00 $28.08 2 55 $21.92 $8.15 $ .64 $0.00 $3:5.71 3 60 $23.92 $8.15 $6.15 $0.00 $38.22 4 65 $25.91 $8.15 $6.66 $0.00 $40.22 :5 70 $27.90 $9.15 $17.78 $0.00 $53.83 6 75 $29.90 $8.15 $18.29 $0.00 $56.34 7 80 $31.99 $9.15 $18.80 $0.00 $58.84 8 9€1 $35.87 $8.15 $19.83 $0.00 $63.85 �Nates: Steps are 750 hrs. . - -- ........ .............. r........... Appreu tiee to Journeyworker Ratio:1:I HOISTING EN01NEER/CRANES1G ADALL 06/01/2018 $47,08 $11.00 $1 S.50 $0.00 $73.58 12/01I2018 $48.23 $11.00 $15.50 $0.00 $74.73 06/0112019 $49.3 3 $11.00 $15.5 0 $0.00 $75.83 12/01/2019 $50.48 $11.00 $15.5 0 $0.00 $76.98 0610 1/2020 $51. 8 $11.00 $15.50 $0.00 $78.08 12101/2020 $52.73 $1 1.00 $15.50 $0.00 $79.23 06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.3 3 12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.48 issue Date: 08/07/2018 Wage Refine-sI Number: 20180907--059 Page 15 of 42 Classification Effective late Base Wage Health Pensi011 supp]erklelitaI Total Date 1Jminployntent Apprentice- OPER,4 TING ENG.TNEERS-Local 4 Effective Date- 06/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemploymcnt Total Rate 1 55 $25,89 $11.00 $0.00 $0.00 $36.89 2 60 $28.25 $11.00 $15.50 $0.00 $54.75 3 65 $30.60 $11.00 $15.50 $0.00 $57.10 4 70 $32.96 $11�00 $15.50 $0.00 $59.4 5 75 $35.31 $11.00 $15.50 $0.00 $61.81 6 80 $37.66 $11.00 $15.50 $0.00 $64.16 7 85 $40.02 $11.00 $i 5.50 $0.00 $66.52 8 90 $42.37 $11.00 $15.50 $0.00 $68.87 Effective Date- 12/01/2018 S«ppleMeRtRl Stop percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $26.53 $11.00 $0.00 $0.00 $37.5 3 2 60 $28.94 $11.00 $15.50 $0.00 $55.44 3 65 $31.3 5 $11.00 $15.50 $0.00 $57.8 5 4 70 $33.76 $11.00 $15.50 $0.00 $ 0.26 5 75 $36.17 $11.00 $15.50 $0.00 $62,67 6 80 $38.58 $11.00 $15.50 $0.00 $65.08 7 85 $41,00 $11.00 $15.50 $0.00 $67.50 8 90 $43.41 $11.00 $15.50 $0.00 $69.91 motes: Apprentice to Journeyworker Ratio:1:6 H A (DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $ .41 $92,84 SHEL'T ETAL�r0R ERS L0CA 1,17-A For apprentice rates ser,"Apprentice-SHEET ME,TAL WORKER" HVAC(ELECTRICAL CONTROLS) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $91.00 9/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23 0310 1/20 1 9 $52.53 $13.00 $17,93 $0.00 $83.46 Vor apprentice rates sec"Apprentice-ELECTRICIAN" RVAC(TESTING AND BALANCING-AIR) 02/01/ 018 $44.11 $1 .20 $24.12 $2.41 $82.84 SHEET F,TAL WORXERS L0CAL 17-A For appv,,nticc rates sec"Apprentice-SHEET METAL WORKE , UVAC(TESTING AND BALANCING-WATER) 09/01/ 017 $47.11 $9.95 $18.74 $0.00 $75.80 09/01/ 018 $48.61 $9.95 $1&74 $0.00 $77.30 09/01/2019 $5U 1 $9.95 $19.74 $0.00 $78.80 09/01/2020 $51.61 $9.95 $18.74 $0.00 $80.30 For apprentice rates see"Apprentice-PIPFFITTER"or"Ft1LTN0EwP1PEFITTFR" HVAC MECHANIC 09/01/2017 $47.1 1 $9.95 $18.74 $0.00 $75.80 0910 1/20 1 9 $50.11 $9.95 $18.74 $0.00 $78.80 09/01/2020 $51.61 $9.95 $18.74 $0.00 $8030 Issue Date: 08/07/2018 Wage Request Number: 20180807-059 Page 16 of 42 classification �ffective Date Base Wage f�ealtla Pension Unemployment T�#�Y Rate Urtemptoyment For apprentice rates see"Apprentice-PIPEFITTER"or i'PLUNMEWPI PEI�ITTER" HYDRAULIC TLI DRILLS 06/01/ 019 $34.00 $7.70 $14.02 $0.00 $55.7 12/01/2019 $34.84 $7.70 $14.02 $0.00 $5 .56 06/01/2019 $35.71 $7.70 $14.02 $0.00 $57.43 12/01/2019 $36.57 $7.70 $14,02 $0.00 $58,29 WO1/2020 $37.46 $7.70 $14.02 $0.00 $59.19 12/01/20 0 $3 8,3 5 $7.70 $14.02 $0.00 $60.07 06/01/2021 $3 .27 $7.70 $14.02 $0.00 $ 0.99 12/01/2021 $40.19 $7.70 $14.02 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER," INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04 091011201 8 $49.3 4 $11.75 $14.20 $0.00 $75.29 09/01/2019 $51.84 $11.75 $14.20 $0,00 $77.79 App-rentice, ASBESTOS INSULATOR(Pipes& Tanks)-Local 6 Boston Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension uner"ployment Total Rate 1 50 $23.55 $11.75 $10.45 $0.00 $45.75 60 $28.25 $11.75 $11. 0 $0.00 $51.20 3 70 $32.96 $11.75 $11.95 $0.00 $56.66 4 80 $37.67 $11.75 $12.70 $0.00 $62.12 Effective Date- 09/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.67 $11.75 $10,45 $0.00 $46.8 7 2 60 $ 9.60 $11.75 $11.20 $0.00 $52.55 3 70 $34.54 $11.75 $11.95 $0.00 $58.24 4 80 $3 9.47 $11.75 $12.70 $0.00 $63.92 'Notes: Steps are 1 year a a y ..�.,..i ......._._.... .... ,............ . ................� -......... _... ......._...__ .._:...-... �........... .........._.> e....:.....x ............. .............. �-----....--- ..._--...., ........... .......... ............ .:-.'........ ..............i ...............i ............ �_............. .............. .... Apprentice to Journey-worker patio:1:4 IRONWORKER/WELDER 03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.59 IR OM PDR-KE,RS LOCAL I(LA IVRENCE ARC) Issue Date: 08/07/2018 Wage Request Number: 20190807-059 Page 17 of 42 C1asslfieatioli Effective Date Base Wage Health PelIS1011 Supplemejital Total Rate Unemplayinemt Apprentice- -I O.WORKEI?-Local 7 Lawrence Effective.Date- 03/16/2017 Stippiemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.14 $7.80 $20.85 $0.00 $52.79 2 70 $ 8.17 $7.80 $ 0.95 $0.00 $56,92 3 75 $30.18 $T80 $20.85 $0.00 $58.83 4 80 $32.19 $7.90 $20.85 $0.00 $60.84 5 85 $34. 0 $7.90 $20.85 $0.00 $62.85 6 90 $36.22 $7.80 $20.85 $0.00 $64.87 .,...,..r .-..:_.. ....... .........- S _•..-.---< t.,-......-. .-. - .:.- ...... .: ............ •�-- -.-...1 •-.-.�....J .............� ..... -... ..........c .- --,----------- -........ ...... --..-- ......... -.----.-.� . .:.. ........ Dotes: Structural 1:6;Ornamental 1:4 __-- . -_ Apprentice to►Iuurneyworker Ratio: JACKHAMMER&PANG BREAKER OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55. 2 LABORERS Ri] ZONE 12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $35.21 $7.70 $14.02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $5 8.68 12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57 06/01/2021 $3 8.77 $7.70 $14.02 $0,00 $60.49 1 /01/2021 $39,68 $7.70 $14.02 $0.00 $61.40 For apprentice rates sco"Apprentice-LABORER" I.A-BORER 06/0 I/2018 $3 3.25 $7.70 $14.02 $0.00 $54.97 LABORERS-ZONE 2 12/01/ 018 $34.09 $7.70 $14.02 $0.00 $55.81 06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68 12/01/2019 $35.82 $7.70 $14.02 $6.00 $57.54 06/01/2020 $36.71 $7.70 $14.02 $0.00 $58.43 12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32 06/01/2021 $38.52 $7.70 $14.02 $0.00 $60. 4 12/01/2021 $39,43 $7.70 $14.02 $0.00 $61.15 Issue Date: 09107/2018 Wage Request Number. 20180807-059 Rage 18 of 42 Classification Efi'ectlye Date Base Wage Health pension Supplemental Total Rate Unerrtvloyment Apprentice-- LABORER-Zone 2 Effective Date- 06/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Uliernploy€Iml Total Rate 1 60 $19.95 $7.70 $14.02 $0.00 $41.67 2 70 $23.28 $2.70 $14.02 $0.00 $45.00 3 80 $26.60 $7.70 $14.02 $0.00 $48.32 4 90 $29.93 $7.70 $14.02 $0.00 $51.65 Effective Date-- 12/01/2018 Supplemental Step percent. Apprentice Base Wag Health Pension Unemployment Total Rate 1 60 $20.45 $7.70 $14.02 $0.00 $42.17 2 70 $23.86 $7.70 $14.02 $0.00 $45.58 3 80 $27.27 $7.70 $14.02 $0,00 $48.99 4 90 $30. 8 $7.70 $14.02 $0.00 $52.40 Notes: � s Apprentice to Journey-svorker Ratio:1:5 LABORER:CARPENTER TENDER 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97 LABORERS-ZONE 2 1210 t 7201 8 $34.09 $7.70 $14.02 $0.00 $55.8 1 06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68 12/0112019 $35.82 $7.70 $14.02 $0,00 $57.54 06/01/2020 $3 6_'71 $7.70 $14.02 $0.00 $5 8.43 12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32 06/01/2021 $3 9.52 $7.70 $14.02 $0.00 $60.24 1210172021 $39.43 $7.70 $14.02 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:CEMENT FINISI-IER TENDER. 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97 12/01/2018 $34.09 $7.70 $14,02 $0.00 $55.,81 06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68 1270112019 $3 5.82 $7.70 $14.02 $0.00 $5'7.54 06/01/2020 $36.71 $7.70 $14.02 $0.00 $58.43 12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32 06/01/2021 $3 8.5 2 $7.70 $14.02 $0.00 $60.24 12/01/2021 $39.43 $7.70 $14.02 $0.00 $61,15 For apprentice rates see"Apprentice-LABORER" LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 06/0172018 $33.45 $7.70 $13.97 $0.00 $55.12 12/01/20.18 $34.29 $7.70 $13.97 $0.00 $55.96 06/01/2019 $35,16 $7.70 $13.97 $0.00 $56.83 12/01/2019 $36.02 $7.70 $13.97 $0.00 $57.69 For apprentice rates see"Apprentice-LABORER" ER" Issue mate:---08/0 7/2018 Wage Request Number: 20180807-059 Page 19 of 42 Classification Effective Date Base 'age Health Pension Supplemental Total Rate Vnern Ala meyt LABORER:MASON TEN-DER 06/01/2018 ' 3.50 $7.70 $14.02 0LABORERS-ZONE 2 2/01/2018 $34.34 $7.70 $14.02 $0.00 $56.0 06/0112019 $3 5.21 $7.70 $14.02 $0.00 $5 6.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $3 6.96 $7.70 $14.02 $0.00 $5 8.65 1 /01/2020 $37.85 $7.70 $14,02 $0.00 $59.57 06/01/2021 $38.77 $7.70 $14,02 $0.00 $60.49 12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" LABORER:MULTI-TRADE TEN-DER 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97 12/0112018 $34.09 $7.70 $14.02 $0.00 $55.81 06701/ 019 $34.96 $7.70 $14.02 $0,00 $56.68 12/01/2019 $35,82 $7.70 $14.02 $0,00 $57.54 06/01/2020 $36.71 $7.70 $14.02 $0,00 $58.43 1 /01/2020 $37.60 $7.70 $14.02 $0.00 $59.32 06/0 1 7202 1 $38.52 $7,70 $14.02 $0.00 $60.24 12/01/2021 $39.43 $7.70 $14.02 $0.00 $61.15 For apprentice rates see"Apprentice-LAaC)RER" LABORER:TREE REMOVER 06/01/2018 $3 3,25 $7.70 $14.02 $0.00 $54.97 1270172018 $34,09 $7.70 $14.02 $0.00 $55.81 06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68 12/01/2019 $3 5.82 $7.70 $14.02 $0.00 $57.54 06/01/ 020 $36.71 $7.70 $14.02 $0.00 $58.43 12/01/ 020 $37. 0 730 $14.02 $0.00 $59.32 06701I021 $38,52 $7.70 $14.02 $0.00 $60.24 12/01I2021 $39.43 $7.70 $14.02 $0.00 $61.15 This classification applies to all tree work associated witl3 the removal of standing trees,and trimining and removal of branches and 1�nbs wh-an the work is[gat done for a utility company for the purpose of operation,rnaintenance or repair of utility company equipment.For apprentice rags see"Apprentice-LABOREW LASER BEAM OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.2 2/01/ 018 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $3 5.21 $7.70 $14.02 $0.00 $5 .93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/20 0 $36.96 $7.70 $14.02 $0.00 $58,68 12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57 06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49 12101/2021 $39.68 $7.70 $14.02 $0.00 $6 1.40 For apprentice rates see"Apprentice-LABORER" MARBLE&TILE FINISHERS 09/01/2018 $40.40 $10.75 $18.97 $0.00 $70.12 08/01/2019 $41.99 $10.75 $19.11 $0.00 $71.85 02/01/2020 $4 .50 $10.75 $19.11 $0.00 $72.36 08/01/2020 $43.58 $10.75 $19. 6 $0.00 $73.59 02/01/2021 $44.09 $10.75 $19. 6 $0.00 $74.10 08/01/2021 $45.21 $10.75 $19.42 $0.00 $75.3 8 02/01/2022 $45.69 $10.75 $19.42 $0.00 $75.85 Issue Date: 09/07/ 018 Wage Request Number: 20180907-059 page 20 of 42 Cla'sslfication Effective Date Base Wage Health Pensioa Supplemental Total Rate Uneutploviiient Apprentice- AI47B. E& TILE F IN1,'1IE'R-Local 3 Marble&Tile Effective Date- 0$I01/2018 Suppleisiental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.20 $10.75 $18.97 $0.00 $49.92 2 60 $24.24 $10.75 $18.97 $0,00 $53.96 3 70 $28.28 $10.75 $18.97 $0.00 $58.00 4 80 $32.32 $10.75 $18.97 $0.00 $62.04 5 90 $36.36 $10.75 $18.97 $0.00 $66.08 Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $10.75 $18.97 $0.00 $50.18 2 60 $24.55 $10.75 $18.92 $0.00 $54.27 3 70 $29.64 $10.75 $18.97 $0.00 $5 8.36 4 80 $32.73 $10.75 $18.97 $0.00 $62.45 5 90 $36.82 $10.75 $18.97 $0.00 $66.54 Notes Apprentice to jo urn ey-svorker Ratio:l:3 MARBLE MASONS JILELAYERS&TERRAZZO MECH 08/01/2018 $52.95 $10.75 $20.66 $0.00 $84.36 02I0 l 1201 9 $5 3.57 $10.75 $20.66 $0.00 $84.98 08/01/2019 $54.92 $10.75 $20.80 $0.00 $96.47 02/01/2020 $55.55 $10.75 $20.80 $0.00 $8 7.10 09/01/2020 $56.90 $10.75 $20.95 $0.00 $98.60 02/01/2021 $57.54 $10.25 $M95 $0.00 $89.24 08/01/2021 $58.94 $10,75 $21.11 $0.00 $90.80 02101/2022 $59.51 $10.75 $21.11 $0.00 $9 i.37 --- _..._ ------­...______...._____­----------­­------ --------------- -------- ............. ----------- -------- Issue Date; 08/07/2018 Wage Request Dumber: 20190807-059 Page 21 of 42 Classification Effective Date Base Wage Health Pension Supplemental Total date Unemployment Apprentice- AfA RBLE,-TILE-TERR,4ZZO 1ECHANIC-Local 3 Marble& Tile Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployinent Total Rite 1 50 $26.48 $10.75 $20.66 $0.00 $57.89 2 60 $31.77 $10.75 $20.66 $0.00 $63.18 3 70 $37.07 $10.75 $20.66 $0.00 $68.48 4 80 $42.36 $10.75 $20.66 $0.00 $73.77 5 90 $47.66 $10.75 $20.66 $0.00 $79.0 7 Effective Date- 02/01/2019 ;Sapplemen#al Step percent Apprentice Base Wage Health Pension Unemploymcnt Total Rate 1 50 $26.79 $10.75 $20.66 $0.00 $58.20 2 60 $32.14 $10.75 $20.66 $0.00 $63.5 5 3 70 $37.50 $10,75 $20.66 $0.00 $68.91 4 90 $42.96 $10.75 $20.66 $0.00 $74.27 5 90 $48.21 $10.75 $20.66 $0.00 $79. 2 Notes: Apprentice to Journeyworker Ratio:1:5 MECH.SWEEPER OPERATOR(ON CONS '. SITES) 06/01/2019 $46. 1 $11.00 $15.50 $0.00 $73.11 12/011201 9 $47.75 $11.00 $15.50 $0.00 $74.25 06/01/2019 $4 . 4 $11.00 $15.50 $0.00 V-5_34 12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.49 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56 12/01/2020 $52.20 $11.00 $1.5.50 S0.00 $79.70 06/01/2021 $53. 9 $11.00 $15.50 $0.00 $7 .'79 12/01/2021 $54.43 $11.00 $15.50 $0.00 $80.93 For apprentice rates see"Apprentice-OPERATING ENGT EERS" MECHAN1 S MAINTENANCE 06/0 t/201 S $46.61 $11.00 $15.50 $0.00 $73.11 OPERATING TING ENGINEERS LOCAL 4 12101/201 S $47.75 $11.00 $15.50 $0.00 $74.25 06/01/2019 $49.84 $11.00 $15,50 $0.00 $75.34 12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.49 V 6l 0 1 l 2 0 2 Y $5 1 Y LJ 6 $11.00 11.0Lf $15.50 $0.00 $! 1.5 6 06/01/20 1 $53.29 $11.00 $15.50 $0.00 $/9.79 1 2/ 1/202 1 5 1.43 $11.00 $15.50 $0.00 80.93 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MILLWRIGHT(Zone 2) 04/01/2018 $37.17 $9.90 $18.50 $0.00 $65.57 10/01/2019 $3 8.02 $9.90 $18. 0 $0.00 $66.42 04/01/2019 $3 8.87 $9.90 $19. 0 $0.00 $67.2 7 Issue Date: 08/07/ 019 Wage Request Number: 20180807-059 Rage 22 of 42 Classification Effective Hate base Wage Health Pension Supplemental Total Rate Uneinplovnient Apprentice- LL HT-Local I J21 Zone Mfeetiye Date- 04/01/2018 Supplome€(ai Step percent Apprentice Base Wage Health Pension Unernpioyrnent Total Rate 1. 55 $ 0.44 $9.90 $5.31 $0.00 $35.65 2 65 $24.16 $9.90 $15.13 $0.00 $49.19 3 75 $2 7,98 $9,90 $16.10 $0.00 $53.88 4 85 $31.59 $9.90 $17.06 $0.00 $5 8.55 Notes: 3 Steps are 2,00 :.::_. ....------ -- ---------- 0...........-hours ........ -- - -,.-, - ... --, ..... ............ . - ..: ._ _:..: - . w. Apprentice to journey-syprker Ratio:1;5 MORTAR MIXER 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22 12/01/2018 $34.34 $7.70 $t 4.02 $0.00 $5 .06 06/01/2019 $35. 1 $7.70 $14,02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0,00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.69 12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57 06101/20 1 $3 8.77 $7.70 $14.02 $0.00 $60.49 12/01120 1 $39.68 $7.70 $14.02 $0.00 $61.40 FQr apprentice rates sec"Apprentice-1,ASORER" OILER(OTT-TER THAN TRUCK CRANES,GRADALL ) 06/0112018 $23.14 $11.00 $15.50 $0.00 $49.64 01'J4'RA JfNG ENGINEERS LOCAL 4 1 2/011201 9 $23.7 1 $11.00 $15.50 $0.00 $50.2 1 06/0112019 $24.26 $11.00 $15.50 $a.00 $50.76 12/01/2019 $24.83 $11.00 $15.50 $0.00 $51.33 06101/2020 $25.3 9 $11.00 $15.50 $0.00 $51.S8 12/01/2020 $25.95 $11.00 $15.50 $0,00 $52.45 0610 1/202 1 $26.50 $11.00 $15.50 $0,00 $53.00 1 /01/2021 $27.08 $t 1.00 $15.50 $0.00 $53.5 S P-or apprentice rates see"Appwntice-OPERATING ENGINEERS" --- OILER i!(TR�L�rC1 r]TCRAT yES, RADALL ) 06/01/2018 $27.40 $11.00 $15.50 $0.00 $53.90 OPERA TING JJryl 1 VI1 IAJ..�4�S L VA if F 12/01/2018 $28.07 $11.00 $15.50 $0.00 $54.57 06/01/2019 $28.72 $11.00 $15.50 $0.00 $55.22 12/01/2019 $29.39 $11.00 $15.50 $0.00 $55.89 06101/2020 $30.04 $11.00 $15.50 $0.00 $56.54 12101/20 0 $30.72 $11.00 $15.50 $0.00 $57.22 06/01/2021 $31.36 $11.00 $15.50 $►0.00 $57.86 12101/2021 $32.04 $11.00 $15.50 $0.00 $5 8.54 For apprentice rates see"Apprentice-OPERATING ENGfNEFR " Issue Date: - 08/07/201 S Wage Request Number. 20180807-059 gage 23 of 42 Classification Effective!Rate Base Wage Health pellsioll Supplemental Total Rate 1 neni lo me"t OTHER POWER DRIVEN EQUIPMENT-CLASS T1 0 /01/2019 $46.61 $i 1.00 $15.50 $0.00 $73.11 12/01/2,019 $47.75 $11,00 $15.50 $0.00 $74.25 O IO 112019 $48.84 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49,99 $11.00 $15.50 $0.00 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56 12/01/2020 $52.20 $11.00 $15.50 $0.00 $78.70 06/01120 1 $53.29 $1L00 $15.50 $0.00 $79.79 12701/2021 $54.43 $11.00 $15.50 $0,00 $80.93 1;or apprentice rates see"Apprentice-OPERATING ENGMEERS" PAINTER(BRIDGES/TANKS) 01/01/2018 $50,01 $8.15 $20.15 $0.00 $78.31 01101/2019 $50.36 $9.15 $20.85 $0.00 $79.3 07/01/2019 $51.46 $8,15 $20.85 $0.00 $80.4 01/01/2020 $52.56 $5.15 $20.85 $0.00 $81.56 07/01/2020 $53.66 $8.15 $20.85 $0.00 $8 .6 01/01/2021 $54.76 $8.15 $20.85 $0.00 $83.+76 Apprentice^ PAINTER Local 35 -BRIDGESITANKS Effeetivc Date-- 07/0172018 supplumuntal Step percent Apprentice Base Wage health pension Uneinployment Total Rate 1 50 $25.01 $8.15 $0.00 $0.00 $33.16 2 55 $2 7.5 i $8.15 $5.34 $0.00 $41.00 3 60 $30.01 $8.15 $5.82 $0.00 $43.98 4 65 $32.51 $8.15 $6.31 $0.00 $46.97 5 70 $35.01 $8.15 $17.24 $0.00 $60.40 6 75 $37.51 $8.15 $17.73 $0.00 $63.3 9 7 80 $40.01 $8.15 $18.21 $0.00 $66.37 8 90 $45.01 $8.15 $19.18 $0,00 $72.34 Effective Date- 0II01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.18 $8.15 $0.00 $0.00 $33.33 2 55 $27.70 $8.15 $5.64 $0.00 $41.49 3 60 $30.22 $8.15 UJ 5 $0.00 $44.52 4 65 $32,73 $9,15 $6.66 $0.00 $47.54 5 70 $35.25 $8.15 $17.78 $0.00 $61.18 0 75 $37.77 $9.15 $18.29 $0.00 $64. 1 7 80 $40.29 $8.15 $18.80 $0.00 $6 7,24 8 90 $45.32 $8.15 $19.83 $0.00 $73.30 .----.....--- ::::..• .............. ........ r.:--..__ ,.._..--_.,.-- i.....,..-. :::'•..:,•.:�e ............... ...........a ....---__- ............ •......a ........... •••........._ .............. ...-........ -_•_-,- __...-..--_f .--- .. .... ............. ..-- ..-- .-..------_ .----- ..'----- ................. ......... Motes. r Steps are 750 hrs. Apprentice to►you rneyworker Ratio:I:I ------- ------------------------I------ ---------------- --------- -------------- ---------- ----------- ---------------------- Issue Bate; -- Page�4 of 4� 08/07/2018 Wage Request Number. 20180807-059 classification Effective Date Rage Wage Health Pension Supplemental Total Rate Ullen1ploynielit PAINTER(SPRAY OR SANDBLAST,NEW)* 07/01/2018 $40.91 $8.15 $20.15 $0.00 $69.21 *1f 30%or more of surfaces to be painted are new construction, 01/01/201.9 $41.26 $8.15 $20.85 $0.00 $70.26 NE W p1nt rate shall b e uscd.PA INTERS OCAL 35-ZONE 01/01/2020 $43.46 $8.15 $20,85 $0.00 $72,46 07/01/2020 $44.56 $8.15 $20.95 $0.00 $73.56 01/01/2021 $45.66 $8.15 $20.85 $0,00 $74.66 Apprentice- PAINTER TER Local.35 Zone 2-SpraylSandbla st-New Effective Date- 07/01/2018 -Supplemental Step percent Apprentice Base Wage Health Pension Untinpleymcnt Total Rate 1 50 $20.46 $8.15 $0.00 $0.00 $28.61 2 55 $22.50 $8.15 $5.34 $0.00 $35.99 3 60 $24.55 $8.15 $5.82 $0,00 $38.52 4 65 $26.59 $8.15 $6.31 $0.00 $41.05 5 70 $29.64 $8.15 $17.24 $0.00 $54.03 6 75 $30.68 $9.15 $17.73 $0.00 $56.56 7 $O $32.73 $8.15 $18.21 $0.00 $59.09 8 90 $36,82 $8.15 $19.18 $0.00 $64.15 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Une-niploymeni Total Rate 1 50 $20.63 $8.15 $0.00 $0.00 $28.78 2 55 $22.69 $8.15 $5.64 $0.00 $36.48 3 60 $24.76 $6.15 $0.00 $39.0 4 65 $26.82 $8.15 $6.66 $0.00 $41.63 5 70 $28.88 $8.15 $17.78 $0.00 $54.81 6 75 $30.95 $9.15 $18.29 $0.00 $5 7 39 7 80 $33.01 $8.15 $18.90 $0.00 $59.9 9 90 $37.13 $8.15 $19.83 $0.00 $65.11 _....r Notes: Steps are 750 hrs. Apprentice to Journe vo rker Ratio:I J PAINTER(SPRAY OR SANDBLAST}REPAINT) 07/01/2018 $3 8.97 $8.15 $20.15 $0.00 $6 7.27 01/01/2019 $39.32 $8.15 $20.85 $0.00 $68.32 07/01/2019 $40.42 $8.15 $20.85 $0.00 $69.42 01/01/2020 $41.52 $8.15 $20.85 MOO $70.52 07101/2020 $42.62 $8.15 $20.85 KOO $71.62 01/01/2021 $43.'72 $8.15 $20.85 $0.00 $72.72 3 ... -------- ---------1------------------------------------------- --------- --------­­­___­­----------- Issue Date: 08/07/201 S Wage Request Number: 20180807-059 Page 25 of 42 Classification Effective Date Base Wage Health t*ensiOn Supplemental Total Rate C��ten��l��ment Appt-entice- .FAINTER Local.35 Zone 2--Spi-ayl andblast-Repaint Effective dive Date- 07101/ 018 Supplemental Step percent Apprentice Base Wage Heattl-i Pension Unemployment Total Rate 1 50 $19.49 $8,15 $0.00 $0.00 $27. 4 2 55 $21.43 $8.15 $5.34 $0,00 $34.92 3 60 $23.3 8 $8.15 $5.82 $0.00 $3 7.3 5 4 65 $25.3 3 $9.15 $6.31 $0.00 $39.7 5 70 $27,28 $8.15 $17.24 $0.00 $52.67 6 75 $29.23 $9,15 $17.73 $0.00 $55.11 7 s0 $31.1 S $8.15 $19,21 $0.00 $57.54 9 90 $35.07 $8.15 $19.18 $0.00 $62.40 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Ease Wage Health Pension Unemployment Total Rate 1 50 $19.66 $8.15 $0.00 $0.00 $27.81 2 55 $21.63 $8.15 $5.64 $0.00 $35.42 3 60 $23.59 $8.15 $6.15 $0.00 $37.89 4 65 $25.56 $8.15 $6.66 $0,00 $40.3 7 5 70 $27.52 $8.15 $17.78 $0.00 $53.45 6 75 $29.49 $9.15 $18.29 $0.00 $55.93 7 80 $31,46 $9,15 $18.80 $0.00 $55.41 8 90 $3 5.3 9 $8.15 $19.83 $0.00 $63.37 'Notes- Steps are 750 hrs. Ap pi-entice to Jnurne vot•ker Ratio:1:1 PAINTER(TRAFFIC MARKINGS) 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97 12/01/2018 $34.09 $7.70 $14,02 $0.00 $55.91 06/01/2019 $34.96 $7.70 $14,02 $0.00 $56.68 12/01/2019 $35.82 $7.70 $14.02 $0.00 $57.54 06/01/2020 $36.7 l $7.70 $14.02 $0.00 $55.43 12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32 06/01/2021 $3 8.52 $7.70 $14.02 $0.00 $60.24 12/01/2021 $3 9.43 $7.70 $14.02 $0.00 $61.15 For Apprvntiee rates see"Apprentice-LA-BORER" PAINTER/TAPER(BRUSH,STEW)* 07/01/2018 $39.51 $8.15 $20,15 $0.00 $67.81 *If 30%or more of surfaces to he painted are new construction, 0170112019 $39.86 $8.15 $20.85 $0.00 $68.86 NEW faint rats Sh.a11 he used.PAINTE LOCAL 35-ZONE 2 07701/201 9 $40.96 $8.15 $20.85 $0.00 $69.96 01101/2020 $42.06 $8.15 $20.85 $0,00 $71,06 07/01/2020 $43.16 $8.15 $20.85 $0.00 $72,16 01/01/2021 $44.25 $8.15 $20.85 $0.00 $73,25 ----- ..---- --. ------ ---------- ---­.1---------­------ ------------­------- Issue Date: 08/07/2019 Wage Request Number-5. 20180807-059 Page 26 of 42 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAMTER--Local 35 Zone 2-BRUSH NEW Effective Date- 07/01/2018 Supplemental Stop percent Apprentice Base Wage Health Pension Uticinplayment Total Rate 1 50 $19.76 $9,15 $0.00 $0.00 $27.91 2 55 $21.73 $8.15 $5,34 $0.00 $35.22 3 60 $23.71 $8.15 $5.82 $0.00 $37.68 4 65 $ 5�68 $8.15 $6.31 $0.00 $40.14 5 70 $27,66 $8.15 $17.24 $0.00 $53,05 6 75 $29.63 $8,15 $17.73 $0.00 $55.51 7 80 $31.61 $8.15 $18.21 $0.00 $57.97 8 90 $35.56 $8.15 $19.18 $0.00 $62.89 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Utiemplayment Total Rate 1 50 $19.93 $8.15 $0.00 $0.00 $28.08 2 55 $21.92 $8.15 $5.64 $0.00 $35.71 3 60 $23.92 $9.15 $6.15 $0.00 $38.2 4 65 $25.91 $8.15 $6.66 $0.00 $40.72 5 70 $27.90 $8.15 $17.78 $0.00 $53.83 b 75 $29.90 $9.15 $19.29 $0.00 $56.3 4 7 80 $31.89 $8,15 $18.90 $0.00 $58.84 9 90 $35.87 $8.15 $19.83 $0.00 $63.85 H �Notes: Steps are 750 ors. t ............. .......... ............ _ ._. ... ----- Apprentice to Journeyworker Ratio:1:1 PAINTER I TAPER(BRUSH,REPAINT) 07/01/2018 $37.57 $8.15 $20.15 $0.00 $65.97 1/01/ 019 $37.92 $8.15 $20.85 $0.00 $66.92 0710 1/20 1 9 $39.02 $8.15 $20.85 $0.00 $68.02 01/01/2020 $40,12 $8.15 $20.85 $0.00 $69.12 07/01/ 020 $41.22 $8.15 $20,95 $0.00 $70.22 01/01/2021 $42.32 $8.15 $20,95 $0.00 $71.32 omie Date: �1R107/201 ----------- ..-- --` l ne Request umber: 20180807-059 Page 27 of 42 I Classification Effective Date Base Wage Health li nioizpP1men#al Total Rate unel"Ploment Ap prey tic - PAINTER Local 35 Zone 2-BR S11 REPAINT Effective Date- 07/01/20 t 8 SLIpplMeRtat Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $t 8.79 MIS $0.00 $0.00 $26.94 2 5:5 $20.66 $8.15 $5.34 $0.00 $34.15 3 60 $22.54 $8.15 $5.82 $0.00 $36.51 4 65 $24.42 $8.15 $6.31 $0.00 $3 8.88 5 70 $20.30 $8.15 $17.24 $0.00 $51, 9 6 75 $28.18 $8.15 $17.73 $0.00 $54.06 7 s0 $30�06 $8,15 $18.21 $0.00 $56.42 8 90 $33.81 $8.15 $19.18 $0.00 $61.14 Effective Date- 01/01 f 2019 Supplemental Step percent Apprentice Ease Wage Health Pension Unemploynxpt Total Rate 1 50 $18.96 $8.15 $0.00 $0.00 $27.11 55 $20.86 $8.15 $5.64 $0.00 $34.65 3 60 $22.75 $8.15 $6.15 $0,00 $37.05 4 65 $24.65 $8.15 $6.66 $0.00 $39.46 5 70 $26.54 $8.15 $17.78 $0.00 $5 .47 6 75 $28.44 $8.15 $1&29 $0.00 $54.88 7 80 $30.34 $8.15 $18.80 $0.00 $57.29 8 90 $34.13 $8.15 $M83 $0.00 $62.11 lNotes: Steps are 750 hrs. z - r......... App-rentice to Journeywork-,r Ratio-.1A PANEL&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9,07 $8.00 $0.00 $47.3 5 TEAMSTERS JOINT CO UNCIL NO. 10 ZONE B PIER AND DOCK CONSTRUCTOR(UNDERPIM-IN T AND 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77_62 DELI ) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 PILE DRIVER LOCAL 56(ZONE 1) For approndee rates see"Apprentice-PILE DRIVER" PILE DRIVER 0810 1/20 1 8 $46.57 $9.90 $21.15 $0.00 $77.62 PILE DRIVER LOCAL 56(ZONE,1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 Issue Date: 08/07/2018 Wage Request umbel-. 20180807-059 Page 28 of 42 CIassifiea#t011 Effective Date Base Wage Health Pensiall Supplemental Total Rafe U umploy nient Apprentice- .BILE DRJVER-Local 56Zone I Effective Date- 08/01/201 S -Supplemental Stop percent ,Apprentice Base Wage Health Pension Un-cmployineiit Total Rate 1 50 $23.29 $9.90 $21.15 $0.00 $54.34 2 60 $27.94 $9.90 $21.15 $0,00 $58.99 3 70 $32. 0 $9.90 $21.15 $0.00 $63.65 4 75 $34,93 $9,90 $21.15 $0.00 $65 M 5 80 $37.26 $9,90 $21.15 $0.00 $68.31 6 s0 $3T26 $9.90 $21.15 $0.00 $69.31 7 90 $41.91 $9.90 $21.15 $0,00 $72.96 8 90 $41M $9.90 $ 1!15 $0.00 $72.96 Effective Date^ 08/01/2019 upplemmental Step percent Apprentice Base mirage Health Pension Unemployment Total Rate 1 50 $24.47 $9.90 $2 t.15 $0.00 $55.5 2 60 $29.36 $9.90 $21.15 $0.00 $60.41 3 70 $34.26 $9.90 $21.15 $0.00 $65.31 4 75 $36.71 $9.90 $21.15 $0.00 $67.76 5 80 $39.15 $9.90 $21,15 $0.00 $70.20 6 80 $3 .15 $9,90 $21.15 $0.00 $70.20 7 90 $44.05 $9.90 $21.15 $0.00 $75.10 9 90 $44.05 $9.90 $21.15 $0,00 $75.10 ,Notes s a s s _ - --Y _..._ r.-.. .............. --_ ..........._ t...... ---------- r...._...... --'.r•v;, ..:.:.::.::.s ----.:.: ---_---_._-.� _-_.�.......... ......... --------_- .----__.___ .__........- - ........... .... .__.__......_ Apprentice to Jourineyworker Ratio:1:5 PIPEFITTFR&STEAMFITTER 09/01/ 017 $4 7.11 $9.95 $18.74 $0.00 $75.80 09/0 I/201 8 $48.6 1 $9. 5 $18.74 $0.00 $77.30 09/0112019 $50.11 $9.95 $18.74 $0.00 $78.80 09/01/2020 $51.61 $9.95 $18.74 $0.00 $80.30 huge Hate. -0RI077201 9 ------.... Wane Request Number: 20180807-059 Page 29 of 42 Classification Supplemental 'Total Rate � 1Jft-ec#ive late Base Wage Health l'ex��i�n CJncmolor7ntent Apprentice- PI'PEFJTT R Local 537(Local 138) Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 SI&84 $9.95 $7.75 $0.00 $3 .54 2 45 $21.20 $9.95 $18.74 $0.00 $4 .89 3 60 $28. '7 $9.95 $18.74 $0.00 $56.96 4 70 $32.98 $9.95 $18.74 $0.00 $61. 7 5 80 $37.69 $9.95 $18.+74 $0.00 $66.3 8 Effective]date- 09/01/2018 supplemental Step percent Apprentice Base Wage Health Pension ulip'I ployment Total Rate 1 40 $19.44 $9.95 $7.7 5 $0.00 $37.14 2 45 $21.87 $9.95 $18.74 $0,00 $50.56 3 60 $ 9.1'7 $9,95 $18.74 $0.00 $57.86 4 70 $34.03 $9.95 $19.74 $0.00 $62.72 5 80 $3 8.89 $9.95 $18.74 $0.00 $67.58 _. Notes: 1:3;3:15; 1:10 thereafter 1 Steps are 1 yr. .efri ABC Mechanic' ' 1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) � Apprentice to Jon-rueyworker Ratio-.** PIPELA►YER 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22 12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06 06/01/2019 $35.21 $7.70 $14.02 $0.00 $56. 3 12/01/2019 $36,07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $+7.70 $14.02 $0.00 $58.68 (2/01/2020 $37.85 $7.70 S t 4.02 $0.00 $59.57 06/01/2021 $3 8.?7 $7.70 $14.02 $0.00 $60.49 12/01/2021 $39.69 $7.70 $14.02 $0.00 $61.40 For apprentice rates see"Apprentice--LABORER" __.......PLUMBER 03/01/2019 $50.61 $11,57 $15.76 $0.00 $7 7.94 PLUMBERS&GASP'7TERS LOC',iL 12(Local 138) 0910112018 $5 2.11 $11.57 $15.76 $0.00 $7 .44 03/0112019 $53.61 $11.57 $15.+76 $0.00 $80. 4 09/01/2019 $55.11 $11.57 $15.76 $0.00 $82.44 03101/2020 $56,61 $11.57 $15.76 $0.00 $83.94 09/01/2020 $58.11 $11.57 $15.76 $0.00 $85.44 03/01/2021 $59.61 $11.5+7 $15.76 $0.00 $86. 4 --- ... --- .....-- -- - --------------------------- .............I------- -------­­--------------------­_­------- Nque Date; 09/07/201 S Wage Request Number: 20180807.059 page 30 of 42 1 sif #inn Effective f ate Base Wage Health Pemierl s upplemenfill Total Rate a Unemployment Apprentice- PLU E1RIGA ITTER-Loeat 12(Local 138) Effective Date- 03/01/2018 s-upplemmmi Step percent Apprentice Base Wage Health Pension Unemployment Total late 1 35 $17.71 $11.57 $5.72 $0.00 $3 5.00 2 40 $20.24 $11.57 $6.49 $0.00 $38,30 3 55 $27.84 $11.57 $5.91 $0.00 $45.22 4 65 $32.90 $11.57 $10.36 $0.00 $54.93 5 75 $37.96 $11.57 $11.90 $0.00 $61.43 Effective Date- 0 /01/2019 supplemental Step percent Apprentice Base Wage Health Pension unemployment 'Total Rate 1 35 $18.24 $11.57 $5.72 $0.00 $35.53 2 40 $20.84 $11.57 $6.49 $0.00 $3 8.90 3 55 $28.66 $11.57 $8.82 $0.00 $49.05 4 65 $33.87 $11.57 $10.36 $0.00 $55.80 5 75 $39.OS $11.57 $1 1.90 $0.00 $6 .55 [Notes: 5 Steps are 1 yr Step 4 with lie$55.15,Step5 with lie$64.74 Apprentice to Juu rney%vurker R-9 tie:1:5 PNEUMATIC CONTROLS(TEMP.) 09/01/2017 $47.11 $9.95 $1 S,74 $0.00 $75.90 09101/201 S $4 S.61 $9.95 $18.74 $0.00 $77.3 0 09/0 f/2019 $50.1 1 $9.95 $119.74 $0.00 $78.80 09/01/2020 $51.61 $9.95 $18.74 $0.00 $50.30 For apprentice rates see"Apprentice-PIP Fr,iTTER"or"PLUI�DEFVPIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22 LABORERS-ZONE 2 12/01/201 S $34.34 $7.70 $14.02 $0.00 $56.06 06101/2019 $35.21 $7.70 $14.02 $€1.00 $56.93 12/01/ 019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68 12/01/20 0 $37.55 $7.70 $14.02 $0.00 $59,57 06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49 12101/2021 $39.69 $7.70 $14.02 $0.00 $61,40 For apprentice ruts see"Apprentice-LA ORER" POWDER MAN&BLASTER 06/01/2018 $34.25 $7.70 $14.02 $0.00 $55.97 1 /01/2018 $35.09 $7.70 $14.02 $0.00 $56.51 06101/ 019 $35,96 $7.70 $14.02 $0.00 $57.68 12/01/2019 $36.92 $7.70 $14.02 $0.00 $55.54 06101/ 020 $37.71 $7.70 $14.02 $0.00 $59.43 12/0112020 $3 8.60 $7.70 $1.4.02 $0.00 $60.32 06/01/20 1 $39.52 $7.70 $14.02 $0.00 $61.24 12101/2021 $40.43 $7.70 $14.02 $0.00 $ 2.15 For apprent'Tce rates see"Apprentice-LABORER" _g»e Elate:---09/07/201� -----..... -- -- -- tq Wane Request Numbet•: 20180807-059 Page 31 of 42 Classification Effective late Base Waage Health Pension Supplemental Total Rate Unemployment POWER S1-1O EL/DE RICK/TRE CMNG MACHTITE 06/01/2018 $47.0 9 $11.00 $15.50 $0.00 $►73.5 9 1210112018 $49.23 $11.00 $15,50 $0.00 $74.73 06/01/2019 $49.33 $11.00 $15.50 $0.00 $75.83 12/011 019 $5 0.48 $11.00 $15.50 $0.00 $76.98 06/01/2020 $51.5 8 $11.00 $15.50 $0.00 $78-08 12101l2020 $52.73 $11.00 $15.50 $0.00 $7923 06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.33 1 270 1/202 1 $54.98 $11.00 $15.50 $0.00 $81.48 For apprentice rates sce"Apprentice-C)PFRA'f NG ENGINI-ERS" PUMP OPERATOR(CONCRETE) 06101/2018 $47.08 $i 1,00 $15.50 $0.00 $73.58 OPE,RA TING ENGINEER 8 LOCAL 4 1 2101/201 8 $48.23 $11,00 $15.50 $0.00 $74.73 06/01/2019 $49.33 $11.00 $15.50 $0.00 $75.83 12/01/2019 $50.48 $11.00 $15.50 $0.00 $76.98 06/01/2020 $51.58 $11.00 $15.50 $0.00 $78.08 12/01/2020 $52.73 $i i.00 $15.50 $0.00 $79. 3 06/01/2021 $53.53 $11.00 $15.50 $0.00 $80.33 12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.49 For apprentice rates see"Apprentice-OPERATING ENOFNEERS" P1 JamE**1�ATO ��(DE A.TERIN ,OTHER) 06/01/201 S $31.90 $11.00 `�15.50 $0.00 $59.40 OPERA l TINGI fiNGl(Y�'eyl�llC1 LV Cir`# 12101120 l 8 $32.68 $11.00 $15.50 $0.00 $59.1 8 06/01/2019 $33.43 $11.00 $15.50 $0.00 $59.93 12/01/2019 $34.22 $11.00 $15.50 $0.00 $60.72 06/01/2020 $34,97 $i i m $15.50 $0.00 $61.47 12/01/2020 $35,75 $11.00 $15.50 $0.00 $62.25 06/01/2021 $36.50 $11.00 1$15,50 $0.00 $63.00 12/01/2021 $37.29 $11.00 $15.50 $0.00 $63.79 For apprentice rates see"Apprentice-OPERXfING ENGtNEERS" READY-MIX CONCRETE DR ER 0510 1/20 1 9 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24. 4 $8.49 $12.92 $0.00 $45.65 RECLAIMEI 06/01/2018 $46.61 $1 I.00 $15.50 $0.00 $73.11 OPERATING El Y LlINEii RS lr1J CAL T i 2/01/2018 $4 7.'75 $11.00 $15.50 $0.00 $74,25 06/01/2019 $45.84 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49.99 $11.00 $15.50 $0.00 $76.48 06/0112020 $51.06 $11.00 $15.50 $0.00 $77.56 12/011020 $52.20 $11.00 $15.50 $0.00 $78.70 06/01/2021 $53.29 $11.00 $15.50 $0.00 $79.79 1 /01/2021 $54.43 $11.00 $15.50 $0.00 $80.93 For apprentice rates see"Apprentice-OPERATING ENGII URSt" RI-DF--ON MOTORIZED BU66Y OPERATOR 06/0 1120 1 8 $33.50 $7.70 $14.02 $0.00 $55.2 LABORERS-ZONE 2 1 /01/2018 $34.3 4 $7.70 $14.02 $0.00 $56,06 0610 1/20 1 9 $35.21 $7.70 $14.02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $5 8.68 12/01/2020 $37.95 $7.70 $14.02 $0.00 $59.57 06/01/2021 $3 8.77 $7.70 $14.02 $0.00 $60.49 12101/2021 $39.6 S $7.70 $14.02 $0,00 $61.40 -- ----.-- ---------- --------- ------ ---------- ----------- --------- --------- isine Date: 09/0712019 Wane bequest lumber: 20180807-059 Page 32 of 42 classification Effective mate Base age Health Pension Supplemental Total late t.Tireniptflyment For apprentice rates see"Apprentice-LABORER" ROLLE /SPREADER/M LCMN 1 AMNE 06/01/2018 $46.61 $11.00 $15.50 $0.00 $73.11 i 2/01/2018 $47.75 $11.00 $15.50 $0,00 $74.25 06/01/2019 $4U4 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77. 6 12/01/2020 $52. 0 $11.00 $15.50 $0.00 $79.70 06/01/2021 $5 3.29 $11.00 $15,5 0 $0.00 $79.79 12/01/2021 $54.43 $11,00 $15.50 $0.00 $80.93 FOT apprentice rates see"Apprentice-OPERATING ENi GINEERS" ROOFER(1ne.Roofer Waterproofng&Roofer Damproofg) 08/01/2019 $42.36 $11.35 $15.90 $0.00 $69.61 ROOFERS LOCAL 33 02/01/2019 $43.51 $11.35 $15.90 $0.00 $70.76 Apprentice-- ROOFER-Local 33 Effective]Date- 08/01/201 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.18 $11.35 $3.69 $0.00 $36.22 2 60 $25.42 $11.35 $15.90 $0.00 $52.67 3 65 $27.53 $11.35 $15.90 $0.00 $54.78 4 75 $31.77 $11.35 $15.90 $0.00 $59.02 5 85 $3 6.01 $11.35 $15.90 $0.00 $63.26 Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wag Health pension Uaempioyme-nt Total Rate 1 50 $21.76 $11.35 $3.69 $0.00 $36,80 60 $ 6.11 $11.35 $15.90 $0,00 $53.36 3 65 $ 8.28 $11.35 $15.90 $0.00 $55,53 4 75 $32.63 $11.35 $15.90 $0.00 $59.88 S 85 $36.98 $11.35 $15.90 $0.00 $64.23 Notes 1:5 2:6-10)the 1:10;Reroofing: 1:4r then 1:1 Step I is 2000 hrs.;Steps 2-5 are 1000 firs. (Hot Pitch Mechanics'receive$1.00 hr.above ROOFERS Apprentice to Journeyworker Matto.** ROOFER SLATE 1 TILE/PRECAST CONCRETE 08101/2018 $42.61 $11.35 $15-90 $0.00 $69.86 ROOFERSLOCAL 33 02101/2019 $43.76 $11.35 $15.90 $0.00 $71.01 For apprentice rates see"Apprentice-ROOFER" SIEET1 FETAL WORKER 02101/ 018 $44.11 $12. 0 $24.12 $2.41 $82.84 SHEET ETAL WORKEWS'LOCAL 17--A - _------ ------ ----.....- ---------------- ------------- ------------------------- --------- ----------- ---------- hgiie Date: 09/07/201� Waae Request Number: 20180807-059 page 33 of 42 I lassifiea#inn Effective Date Page Ruth Pension SupplementalTotat Rate Uuexniplovnient Apprentice- SHEET METAL WORKER-Local 17-A Effective Date-- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health -Pension Unemployment Total Rate 1 40 $17.64 $12.20 $5.61 $0.00 $3 5.45 2 40 $17.64 $12.20 $5.61 $0.00 $35.45 3 45 $19.85 $12.20 $10.85 $1.29 $44.19 4 45 $19.95 $12.20 $10.95 $.1.29 $44.19 5 50 $22.06 $12.20 $11.80 $1.3 8 $47.44 6 50 $22.06 $12.20 $12.05 $1.39 $47.70 7 60 $26.47 $12.20 $13.70 $1.5+7 $53.94 8 65 $28.67 $12.20 $14.65 $1.67 $57.19 9 75 $3 3.0 9 $12.20 $16.56 $1.56 $63.70 10 85 $37.49 $12.20 $17.96 $2.03 $69.69 ..........: . ........ ..._ - - zNotes: } Steps are 6 mos., ----- ----.._ ...... - - ... ......:.. �..._.__:.- ............. .. _:---__: __.-.. ....._... _ _ -___- _-_ __ _ _ _--____ r .. ......_ Apprentice to Joarneysvorker patio:1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35-ZONE 2 Apprentice- SIGN ERECTOR-Local 35 Zone 2 Effective Mite-- 0610112013 Stipplellwiltat Step percent Apprenfiee Base Wage Health Pension Unemployment Total Rate 1 50 $12,91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15,49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.3 0 5 70 $19.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.0+7 $7.05 $0.00 $34.77 9 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23. 3 $7.07 $7.05 $0.00 $37.3 5 -- -- _..- _ _ --._.._.. . - Notes: Steps are 4 mos. r� .............. ..........�... �r.�'--_::=i �::..�-...n .-.--.-ii-r •i.......a ............ ...... .....--_.. -..-..,- -;•�:t.�•-� ...........� ..�..�..n.[r .--..--.r.• ...• .. ...tr -i...r_..a ............ -..r._-.n •....__ _• v i }...-i.• ........i..... ..........[._ Apprentice to Jou rneyworker Ratiw l:l SPECIALIZED EARTH MOVING EQUIP<3 5 TON 12/01I2016 $32.44 $10.91 $10.99 $0.00 $54.24 TEAMSTERS JOINT COUNCIL NO.}0 TONE R SPECIALIZED EARTH MOVING EQUIP>35 TONS 1 /01/ 016 $32.73 $10.91 $10.89 $0.00 $54.53 TLL_ASTERS jOINT CoUNCIL No.10 TONE B 1-une Tate; 09/0'7/201 9 "------._ Wane Request Number: 20190807-059 Page 34 of 42 classification Effective late fuse Wage Health Pemion Supplemental Total Rate Unemployment SPRINKLER FITTER 03/01/2018 $52,00 $9,12 $18.15 $0.00 $79.27 01/01/2019 $53.35 $9.47 $18.35 $0.00 $81.17 03/01/2019 $54.70 $9.47 $18.35 $0.00 $82.52 10/01/2019 $56.05 $9.47 $18.35 $0.00 $83.87 03/01/2020 $57.40 $9.47 $18.35 $0.00 $85.22 10/01/2020 $58,75 $9.47 $18.35 $0.00 $86.57 0370 1/202 1 $60.10 $9.47 $18.35 $0.00 $9 7.92 Apprentice- SPRINKLER FITTER-Local 550(Section R)Zone 2 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $18.20 $9.12 $8.90 $0.00 $36.22 2 40 $20.80 $9.12 $8.90 $0.00 $3 8.82 3 45 $23.40 $9,12 $8.90 $0.00 $41.42 4 50 $26,00 $9.12 $8.90 $0,00 $44,02 5 55 $28.60 $9.12 $8.90 $0.00 $46.62 6 60 $31.20 $9.12 $10.40 $0.00 $50.72 7 65 $33.80 $9.12 $10.40 $0.00 $53.32 8 70 $36.40 $9.12 $10.40 $0.00 $5 5.92 9 75 $39,00 $9.12 $10.40 $0,00 $58.52 10 80 $41.60 $9.12 $10.40 $0.00 $61.12 ETfective Date- 1 0/0 1/2018 siippicinvatral Step percent Apprentice Base Wage Health pension Unemployment Total Rate 1 35 $18.67 $9.12 $8.90 $0.00 $3 .69 2 40 $21.34 $9.12 $8.90 $0.00 $39.36 3 45 $24.01 $9.12 $8.90 $0.00 $42.03 4 50 $26.68 $9.12 $8. 0 $0.00 $44.70 5 55 $29,34 $9.12 $8.90 $0,00 $47.36 6 60 $32,01 $9.12 $10.40 $0.00 $5 L53 7 65 $34.68 $9.12 $10.40 $0.00 $54.20 8 70 $37.35 $9,12 $10.40 $0.00 $5 .87 9 75 $40.01 $9.12 $10.40 $0.00 $5 9.5 3 10 80 $42.68 $9.12 $10.40 $0.00 $62.20 Notes: Apprentice entered prior 9I30/10; 40/45/5 015 5/60/65/70/75/80/85 Steps are 850 hours App rentice to Jonmerywo rker Ratio:t:3 -------------------- ---------- ------- ------------- ------ -------------- ------ - '719.01 tozui tm Y7gtP, 02/0 size Rea nest Number: 20190807-059 Page 35 of 42 1 ss1 ti��t Effective Date Base ;age Health Pension Supplemental `Total .ate iiem l{ iinent STEAD BOILER OPERATOR 06/01/2018 $46.61 $11,00 $15.50 $0.00 $73.11 OPF,RA TING F.NGIN ERE L0CALr 06/01/2019 $48.84 $11,00 $15.50 $0.00 $75.34 12/01/2019 $49.9 9 $11.00 $15.50 $0.00 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56 12/01/2020 $52.20 $11.00 W.5 0 $0.00 $7 8.70 06/01/2021 $53,29 $11.00 $15.50 $0.00 $79.79 121017 021 $54.43 $11.00 $15,50 $0.00 $90,93 For appreEitice rates see"Apprentice-OPERATTNG ENGINEERS" TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 06/01/2019 $46.61 $11.00 $15.50 $0.00 $73.11 12/01/2018 $47.75 $11.00 $15.50 $0.00 $74.25 06/01/2019 $48.54 $11.00 $15.50 $0.00 $75.34 12101/2019 $49.98 $11.00 $15.50 $0.00 $76.48 06/01/20 0 $51.06 $11.00 $15,50 $0.00 $77.56 12/01/ 0 0 $52.20 $11.00 $1 ,50 $0.00 $78.70 06/01/2021 $53.29 $11.00 $15.50 $0.00 $79.79 1 /01/2021 $54.43 $11.00 $15.50 $0.00 $80. 3 For,apprentice rates see"Apprentice-OPERATING ENGINEERS" TELECOM -r T A TT N TECHNICIAN 03/01/2018 $37,61 $13.00' $15.93 $0.00 $6 .54 L'LZrCTRICfAMS LOCAL 103 09/01/ 018 $38.51 $13.00 $15.96 $0.00 $67.47 03/01/2019 $39.40 $13.00 $15.98 $0.00 $69,38 T ---- ��snp Date: 09107/201� ----- Watt Request Numbs , 20180807-059 P���3�of�� Classificatiolt Effective Date Base Wage Health Pension Sti ppiemeatat Total Ptate unemployment Apprentice- mLECO MU ICATIO TECI- IC'IAN-Local 103 Effective Date- 03/01/2018 SUppieinentat Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.04 $13.00 $0.45 $0.00 $29.49 40 $15.04 $13.00 $0.45 $0.00 $28.49 3 45 $16.92 $13.00 $12.74 $0.00 $42.66 4 45 $16.92 $13.00 $12.74 $0.00 $42.66 5 50 $18.81 $13.00 $13.03 $0.00 $44.84 6 55 $20.69 $13.00 $13.32 $0.00 $47.01 7 60 $22.57 $13.00 $13.61 $0.00 $49.18 8 65 $ 4.45 $13.00 $13.90 $0.00 $51.35 10 75 $28.21 $13.00 $1 4.48 $0.00 $55.6 Effective Date- 09/01/2018 -suppl rental Step percent Apprentice Base Wage Health Pension Unemployment 'Total late 1 40 $15.40 $13.00 $0.46 .i 0,00 $28.86 2 40 $15.40 $13.00 $0.46 $0.00 $ 8.86 3 45 $17.33 $13.00 $12,75 $0.00 $43.08 4 45 $17.33 $13.00 $12.75 $0.00 $43.08 5 50 $19.26 $13.00 $13.05 $0.00 $45.31 6 55 $21.18 $13.00 $13.34 $0.00 $47.52 7 60 $23.11 $13.00 $13,62 $0.00 $40_73 a 65 $25,03 $13.00 $13.92 $0.00 $51.95 9 70 $ 6.96 $13.00 $14.21 $0.00 $54.1 f7 10 75 $28,88 $13.00 $14.50 $0.00 $56.38 ............. ,------- ...........,. •.y ••........ -.-. .r ..--r < •••, .r . -.-...... ------------. t _.,..� „ ---. ..� - ..e Notes: Apprentice to Journe vorker Ratio:1:1 TERRAZZO FINISHERS 08l01l201'9 $51.85 $10.75 $20.66 $0.00 $83.26 02/0112019 $52.49 $10.75 $ 0.66 $0.00 $83. 0 08/01/2019 $53.54 $10.75 $ 0.90 $0.00 $85.39 02/01/2020 $54.49 $10.75 $20.90 $0.00 $86.03 08/01/2020 $55.83 $1 0,75 $20.95 $0.00 $87.53 0 /01/2021 $5 6.4'7 $10.75 $20.95 $0.00 $8 8.17 08/01/ 021 $57.97 $10.75 $21.11 $0.00 $89.73 02/01/2022 $58.46 $10.75 $ 1.11 $0.00 $90.32 ra„p D:Rtt.F ORM' / 1 20 --- -- ------ -- - Y aee Idea u es1 Number: 20190 907-059 Page 37 of 42 Ia sificatio L,ffective Da to Base Wage Healtb Persian Supplemental Total Rate Unemploment Apprentice- TERRAZZO FINISHER--Cowl 3 Marble& Tile Effective Date- 08/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.93 $10.75 $20.03 $0.00 $56.71 2 60 $31.11 $10.75 $20.03 $0,00 $61.89 3 70 $36.30 $10.75 $20.03 $0.00 $67.0 4 80 $41.48 $10.75 $20.03 $0.00 $72.26 5 90 $46.07 $10.75 $20.03 $0.00 $77.45 Effective Date- 0 /01/2019 Supplemental Step percent Apprentice Base Wage Health Pension unemplayment Total Rate I so $26.25 $10.75 $20,03 $0.00 $57.03 2 60 $31.49 $10.75 $20,03 $0.00 $62.2? 3 70 $36.74 $10.75 $20.03 $0.00 $6 7.52 4 80 $41.99 $10.75 $20.03 $0,00 $7 .77 5 90 $47.24 $10-75 $20.03 $0.00 $78.02 _ ._.::- a_ : ::...........n ...... ...........N m_w, - - .. ............. ........... ......., _ .......... _ Notes: f FC k S ........ ...... Apprentice to Jou rneywo rker Ratio:t:3 TEST BORING DRILLER 06/01/2018 $39.35 $730 $15.40 $0.00 $62.45 LABORL,'ti.La-F0 UNDA TION AND AM R10: l 2/01/201 8 $40.30 $7.70 $15.40 $0,00 $63.40 6/0 I/2019 a$41,30 $7.70 $15,40 $0.00 $64,40 12/01/2019 $42.30 $7.70 $15.40 $0.00 $65.40 06/01/2020 $43.29 $7.70 $15.40 $0.00 $66.39 12/01/2020 $44.27 $7.70 $15.40 $0.00 $67.37 06/01/2021 $45.29 $7.70 $15.40 $0.00 $68.3 12/01/2021 $46.30 $7.70 $15.40 $0.00 $69.40 For apprentice rates see"Apprentice-LA'BOP .R" TESL'BORING DRILLER HELPER 06/01/2018 $38.07 $7.70 $15.40 $0.00 $61,17 L.4B ORx,Rs-FO UNDATION.AND MARIIlfE, 12/01/201 8 $39.02 $7.70 $15.40 $0.00 $62,1 2 0610 1/20 1 9 $40.02 $7.70 $15.40 $0.00 $63.12 12101/2019 $41.02 $7.70 $15.40 $0.00 $64.12 0 /01/2020 $42.01 ST70 $15.40 $0.00 $65.11 12/01/2020 $4 . 9 $7.70 $15.40 $0.00 $6 .09 06/01/2021 $44.01 $7.70 $15.40 $0.00 $6 7.11 12/01/2021 $45.02 $7.70 $15.40 $0.00 $69.1 For apprentice rates see"AppreDtiQe,-LABORER" i �bvift*•1 .own7no 1 R ace Request Number: 20180807-059 Page 38 of 42 Classification rfl'ective mate Base Wage Health Pension Supplemental 'Dotal Rate Ultem 10 meat TEST BORING LABORER 06/01/2018 $37.95 $7.70 $15.40 $0.00 $61.05 Lei B0REkS,F0 UNDA TION/I ND W R INE l0 1 fr 2 9 {.{7��'L 7r�{'J ��}[ry{'1 [�+1y l'0■0/ykF J��y�J,e0 ���4.R1 L��� ��.J� L{+�.�RF .Y 1�.1� L�V.S..F� 4��.1JV 06/01/2019 $39.90 $7T70 $15.40 $0.00 $63.00 12101/2019 $40.90 $7.70 $15,40 $0.00 $64.00 06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99 12/01/2020 $42.97 $7.70 $15.40 $0.00 $65.97 06/01/2021 $43.89 $7.70 $15.40 $0,00 $66.99 12/01/2021 $44.90 $7.70 $15.40 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" TRACTORS/PORTABLE STEAM GENERATORS 06/01/2018 $46.61 $11.00 $15.50 $0.00 $73.11 .[NG ENGINEERS LOCAL 4 12/01/2019 $47.75 $11.00 $15.50 $0.00 $74.25 06/01/2019 $48.84 $11.00 $15.50 $0.00 $75.34 12/01/2019 $49.9 S $11.00 $15.50 $0.00 $76.48 06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.5 6 12/0112020 $52.20 $11.00 $15.50 $0.00 $78.70 06/0112021 $53.29 $11.00 $15.50 $0.00 $79.79 12/01/2021 $54.43 $11.00 $15.50 $0.00 $80.93 For apprentice rates see"Apprentice--OPERATING ENGINEERS" TRAILERS FOR EARTH 11 OVINCT E MPM E T 12101/2016 $3 3.02 $10.91 $10.89 $0.00 $54.82 TE,AMSTERS jOINT COUNCIL NO IO ZONE B TUNNEL WORK-COMPRESSED AIR 06/01/2018 $50.23 $7.70 $15.80 $0.00 $73.73 12/01/2018 $51.18 $7.70 $15.80 $0.00 $74.68 06/01/2019 $52.18 $7.70 $15.90 $0.00 $75.69 12/01/2019 $53.18 $7.70 $15.80 $0.00 $76,68 06/0112020 $54.17 $7.70 $15.80 $0.00 $77.67 12/01/2020/2020 L$55.15 $7.70 $15.80 $0.00 $78,65 0610 1/202 1 $56.17 $7.70 $15.80 $0.00 $79.67 12/01/2021 $57.18 $7.70 $4 5.90 $0.00 $80.68 For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 06/01/2018 $52.23 $7.70 $15.80 $0.00 $75.73 LABORERS(COMPRESSED AIR) 12/01/2018 $53.18 $7.70 $15.80 $0.00 $76.68 06/01/2019 $54.18 $7.70 $15.80 $0.00 $77.68 12/01/2019 $55.18 $7.70 $15.80 $0.00 $78.68 06/01/2020 $56.17 $7.70 $15.80 $0.00 $79.67 12/01/2020 $57 L 15 $7.70 $15.80 $0.00 $80.65 06/01/2021 $58.17 $7,70 $15.80 $0.00 $81.67 12/01/2021 $59.18 $7.70 $15.80 $0.00 $82.65 For apprentice rates see"Apprentice-LABORER" TUNNEL STORK-FREE A1R 06/01/2018 $42.30 $7.70 $15,80 $0.00 $65.80 12/01/2018 $43.25 $7.70 $15.90 $0.00 $66.75 06101/2019 $44.25 $7.70 $15.80 $0.00 $67.75 12/0 t/2019 $45.25 $7.70 $15.80 $0.00 $68.75 06/01/2020 $46. 4 $7.70 $15.80 $0.00 $69.74 12/01/2020 $47.22 $7.70 $15.80 $0.00 $70.72 06/01/2021 $48.24 $7.70 $15.80 $0.00 $7134 12/01/2021 $49.25 $7.70 $15.80 $0.00 $72.75 E'er apprentice rates see"Apprentice-LABORER" tQcup D.gtet OR/071�.01 - ..._---- -..._--- aife Rcuuest Number, 20180907-059 rage 39 of 42 2 5 Supplemental I if ica ��� Ef�'ective Da to Base Wage Health Pension Total Rate �Jnemployment TUNNEL WORK-FREE AIR(HA .WASTE) 06/01/2018 $44.30 $7.70 $15.90 $0.00 $67.80 06/01/2019 $46.25 $7.70 $15.90 $0.00 $69.75 12/01/2019 $47. 5 $7.70 $15.80 $0.00 $70.75 06/01/2020 $48.24 $7.70 $15.80 $0.00 $71.74 12/01/2020 $49.22 $7,70 $15.80 $0.00 $72.7 06/01/2021 $50.24 $7.70 $15.80 $0.00 $73.74 1 /01/2021 $51.25 $7.70 $15.90 $0.00 $74.75 For apprentice rates see"Apprentice-LABORER" VAC-HAUL 12/01/2016 $3 .44 $10.91 $10.89 $0,00 $54.24 TEAMSTERS JOINT COUNCIL NO.10 ZOJVE R WAGON DRILL OPERATOR 06/01/ 018 $33.50 $7.70 $14.02 $0.00 $55M LABORERS-ZONE 2 12101/2019 $34.34 $7.70 $14,02 $0.00 $56.0 06/01/2019 $3 5.2 t $7.70 $14.02 $0.00 $56.93 12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79 06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68 12/01/2020 $37,85 $7.70 $14.02 $0,00 $59.57 06/01/2021 $3 8.77 $7.70 $14.02 $0,00 $60.49 12701/2021 $39.68 $7.70 $14.02 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" WASTE WATER PUMP OPERATOR 06/01/ 018 $47.09 $11.00 $15.50 $0.00 $73.58 OPERA TINC,ENGINEERS L 0 CAL 4 12/01/ 018 $48.23 $11.00 $15.50 $0.00 $74.73 06I01I2019 $49.33 $11.00 $15.50 $0.00 $75.83 12/01/2019 $50.48 $11.00 $15.50 $0.00 $76.98 06/01/2020 $51.58 $11.00 $15.50 $0.00 $79,09 12/01/2020 $52.73 $11.00 $15.50 $0.00 $79.23 06/01/2021 $53.83 $11,00 $15.50 $0.00 $50,33 12/01/2021 $54.98 $11,00 $15.50 $0,00 $81.49 For apprentice rates see"Apprentice-OPERAT[NG ENGINEERS WATER METER INSTALLER 03/01/2018 $50.61 $11.57 $15.76 $0.00 $77.94 PL UMBERS&GASFI TFR,5 I,0CAL 1-2(Locaf 138) 09101/201 8 $52.11 $11.57 $15,76 $0.00 $79.44 03/01/2019 $53.61 $11.57 $15.76 $0.00 $80.94 09I0112019 $55.11 $11.57 $15.76 $0.00 $92.44 03/01/2020 $56.,61 $11.57 $15.76 $0,00 $83.94 09101/2020 $58.11 $11,57 $15.76 $0.00 $85.44 03101/2021 $59.61 $X 1,57 $15.76 $0.00 $8&94 For apprentice rates see"Apprentice-PLUMBERIPIPEFYYFER"or"PLUM FR/GASF ITT ER" Outside Electrical-East CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.91 $0.00 $36.70 OUTSIDE ELECTPJCA L IVORKE'RS-EAST LOCAL 104 For apprentice rates sec"Apprentice-LINEMAN" CABLE MAN(Underground Duets&Cables) 09/03/2017 $3 8.45 $7.75 $9.53 $0.00 $55.73 0UTaSIDE'ELE'CTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER 7 GROUND AN CDL 09/03/2017 $31.66 $7.75 $9.44 $0.00 $48.85 OUTSIDE ELECTRICAL JVORKETRS-EA+S'T LOCAL 104 For apprenke rates see"Apprentice-LINEMAN" -- - --._..,---- ---------------- ............­_­------------­---------1____....­___­-------­­------- 1-0e1rA 11-aik, n5z/n-7i,?n 1 k Wage Reauest Number: 20180807-059 Rage 40 of 42 lassifleation Effective Date Base Wage Health Pettsion Supplemental Total Rate Unemployment DR VE,R/GROU MA -Inexperienced(<2000 H•s) 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.3 9 OUTSIDE ELECTRICAL)YO ERS--EASTLOCAL 104 For apprentice rates see"Apprentice-tANl'':�1r1AN" EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $39.45 $7.75 $13.61 $0.00 $59.81 OUTSIDE E1�ECTRICAL,iflOkKERS-LAST LOCAL 104 For apprentice,rates see"Apprentice-LfNEMANI " E MRMENT OPERATOR(Class 13 CDL) 09/03/2017 $33.92 $7.75 $10.21 $0.00 $51.88 OUTSIDE ELECTRICAL WORKERS ERS-EASTLOCzIL 104 For apprentice rates see"Apprentice-LMMAN" ROUNDMA 09/03/2017 $24,98 $7.75 $I.75 $0.00 $34.3 8 OUTS[DE ELECTRICAL MOAK R -EAST LOCAL 104 For apprentice rates see"Apprentice-LE%EMAN` GROU DMAI -Inexperienced(<2000 Hrs-) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29.71 OUTSIDE ELECTRICAL FYO ERS--EASTLOCAL IN For apprentice rates see"Apprentice LMEMAN" JOURNF�'r MA LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59 0UTS'IDE El,ECTRICAL FFOI ERS-EASTLOCAL 104 Apprentice- LINE'M A'(Oul ride Electrical)-East Local 104 f Effective Date- 09/03/2017 Supplemental Step p-ercent Apprentice Base Wage Health Pension Unemployment Total Rate I 60 $27.14 $7.75 $3.31 $0.00 $38.20 2 65 $29.40 $7.75 $3,3$ $0.00 $40.53 3 70 $31.66 $7.75 $3.45 $0.00 $42,86 4 75 $33.92 $7.75 $5.02 $0.00 $46.69 5 80 t$36.18 $7,75 $5.09 $0.00 $49-02 6 85 $38.,45 $7.75 $5,15 $0.00 $51.35 7 90 $40.71 $7.75 $7.22 $0.00 $55. 9 -- ......... __._......, :. :_f ......_......, .. . . .....� .......... ........... Notes a .-..-:........ :,, .�...,,_a., .............. ........._. _.�.------• .. . r r 1 .- .. z.- -: s .....- ..-...�.. ., .... e r r.....v .. ..... --.rc...-,- --..,.--.. .--. ... .... Apprentice to Journeyworker Ratio.t:2. ... TELEDATA CABLE SPLICER 02/05/2018 $29.98 $4.70 $3.15 $0.00 $37.83 OUTSIDE ELECTRICAL 1FrORKE,RS-EAS'TLOCAL 10 02/04/2019 $30,73 $4.70 $3.1 7 $0.00 $3$. 0 TELEDATA LINEMANiEQUIR T OPERATOR 05/05/ 018 $28,22 $4.70 $3,10 $0.00 $36.02 OU71YIDE ELECTRICAL WORKERS--EASTLOCAL 104 02l04I201 9 $2$.93 $4.70 $3,14- $0.00 $3 6.77 TELEDATA WIRE IAWNSTA,LLEI TE EMCIA 02105/ 018 $29.22 $4.70 $3.Z 0 $0.00 $36.02 OUTSIDE ELECTRICAL iyo E -EAS T LOCA L 10 021041201 9 $28.93 $4.70 $3.14 $0.00 $3 6.77 TREE TRIMMER 01/3 t/2016 $18.51 $3.5 5 $0.00 $0,00 $22.06 0UTSIDE ELECTRICAL WORKERS--EASE'LOCAL 104 This classification applies only to tree work done:(a)for a utility-company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or inechanical cutting methods and is not on the ground. This classification does not apply to wholesale tree refnaval. TREE TRIMMED GROUNDMAN 01/31/2016 $16,32 $3.55 $0,00 $0.00 $19.87 OUTSIDE ELECTRICAL IVO ERS-EASTLOCAL 104 This classification applies only to tree}nark done:(a)for a utility company,RX.A,cooperative,or railroad or coo[mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipmemt,and(c)by a person who is►rshig hand or mecharfieal cutting methods and is on the ground. This classification does not apply to wholesale tree,remnoval. T �� n ,--- �I �l - l ------- -----...._-- ae Reizes# �tr�nleir� 0100 -059 'age 41 of 42 Supplemental Total Rate ClasSi���#iun Effective DateBaseWage ��alth Pension ��t�t�t�1��a�����t Additional Apprentice Information: Min inium wage rates for apprentices employed on publie works projects are 1 istud above as a percentage of the p re-delerrhined hourly wage rate establislied by the Comniiss ion er{trader the pro visioTis of the M.G.L.c.149,ss.2-6-27D. A.pprentice ratios are established by the Divisi-on of Apprenticeship Training pursuant to M,G L. e,231A ss.11 E-1IL. All apprentices must he registered with the Division of Apprenticeship Trainuig in accordance with M.G.L.c.23,ss. l I E-11L. All steps are six nionths(1000 hours.) Ratios are,expressed in allowable number of apprenti(,es to journeymen or fraction thereof,sinless otherwise specified. ** Multiple ratios are listed in the canuiie€at fteld. * * APP to JM;1:1,2:2,2:3,3A,4:4,4:5,4:6,5-.7,6:7,6:$7 6-9 a 7:10,8:10,8:11,8,,12,9:13,10:13,10:14,etc. * * APP to JM;1:1,1:2,2:3,2:4,3.5,4:6,4:7,5:8,6:4,6:10,7:11,$:12.,8:13,9:14,10:15,10,16,etc. --- -------..- ---...- -- .. ------- ----------------- ------------------- ---------- ------ --------- -------- Tumno n!q to,, nR/n nn i R WaLye ec(uest Number: 20 t 80807-059 Page 42 of 42 E RTIFICATIONS CERTIFICATE OF NON-COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and. submitted in good faith n w thout collusion or fraud with any other, person. As used in. this certification., 'the world: "person" shall mean natural. person, business, partnership', corporation, committee ��i.on 1 r other rani Lion entity r group "inch. i al . lip � -00 JIV �pr. 'imp`"" r � �I�f���.,.:�� ., aid' ��ii;.�?m Date / /Itl ° .......... Russell R Stiles President b Tempe[ature CorpOmt Print Name &Title Company Name, CERTIFICATEOF TAX COMPLIANCE Pursuant,to Chat r 62C of the,Massachusetts General. Dews, Section.49A , I Russell, H. Stil,es 7 authorized signatory for Ambient TpMpelrture C ,Fame of individual Name of colintractor do hereby certifyunder the pains andnalti of perjury that said,contractor has mplied with all laws of the Commonwealthof Massachusetts, the Nor r, relating t taxies., per-it or other fees, reporting of employees and contractors, and withholding remitting child u ort. Wy, oiu m 9/5/18 u ,fl u u^ ,, ^ ture -a I--14 Stil President 'Date Town of North,Andover I °.B, Page 39 of 4 E R LABOR HARMONY AND OSHA TRAINING RE,QUIREMENTS The undersigned certi 1 u r penalties, of perjw-y he is able, to furnish labor that can work i in harmony with, ll other elements, of labor ploy r to be employed at the work .. nd that alI erriployees t l y t the w ksit and � the wore will have cow t OSHA,-approved n tru t o safety and .lt course lasting atleast tee 1hours. m� �H1 Date 18, � S re r rSS � 4 ur ,77�­ �� _n air am,0..r R.usseill H. Stiles President Ambient or1 "rI t Name & Title Company Name Town of North Andover IFB Page HVAC M-ain c 'Services CERTIFICATE OF VOTE Atadul.yautli r ized meet in,gtie Board off`D�irectorsof'the Ambient Temperature Cur� o�ration held on 1/27/08 it was VOTED,, THAT Russell H. Stiles President (Name) (Officer) of-Amblerat Temperature C be and hereby is authorized to execute contracts and bonds, 'in .1 1 V the name and on �t)enalf of said Corpo.ration and affix its corporate seal, hereto, and such execution of any contract or obligation in the. name of Corporation on its behzlf by such. officer under seal Of— Corporation shall be valid and binding upon Corporatim I hereby certify-that I am the clerk. of the above named Corporation and that Russell H. Stiles 'I S the duly elected officer as above of said GQ r un and that the above, vote has not, been amended or rescinded and remains in,full,for and effect as-the at f this contract., ,September 5, 2018 A (Date) (Clerk) 'anielle 1411-6 Town,of North Ando'wr I B Page 41 of 43 HVAC Maintenance Services I AN/11 CERTIFICATE OF VOTE OF AUTHORIZATION Date: September 12, 2018 I Danielle Pl Clerk f Ambient Temperawre ,uornoration hereby eb certify that at tin f the Board f�Directors of SaidCorporation rpor n idulyheld on,the ` du of January, t which ti,,e a quorum was present and voting throughout,the following vote was duly passed and i now in fill force andeffect:. VOTES ThatRussell H. Stiles i s hereby authorized, directed and empowered for the name and on behalf of this Corporation t.o sign, meal with the corporate seal, execute:, acknowledge .n deliver all contracts and other obligations of this Corporation; the execution of any such contract to be validand binding,upon tins, Corporation for all r and that this vote shall remain_in fill force and effect unless and until the samle has been altered, amended or revoked by a subsequent vote of such directors and certificate of such later vote attested by the Clerk of this Corporation.. I further certify that Russell H,. Stiles is duly, l t / pp� int � Pr i nt f said corporation. SIGNED r d (,Corporate,, 1 , � e Dantoelle, Hartley Clerk of the Corploration 1A Graf Road o Newburypor,t, MA 01,950Phone 97 -6 6- 660 Fax -6 - 1 1 Tax Com,j�Iia�n�: §49A I certify under the penalt-Ics of pe'rJury that, to-the best of my knowledge and belief I am "in compliance with all,laws of the C r nw t relating t taxes,:reporting f m to and contractors,,t r ,, and withholding and remitting 1ld . support. Ambient Temnerature Co!po.ration ICompany Russell H. Stiles Typed NwTie of Personel-77 'zqd to Sign Bid IN^M m 0 err th -ri to Sign Bid, "President Title Signatory 14 GrafRoad Newburyport,MA 0 1950 Company,Address ,Company Telephone Company Fax Number 04-3542600 tntr 11112.2.018 Federal . n:ti �..� ion No. Date 114raf Road a N ewburypio rt,l MA 0 1950 a iPl one, 7 -6461-066 'Fax 7 6, -0 1 ���� NJ DATE� MfDalYYYlf) CERTIFICATE OF LIABILITY INSURANCE 9/12/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETVVEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If S U BROOATIO N IS WAIVED, subject to the terms and conditions of the policy, certain policies may require art endorsement. A statement on this certificate does not confer rights to the certificate holder in lied of such endorsement(s). PROI DOER CONTACT NAME; Marsh&McLennan Agency LLC PHONE c a E AfN :100 Front 5t, Sty E-MAIL 866-795-8016 Worcester MA 01608 ADDRESS: INSURER AFFORDING COVF-RAGE NAIL N INSURERA:Acadia Insurance Company 31825 INSURED AMBIETEMPE INSURER 13.Firemen's Ins.Co.of 1�I�ashirl tor',�� 21784 Ambient Temperature Corp. 14 Henry Graf Jr. Road INSURER 0. elf bu ryport MA 01950 INSURED a: INSURER E INSURER F COVERAGES CERTIFICATE NUMBER:2881410887 REVISION NOMBER� THIS IS TO CERTIFY 1-HAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUFD OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL St- POLICY EFF POLICY UP LIMITS INS.Q MD POLICY NUMBER IMMIDWMI fMODIMY) A X COMMERCIAL GENERAL LIABILITY CPA0262414 11212018 1/212019 EACH OCCURRENCE $11000.000 D FAMTO RENTED CLAIMS-MADE [fl OCCUR PREMISES Ea accurren $300,000 MEa EXP{Arty one person} $6,0w PERSONAL&ADV INJURY $11000100D GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,00D,000 POLICY LOC PRODUCTS-COMPIOP AGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY MAA0324735 1W2018 11212019 COMBINED SINGLE LIMIT $1,000,000 Ea accident) ANY AkJT❑ BODILY INJURY(Per Person) $ ❑MED xSCHEDULED BODILY INJURY(Per ar-cident) $ AUTOS ONLY AUTOS HIRED x NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident) A X UMBRELLA LIAS X OCCUR GUA0262416 112/2018 112/2019 EACH OCCURRENCE $10,000,000 EXCESS LIAR CLAIMS-MADE AGGREGATE $10,000,000 DED L RETENTION$ $ A WORKERS COMPENSATION WPA5081139 112/2018 11212019 X PER STATI TE 4ROTH- AND EMPLOYERS'LIABILITY Y 1 N ANYPROPMTOWPARTNERIEXECUTIVE N E.L.EACH ACCIDENT $500,000 OFF ICE RIM EMBER EXC;LUDFD? N!A (Mandatary in NH) E.L.DISEASE-EA EMPLOYFF $600,000 If yes,describe under DESCRIPTION OF OPERATIONS balow E.L.DISEASE-POLICY LIMIT $500,000 A Equipment Floater CPA0262414 11212018 11212019 Leased/Rented $50,000 Installation Fltr Joky Site $300,000 DESCRIPTION OF OPERATIONS l LOCATIONS f VEHICLES (ACORN 101,Additfonal Remarks Schedule,may be attached If mare space its required) ICE: 1-MAC Maintenance Services for All Municipal and School Buildings Town of North Andover is included as additional insured as respects the general liability if required by written contract for work performed by the Rained Insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Town of Forth Andover 120 Main Street AUTHORIZED REPRESENTATIVE North Andover MA 0184 .zr* -. ......_. Q 1988-2015 AOORD CORPORATION. All rights reserved. AOORD 26(2016103) The ACORD name and logo are registered marks of ADORD L. PA.Y MENT BON,D Bond No. 848.9 KNOW ALL NIEN BY THESE PRESENTS,t,hat we Ambient Temperature Corporation Newburyport, MA 01950 with a place of bust ness at 1413rafRoa,d., as Primipal (the"'Pi-incipal'"),and United Casualty and Surety Insurance Company corpo I ration qtcalified to do businessin the Coin nionwealth ofiNvIassac husett's I , ,wIth a place of Wsittess at 292 Newbury Street,suite 105.,Boston,MA 021,15 B3 SUretv ("the.* Surety"),are heldtind firnity boundmito the'foxvnof North Andover, Massachtis-etts,as Obligee In the sum of'S Hundred Fifty and no 1 00IL)ollars($66,950-001awrul money of the United Stags of Aiiiericn, to be paid to the Obligee, for which payinent,well and truly to be niiade, we bind wirselves,, OUr respective heirs,executo I r's,adniIti'strators. successors and assigns.,Jointly ami severaliv., rtrnfly7 by 1:11 ese presents,. 4- WHEREAS,the Pr nisi pal hAs assumed and made acontract with,the Obhgee,beavi:ng the date of for the con StIlICU011 Of HVAC Maintenance Services,for All ..M�2n i i 11 r��School Buildings NOWI1"HE CC)ND114IOthot ,5(mfi.ofiaretich that fthPrinipldtiontrctors U111der .said contract shall pay ftm-rill labor peffofl-ned or ftirnisfied mild ffir all materials used or emp loved in said contract an,d in.canv,-cmd all dulvauthor izcd extensions ot"Ailne,changes or additions to said contradthat may,hereafter be iiiadel! notice to ibe Suretiv of such niodirications, alteultions,-e^xtensions(,,)f time",clung es or addltioiis being Ivereb.), waVvedl,the foregoing to incItide., but not be limited to,any other p(irposes or item s set oult in.and to be SUbject to,the provisions ot.' Nt and Chapter 149, Sem"on 19, as amended then assmelmsetts General Laws,. 01apter 33,011 Sect-ion 39?011 5 tlits obligntionsha-11 become mill mid vowel;otherivise.it sMall lviliabi In fiffl, force and virme. IN wrrNESSMIEREFORE, the 116116pal and Surety fiave hereto sei flicir haiiids and seals tivis clay 2018 PRINCIPAI. SURETY Ambient Te l: f,"orporation U nited casualty and Surety Inpiurance Company 014 Po .Poo" 'feo'd WWI- )114 5" Mark D.Leskanic '101/ u 'I es Pres,Idei�,,t—5 e stil 11 H. 205 Union Street, S.Natick, MA 01760 [TI t I el IVSSI 781-559-0568- > Atf6st Phonel Attest, EN D OF PAYNNIEN-F BOND, ®. d .i `F' ATT011;MEY NIT, I CASUALTY AND SURETY rNSURANCE e_wUSCASU,ALTYt M M .. - a .......5 _ - . _: _� corporation - _ - - a. K ALL .BEN Bid ' SE PRESE ' h _.. .. ss l� s tts, nsuanc H "sat S r r � vel the Companies"),do by these presents make,constitute and appoint: _... Mar ,�Le lcanic,,Matthew Leska �.,Greg �� ... _ . ._.. _ T. full c r an. i� fi leer�t � � tta ' 's ire Fact 1 is ar P _ _ - p a it rat ca ace ' more tl r� � .� �°� , ...._ it�mnic 1 and.stead t excc t 1 ow1 d a sand deliver-a �l � ; s r oc s de t ,kin or t �� instruments mm_ r contracts of sjuretyshipto inchide riders, amendments, and tin eats of surety,providing the bond penalty does not exceed This Power,of Attorney hall expire without far t er action .. _ �:=l t,asdtad ltl�Board of l „ � s � �ra t-lame dell� d grad1 t -+ :. ...... Resolved that the President,"T'x asurer� .or"Sep k �_..�rely be and they aro herby anithor-id and empowered to appoint Attnrneys-irh-p"act o`tlne Company,in its cue and,a its acts to c cent ai nd acknowledge for and on its_bch If"Suxcty any and all bonds,r.co •' an.ces,,coot cts:,of""ndc it,waivers,oftitation and all other-writings s obligator yin the nature theruof with p6wer-to attach thereto the seal off°the Company, Any such Writings so execut d by sbeh ft r-n s-lire-Fa shall b n in upon d mean aS it the�had been d ekmuted anacknowledged� the regularly elect d Officers of th Corn an"-in their a "roper persons. ........... .. rat lre a� t officer autl en'zed h Resolutions of this,Board and the Cow � al�� b � . �� U � ��re�- tt�a r e��l rer of �� �� - ' _...._ ..�. p p .. +" �..__ �. _ - - , �.._ �� -b 1 r���. _�, .� .. h at�n th�_r �r thrc+ cl�signature AM �r ificafi6 o either given for the execution, f any,bond,�und�e e� ppe� other� -.- lI � �tt e _ .mm r x� a tl� real a re. aeh a "er and tl�e na s f" ern t e ial and,binding,upon whim mile betr�,�- a "b dopt d b� e oa p +y e n i c 1 p °� .. 1�! "� , p ......._ ..... -� = +yrprtt .. ith t aard fierce at e `et a flu in,artall ffie _ ........... IN WITNESS 0,f,the Companies have caused th.i it nt to,be signed and their corporate seals to be hereunto affixed, this 19th day July,20181 A , -_ ............................................ ............................ ...............................—... .................. . T CASUALS. :. P .. . . N Y �...... ......... . ...®® S79U CASU ALTY AND SURETY INSURANCE COMP , SRAL de {g+ I roe rm„�a,nrr'k�^�' �s 'r RR1�.' r�4 , 4..17 t Seals_- f ;Mmd _. r� d a X�NP�IY11d+�U�Xti"��" � � — 1 ►t� tttt _ Chaqq* . ................ = -_. _._.�_._®®mm.. b _ .� fN ' 9: .... n this 1 th day of July, 2018, before me, Thomas, P. Cam, a , k,, a notate public,personally appeared Io l K Chat k s,, Treasurer of United Casualty and Surety Insurance Company and, US Casualty and Surety Insurance Company who proved to me oil the basis, o satisfactory-evidence to the person h_ s s ssd t �it instrument acknowledged t+ that executed,t , . in his auathorizqd � t _ � ha rt s t r �t if m �.. _�� --_ _. �r �"' ': odor the laws o the Commonwealth o Massachusetts that:the for �i ragr l�is true,axed correct. WITNESS my land and seal; (se0 �"Oubkr ............................. .............. .._ Tomas . rr� an .err,, � i ubli ........... i �c ? M 2018 a _ . d .1� Ch-Fbf prat ° ice. o United Casual and Rum ns ra - E[r� and S' Casualty- .r� S Insurance - . 'Company do her �rt�� t it t � � � ��d +��° is to and correct o f Power o Attorney, executed b saidCompanies, wl ich is still in fall ford and effect; furthermore,the resolutions of the B card.of Directors,set out in the Power of Attorney are are full ore, and effea, ss,.t .�c d — . ................. ............ ...... ............. . .......... �." ........ ................... �Qea waeab ayTo In u 1 1U ,a�l wi"h riri77 , Nall 1 ` �� -..... p - +_ � -; ' TO CON