HomeMy WebLinkAboutContract #: 1139 - From: 10-01-2018 To: 09-30-2019 - Ambient Temperature Corporation - TOWN of NORTH ANDOVER
CONTRACT
CONTRACT#
DATE; 09 _c90-- d0J (P _
This Contract is entered 'into on,, or as of,this date by and between the Town of North Andover
(the "Town"), and
Contractor: Ambient Temperature Corporation
Address: 14 Graf Road
Nc bur port, MA o 1950
Telephone Number: 97 -646-06 0
Fax Number: 978-646-0661
1. This is a Contract for the procurement of the following:
HVAC maintenance services for all municipal and school buildings for the period of
October 1, 2018 through September 30, 2019 (with two additional one-year renewals solely
at the discretion of the Town) in accordance with the Invitation for Bids dated ,August 15,
01
. The Contract price to be paid to the Contractor by the Town of forth Andover is:
Regular business hours $117.00 per hour
Non-business hours $164.00 per hour
Material./Supplies 1 }0% markup
3. Payment will be glade as follows;
Upon performance of services and receipt of invoice (net 30)
4. Definitions
t
4.1 Ace e Lance: All Contracts require proper acceptance of the described goods or -
services by the Town of North Andover. proper acceptance shall be understood to r
include inspection of goods and certification of acceptable performance for services by
(Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page i
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, general Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. f 1'he Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party'} to any Contract with the Town. This terns shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
`Contractor'} shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance. The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 Subcontractor: Whose having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both,
5. Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before Scptember 30, 2019, unless extended pursuant to a provision
for extension contained in the Contract documents at the sole discretion of the Town, and not
subject to assent by the Contractor, and subject to the availability and appropriation of funds as
certified by the Town Accountant. The time limits stated 'n the Contract documents are of the
essence of the Contract,
6. uN e t to pro nation
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
(Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 2
r
a
2
i
2
7. Perrnits and vats
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default
.1 without Cause. The Town may terminate this Contract on seven (7) calendar days' notice
when in the best interests of the Town by providing notice to the Contractor, which shall be
in writing and shall be deemed delivered and received when given in person to the
Contractor, or when received by fax, express mail, certified mail return receipt requested,
regular nail postage prepaid or delivered by any other appropriate method evidencing
actual receipt by the Contractor. Upon termination without cause, Contractor will be paid
for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be: in default of any term or
condition of this Contract, the Town may terminate this Contract on seven (7) days' notice
by providing notice to the Contractor, which shall be in writing and shall be deemed
delivered and received when given in person to the Contractor, or when received by fax,
express mail, certified mail return receipt requested, regular mail postage prepaid or
delivered by any other appropriate method evidencing actual receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract;
1 any material misrepresentation made by the Contractor to the Town; ) any failure to
perform any of its obligations under this Contract including, but not limited to the
following: (i) failure to commence performance of this Contract at the time specified
in this Contract due to a reason or circumstance within the Contractor's reasonable
control, (ii) failure to perform this Contract with sufficient personnel and equipment or
with sufficient material to ensure the completion of this Contract within the specified
time due to a reason or circumstance within theContractor's reasonable control, (Ili)
failure to perform this Contract in a manner reasonably satisfactory to the Town, iv)
failure to promptly re-perform within a reasonable time the services that were rejected
by the Town as unsatisfactory, or effoneous, (v) discontinuance of the services for
reasons not beyond the Contractor's Treasonable control, (vi) failure to comply with a
material terra of this Contract, including, but not limited to, the provision of insurance
and non-discrimination, (vii) any other acts specifically and expressly stated in this
Contract as constituting a basis for termination of this Contact, and (viii) failure to
comply with any and all requirements of state law and/or regulations, and Town bylaw
anal/or regulations.
9. The Contractor's Breach and the Tomas Remedies
Failure of the Contractor to comply with any of the tarns or conditions of this Contract shall be
deemed a material breach of this Contract, and the Town of North Andover shall have all the
rights and remedies provided in the Contract documents, the right to cancel, terminate, or
suspend the Contract in whole or in part, the right to maintain any and all actions at law or in
equity or other proceedings with respect to a breach of this Contract, including damages and
(Rev 5-2007)Contract by and between'rown of North Andover and Ambient Temperature Corporation Page 3
y 3
{
f
's
speeiic performance, and the right to select among the remedies available to it by all of the
above.
From any sums due to the Contractor for services, the Town may beep the whole or any pail of
the amount for expenses, losses and damages incurred by the Town as a consequence of
procuring services as a result of any failure, omission or mistake of the Contractor in providing
services as provided in this Contract.
10. Statutory Compliance
10.1 This Contract will he construed and governed by the provisions of applicable federal,
state and local laws and regulations; and wherever any provision of the Contract or
Contract documents shall conflict with any provision or requirement of federal, state or
local law or regulation, then the provisions of law and regulation shall control. Where
applicable to the Contract, the provisions of the General Laws are incorporated b
reference into this Contract, including,but not limited to, the following:
General Laws Chapter 30B—Procurement of Goods and Services.
General Laws Chapter 30, See. 39, et seq: - Public Worhs Contracts.
General Laws Chapter 149, Section 44A, et see: Public Buildings Contracts.
10.2 wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or provision
into this Contract. To whatever extent any provision of this Contract shall be
inconsistent with any law or regulation limiting the power or liability of cities and
towns, such laAv or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations hearing on
the perfortnance of the Contract. If the Contractor performs the Contract in violation of
any applicable law or regulation, the Contractor shall bear all costs arising therefrom.
10.4 The Contractor shall beep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and decrees of
any bodies or tribunals having jurisdiction in any manner affecting those engaged or
employed in the worl�, of the materials used in the work or in any way affecting the
conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings,
Specifications or Contract for this work in violation of any such law, by-law, regulation,
order or decree, it shall forthwith report the same in writing to the Town. 1t shall, at all
times, itself observe and comply with all such existing and future laws, by-laws,
regulations, orders and decrees; and shall protect and indemnify the Town of North
Andover, and its club appointed agents against any claim or liability arising from or
based on any violation whether by him or its agents, employees or subcontractors of any
such law, by-law, regulation or decree,
(Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 4
11. Conflict of Interest
Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest
Law (General Laws Chapter 8A), and this Contract expressly prohibits any activity which
shall constitute a violation of that law. The Contractor shall be deemed to have investigated the
application of M.G.L. c. 268A to the performance of this Contract; and by executing the
Contract documents the Contractor certifies to the Town that neither it nor its agents,
employees, or subcontractors are thereby in violation of General Laws Chapter 268A.
12. ,Certification of Tax Compliance
This Contract must include a ceftification of tax compliance by the Contractor, as required by
General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors
Providing goods, Services, or Real Estate Space to the Commonwealth or Subdivision).
13. Discrimination
The Contractor will cam out the obligations of this Contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 1 1 B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time he amended.
1 . Assignment
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
1 5. Condition of Enforceability Against the Town
This Contrad is only binding upon, and enforceable against, the Town if: 1 the Contract is
signed by the Town Manager or its designee; and (2) endorsed with approval by the Town
Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the
Town Counsel as to form,
16. Col orate Contractor
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's
Certificate certifying the corporate capacity and authority of the party signing this Contract for
the corporation. Such certificate shall be accompanied by a letter or other instrument stating that
such authority continues in full force and effect as of the date the Contract is executed by the
Contractor. This Contract shall not be enforceable against the Town of North Andover unless
and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws,
Chapter IS 1, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto,
relating to the appointment of the Commissioner of Corporations as its attorney, shall file with
the Commissioner of Corporations a. power of Attorney and duly authenticated copies of its
(Rev 5.2007)Contract by and between Town of North Andover and Ambient Temperature Corpotation Page 5
• i
Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the
Commonwealth.
17. Li ability of public Officials
To the full extent permitted by law, no official, employee, agent or representative of the Town of
North Andover shall be individually or personally liable on any obligation of the Town under this
Contract.
18. Indenuiffication
The Contractor shall indemnify, defend and save harmless the Tern, the Town's officers, agents
and employees, from and against any and all damages, liabilities, actions, suits, proceedings,
claims, demands, losses, costs, expenses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) t-hat may arise in whole or in part out of or in
connection with the work being performed or to be perfornned, or out of any act or omission by
the Contractor, its employees, agents, subcontractors, material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
regardless of whether or not it is caused in part by any party 'Indemnified hereunder. The
Contractor fui then agrees to reimburse the Town for damage to its property caused by the
Contractor its employees, agents, subcontractors or material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
including damages caused by his, its or their use of faulty, defective, or unsuitable material or
equipment, unless the damage is caused by the Town's gross negligence or willful misconduct.
The existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this contract.
19. workers Compensation Insurance
The Contractor shall provide by insurance for the payment of compensation and the f mishing of
other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's
Compensation Act) to all employees of the Contractor who are subject to the provisions of
Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract shall be
deemed a material breach of this Contract, shall operate as an immediate termination thereof, and
Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure
to provide the insurance required by this Article.
The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this
Contract before the same shall be binding on the parties thereto} except if specifically waived by
the Town.
o. Documents Materials etc.
Any materials, reports, information, data., etc. given, to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available to any
individual or organization by the Contractor (except agents, servants, or employees of the
(Rev 5-2007)Contract by and between Town of North Andover and Ambi-ent Temperature Corporation Page 6
Contractor) without the prior written approval of the Town, except as otherwise required by law.
The Contractor shall comply with the provisions Chapter 66A of the General Laws of
Massachusetts as it relates to public documents, and all other state and federal laws and
regulations relating to confidentiality, security, privacy and use of confidential data.
Any materials produced in whole or in pail under this Contract shall not be subject to copyright,
except by the Town, in the United States or any other country, The Town shall have unrestricted
authority to, without payment of any royalty, commission, or additional fee of any type or nature,
publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole
or in part, any reports, data or other materials prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other doc'umentatioll or
product paid for by the Town shall vest 1n the Town at the termination of this Contract. The
Contractor shall at all tines, during or after termination of this Contract, obtain the prier written
approval of the Town before making any statement bearing on the work, performed or data
collected under this Contract to the press or issues any material for publication through any
medium.
21, Audit Inspection and l ecordkee in
At any time during normal business hours, and as often as the Town may deem it reasonably
necessary, there shall be available in the office of the Contractor for the purpose of audit,
examination, and/or to make excerpts or transcript all records, contracts, invoices, materials,
payrolls, records of personnel, conditions of employment and ether data relating to all matters
covered by this Agreement:.
. pyxnent
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the
Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work-
completed and acceptance from the Town of the work completed.
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all signatories to
the original Agreement, prior to the effective date of the amendment.
To the extent allowed by lave, any conditions, duties, and obligations contained in this Contract
may be waived only by written Agreement by both parties.
Forbearance or indulgence in any fot-n or manner by a party shall not be construed as a waiver,
nog' in any manner limit the legal or equitable remedies available to that party. No waiver by
either party of any default or breach shall constitute a waiver of any subsequent default or breach
of a similar or different matter.
(Rev 5- 007)Contract by and between Town of North Andover and Ambient'remperature Corporation Page 7
24. For i m and Choice of Law
This Contract and any performance herein shall be governed by and be construed in accordance
with the laws of the Commonwealth. Any and all proceedings or actions relating to subject
natter herein shall be brought and maintained in the courts of the Commonwealth or the federal
district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This
paragraph shall not be construed to limit any other legal rights of the parties.
5. Notices
Any notice peiTnitted or required under the provisions of this Contract to be given or served b
either of the parties hereto upon the other party hereto shall be in writing and signed in the name
or on the behalf of the party giving or sei-ving the same. Notice shall be deemed to have been
received at the time of actual service or three (3) business days after the date of a ceilifted or
registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent
to the address set forth in the Contract and to the Town of North Andover by being sent to the
Town Manager, Town Hall, 120 ruin Street,Forth Andover, Massachusetts o 1845.
6. Binding on successors
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors ill
interest(and where not corporate, the heirs and cstate of the Contractor).
7. CoMplete Contract
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no agreements otber
than those incorporated herein.
. Supplemental Conditions
The foregoing provisions apply to all contracts to which the Town of Notth Andover shall be a
party. one of the following "Supplements" must be "checked' as applicable to this Contract,
shalt be attached hereto, and shall in any evert apply as the nature of the Contract requires. The
Supplement contains additional terms governing the Contract;
CONSTRUCTION
SUPPLEMENT �� � Applicable to Contracts for Construction
(Rev 5-2007)Contract by and between Town of North Andover and Ambient Temperature Corporation Page 8
IN WiTNESS, WHEREOF the parti"es, have hereto and to two other identical 'Instruments set forth
their,liands the day and,year first above-written.
THE TOWN THE CONTR ACTOR
Ole
Ambient Temperature,, Corporat-ion
Divi IUD/�e artment Head Company 'am
�01 0000
yp.................
/12 18
0
S i.g ip, Date
To`,An Manager Date �na
Russell H,, Stiles I,, President
Print Name & Title
Federal. Identification
No.. 04-354-2600
APPROVED AS TO FORM:
TY, )wn Counsel Date
41�/111?
CERTI IFICATION AS TO AVAILABILITY OF FUNDS-.
T 4A nan ZE
oVM c "utt Date
L/
(Rev 5-2007)contract,by and.between Town of North Andover and,Anibient Temperature Corporation Page 9
SUPPLEMENT ;V'5
CONSTRUCTION
SUPPLEMENT`C"-Applicable to Contracts for the construction of:
(1)Public Buidi and Public works
(governed by the provisions of General Laws Chapter 3 0B);
(2)Public Bui ldiUs
(governed by the provisions of General Laws Chapter 1 4.9, 44A,
et seq.); and
(3)Public works
(governed by the provisions of General Laws Chapter 30, 9M, et seq)
This fon-n supplements the Town of Noah Andover"Contract and GeneralConditions"and applies
only to contracts for the construction,reconstruction, alteration,remodeling or repair of public...works
or public buildings,
2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an of iginal thereof to the Town prior
to the commencement of performance.
3. Equality:
3J. In the ease of a closed Specification written for a specific item or items to be furnished Under
the Base Bid,such specifications shall,as applicable,be in compliance with the
Massachusetts Gencral Laws,Chapter 3 0, Section 3 9M and Chapter 149, See.44A et seq.
3.2. where the name of an item,material or manufacturer is mentioned in the Specifications or
on the Drawings,except as above noted,the intent is to establish a standard and hi no way
should be construed to exclude any item or manufacturer net mentioned by name,but whose
product meets the Specifications as to design,utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 3 0B may not increase the quantity of
goods or services provided by more than twenty-five(25%)per cent, in compliance with See. 13 of
Chapter 30B.
. The Contractor will earry out the obligations of this oontract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 15 1, See. 1,et seq.(M't1itnum wage
Law)and any executive orders,rules,regulations,and requirements of the Commonwealth of
Massachusetts as they may fi-om time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D(Prevailing Wage),as shall
be in force and as amended.
6, The Contractor shall continuously maintain adequate proteetion of all work from damage and shall
protect the property of the Town and others, including adjacent-property,from injury or loss arising
(Rev 5-2007)Supplement"C"to Contract'between the Town of North Andover Page t
and Ambient Temperature Corporation
r
in connection with the Contract. The Contractor shall snake good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town,or due to causes beyond the Contractor's control and not theContractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work,and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on,about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all tirnes,as required by the Conditions and progress of
the work,all necessary safeguards for the protection ofworkers and the public,shall post danger
sighs warning against the hazards created by such Features of constnietion such as pits, protruding
nails,hosts,well holes,elevator hatchways,scaffolding,window openings,stairways and falling
materials;and shall designate a responsible member of its organization on the work,whose duty shall
be the prevention of accidents.
8'. The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sore discretion determines that the
construction superintendent,foreman,or assistants are unacceptable to the Town,then upon seven
days notice from the Town,the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work,using its best shill and attention. The
Contractor shall carefully study and compare the drawings,specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this respoiisihility shall be supervision of all od<-performed by subcontractons on the
work.
11. if the Contractor should neglect to-prosecute the work properly,or fail to perform the contract or any
of its provisions,the Town,upon three days written notice,may,without prejudice to any other
remedy it may have,male good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection b the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may male periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project representative will not be required to make exhaustive or
continuous on--site inspections to cheep the quality or quantity of the work, and will not be
responsible for the Contractor's failure to cart'out the constr ction work in accordance with
the CoDtract Documents. During such visits and on the basis of these observations while at
the site,the Project Representative will beep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural Ivork as failing to conform to the Contract Documents_ The
Project Representative shall have authority to act on behalf ofthe Town only to the extent
expressly delegated by the Town,which shall be shown to the Contractor,and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 2
and Ambient Temperature Corporation
ti
1 In connection with the wo k,the Project Representative shall not be responsNe for
construction methods,means,techniques,sequences or procedures employed by the
Contractor or the Contractor's safety programs,requirements,regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall,within a reasonable time,make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision,in matters relating to the project,shall be final,if
within the terms of the Contract Documents.
13.3. if,however,the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Prof ect Representative renders a
decision after such remedies have commenced,such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or peti-n i t any part of the struetti re to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times beep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work"broom-clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors} as the Town
shall determine to be j u st.
16. Riaht to Terminate
If the Contractor should(1)be adjudged a bankrupt, (2)make a general assignment for the benefit
of creditors, (3)have a receiver appointed on account of its insolvency, (4)persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, 5)fall
to make prompt payment to subcontractors or to providers of materials or labor, (6)persistently
disregard laws and regulations or lawful directives of the Town, or(7)be guilty of a substantial
violationof any provision of the Contract,then the Town-may, without prejudice to any other
right or remedy and after giving the Contractor(or any surety)seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of al l materials,tools and appliances thereon and finish the worl-C by whatever method it
deems appropriate.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 3
and Ambient Temperature Corporation
In such cases,the Contractor shall not be entitled to receive any further payment until the work is
Finished. rf the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of Finishing the work, including compensation for additional architectural,
managerial, legal and administrative sc14vicesa such excess shall be paid to the Contractor. if such
expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town.
The Contractor-shall not be relieved of liability to the Town by virtue of any termination of this
contrast, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder•.
Notwithstanding any other provision of this Agreement,the Town reserves the right at any time
in its absolute discretion to suspend or terminate this agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the ob I igation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination slate.
17. Progress Payments:
17.1. The Contractor shall submit to the Town an itemized application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall} before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sure of the
Contract, divided so as to facilitate payments to Subcontractors,made out in such form as
the Town and the Contractor may agree upon, and., if required, supported by such
evidence as to its correctness. This schedule, when approved. by the Town, shall be used
as a basis for payment,unless it is found to be in error. 1f applying for payments,the
Contractor shall submit a statement based upon this schedule.
18. withholding of Pgy ents
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town oforlh Andover from lass on account of:
18.1.1. Defective work not remedied.
19.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
(Rev 5-2007)Supplement"C"to Contract between the Town of Forth Andover Fag 4
and Ambient Temperature Corporation
18. . Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims bv Contractor and Liabilit of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven 7)calendar days after the
event or the first appearance of the circumstances causing the claiin. The claim shall set forth in
detail all known facts and circumstances supporting the claim, The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims,
The limit of liability of the Town under this Agreement is liralted to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
0. Liquidated Dana es;
Because both parties recognize 1 that the tine for completion of this Contract is of the essence,
(2)that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract,and 3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated darnages representing an estimate of delay damages, not as a penalty,the
suite of One Thousand Dollars($1,000)per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person, The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Towri's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages,then the Contractor shall pay the amount due.
1. The Contractor's' Mutual Res on s ib i li
Should the Contractor cause dainage to any separate subcontractor on the work,the Contractor
agrees,upon due notice,to settle with such contractor by agreement, or by recourse to remedies
provided by later or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shal l defend such p roce ed ings at th e Town's expense and, if any j u€lgment against the Town
arises therefrom,the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts.
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execration of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor,the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
(Rev 5. 007)Supplement"'C"'to Contract between the'rown of North Andover Page 5
and Ambient Temperature Corporation
v
L
}
L }
}
}
}
}
}
2
}
3
E
5
of the other contractor's work as fit and proper for the reception of its work except as to f
defects which may develop in the other contractor's work after the execution of its work. 5
t
t
t
22.3. To insure the proper execution of its subsequent work,the Contractor shall measure wog{
c re oit to the Town an discrepancy scre anc between the �
already�� place and shall at once p � �
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
3.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
then, as it is for the acts and omissions of persons directly employed by it.
3.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
4. Contractors-Subcontractor Relations;
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement,the General Conditions of the Contract,the Supplementary
General Conditions., the Drawings and Specifications, as far as applicable to its work, including
the provisions-of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
1, The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and i udginents of ever nature and
description(including reasonable attorneys' fees) brought or recovered against there that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder.The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct..The
existence of insurance skull in no way limit the scope of theContractor's indemnification
under this Contract.
5.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor,anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable,the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
(Rev 5-2007)Supplement"C"to Contract between the Town of Forth Andover Page 6
and Ambient Temperature Corporation
i
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
einployee benefit acts.
253. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. however, it shall be the
Contractor"s responsibility to purchase and malatain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
. TheContractor's Ynsuranec:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract,whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
2 .1.1. Claims under Worker's Compensation,disability benefit and other similar
employee benefit acts;
26.1.2. i aims for damages because of bodily injury, occupational sickness or
disease,or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. laims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees,and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
6. .1. worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability..insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and operations, owners and Contractor's protective,
Products and Completed operations,and Owned,Non--owned and Hired Motor vehicles.
All such insurance shall be written for not less than any limits of liability requited by law,
unless otherwise provided in the contract documents, or the following limits,whichever
are greater:
(Rev 5-2007)Supplement"Cap to Contract between the Torn of North Andover Page 7
and Ambient Temperature Corporation
a
Comprehensive General Liability Insurance (Broad Form)
Bodily It-ijury $1,000,000 per person
,000,000 aggregate
Property Damage $1,1000,000 per occurrence
,000,000 aggregate
Automobile Liability Insurance $5 0 0,0 oo per person
$1.000,000 per occurrence
Excess Liability(Umbrella) $ 1,000,000
26.3. The above insurance policies shall also be subject to the following requirements:
6.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under paragraph entitled"Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten(10) days prior to the expiration
date of required policies.
26.3.3. o insuraliee coverage shall be Subject to eancella.tion WithOLIt at least thirty(30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town slial l also be notified of the attachment of any restrictive amendments
to the policies.
6.3,4, All Certificates of Insurance shall be on the`M11-A"or"ACORM Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper office`of the Insurer,evidencing in particular those insured, the extent
of coverage,the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. l l premium costs shall be included in the Contractor's bid.
6.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
7. Protective Liability
_Insurance:
7.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 8
and Ambient Temperature Corporation
r '
z
7. . The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non--Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable,
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing theContractor's General Liability
Policy.
7.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
8. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract,or receipts in full in lieu thereof and, if required in either case,an affidavit that as fay`as
it has knowledge or information,the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 aild 14
as amended as a minimum requirement).
29. Guarantees:
9.1. The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken,that the product of such
labor will yield only first-class results,that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the work will
be of good quality, free from faults and defects and in strict conformance with this
Conti-act. All work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terns of this contract shall in the
opinion of the Town Manager require:repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to nuke the required.
repairs. If the Contractor shall negleet to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch,then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient,the Contraetor shall be
obligated to pay the balance thereof.
9.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page
and Ambient Temperature Corporation
0
obligation to coiTect work is in addition to, tad not in substitution of, such guarantees o,'i'l*
1 -warranties as may be requirect m,the various ,sections of the SpecIfi ratio n.S.,
This Agreement is I'llitended to take eff6et as a seated in,strument. Witness our hands and seats hereto:
Dated: /00 /1/ OF
'010100,10"00
l"
elall .....q
ThContratorby: ole uttionzed
V�
The Town of North Andover,by:
'00OL/.o
Town Klanager
Del ItIm Division Head
OW11 COUIrlSel
Approved as,to Form
TO 11 Xle t untant
Certified as to Appropriation
(Rev 5-2007)SuppItment""C"''to Contract between the Town of North Andover Page 10
and Aambient"Tem-peralure Corporation
THE COMMONWEALTH OF I ASSA HUSETTS
E E UTIVE OFFICE OF LABOR.AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing wage Rates
CHARLES D.BAKER As determined by the Director under the provisions of the ROSALIN ACOSTA
Secretary
❑overnar Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D aic r N;Y
KARYN E.POLITO Director
Lt,Governor
Awarding Authority: Town of North Andover
Contract Number: Cityffown: NORTH A HO ER
Description of Work: Perform preventative service and as--creed repairs of the HVAC units located in all municipal and school buildings
Job Location: Various locations
Information about Prevailing wage Schedules for Awarding Authorities and Contractors
} This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the
"Wage Request Number"on all pages of this schedule.
An Awarding Authority must request an updated wage schedule from the Department of Labor Standards(",DL ' if it has
not opened bids or selected a contractor within 90 days of the date of issuartee of the wage schedule. For CND AT RISK
projects(bid pursuant to G.L. c.149A),the earlier of: (a)the execution date of the GMP Amendment,or(b)the bid for the first
construction scope of work must be within 90-days of the wage schedule issuance date.
{ The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149,
§27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a
conspicuous place at the work site for the life of the project its accordance withM.G.L. c. 149 §27. The wages listed on the
wage schedule must be paid to employees performing construction work on the project whether they are employed by the prune
contractor,a filed sub-bidder, or any sub-contractor.
} All apprentices working on the prQ j ect are regt ir-ed to be registered with the Massachusetts Department of Labor
Standards}Division of Apprentice Standards DL /DA ). apprentice must beep his/her apprentice identification card on
his/her person during all work hours on the project. An apprentice registered with LEAS inay be paid the lower apprentice
wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with ILLS/DAS
rega-rdtess of wh ether or not they are registered with any other federal,state,Kcal,or private agency must he paid the
journey worker's rate for the trade,
• The wage rates will remain in effect for the duration of the project,except in the case of muhi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeps before the anniversary of the date the
contract was executed by the awarding authority and the general contractor.For multi-year CM AT RISK projects,awarding
authority must request an annual update no later than two weeps before the anniversary date,determined as the earlier of: (a)
the execution date of the GW Amendment,or b)the execution date of the first amendment to perm it procurement of
construction services,Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than
these rates to covered workers. The annual update requirement is not applicable to 2 7F"rental of equiprnent"'contracts.
ip Every contractor or subcontractor which performs construction work on the project is required to submit weedy payroll
reports and a Statement of Compliance directly to the awarding authority by mail or email and keep there on file for three years.
Each weekly payroll report trust contain; the employee's name,address,occupational classification,hours worked,and wages
paid. Do not submit weekly payroll reports to DL . A sample of a payroll reporting foiTn may be obtained at
11ttp;f/ww.niass.govfdols/pw.
• Contractors with questions about the wage Fates or classifications included on the wage schedule have an affirmative
obligation to inquire with ILLS at(617)626-6953.
4F Employees not receiving the prevailing wage rate set forth on the wage schedule iray report the violation to the Fair Labor
Division of the office of the Attorney General at(617)7 7-3465,
Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and
Issue Date: 08107/20l 8 wage Request Number: 201 80807-059
Classlfleation Effective Date Base Wage Health Pension Supplemental Total Rafe
Uneinvloyment
Construction
(2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95
TF,AA1STER S J0.hVT C0UJVC1L N0. 1 O ZONE B
(3 AXLE)DRIVER-EQLUMENT 12/01/2016 $32.22 $10.91 $1 U9 $0.00 $54.02
TEAMSTERS JOINT COUNCIL NO ]p ZONE}3
(4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14
TE,,l STF-RS JOINT Co UNCIL NO, 10 ZONE B
ADS/SUBMERSIBLE PILOT 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85
081011201 9 $102.78 $9,90 $2 1.1 5 $0.00 $133.83
For apprentice rates see"Apprentice-FI LE DRIVER"
AIR TRACK OPERATOR 06/01/2018 $34.00 $7.70 $14.02 $0.00 $55.72
LriBORERS-ZONE 2
2/01/2018 $34.84 $7,70 $14.02 $0.00 $56.56
06/01/2019 $3 5.71 $7.70 $14.02 $0.00 $57.43
12/01/2019 $3 .57 $7.70 $14.02 $0.00 $58.29
06/01/2020 $37.46 $7.70 $14.02 $0.00 $59.18
12/01/2020 $3 8.3 5 $7.70 $14.02 $0.00 $60.07
06/01/2021 $39.27 $7.70 $14.02 $0.00 $60.99
12/0112021 $40.18 $7.70 $14.02 $0.00 $61.90
For apprentice rates see"Apprentice-LABORF R"
ASBESTOS REMOVER-PIPE 71ECH.EQUIFT. 06/01/2018 $36.90 $11.50 $7.10 $0.00 $5 5.50
1 /01/201 8 $37.90 $11.50 VA0 $0.00 $56.50
06/0112019 $3 8.90 $11.50 $7.10 $0.00 $57.50
12/01/2019 $39.90 $11.50 $7.10 $0.00 $58.50
06/01/2020 $40.90 $11.50 $7.10 $0.00 $59.50
12/01/2020 $41.90 $11.50 $7.10 $0.00 $60.50
ASPHALT RAKER 06/01/2019 $33.50 $7.70 $14.02 $0.00 $55.22
LABORERS-ZONE 2 12/01/2019 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $35.21 $7.70 $14.02 $0.00 $56.93
12101/ 019 $36.07 $170 $14.02 $0.00 $57.79
06/01/2020 $36. 6 $7.70 $14.02 $0.00 $58.68
12/01/2020 $37.55 $7.70 $14.02 $0.00 $59.57
06/01/2021 $3 8.77 $7.70 $14.02 $0.00 $60.49
12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
ASPHALT/CONCRETE/ RUS1 R PLANT-ON SITE 06/01/2019 $47.09 $11.00 $15.50 $0.00 $73.5 8
OPETING ENG INEERS L 0 CA L 4
12/01/2019 $49.23 $11.00 $15.50 $0.00 $74.73
06/01/2019 $49.3 3 $11.00 $15.50 $0.00 $75.83
12/01/2019 $50.49 $11.00 $15,50 $0.00 $76,99
06/01/2020 $51.59 $11.00 $15.50 $0.00 $75.08
12/01/2020 $52.73 $11.00 $15.50 $0.00 $79.23
06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.3 3
12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.48
For appren#ice rates see"Apprentice-OPEPAT NG ENG€NEER5"
Issue Date: 08/07/2018 Wage Request Number 20180807-059 Page 2 of 42
C1assilicatiolt rrppxemenfid Total Rate
E�#'ee#ire Date Base age Health Pensron
nern 1a rrrent
BAC 1OE/FRONT-END LOADED 06/01/2018 $47.08 $11.00 $15.50 $0.00 $73.58
06/01/2019 $49,3 3 $11.00 $15.50 $0.00 $75.83
1 270 1 720 1 9 $50.49 $1 i m $15.50 $0.00 $76.98
06/01/2020 $5 L58 s i 1.00 $15,50 $0.00 $78,08
12101/2020 $52.73 $i im $15.50 $0.00 $79.23
0 /01/2021 $53.83 $11,00 $t5.50 $0.00 $80.33
12/01/ 021 $54. 8 $11.00 $tS.50 $0.00 $81.48
For apprentice rates sec"Apprenticc-GPERAUNG ENGINEERS"
BA CO-TYPE JUMPTNG TAMPER 06/01/2019 $33.50 $7,70 $14,02 $0.00 $55.22
12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $35a21 $7.70 $t 4.02 $0.00 $56.93
12701/ 019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14,02 $0.00 $58.68
12/01/20 0 $37.85 $7.70 $14,02 $0.00 $59.57
06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49
1270 t/2021 $3 9.68 $7.70 $t 4.02 $0.00 $61.40
For apprentice rates sec"Apprentice-LABORER"
BLOCK PAVER,RA MER 1 CURB SETTER 06/01/ 01 S $34.00 $7.70 $14,02 $0.00 $55.72
LABORERS-ZONE 2 12/01/2018 $34.84 $7.70 $14,02 $0.00 $56.56
06/01/201 J $3 5.71 $7.70 $14,02 .$0.00 $57.43
12/01/2019 $36.5 7 $7.70 $14.02 $0.00 $58.29
06/01/2020 $37.46 $7.70 $14.02 $0.00 $59.18
12/01/2020 $39.35 $7.70 $14.02 $0.00 $60.07
06 01 f 2021 L$39.27 $7.70 $14.02 $0.00 1$60.99
12/01/2021 $40,19 $7.70 $14.02 $0.00 $61.90
For apprentice rates sec"Apprentice-LABOREW
BOILER DER 01/01I 017 $41 2 $6.97 $16,21 $0.00 $66.10
14011,RR?WAKERS LOCAL 29
Apprentice- BOILERMAKER-Local 29
Effective Date-- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 65 $27.90 $6.97 $10.54 $0.00 $45.41
2 65 $27.90 $6.97 $10.54 $0.00 $45.41
3 70 $30.04 $6.97 $11.35 $0.00 $48.36
4 +75 $32.19 $6,97 $12.16 $0.00 $51.32
5 80 $34.34 $6.97 $12.97 $0.00 $54.28
6 85 $36.48 $6.97 $13.78 $0.00 $57.23
7 90 $38.63 $6.97 $14,59 $0,00 $60.19
9 95 $40.77 $6.97 $15.40 $0.00 $63*14
.... ... - .............. .............. .. ---------- ...... ............. 3
Dotes.
E(3 Y
1
...:'..::ti ....... ............ ..... -- -:-:-:.::•.:•a •..-...-..-. i. .! ............f ............� ............ .........- ........._ ... .. ...�... nnwxxx.n r.vi ir.nv� ........ ..... -'--' -• __.___.- .�--..-. .. .... ...1.� .......L .............. ....-..
Apprentice to Jou meywo3rker Ratio:1.5
Issue Date: 08/07/ 018 Wage Request Number, 20180807-059 Rage 3 of 42
Classification E ft'edive Dale Base Wage Health Pelasi011 uppleitmital Total Rate
»ueniploy1neut
BRICK/STONE/ARTIFICIAL MASONRY(fNCL.MASONRY 08/01/2018 $5 .91 $10.75 $20.66 $0.00 $84.32
WATERPROOFING) 02/01/2019 $53.55 $10,75 $20, 6 $0.00 $84.96
Bk[CKj r#]'EI S LOCA L 3(L YNN)
08/01/2019 $54.90 $10.75 $20.90 $0.00 $86.45
02/01/20 0 $55.54 $10.75 $20.80 $0.00 $87.09
09/01/20 0 $56.89 $10.75 $20.95 $0,00 $88.59
02/01/ 021 $57.53 $10.75 $20.95 $0.00 $8 .23
09/01/2021 $58.93 $10,+75 $21.11 $0.00 $90.79
02/01/2022 $59.52 $10.75 $21.11 $0.00 $91.38
Apprentice- MCKI LASTS CEME T AYA SON-Local 3 Lynn
Effective Date- 08/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $26.46 $10.75 $20.66 $0.00 $5'7.87
2 60 $31.75 $10.75 $20.66 $0.00 $63,16
3 70 $37.04 $1 U5 $20.66 $0.00 $68.45
4 80 $42.33 $10.75 $20.66 $0.00 $73.74
5 90 $47.62 $10.75 $20.66 $0.00 $79.03
Effective Date- 02/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension unelnployrne�n( Total Rate
1 50 $2 .78 $10.75 l$M66 $0.00 $5 8■19
2 60 $3 .13 $10.75 $20.66 $0.00 $63.54
3 70 $37.49 $10.75 L$20.66 $0.00 $68.90
5 90 $48.20 $10.75 $20.66 $0.00 $79.61
Notes:
y
e
a
.- -' ---- -------- --....--. ................ ------ -------- ----.. ,, .. ,.........,.. ,,...,..t -.- ..--- --..--..- -.... ........... ........
... ----- -...- ...- -----------
pprentice to Journeyworker Ratio:1:5
BULLDOZER/GRADER/SCRAPER 06/01/2018 $46.61 $11.00 $15,5 0 $0.00 $73.1 I
1 2I011201 8 $47.75 $l 1.00 $15.50 $0.00 $74. 5
06/01/ 019 $48.84 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $7 7.56
12/01/2020 $52.20 $11.00 $15.50 $0.00 $78,70
06/01/2021 $5 3.29 $11.00 $15.50 $0.00 $79.79
12/01/2021 $54.43 $11.00 $15.50 $0.00 $90.93
For apprentice rates see"Appwntive-OPERATING ENGFMEERS"
Issue Date: 08/07/ 018 Wage Request Number: 20180807-059 Page 4 of42
classification E ffective Date Base image HealthPensionsupplemental Total Rate
Unem icy rneat
CAfSSON&UNDERPINNlNG BOTTOM MAN 06/01/2018 $39.10 $7.70 $15.40 $0.00 $62.20
06/01/2019 $41.05 $7.70 $15.40 $0.00 $04.15
12/01/2019 $42.05 $7.70 $15.40 $0.00 $65.15
06/01/2020 $43.04 $7.70 $15.40 $0.00 $66.14
12/01/2020 $44.02 $7.70 $15.40 $0.00 $67.12
06/01/2021 $45.04 $7.70 $15.40 $0.00 $ 8.14
12/01/20 1 $46.05 $7.70 $15.40 $0.00 $69.15
For apprentice rates see"Apprentice.-LABORER"
CAISSON&UNDERPINNTNG LABORER 06/0112018 $3 7.95 $7.70 $15.40 $0.00 $61.05
12/01/2019 $3$.90 $7.70 $15.40 $0.00 $62.00
06/01/2019 $39.90 $7.70 $15.40 $0.00 $63.00
12/01/2019 $40.90 $7.70 $15.40 $0.00 $64.00
06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99
12/0112020 $42.87 $7.70 $15.40 $0.00 $65.97
06/01/2021 $43.99 $7.70 $15.40 $0.00 $66. 9
12/01/ 021 $44.90 $7.70 $15.40 $0.00 $68.00
For apprentice rates see"Apprentice-LABORER"
CAISSON&UNDE' I1�l��yTI��I{G}TOP MAN 06/01/2018 $3'7,95 $7.70 $15.40 $0.00 $61.05
.++4B�liLr��'�f L!Lft ii�A 1 ILfN AN+--�AR NE
YL.a
1 2101l20 1 8 $3 S.90 $7.70 $15.40 $0.00 $62.00
06/01/ 019 $39.90 $7.70 $15.40 $0.00 $63.00
12/01/2019 $40.90 $7.70 $15.40 $0.00 $64.00
06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99
12/01/2020 $42.87 $7.70 $15.40 $0.00 $65,97
06/0.1/2021 $43.89 $7,70 $15.40 $0.00 $66.99
1210 1120 1 $44.90 $7.70 $15.40 $0.00 $65.00
For apprentice Fates see"Apprentice-LABORER"
CARBIDE CORE DRILL OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22
LABORERS-ZONE,2 12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06
0610 1/20 1 9 $35.21 $7.70 $14.02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68
t 2/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57
06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49
12/0112021 $3 .,6 9 $7.70 $14.02 $0.00 $61,40
For apprentice rates see"Apprentice-LABORER"
CARPENTER 03/01/2018 $40.28 $9.90 $17.50 $0.00 $67.68
CARPENTERS-ZONE 2(Emlern Massachusetts) 091011201 8 $41.32 $9.90 $17.50 $0.00 $68.72
03/01/2019 $4 .35 $9.90 $17.50 $0.00 $69.75
Issue Date: 08/07/2018 Wage Request Number: 20180807-059 Page 5 of 42
�
Classification Effective Date -Base Wage Health Pension Supplemental Total Rate
Unexn Plo- ntent
Apprentice- CARPENTER--Zane 2 Ea.vtem M4
Effective Date- 03/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.14 $9.90 $1.73 $0.00 $31.77
60 $24.17 $9.90 $1.73 $0.00 $35.80
3 70 $28.20 $9.90 $12.31 $0.00 $50.41
4 7 $30.21 $9.90 $12,31 $0.00 $52.4
5 g0 $32.22 $9.90 $14.04 $0.00 $56.16
6 s0 $32.22 $9.90 $14.04 $0.00 $56.16
7 90 $36.25 $9.90 $15.77 $0.00 $61.9
9 90 $36.25 $9,90 $15.77 $0.00 $61.92
iltteetive Date- 09101/2018 -Supplemental
Step percent ,Apprentice,Base Wage Health pension Unemployment Total Rate
1 50 $20.66 $9.90 $1.73 $0.00 $3 .29
2 60 $24.79 $9.90 $1.73 $0.00 $36.42
3 70 $29.92 $9.90 $12,31 $0.00 $51.13
4 75 $30,99 $9.90 $12.31 $0.00 $53.20
5 80 $33.06 $9.90 $14.04 $0.00 $57.00
6 so $33.06 $9.90 $14.04 $0.00 $57.00
7 90 $37.1 9 $9.90 $15.77 $0.00 $62,86
8 90 $37.19 $9.90 $15.77 $0.00 $62.86
�Notes.-
%Indentured After 10/1/17;4 l45/55/55n0I7O/80/80
Step 1 2$2 .76/3&4$35,4515&6$52.1417&8$57.89
- n---- . ... _ :.-....-..
App1`entiee to Juu rneyworker Ratio:1:5
CARPENTER WOOD FRAME 04/01/2018 $ 6.67 $7.07 $7,86 $0.00 $41.60
CARPENTERS-ZONE 2(Wood Fraine) 107011201 9 $27.09 $7.07 $7.86 $0.00 $42.02
04/01/2019 $27-52 $7.07 $7.86 $0.00 $42.45
10/01/2019 $27.95 $7.07 $7.96 $0.00 $42.98
As of9/1M9 Carpentry work on wood-frame WEATBE R I ZATION priojeets shall be paid the WOOD FRAMF,CARPENTER rate.
Issue Date: 08/07/2019 Wage Request umber: 20180907-059 Page 6 of 42
Classification Effective Date Base wage Health Pension
Supplemental Total Rate
Unemploment
Appi-entice- CARPENTER(Woad Fi-ante)-Zone 2
Effective Date- 04/0 t/ 0 t 8 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $16.00 $7.07 $0.00 $0.00 $23.07
60 $t 6.00 $7.07 ,$0.00 $0.00 $23.07
3 65 $17.34 $7.07 $7.86 $0.00 $3 .27
4 70 $18.67 $7.07 $7.86 $0.00 $33.60
5 75 $20.00 $7.07 $7.86 $0.00 $34.93
6 80 $21.34 $7.07 $7.86 $0.00 $36,27
7 85 $22.67 $7.07 $7.86 $0.00 $3T60
8 90 $24.00 $7.07 $7.86 $0.00 $3 9.93
ffective)date- t 0/01/ 018 SLIpptelneltt-R1
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $16. 5 $7.07 $0.00 $0.00 $23.32
2 60 $16. 5 $7.07 $0.00 $0.00 $23.32
3 65 $17.61 $7.07 $7.86 $0.00 $32.54
4 70 $18.96 $7.07 $7.86 $0.00 $33.8
5 75 $20,32 $7.07 $7.86 $0.00 $35.25
6 80 $21.67 $7.07 $7.86 $0.00 $3 .60
7 85 $23.03 $7.07 $7.86 $0.00 $37.96
8 90 $24.3 8 $7.07 $7.86 $0.00 L$39.31
'Notes:
%Indentured After 1011/17a 45/45/5 5/5 5/7 0/70/80/80
Step1 2$19......... ..... ----- Y...... -_ ____-r ............ .......:-..... n...:... • __=r== m..... _.._-r .ti.. .---_- _ -__ .......
Apprentice to Journeyworker Ratio:1:5
CARPENTER WOOD FRAME(All Other Work) 06101f2016 $25.32 $9.80 $16.82 $0.00 $5 t.94
CARPENTERS-ZONE 2(Wood Frame)
CEMENT MASONRY/PLASTERING 0710 t72018 $46.20 $12.42 $22.41 $0.30 $81.33
01101/2019 $47.58 $12.42 $22.41 $0.30 $82.71
07/01/2019 $48.32 $12.42 $22.41 $0.30 $83.45
01/01/2020 $49.72 $12.42 $22,41 $0.30 $84.85
YSsILe Date- 09/07/2018 Wage Request Number: 20180807-059 Page 7 of 42
Classification Effective late Base Wage Health peltslart
Sltpplealwit#al Total date
Unewplovment
Apprentice- CEMENTAVSONRYIPL4STERING-Eastern Mass(Lynn)
Effective Date- 07/01/2019 suppler wntal
Step percent Apprentice Ease Wage Health pension Unemployment Total Date
1 50 $23.10 $12,42 $15.41 $0.00 $50.93
2 60 $27.72 $12_42 $17.41 $0.30 $57.85
3 65 $30.03 $12.42 $19.41 $0.30 $61.16
4 70 $32.34 $12.42 $19.41 $0.30 $64.47
5 75 $34.65 $12.42 $20.41 $0.30 $67.78
6 SO $36.96 $12.42 $21.41 $0.30 $71.09
7 90 $41.58 $12.42 $22.41 $0.30 $76.71
Effective Date, 01/01/2019 5rIpplemental
Step percent Apprentice Base Wage Health pension I Tti emp I oyrne nt Total Rate
1 50 $23.79 $12.42 $15.41 $0.00 $51.62
2 60 $28.55 $12.42 $17.41 $0.30 $58.68
3 65 $30.93 $12.42 $18.41 $0.30 $62.06
4 70 $33.31 $12.42 $19.41 $0.30 $65.44
5 75 $35.69 $12.42 $20.41 $0.30 $68.92
6 80 $38.06 $12.42 $21.41 $0.30 $72.19
7 90 $4 .82 $12.42 $22.41 $030 $77.95
.... _.. ........... ----- ..z - .... , ..........
.
Notes
Steps 3,4 are 500 hrs.All other steps are 1,000 hrs.
-----------
Appi•entice to Journeyworker Ratio:1:3
CHArN SAW OPERATOR 06701/2019 $33.50 $7.70 $14.02 $0.00 $55+ 2
LABORERS-ZONE 2
12/01/2019 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $3 5.21 $7.70 $14.02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68
12/01/2020 4$37.85 `i.7.70 $14.02 l$0.00 4$59.57
06/01/2021 $3 8.77 $7.70 $14,02 $0.00 $60.49
12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40
For apprentice rates see"Apprentice,-LABOREW
CLAM SHELLS/SLURRY BUCKETS[HEA DING MACHINES 12/01/2017 $47,63 $10.50 $15.50 $0.00 $73.63
OPERA TING ENGMEERS L0CAL 4
For apprentice rates see"Apprentice-OFERATIN0 ENGINEERS"
COMPRESSOR OPERATOR 06/01/2019 $31.90 $11.00 $15.50 $0.00 $58.40
1270112018 $32.68 $11.00 $15.50 $0.00 $59.18
06/01/2019 $33.43 $11.00 $15.50 $0.00 $5 .93
12/01/2019 $34.22 $11.00 $15,50 $0.00 $60.72
06/01/2020 $34.97 $11.06 $15.50 $0.00 $61.47
12/01/2020 $35.75 $1 1.00 $15.50 $0.00 $62.25
06/01/2021 $36.50 $11.00 $15.50 $0.00 $63.00
12/01/2021 $37. 9 $11.00 $15.50 $0.00 $63.79
Issue Date: 08107/2018 Wage Request Number: 20180807-059 Page 8 of 42
Classification Effective Date Rase Wage Health Pension Supplemental 'Taal bate
Unemployment
For apprentice rates see"Apprentice-OPERA,ri'mG ENGINEERS"
DELrEADER(BRIDGE) 07/01/201 S $50.01 $8.15 $20.15 $0.00 $78.31
01/01/2019 $50.36 W 15 $20.85 $0.00 $79.36
07/01/2019 $51.46 $8.15 $20.85 $0.00 $50.4
01/01/2020 $52.56 $8.15 $20.85 $0.00 $8 1.56
07/01/2020 $53.66 $8.15 $20.85 $0.00 $82.66
01/01/2021 $54.76 $9.15 $20.95 $0.00 $83.76
Apprentice- PATNTER Local 35 -BRIDGESITANKS
Effective Date- 0710 1 120 1 8 supplemp'ntal
Step percent Apprentice Base Wage Health Pension Unemployment (Total Rate
1 50 $25.01 $9,15 $0,00 $0,00 $33.1
2 55 $27,51 $8.15 $5.34 $0.00 $41.00
3 60 $30.01 $8,15 $5.92 $0.00 $43.98
4 65 $32.51 $8.15 $6.31 $0.00 $4 .97
5 70 $3 5.01 $8.15 $17,24 $0.00 $60.40
6 75 $37.51 $8.15 $17.73 $0,00 $63,39
7 90 $40.01 $8.15 $19.21 $0,00 $6 .37
8 90 $45.01 $8.15 $19.18 $0,00 $72.34
Effective Date- 01/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Untrnploy:nent Total Rate
1 s0 $25.19 $8.15 $0.00 $0.00 $3 3.3 3
2 55 $27,70 $8.15 $5.64 $0.00 $41,49
3 60 $30.22 $8.15 $6.15 $0.00 $44.52
4 65 $32.73 $8,15 $6.66 $0,00 $47.54
5 70 $3 5.25 $8.15 $17.75 $0.00 $61.18
6 75 $37.77 $9,15 $18.29 $0,00 $64.21
7 80 $40.29 $8.15 $18.90 $0.00 $67,24
9 90 $45.32 $8.15 $19.83 $0,00 $73.30
'Notes:
Steps are 750 hrs.
3
l
Apprentice to Journey-wo rker Ratio:1:1
DEMO:ADZEMAI 06/01/2018 $3 8.15 $7.70 $15.20 $0.00 $6 l,05
12/0 t/2019 $39.10 $7.70 $t 5.20 $0.00 $62.00
06101/20 t 9 $40.10 $7.70 $15,20 $0.00 $63.00
12/01/20 t 9 $41.10 $7.70 $1;5,20 $0.00 $64.00
For apprentice rates see"Apprentice-LABORER"
DEMO:BAC HOE L OADEWHAM EFL OPERATOR 06701/20 I 8 $39.15 $7.70 $15.20 $0.00 $62.05
12/01/2018 $40.10 $7.70 $15.20 W00 $63.00
06/01/2019 $41.10 $7.70 $15.20 $0.00 $64,00
12/01/2019 $4110 $7.70 $15.20 $0.00 $65.00
For apprentice rates see"Apprcn ice-LABORER"
Issue Date: 08/07/201 S Wage Regnest Number: 20180907-059 Page 9 of 42
lf i #ia�� Effective Date Base Wage Healt�� Pension Supplemental '�'�fat Rate
L]nem pIoyrrtent
DEMO:BURNERS 06101/ 018 $3 8.90 $7.70 $15.20 $0.00 $61.80
12/0112018 $39.85 $7.70 $15.20 $0.00 62.75
06/01/2019 $40.95 $7.70 $15.20 $0.0 $6175
1270 112019 $41.85 $7.70 $15.20 $0.00 $64.75
For apprentice ra#es see"Apprentice,-LABORER"
DEMO:CONCRETE CUTTER/SABER 06701/2018 $39.15 $7.70 $15.20 $0.00 $62.05
LABORERS-ZONE-2 127017 018 $40.10 $7.70 $15.20 $0.00 $63.00
06/01/2019 $41.10 $7.70 $15.20 $0.00 $64.00
12/01/2019 $42.10 $7,70 $15.20 $0.00 $65.00
For apprentice rates see"Apprentice-LABORS,R"
DEMO:JACKHAMMER OPERATOR 06101/2018 $3 8.90 $7.70 $15.20 $0.00 $61.80
12/01/2018 $3 9.85 $7.70 $15.20 $0.00 $62.75
06/01/2019 $40.85 $7.70 $15.20 $0.00 $63.75
12/01/2019 $41.85 $7.70 $15,20 $0.00 $64.75
ror apprctitice rates see"Apprentice--LABO ER"
DEMO;WRECKING LABORER 06/01/2018 $38.15 $7.70 $15.20 $0.00 $ 1.05
LABORERS-ZONE 2 2701/2018 $3 9.10 $7.70 $15.20 $0.00 $62.00
06/01/2019 $40.10 $7.70 $15.20 $0.00 $63.00
12/01/2019 $41.10 $7.70 $15.20 $0.00 $64.00
For apprentice rates see"}Apprentice-LABO EW
DIRECTIONAL DRILL MACFENE OPERATOR 06/01/2019 $46.61 $11.00 $15.50 $0,00 $73.11
OPERA TING ENGINEERS LOCAL 4 12/01/2019 $47.75 $11.00 $15.50 $0,00 $74.2 5
06/01/2019 $48.84 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49.98 $11.00 $15.50 $0.€10 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56
12/01/2020 $52.20 $11.00 $15.50 $0.00 $?&70
1 2f 0 1 1 202 1 $ T.1 3 $11.00
11.00 $15.50 0.00 $80. 3
For apprentice rates see"Apprentice-OPERArI WO ENGINEERS"
DIVED 08/01/2018 $65.20 $9.90 $21.15 $0.00 $96.25
08701/201 9 $69.52 $9.90 $2 1.15 $0.00 $99.57
For apprentice rates see"Apprentice-PILE DRIVER"
DIVER TENDER 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.6
For apprentice rates sec"Apprentice-PI LE DRIVER"
R"
DIVER TENDER(EFFLUENT) 08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91
PILE D R I VE,R L 0 CAL 5 6(7,ONE 1) rr1 f{�[f��i1 If{■e y11 ,1���y} {�}f $21.15
f� f[ +[F 7/�f1.
a�f���i.e 1J 1� �'��i!1 V'�4J� i.e�.i� $0.00 L�}i��.1
For apprentice rates see"Apprentice-FILE OR]VER"t
DIVER/SLURRY(EFFLUENT)Li ENT) 08101! 01 8 $9 f.90 9,90 $21.15 $0.00 4 128.85
09/0112019 $10178 $9.90 $21,15 $0.00 $133.83
For apprentice rates see"Apprentice-PILE DRIVER"
DRAWBRIDGE OPERATOR(Construction) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00
ELECTRICIANS LOCAL 103 09/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23
03/01/2019 $52.5 3 $13.00 $17.93 $0.00 $83.46
For apprentice rates see 'Apprentice-ELF-Ur CIAN"
Issue Date: 08/07/2018 Wage Request Number. 20180807-059 Page 10 of 42
�las��f ic�tio�t ��#'��1ive��t� Base ��� Health Pension Supplemental Total Rate
U ttentpt2yntent .--------
ELECTF1C1A 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81..00
09/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23
03/01/2019 $52.53 $13.00 $17. 3 $0.00 $83.46
Apprentice- ELECTPJCIAN-Local 103
Effective Nato- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension liner pluymeffl Total Rate
1 40 $20.06 $13.00 $0.60 $0.00 $3 3.66
2 40 $20.06 $13.00 $0.60 $0.00 $3 3. 6
3 45 $22.57 $13.00 $13.61 $0.00 $49.18
4 45 $22.57 $13.00 $13.6 1 $0.00 $49.1 8
5 50 $25.08 $13.00 $13.99 $0.00 $52.07
55 $27.5 9 $13.00 $14.3 9 $0.00 $54.96
7 60 $30.09 $13,00 $14.76 $0.00 $57.8S
S 65 $32.60 $13.00 $15.15 $0.00 $60.75
9 70 $35.11 $13.00 $15.53 $0.00 $63.64
10 +75 $37.61 $13.00 $15.93 $0.00 $66.54
Effective Date- 09/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 $20.54 $13.00 $0.62 $0.00 $34.16
2 40 $20.54 $13.00 $0.62 $0.00 $34.16
3 45 $23.10 $13.00 $13.62 $0.00 $49.72
4 45 $23.10 S 13.00 $1.3.62 $0.00 $49.72
5 50 $25.67 $13.00 $14.01 $0.00 $52.68
6 55 $28.24 $13.00 $14.40 $0.00 $55.64
7 60 $30.80 $13.00 $14-79 $0.00 $58.5 9
8 65 $33.37 $13.00 $15.1 7 $0.00 $6 1.54
9 70 $3 5.94 $13.00 $15.56 $0.00 $64.50
10 75 $3 5.51 $13.00 $15.96 $0.00 $6 7.47
Notes:
App Prior 11V03-30/35/40/45/50/55/65/70/75/80 �
Apprentice to Jonrue vorke r Ratio;2:3***
ELEVATOR CONSTRUCTOR 01/01/ 019 $57. 2 $15.43 $16.61 $0.00 $89.66
01701/2019 $59.47 $15.58 $17.5 i $0.00 $92.56
01/01/2020 $61.42 $15.73 $18.41 $0.00 $95.56
01/01/2021 $63.47 $15.88 $19.31 $0.00 $99.66
01/01/2022 $65.62 $16.03 $20.21 $0.00 $101.86
Issue Date:...08/07/2019 Wage Request Number: 20180807-059 Page 11 of 42
Classifeation Effective Date Base Wage Health Pension Supplemental Total mate
Uizem plovnient
Apprentice- ELEVATOR CO TR UCTOP-Local
Effective Date-- 01/01/201 S Supplemental
Step pet-cent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $28.81 $15.43 $0.00 $0.00 $44.24
2 55 $31.69 $15.43 $16.61 $0.00 $63.73
3 65 $37.45 $15.43 $16,61 $0.00 $69.49
4 70 $40.33 $15.43 $16.61 $0.00 $72.37
:5 80 $4 .10 $15.43 $16.61 $0.00 $79.14
Effective Date_ 01I0112019 supplcmental
Step Percent Apprentice Base Wage -Health Pension Unemployment Total Rate
1 50 $29.74 $15.59 $0.00 $0.00 $45.32
2 55 $32.71 $15.58 $17.51 $0.00 $65.80
3 65 $35.66 $15.58 $17.51 $0.00 $71.75
4 70 $41.63 $15.58 $17.51 $0.00 $74.72
5 80 $47.58 $15.58 $17.51 $0.00 $80.67
Notes:
t p 1- •e teas.;St �s 3--5 are X year
Lk€
F
Apprentice to.bourn eyworker Ratio F1:1
ELEVATOR CONSTRUCTOR HELPER 01/01/2019 $40.33 $15.43 $16. 1 $0.00 $72.37
017011201 9 $41.63 $15.58 $17.51 $0.00 $74.72
01/01/2020 $42.99 L$15.73 $18.41 $0.00 $77.[3
01/01/2021 $44.43 $15.58 $19.31 $0,00 $79.62
01/01/2022 $45.93 $16.03 $20.21 $0.00 $82.I7
For apprentice rates see"Apprentice-ELEVA'm CONSTRucrOR"
FENCE&GUARD RAIL ERECTOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22
12/01/201 S $34.34 $7.70 $14,02 $0.00 $56.0
06/01/2019 $35.21 $7.70 $14,02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $3 .96 $7.70 $14,02 $0.00 $58.68
12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57
06701/2021 $3 9.77 $7.70 $14.02 $0.00 $60.49
12/01/2021 $39. 8 $7.70 $14.02 $0.00 $61.40
For appr-mice rates see"Apprentice-LABORER"
FIELD E {-r.INST.PERSON-BLD ,SITErHVY[ffWY 05#01/2018 $4 .84 $10.50 $15.50 $0.00 $68.84
Op EFU TING ENGINEER S L0CAL 4
For apprentice rates see"Apprentice-OPERATINd ENGINEERS F"
FIELD ENVY.PARTY CHIEF--BLDG, 1TE,HVY/H_WY 05/01/2019 $44.31 $10.5 0 $15.50 $0.00 $70,31
OPERATING ENGINEER'LOCAL 4
For apprentieo rates see"Apprentice-OPERATING ENGINEERS"
FIELD ENCIROD PERSON-BLD ,S1TE}HVYIHWY 05/01/2019 $22.51 $10.50 $15,50 $0.00 $48.51
OPERA TING EIVGI EE,R S L OCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
Issue Date: 09/07/201 S Wage Request Number: 201 SOS07-059 Page 12 of 42
Classification L4 ffeetive Date Base Wage Health Pension Supplemental Total Rate
Unemployment
FIRE ALARM INSTAL LER 03/01/ 018 $50.15 $13.00 $17.85 $0.00 $81.00
09/01I 018 $51.34 $13.00 $1 f7.89 $0.00 $82. 3
03/01/ 019 $52.53 $13.00 $17.93 $0.00 $83.46
For apprentice rates see"Apprentice-ELECTRICIAN'
FIRE ALARM REPAIR MMNTENANCE 0370 1/20 1 8 $3 7.61 $13.00 $15 t93 $0.00 $66.54
l C OAS SIO1 NG ELECT1 ICIA 5 09701/2019 $3 8.51 $13.00 $15.96 $0.00 $6 7.47
LOCAL 103
03/01/2019 $39.40 $13.00 $15.98 $0.00 $69.39
For apprentice rates see"Apprentice-TEL'ECONMUNICA.TION S TECFIr CIAN"
FIREMAN(A SST.ENGINEER) 06/01/2018 $3 .83 $11.00 $15.50 $0.00 $65.33
1 2I01/201 8 $39.78 $11,00 $15.50 $0.00 $66.28
06I0 112019 $40.69 $11.00 $15.50 $0.00 $6 7.19
12/01/2019 $41.64 $11.00 $15.50 $0.00 $68.14
06/01/2020 $42.55 $11.00 $15.50 $0.00 $69.05
12/01/2020 $43.50 $11.00 $15.50 $0.00 V0.00
06/01/2021 $44.41 $11.00 $15.50 $0.00 $70. 1
12/0112021 $45.36 $11.00 $15.50 $0.00 $71.86
For apprentice rates see"Apprentice-OPERATrNG ENGINEERS"
FL,AGGER&SIGNALER 06/01/ 018 $21.50 $7.70 $14.02 $0.00 $43.2
12/01/2018 $22.50 $7.70 $14.02 $0.00 $44.2
06/01/2019 $22.50 $7.70 $14.02 $0.00 $44.22
12/01 f 2019 $23.50 $7.70 $14.02 $0.00 $45.22
06/01/2020 $ 3.50 $7.70 $14.02 $0.00 $45.22
12701/ 020 $24.50 $7.70 $14,02 $0.00 $46.22
06101/2021 $24.50 $7.70 $14.02 $0.00 $46.22
12/01/ 021 $24.50 $7.70 $14.02 $0.00 L$46.22
For appreiiiice rates see"Apprentice-LAI OPC EIV
FL OOR OVERER 03/01/2016 $4 .13 $9.80 $17.62 $0.00 $69.5 5
Apprentice- FL OO COVER R-Local 2168 Zone I
Effective Date-- 03/01/2016 Supplemental
Step percent Apprentice Base Wage Health Pension Ununpinyment Total Rate
1 50 $21.07 $9.90 $1.79 $0.00 $3 .66
2 55 $ 3.1'7' $9.90 $1.79 $0.00 $34.76
3 60 $25.29 $9.80 $12.25 $0.00 $47,33
4 65 $27.38 $9.90 $12.25 $0.00 $49.43
5 70 $29.49 $9.80 $14.04 $0.00 $53.33
6 75 $31.60 $9.90 $14.04 $0.00 $55.44
7 90 $33.70 $9.80 $15.83 $0.00 $59.33
8 85 $3 5.81 $9.80 $15.83 $0.00 $61.44
Notes; Steps are 750 ors,
%After 09/1717;45145/55/55nO/70/90/80(1500hr Steps)
Step 1&2$30.55/3&4$3 .497 5&6$53.33/7&8$5 .33
_ - .- - _
Apprentice to Journeyworker Ratio:1:1
Issue mate: 08/07/2018 Wage Request Number; 20180807-059 Page 13 of 42
Classification Effective Date Rase Wage Health Pension Supplemental Total date
Unemployment
FORD LIFT/CHERRY PICKER 06101/2018 $47.08 $11.00 $15.50 $0.00 $73.58
1 2/0 1/20 1 9 $48.23 $11.00 $15.50 $0.00 $74.73
06/01I2019 $49.33 $11.00 $15.50 $0.00 $75.83
12/01/ 019 $50.48 $11.00 $15.50 $0.00 $76.98
06/01/2020 $51.58 $11.00 $15.50 $0.00 $78.08
12101I2020 $52.73 $11.00 $15.50 $0.00 $79.23
06/01I2021 $53.83 $11.()o $15.50 $0.00 $80.33
12/01120 1 $54.98 $11.00 $15.50 $0.00 $81.48
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
OENERATOI IGHTING PLA Tff-rEATER 06/0 1120 1 8 $31.90 $11.00 $15.50 $0.00 $5 8.40
1 2I01120 1 8 $3 2.68 $11.00 $15.50 $0.00 $5 9.1<8
06/01/2019 $33.43 $11.00 $15.50 $0.00 $59.93
12/01/2019 $3 4. 2 $11.00 $15.50 $0.00 S%72
06/01/2020 $3 4.97 $11.00 $15.50 $0.00 $61.47
12/01/2020 $35.75 $11.00 $15.50 $0.00 $62. 5
06/01/2021 $36.50 $11.00 $15,50 $0.00 $63.00
12I01/2021 $37.29 $11.00 $15.50 $0.00 $63.79
For apprfm ice rates see"Apprentice-OPERA'rmi ENGFNEERS"
GLAZIER(GLASS PLANK/AIR BARRIER/TNTERIOR 07/01/2018 $3 9.51 $8,15 $20.15 $0.00 $67.81
SYSTEMS) 01/01/2019 $39.86 $8.15 $20.85 $0.00 $68.86
GLAZIERS 1.,0CAL 35(ZONE 2)
0710 1/20 1 9 $40.96 $8.15 $20.85 $0.00 $69.96
01/01/2020 $42.06 $8.15 $20.85 $0.00 $71.06
07/01/2020 $43.16 $8.15 $20.85 $0.00 $72.16
01/01/2021 $44.26 $8.15 $20.85 $0.00 $73.26
Issuea Date: 08/07/2019 Wage Request Number: 20190807-059 Page 14 of 42
Supplemental Total Rate Pension
t I 3 l l
UixeniploYinertt
Apprentice- GLAZIER-Local 35 Zone
Effective Date- 07/01/20 i 9 Siipplemenlal
Step percent Apprentice Base Wage Health Pension Unemployment Total Tate
1 50 $19.76 $9.15 $0.00 $0.00 $27.91
2 5 $21.23 $8.15 $5.34 $0.00 $35.22
3 60 $23.71 $8.15 $5.82 $0.00 $37.68
4 65 $25. 8 $8.15 $6.31 $0.00 $40.14
5 70 $27.66 $8.15 $17.24 $0.00 $53.05
6 75 $29.63 $8.15 317.73 $0.00 $55.51
7 80 $31.61 $8.15 $18. 1 $0.00 $57.97
8 90 $3 5.56 $8.15 $19.18 $0.00 $62.8 9
Effective Date- 01/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $19.93 $8.15 $0.00 $0.00 $28.08
2 55 $21.92 $8.15 $ .64 $0.00 $3:5.71
3 60 $23.92 $8.15 $6.15 $0.00 $38.22
4 65 $25.91 $8.15 $6.66 $0.00 $40.22
:5 70 $27.90 $9.15 $17.78 $0.00 $53.83
6 75 $29.90 $8.15 $18.29 $0.00 $56.34
7 80 $31.99 $9.15 $18.80 $0.00 $58.84
8 9€1 $35.87 $8.15 $19.83 $0.00 $63.85
�Nates:
Steps are 750 hrs. .
- -- ........ .............. r...........
Appreu tiee to Journeyworker Ratio:1:I
HOISTING EN01NEER/CRANES1G ADALL 06/01/2018 $47,08 $11.00 $1 S.50 $0.00 $73.58
12/01I2018 $48.23 $11.00 $15.50 $0.00 $74.73
06/0112019 $49.3 3 $11.00 $15.5 0 $0.00 $75.83
12/01/2019 $50.48 $11.00 $15.5 0 $0.00 $76.98
0610 1/2020 $51. 8 $11.00 $15.50 $0.00 $78.08
12101/2020 $52.73 $1 1.00 $15.50 $0.00 $79.23
06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.3 3
12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.48
issue Date: 08/07/2018 Wage Refine-sI Number: 20180907--059 Page 15 of 42
Classification Effective late Base Wage Health Pensi011 supp]erklelitaI Total Date
1Jminployntent
Apprentice- OPER,4 TING ENG.TNEERS-Local 4
Effective Date- 06/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemploymcnt Total Rate
1 55 $25,89 $11.00 $0.00 $0.00 $36.89
2 60 $28.25 $11.00 $15.50 $0.00 $54.75
3 65 $30.60 $11.00 $15.50 $0.00 $57.10
4 70 $32.96 $11�00 $15.50 $0.00 $59.4
5 75 $35.31 $11.00 $15.50 $0.00 $61.81
6 80 $37.66 $11.00 $15.50 $0.00 $64.16
7 85 $40.02 $11.00 $i 5.50 $0.00 $66.52
8 90 $42.37 $11.00 $15.50 $0.00 $68.87
Effective Date- 12/01/2018 S«ppleMeRtRl
Stop percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55 $26.53 $11.00 $0.00 $0.00 $37.5 3
2 60 $28.94 $11.00 $15.50 $0.00 $55.44
3 65 $31.3 5 $11.00 $15.50 $0.00 $57.8 5
4 70 $33.76 $11.00 $15.50 $0.00 $ 0.26
5 75 $36.17 $11.00 $15.50 $0.00 $62,67
6 80 $38.58 $11.00 $15.50 $0.00 $65.08
7 85 $41,00 $11.00 $15.50 $0.00 $67.50
8 90 $43.41 $11.00 $15.50 $0.00 $69.91
motes:
Apprentice to Journeyworker Ratio:1:6
H A (DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $ .41 $92,84
SHEL'T ETAL�r0R ERS L0CA 1,17-A
For apprentice rates ser,"Apprentice-SHEET ME,TAL WORKER"
HVAC(ELECTRICAL CONTROLS) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $91.00
9/01/2018 $51.3 4 $13.00 $17.89 $0.00 $82.23
0310 1/20 1 9 $52.53 $13.00 $17,93 $0.00 $83.46
Vor apprentice rates sec"Apprentice-ELECTRICIAN"
RVAC(TESTING AND BALANCING-AIR) 02/01/ 018 $44.11 $1 .20 $24.12 $2.41 $82.84
SHEET F,TAL WORXERS L0CAL 17-A
For appv,,nticc rates sec"Apprentice-SHEET METAL WORKE ,
UVAC(TESTING AND BALANCING-WATER) 09/01/ 017 $47.11 $9.95 $18.74 $0.00 $75.80
09/01/ 018 $48.61 $9.95 $1&74 $0.00 $77.30
09/01/2019 $5U 1 $9.95 $19.74 $0.00 $78.80
09/01/2020 $51.61 $9.95 $18.74 $0.00 $80.30
For apprentice rates see"Apprentice-PIPFFITTER"or"Ft1LTN0EwP1PEFITTFR"
HVAC MECHANIC 09/01/2017 $47.1 1 $9.95 $18.74 $0.00 $75.80
0910 1/20 1 9 $50.11 $9.95 $18.74 $0.00 $78.80
09/01/2020 $51.61 $9.95 $18.74 $0.00 $8030
Issue Date: 08/07/2018 Wage Request Number: 20180807-059 Page 16 of 42
classification �ffective Date Base Wage f�ealtla Pension Unemployment
T�#�Y Rate
Urtemptoyment
For apprentice rates see"Apprentice-PIPEFITTER"or i'PLUNMEWPI PEI�ITTER"
HYDRAULIC TLI DRILLS 06/01/ 019 $34.00 $7.70 $14.02 $0.00 $55.7
12/01/2019 $34.84 $7.70 $14.02 $0.00 $5 .56
06/01/2019 $35.71 $7.70 $14.02 $0.00 $57.43
12/01/2019 $36.57 $7.70 $14,02 $0.00 $58,29
WO1/2020 $37.46 $7.70 $14.02 $0.00 $59.19
12/01/20 0 $3 8,3 5 $7.70 $14.02 $0.00 $60.07
06/01/2021 $3 .27 $7.70 $14.02 $0.00 $ 0.99
12/01/2021 $40.19 $7.70 $14.02 $0.00 $61.90
For apprentice rates see"Apprentice-LABORER,"
INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04
091011201 8 $49.3 4 $11.75 $14.20 $0.00 $75.29
09/01/2019 $51.84 $11.75 $14.20 $0,00 $77.79
App-rentice, ASBESTOS INSULATOR(Pipes& Tanks)-Local 6 Boston
Effective Date- 09/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension uner"ployment Total Rate
1 50 $23.55 $11.75 $10.45 $0.00 $45.75
60 $28.25 $11.75 $11. 0 $0.00 $51.20
3 70 $32.96 $11.75 $11.95 $0.00 $56.66
4 80 $37.67 $11.75 $12.70 $0.00 $62.12
Effective Date- 09/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $24.67 $11.75 $10,45 $0.00 $46.8 7
2 60 $ 9.60 $11.75 $11.20 $0.00 $52.55
3 70 $34.54 $11.75 $11.95 $0.00 $58.24
4 80 $3 9.47 $11.75 $12.70 $0.00 $63.92
'Notes:
Steps are 1 year a
a
y ..�.,..i ......._._.... .... ,............ . ................� -......... _... ......._...__ .._:...-... �........... .........._.> e....:.....x ............. .............. �-----....--- ..._--...., ...........
..........
............ .:-.'........ ..............i ...............i ............ �_............. .............. ....
Apprentice to Journey-worker patio:1:4
IRONWORKER/WELDER 03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.59
IR OM PDR-KE,RS LOCAL I(LA IVRENCE ARC)
Issue Date: 08/07/2018 Wage Request Number: 20190807-059 Page 17 of 42
C1asslfieatioli Effective Date Base Wage Health PelIS1011 Supplemejital Total Rate
Unemplayinemt
Apprentice- -I O.WORKEI?-Local 7 Lawrence
Effective.Date- 03/16/2017 Stippiemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $24.14 $7.80 $20.85 $0.00 $52.79
2 70 $ 8.17 $7.80 $ 0.95 $0.00 $56,92
3 75 $30.18 $T80 $20.85 $0.00 $58.83
4 80 $32.19 $7.90 $20.85 $0.00 $60.84
5 85 $34. 0 $7.90 $20.85 $0.00 $62.85
6 90 $36.22 $7.80 $20.85 $0.00 $64.87
.,...,..r .-..:_.. ....... .........- S _•..-.---< t.,-......-. .-. - .:.- ...... .: ............ •�-- -.-...1 •-.-.�....J .............� ..... -... ..........c .- --,----------- -........ ...... --..-- ......... -.----.-.� . .:.. ........
Dotes:
Structural 1:6;Ornamental 1:4
__-- . -_
Apprentice to►Iuurneyworker Ratio:
JACKHAMMER&PANG BREAKER OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55. 2
LABORERS Ri] ZONE
12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $35.21 $7.70 $14.02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $5 8.68
12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57
06/01/2021 $3 8.77 $7.70 $14.02 $0,00 $60.49
1 /01/2021 $39,68 $7.70 $14.02 $0.00 $61.40
For apprentice rates sco"Apprentice-LABORER"
I.A-BORER 06/0 I/2018 $3 3.25 $7.70 $14.02 $0.00 $54.97
LABORERS-ZONE 2 12/01/ 018 $34.09 $7.70 $14.02 $0.00 $55.81
06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68
12/01/2019 $35.82 $7.70 $14.02 $6.00 $57.54
06/01/2020 $36.71 $7.70 $14.02 $0.00 $58.43
12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32
06/01/2021 $38.52 $7.70 $14.02 $0.00 $60. 4
12/01/2021 $39,43 $7.70 $14.02 $0.00 $61.15
Issue Date: 09107/2018 Wage Request Number. 20180807-059 Rage 18 of 42
Classification Efi'ectlye Date Base Wage Health pension
Supplemental Total Rate
Unerrtvloyment
Apprentice-- LABORER-Zone 2
Effective Date- 06/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Uliernploy€Iml Total Rate
1 60 $19.95 $7.70 $14.02 $0.00 $41.67
2 70 $23.28 $2.70 $14.02 $0.00 $45.00
3 80 $26.60 $7.70 $14.02 $0.00 $48.32
4 90 $29.93 $7.70 $14.02 $0.00 $51.65
Effective Date-- 12/01/2018 Supplemental
Step percent. Apprentice Base Wag Health Pension Unemployment Total Rate
1 60 $20.45 $7.70 $14.02 $0.00 $42.17
2 70 $23.86 $7.70 $14.02 $0.00 $45.58
3 80 $27.27 $7.70 $14.02 $0,00 $48.99
4 90 $30. 8 $7.70 $14.02 $0.00 $52.40
Notes: �
s
Apprentice to Journey-svorker Ratio:1:5
LABORER:CARPENTER TENDER 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97
LABORERS-ZONE 2 1210 t 7201 8 $34.09 $7.70 $14.02 $0.00 $55.8 1
06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68
12/0112019 $35.82 $7.70 $14.02 $0,00 $57.54
06/01/2020 $3 6_'71 $7.70 $14.02 $0.00 $5 8.43
12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32
06/01/2021 $3 9.52 $7.70 $14.02 $0.00 $60.24
1210172021 $39.43 $7.70 $14.02 $0.00 $61.15
For apprentice rates see"Apprentice-LABORER"
LABORER:CEMENT FINISI-IER TENDER. 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97
12/01/2018 $34.09 $7.70 $14,02 $0.00 $55.,81
06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68
1270112019 $3 5.82 $7.70 $14.02 $0.00 $5'7.54
06/01/2020 $36.71 $7.70 $14.02 $0.00 $58.43
12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32
06/01/2021 $3 8.5 2 $7.70 $14.02 $0.00 $60.24
12/01/2021 $39.43 $7.70 $14.02 $0.00 $61,15
For apprentice rates see"Apprentice-LABORER"
LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 06/0172018 $33.45 $7.70 $13.97 $0.00 $55.12
12/01/20.18 $34.29 $7.70 $13.97 $0.00 $55.96
06/01/2019 $35,16 $7.70 $13.97 $0.00 $56.83
12/01/2019 $36.02 $7.70 $13.97 $0.00 $57.69
For apprentice rates see"Apprentice-LABORER"
ER"
Issue mate:---08/0 7/2018 Wage Request Number: 20180807-059 Page 19 of 42
Classification Effective Date Base 'age Health Pension Supplemental Total Rate
Vnern Ala meyt
LABORER:MASON TEN-DER 06/01/2018 ' 3.50 $7.70 $14.02
0LABORERS-ZONE 2
2/01/2018 $34.34 $7.70 $14.02 $0.00 $56.0
06/0112019 $3 5.21 $7.70 $14.02 $0.00 $5 6.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $3 6.96 $7.70 $14.02 $0.00 $5 8.65
1 /01/2020 $37.85 $7.70 $14,02 $0.00 $59.57
06/01/2021 $38.77 $7.70 $14,02 $0.00 $60.49
12/01/2021 $39.68 $7.70 $14.02 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
LABORER:MULTI-TRADE TEN-DER 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97
12/0112018 $34.09 $7.70 $14.02 $0.00 $55.81
06701/ 019 $34.96 $7.70 $14.02 $0,00 $56.68
12/01/2019 $35,82 $7.70 $14.02 $0,00 $57.54
06/01/2020 $36.71 $7.70 $14.02 $0,00 $58.43
1 /01/2020 $37.60 $7.70 $14.02 $0.00 $59.32
06/0 1 7202 1 $38.52 $7,70 $14.02 $0.00 $60.24
12/01/2021 $39.43 $7.70 $14.02 $0.00 $61.15
For apprentice rates see"Apprentice-LAaC)RER"
LABORER:TREE REMOVER 06/01/2018 $3 3,25 $7.70 $14.02 $0.00 $54.97
1270172018 $34,09 $7.70 $14.02 $0.00 $55.81
06/01/2019 $34.96 $7.70 $14.02 $0.00 $56.68
12/01/2019 $3 5.82 $7.70 $14.02 $0.00 $57.54
06/01/ 020 $36.71 $7.70 $14.02 $0.00 $58.43
12/01/ 020 $37. 0 730 $14.02 $0.00 $59.32
06701I021 $38,52 $7.70 $14.02 $0.00 $60.24
12/01I2021 $39.43 $7.70 $14.02 $0.00 $61.15
This classification applies to all tree work associated witl3 the removal of standing trees,and trimining and removal of branches and 1�nbs wh-an the work is[gat done for
a utility company for the purpose of operation,rnaintenance or repair of utility company equipment.For apprentice rags see"Apprentice-LABOREW
LASER BEAM OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.2
2/01/ 018 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $3 5.21 $7.70 $14.02 $0.00 $5 .93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/20 0 $36.96 $7.70 $14.02 $0.00 $58,68
12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57
06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49
12101/2021 $39.68 $7.70 $14.02 $0.00 $6 1.40
For apprentice rates see"Apprentice-LABORER"
MARBLE&TILE FINISHERS 09/01/2018 $40.40 $10.75 $18.97 $0.00 $70.12
08/01/2019 $41.99 $10.75 $19.11 $0.00 $71.85
02/01/2020 $4 .50 $10.75 $19.11 $0.00 $72.36
08/01/2020 $43.58 $10.75 $19. 6 $0.00 $73.59
02/01/2021 $44.09 $10.75 $19. 6 $0.00 $74.10
08/01/2021 $45.21 $10.75 $19.42 $0.00 $75.3 8
02/01/2022 $45.69 $10.75 $19.42 $0.00 $75.85
Issue Date: 09/07/ 018 Wage Request Number: 20180907-059 page 20 of 42
Cla'sslfication Effective Date Base Wage Health Pensioa Supplemental Total Rate
Uneutploviiient
Apprentice- AI47B. E& TILE F IN1,'1IE'R-Local 3 Marble&Tile
Effective Date- 0$I01/2018 Suppleisiental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.20 $10.75 $18.97 $0.00 $49.92
2 60 $24.24 $10.75 $18.97 $0,00 $53.96
3 70 $28.28 $10.75 $18.97 $0.00 $58.00
4 80 $32.32 $10.75 $18.97 $0.00 $62.04
5 90 $36.36 $10.75 $18.97 $0.00 $66.08
Effective Date- 02/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.46 $10.75 $18.97 $0.00 $50.18
2 60 $24.55 $10.75 $18.92 $0.00 $54.27
3 70 $29.64 $10.75 $18.97 $0.00 $5 8.36
4 80 $32.73 $10.75 $18.97 $0.00 $62.45
5 90 $36.82 $10.75 $18.97 $0.00 $66.54
Notes
Apprentice to jo urn ey-svorker Ratio:l:3
MARBLE MASONS JILELAYERS&TERRAZZO MECH 08/01/2018 $52.95 $10.75 $20.66 $0.00 $84.36
02I0 l 1201 9 $5 3.57 $10.75 $20.66 $0.00 $84.98
08/01/2019 $54.92 $10.75 $20.80 $0.00 $96.47
02/01/2020 $55.55 $10.75 $20.80 $0.00 $8 7.10
09/01/2020 $56.90 $10.75 $20.95 $0.00 $98.60
02/01/2021 $57.54 $10.25 $M95 $0.00 $89.24
08/01/2021 $58.94 $10,75 $21.11 $0.00 $90.80
02101/2022 $59.51 $10.75 $21.11 $0.00 $9 i.37
--- _..._
------...______...._____---------------- --------------- -------- ............. ----------- --------
Issue Date; 08/07/2018 Wage Request Dumber: 20190807-059 Page 21 of 42
Classification Effective Date Base Wage Health Pension Supplemental Total date
Unemployment
Apprentice- AfA RBLE,-TILE-TERR,4ZZO 1ECHANIC-Local 3 Marble& Tile
Effective Date- 08/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployinent Total Rite
1 50 $26.48 $10.75 $20.66 $0.00 $57.89
2 60 $31.77 $10.75 $20.66 $0.00 $63.18
3 70 $37.07 $10.75 $20.66 $0.00 $68.48
4 80 $42.36 $10.75 $20.66 $0.00 $73.77
5 90 $47.66 $10.75 $20.66 $0.00 $79.0 7
Effective Date- 02/01/2019 ;Sapplemen#al
Step percent Apprentice Base Wage Health Pension Unemploymcnt Total Rate
1 50 $26.79 $10.75 $20.66 $0.00 $58.20
2 60 $32.14 $10.75 $20.66 $0.00 $63.5 5
3 70 $37.50 $10,75 $20.66 $0.00 $68.91
4 90 $42.96 $10.75 $20.66 $0.00 $74.27
5 90 $48.21 $10.75 $20.66 $0.00 $79. 2
Notes:
Apprentice to Journeyworker Ratio:1:5
MECH.SWEEPER OPERATOR(ON CONS '. SITES) 06/01/2019 $46. 1 $11.00 $15.50 $0.00 $73.11
12/011201 9 $47.75 $11.00 $15.50 $0.00 $74.25
06/01/2019 $4 . 4 $11.00 $15.50 $0.00 V-5_34
12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.49
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56
12/01/2020 $52.20 $11.00 $1.5.50 S0.00 $79.70
06/01/2021 $53. 9 $11.00 $15.50 $0.00 $7 .'79
12/01/2021 $54.43 $11.00 $15.50 $0.00 $80.93
For apprentice rates see"Apprentice-OPERATING ENGT EERS"
MECHAN1 S MAINTENANCE 06/0 t/201 S $46.61 $11.00 $15.50 $0.00 $73.11
OPERATING TING ENGINEERS LOCAL 4
12101/201 S $47.75 $11.00 $15.50 $0.00 $74.25
06/01/2019 $49.84 $11.00 $15,50 $0.00 $75.34
12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.49
V 6l 0 1 l 2 0 2 Y $5 1 Y LJ 6 $11.00
11.0Lf $15.50 $0.00 $! 1.5 6
06/01/20 1 $53.29 $11.00 $15.50 $0.00 $/9.79
1 2/ 1/202 1 5 1.43 $11.00 $15.50 $0.00 80.93
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
MILLWRIGHT(Zone 2) 04/01/2018 $37.17 $9.90 $18.50 $0.00 $65.57
10/01/2019 $3 8.02 $9.90 $18. 0 $0.00 $66.42
04/01/2019 $3 8.87 $9.90 $19. 0 $0.00 $67.2 7
Issue Date: 08/07/ 019 Wage Request Number: 20180807-059 Rage 22 of 42
Classification Effective Hate base Wage Health Pension Supplemental Total Rate
Uneinplovnient
Apprentice- LL HT-Local I J21 Zone
Mfeetiye Date- 04/01/2018 Supplome€(ai
Step percent Apprentice Base Wage Health Pension Unernpioyrnent Total Rate
1. 55 $ 0.44 $9.90 $5.31 $0.00 $35.65
2 65 $24.16 $9.90 $15.13 $0.00 $49.19
3 75 $2 7,98 $9,90 $16.10 $0.00 $53.88
4 85 $31.59 $9.90 $17.06 $0.00 $5 8.55
Notes:
3
Steps are 2,00 :.::_. ....------ -- ----------
0...........-hours ........ -- -
-,.-, - ... --, ..... ............
. - ..: ._ _:..: - . w.
Apprentice to journey-syprker Ratio:1;5
MORTAR MIXER 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22
12/01/2018 $34.34 $7.70 $t 4.02 $0.00 $5 .06
06/01/2019 $35. 1 $7.70 $14,02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0,00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.69
12/01/2020 $37.85 $7.70 $14.02 $0.00 $59.57
06101/20 1 $3 8.77 $7.70 $14.02 $0.00 $60.49
12/01120 1 $39.68 $7.70 $14.02 $0.00 $61.40
FQr apprentice rates sec"Apprentice-1,ASORER"
OILER(OTT-TER THAN TRUCK CRANES,GRADALL ) 06/0112018 $23.14 $11.00 $15.50 $0.00 $49.64
01'J4'RA JfNG ENGINEERS LOCAL 4
1 2/011201 9 $23.7 1 $11.00 $15.50 $0.00 $50.2 1
06/0112019 $24.26 $11.00 $15.50 $a.00 $50.76
12/01/2019 $24.83 $11.00 $15.50 $0.00 $51.33
06101/2020 $25.3 9 $11.00 $15.50 $0.00 $51.S8
12/01/2020 $25.95 $11.00 $15.50 $0,00 $52.45
0610 1/202 1 $26.50 $11.00 $15.50 $0,00 $53.00
1 /01/2021 $27.08 $t 1.00 $15.50 $0.00 $53.5 S
P-or apprentice rates see"Appwntice-OPERATING ENGINEERS" ---
OILER i!(TR�L�rC1 r]TCRAT yES, RADALL ) 06/01/2018 $27.40 $11.00 $15.50 $0.00 $53.90
OPERA TING JJryl 1 VI1 IAJ..�4�S L VA if F
12/01/2018 $28.07 $11.00 $15.50 $0.00 $54.57
06/01/2019 $28.72 $11.00 $15.50 $0.00 $55.22
12/01/2019 $29.39 $11.00 $15.50 $0.00 $55.89
06101/2020 $30.04 $11.00 $15.50 $0.00 $56.54
12101/20 0 $30.72 $11.00 $15.50 $0.00 $57.22
06/01/2021 $31.36 $11.00 $15.50 $►0.00 $57.86
12101/2021 $32.04 $11.00 $15.50 $0.00 $5 8.54
For apprentice rates see"Apprentice-OPERATING ENGfNEFR "
Issue Date: - 08/07/201 S Wage Request Number. 20180807-059 gage 23 of 42
Classification Effective!Rate Base Wage Health pellsioll Supplemental Total Rate
1 neni lo me"t
OTHER POWER DRIVEN EQUIPMENT-CLASS T1 0 /01/2019 $46.61 $i 1.00 $15.50 $0.00 $73.11
12/01/2,019 $47.75 $11,00 $15.50 $0.00 $74.25
O IO 112019 $48.84 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49,99 $11.00 $15.50 $0.00 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56
12/01/2020 $52.20 $11.00 $15.50 $0.00 $78.70
06/01120 1 $53.29 $1L00 $15.50 $0.00 $79.79
12701/2021 $54.43 $11.00 $15.50 $0,00 $80.93
1;or apprentice rates see"Apprentice-OPERATING ENGMEERS"
PAINTER(BRIDGES/TANKS) 01/01/2018 $50,01 $8.15 $20.15 $0.00 $78.31
01101/2019 $50.36 $9.15 $20.85 $0.00 $79.3
07/01/2019 $51.46 $8,15 $20.85 $0.00 $80.4
01/01/2020 $52.56 $5.15 $20.85 $0.00 $81.56
07/01/2020 $53.66 $8.15 $20.85 $0.00 $8 .6
01/01/2021 $54.76 $8.15 $20.85 $0.00 $83.+76
Apprentice^ PAINTER Local 35 -BRIDGESITANKS
Effeetivc Date-- 07/0172018 supplumuntal
Step percent Apprentice Base Wage health pension Uneinployment Total Rate
1 50 $25.01 $8.15 $0.00 $0.00 $33.16
2 55 $2 7.5 i $8.15 $5.34 $0.00 $41.00
3 60 $30.01 $8.15 $5.82 $0.00 $43.98
4 65 $32.51 $8.15 $6.31 $0.00 $46.97
5 70 $35.01 $8.15 $17.24 $0.00 $60.40
6 75 $37.51 $8.15 $17.73 $0.00 $63.3 9
7 80 $40.01 $8.15 $18.21 $0.00 $66.37
8 90 $45.01 $8.15 $19.18 $0,00 $72.34
Effective Date- 0II01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $25.18 $8.15 $0.00 $0.00 $33.33
2 55 $27.70 $8.15 $5.64 $0.00 $41.49
3 60 $30.22 $8.15 UJ 5 $0.00 $44.52
4 65 $32,73 $9,15 $6.66 $0.00 $47.54
5 70 $35.25 $8.15 $17.78 $0.00 $61.18
0 75 $37.77 $9.15 $18.29 $0.00 $64. 1
7 80 $40.29 $8.15 $18.80 $0.00 $6 7,24
8 90 $45.32 $8.15 $19.83 $0.00 $73.30
.----.....--- ::::..• .............. ........ r.:--..__ ,.._..--_.,.-- i.....,..-. :::'•..:,•.:�e ............... ...........a ....---__- ............ •......a ........... •••........._ .............. ...-........ -_•_-,- __...-..--_f .--- .. .... ............. ..-- ..-- .-..------_ .----- ..'----- ................. .........
Motes.
r
Steps are 750 hrs.
Apprentice to►you rneyworker Ratio:I:I
------- ------------------------I------ ---------------- --------- -------------- ---------- ----------- ----------------------
Issue Bate; --
Page�4 of 4�
08/07/2018 Wage Request Number. 20180807-059
classification Effective Date Rage Wage Health Pension Supplemental Total Rate
Ullen1ploynielit
PAINTER(SPRAY OR SANDBLAST,NEW)* 07/01/2018 $40.91 $8.15 $20.15 $0.00 $69.21
*1f 30%or more of surfaces to be painted are new construction, 01/01/201.9 $41.26 $8.15 $20.85 $0.00 $70.26
NE W p1nt rate shall b e uscd.PA INTERS OCAL 35-ZONE
01/01/2020 $43.46 $8.15 $20,85 $0.00 $72,46
07/01/2020 $44.56 $8.15 $20.95 $0.00 $73.56
01/01/2021 $45.66 $8.15 $20.85 $0,00 $74.66
Apprentice- PAINTER TER Local.35 Zone 2-SpraylSandbla st-New
Effective Date- 07/01/2018 -Supplemental
Step percent Apprentice Base Wage Health Pension Untinpleymcnt Total Rate
1 50 $20.46 $8.15 $0.00 $0.00 $28.61
2 55 $22.50 $8.15 $5.34 $0.00 $35.99
3 60 $24.55 $8.15 $5.82 $0,00 $38.52
4 65 $26.59 $8.15 $6.31 $0.00 $41.05
5 70 $29.64 $8.15 $17.24 $0.00 $54.03
6 75 $30.68 $9.15 $17.73 $0.00 $56.56
7 $O $32.73 $8.15 $18.21 $0.00 $59.09
8 90 $36,82 $8.15 $19.18 $0.00 $64.15
Effective Date- 01/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Une-niploymeni Total Rate
1 50 $20.63 $8.15 $0.00 $0.00 $28.78
2 55 $22.69 $8.15 $5.64 $0.00 $36.48
3 60 $24.76 $6.15 $0.00 $39.0
4 65 $26.82 $8.15 $6.66 $0.00 $41.63
5 70 $28.88 $8.15 $17.78 $0.00 $54.81
6 75 $30.95 $9.15 $18.29 $0.00 $5 7 39
7 80 $33.01 $8.15 $18.90 $0.00 $59.9
9 90 $37.13 $8.15 $19.83 $0.00 $65.11
_....r
Notes:
Steps are 750 hrs.
Apprentice to Journe vo rker Ratio:I J
PAINTER(SPRAY OR SANDBLAST}REPAINT) 07/01/2018 $3 8.97 $8.15 $20.15 $0.00 $6 7.27
01/01/2019 $39.32 $8.15 $20.85 $0.00 $68.32
07/01/2019 $40.42 $8.15 $20.85 $0.00 $69.42
01/01/2020 $41.52 $8.15 $20.85 MOO $70.52
07101/2020 $42.62 $8.15 $20.85 KOO $71.62
01/01/2021 $43.'72 $8.15 $20.85 $0.00 $72.72
3 ...
-------- ---------1------------------------------------------- --------- --------___-----------
Issue Date: 08/07/201 S Wage Request Number: 20180807-059 Page 25 of 42
Classification Effective Date Base Wage Health t*ensiOn Supplemental Total Rate
C��ten��l��ment
Appt-entice- .FAINTER Local.35 Zone 2--Spi-ayl andblast-Repaint
Effective dive Date- 07101/ 018 Supplemental
Step percent Apprentice Base Wage Heattl-i Pension Unemployment Total Rate
1 50 $19.49 $8,15 $0.00 $0.00 $27. 4
2 55 $21.43 $8.15 $5.34 $0,00 $34.92
3 60 $23.3 8 $8.15 $5.82 $0.00 $3 7.3 5
4 65 $25.3 3 $9.15 $6.31 $0.00 $39.7
5 70 $27,28 $8.15 $17.24 $0.00 $52.67
6 75 $29.23 $9,15 $17.73 $0.00 $55.11
7 s0 $31.1 S $8.15 $19,21 $0.00 $57.54
9 90 $35.07 $8.15 $19.18 $0.00 $62.40
Effective Date- 01/01/2019 Supplemental
Step percent Apprentice Ease Wage Health Pension Unemployment Total Rate
1 50 $19.66 $8.15 $0.00 $0.00 $27.81
2 55 $21.63 $8.15 $5.64 $0.00 $35.42
3 60 $23.59 $8.15 $6.15 $0.00 $37.89
4 65 $25.56 $8.15 $6.66 $0,00 $40.3 7
5 70 $27.52 $8.15 $17.78 $0.00 $53.45
6 75 $29.49 $9.15 $18.29 $0.00 $55.93
7 80 $31,46 $9,15 $18.80 $0.00 $55.41
8 90 $3 5.3 9 $8.15 $19.83 $0.00 $63.37
'Notes-
Steps are 750 hrs.
Ap pi-entice to Jnurne vot•ker Ratio:1:1
PAINTER(TRAFFIC MARKINGS) 06/01/2018 $33.25 $7.70 $14.02 $0.00 $54.97
12/01/2018 $34.09 $7.70 $14,02 $0.00 $55.91
06/01/2019 $34.96 $7.70 $14,02 $0.00 $56.68
12/01/2019 $35.82 $7.70 $14.02 $0.00 $57.54
06/01/2020 $36.7 l $7.70 $14.02 $0.00 $55.43
12/01/2020 $37.60 $7.70 $14.02 $0.00 $59.32
06/01/2021 $3 8.52 $7.70 $14.02 $0.00 $60.24
12/01/2021 $3 9.43 $7.70 $14.02 $0.00 $61.15
For Apprvntiee rates see"Apprentice-LA-BORER"
PAINTER/TAPER(BRUSH,STEW)* 07/01/2018 $39.51 $8.15 $20,15 $0.00 $67.81
*If 30%or more of surfaces to he painted are new construction,
0170112019 $39.86 $8.15 $20.85 $0.00 $68.86
NEW faint rats Sh.a11 he used.PAINTE LOCAL 35-ZONE 2
07701/201 9 $40.96 $8.15 $20.85 $0.00 $69.96
01101/2020 $42.06 $8.15 $20.85 $0,00 $71,06
07/01/2020 $43.16 $8.15 $20.85 $0.00 $72,16
01/01/2021 $44.25 $8.15 $20.85 $0.00 $73,25
----- ..---- --. ------ ---------- ---.1--------------- -------------------
Issue Date: 08/07/2019 Wage Request Number-5. 20180807-059 Page 26 of 42
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemployment
Apprentice- PAMTER--Local 35 Zone 2-BRUSH NEW
Effective Date- 07/01/2018 Supplemental
Stop percent Apprentice Base Wage Health Pension Uticinplayment Total Rate
1 50 $19.76 $9,15 $0.00 $0.00 $27.91
2 55 $21.73 $8.15 $5,34 $0.00 $35.22
3 60 $23.71 $8.15 $5.82 $0.00 $37.68
4 65 $ 5�68 $8.15 $6.31 $0.00 $40.14
5 70 $27,66 $8.15 $17.24 $0.00 $53,05
6 75 $29.63 $8,15 $17.73 $0.00 $55.51
7 80 $31.61 $8.15 $18.21 $0.00 $57.97
8 90 $35.56 $8.15 $19.18 $0.00 $62.89
Effective Date- 01/01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension Utiemplayment Total Rate
1 50 $19.93 $8.15 $0.00 $0.00 $28.08
2 55 $21.92 $8.15 $5.64 $0.00 $35.71
3 60 $23.92 $9.15 $6.15 $0.00 $38.2
4 65 $25.91 $8.15 $6.66 $0.00 $40.72
5 70 $27.90 $8.15 $17.78 $0.00 $53.83
b 75 $29.90 $9.15 $19.29 $0.00 $56.3 4
7 80 $31.89 $8,15 $18.90 $0.00 $58.84
9 90 $35.87 $8.15 $19.83 $0.00 $63.85
H
�Notes:
Steps are 750 ors. t
.............
.......... ............
_ ._. ...
-----
Apprentice to Journeyworker Ratio:1:1
PAINTER I TAPER(BRUSH,REPAINT) 07/01/2018 $37.57 $8.15 $20.15 $0.00 $65.97
1/01/ 019 $37.92 $8.15 $20.85 $0.00 $66.92
0710 1/20 1 9 $39.02 $8.15 $20.85 $0.00 $68.02
01/01/2020 $40,12 $8.15 $20.85 $0.00 $69.12
07/01/ 020 $41.22 $8.15 $20,95 $0.00 $70.22
01/01/2021 $42.32 $8.15 $20,95 $0.00 $71.32
omie Date: �1R107/201 ----------- ..-- --`
l ne Request umber: 20180807-059 Page 27 of 42
I
Classification Effective Date Base Wage Health li nioizpP1men#al Total Rate
unel"Ploment
Ap prey tic - PAINTER Local 35 Zone 2-BR S11 REPAINT
Effective Date- 07/01/20 t 8 SLIpplMeRtat
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $t 8.79 MIS $0.00 $0.00 $26.94
2 5:5 $20.66 $8.15 $5.34 $0.00 $34.15
3 60 $22.54 $8.15 $5.82 $0.00 $36.51
4 65 $24.42 $8.15 $6.31 $0.00 $3 8.88
5 70 $20.30 $8.15 $17.24 $0.00 $51, 9
6 75 $28.18 $8.15 $17.73 $0.00 $54.06
7 s0 $30�06 $8,15 $18.21 $0.00 $56.42
8 90 $33.81 $8.15 $19.18 $0.00 $61.14
Effective Date- 01/01 f 2019 Supplemental
Step percent Apprentice Ease Wage Health Pension Unemploynxpt Total Rate
1 50 $18.96 $8.15 $0.00 $0.00 $27.11
55 $20.86 $8.15 $5.64 $0.00 $34.65
3 60 $22.75 $8.15 $6.15 $0,00 $37.05
4 65 $24.65 $8.15 $6.66 $0.00 $39.46
5 70 $26.54 $8.15 $17.78 $0.00 $5 .47
6 75 $28.44 $8.15 $1&29 $0.00 $54.88
7 80 $30.34 $8.15 $18.80 $0.00 $57.29
8 90 $34.13 $8.15 $M83 $0.00 $62.11
lNotes:
Steps are 750 hrs. z
- r.........
App-rentice to Journeywork-,r Ratio-.1A
PANEL&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9,07 $8.00 $0.00 $47.3 5
TEAMSTERS JOINT CO UNCIL NO. 10 ZONE B
PIER AND DOCK CONSTRUCTOR(UNDERPIM-IN T AND 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77_62
DELI ) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99
PILE DRIVER LOCAL 56(ZONE 1)
For approndee rates see"Apprentice-PILE DRIVER"
PILE DRIVER 0810 1/20 1 8 $46.57 $9.90 $21.15 $0.00 $77.62
PILE DRIVER LOCAL 56(ZONE,1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99
Issue Date: 08/07/2018 Wage Request umbel-. 20180807-059 Page 28 of 42
CIassifiea#t011 Effective Date Base Wage Health Pensiall
Supplemental Total Rafe
U umploy nient
Apprentice- .BILE DRJVER-Local 56Zone I
Effective Date- 08/01/201 S -Supplemental
Stop percent ,Apprentice Base Wage Health Pension Un-cmployineiit Total Rate
1 50 $23.29 $9.90 $21.15 $0.00 $54.34
2 60 $27.94 $9.90 $21.15 $0,00 $58.99
3 70 $32. 0 $9.90 $21.15 $0.00 $63.65
4 75 $34,93 $9,90 $21.15 $0.00 $65 M
5 80 $37.26 $9,90 $21.15 $0.00 $68.31
6 s0 $3T26 $9.90 $21.15 $0.00 $69.31
7 90 $41.91 $9.90 $21.15 $0,00 $72.96
8 90 $41M $9.90 $ 1!15 $0.00 $72.96
Effective Date^ 08/01/2019 upplemmental
Step percent Apprentice Base mirage Health Pension Unemployment Total Rate
1 50 $24.47 $9.90 $2 t.15 $0.00 $55.5
2 60 $29.36 $9.90 $21.15 $0.00 $60.41
3 70 $34.26 $9.90 $21.15 $0.00 $65.31
4 75 $36.71 $9.90 $21.15 $0.00 $67.76
5 80 $39.15 $9.90 $21,15 $0.00 $70.20
6 80 $3 .15 $9,90 $21.15 $0.00 $70.20
7 90 $44.05 $9.90 $21.15 $0.00 $75.10
9 90 $44.05 $9.90 $21.15 $0,00 $75.10
,Notes
s
a
s s
_ - --Y _..._ r.-.. .............. --_ ..........._ t...... ----------
r...._...... --'.r•v;, ..:.:.::.::.s ----.:.: ---_---_._-.� _-_.�.......... ......... --------_- .----__.___ .__........- -
........... .... .__.__......_
Apprentice to Jourineyworker Ratio:1:5
PIPEFITTFR&STEAMFITTER 09/01/ 017 $4 7.11 $9.95 $18.74 $0.00 $75.80
09/0 I/201 8 $48.6 1 $9. 5 $18.74 $0.00 $77.30
09/0112019 $50.11 $9.95 $18.74 $0.00 $78.80
09/01/2020 $51.61 $9.95 $18.74 $0.00 $80.30
huge Hate. -0RI077201 9 ------.... Wane Request Number: 20180807-059 Page 29 of 42
Classification Supplemental 'Total Rate
� 1Jft-ec#ive late Base Wage Health l'ex��i�n CJncmolor7ntent
Apprentice- PI'PEFJTT R Local 537(Local 138)
Effective Date- 09/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 SI&84 $9.95 $7.75 $0.00 $3 .54
2 45 $21.20 $9.95 $18.74 $0.00 $4 .89
3 60 $28. '7 $9.95 $18.74 $0.00 $56.96
4 70 $32.98 $9.95 $18.74 $0.00 $61. 7
5 80 $37.69 $9.95 $18.+74 $0.00 $66.3 8
Effective]date- 09/01/2018 supplemental
Step percent Apprentice Base Wage Health Pension ulip'I ployment Total Rate
1 40 $19.44 $9.95 $7.7 5 $0.00 $37.14
2 45 $21.87 $9.95 $18.74 $0,00 $50.56
3 60 $ 9.1'7 $9,95 $18.74 $0.00 $57.86
4 70 $34.03 $9.95 $19.74 $0.00 $62.72
5 80 $3 8.89 $9.95 $18.74 $0.00 $67.58
_.
Notes:
1:3;3:15; 1:10 thereafter 1 Steps are 1 yr.
.efri ABC Mechanic' ' 1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) �
Apprentice to Jon-rueyworker Ratio-.**
PIPELA►YER 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22
12/01/2018 $34.34 $7.70 $14.02 $0.00 $56.06
06/01/2019 $35.21 $7.70 $14.02 $0.00 $56. 3
12/01/2019 $36,07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $+7.70 $14.02 $0.00 $58.68
(2/01/2020 $37.85 $7.70 S t 4.02 $0.00 $59.57
06/01/2021 $3 8.?7 $7.70 $14.02 $0.00 $60.49
12/01/2021 $39.69 $7.70 $14.02 $0.00 $61.40
For apprentice rates see"Apprentice--LABORER" __.......PLUMBER 03/01/2019 $50.61 $11,57 $15.76 $0.00 $7 7.94
PLUMBERS&GASP'7TERS LOC',iL 12(Local 138)
0910112018 $5 2.11 $11.57 $15.76 $0.00 $7 .44
03/0112019 $53.61 $11.57 $15.+76 $0.00 $80. 4
09/01/2019 $55.11 $11.57 $15.76 $0.00 $82.44
03101/2020 $56,61 $11.57 $15.76 $0.00 $83.94
09/01/2020 $58.11 $11.57 $15.76 $0.00 $85.44
03/01/2021 $59.61 $11.5+7 $15.76 $0.00 $86. 4
--- ... --- .....-- -- -
--------------------------- .............I------- ---------------------------_-------
Nque Date; 09/07/201 S Wage Request Number: 20180807.059 page 30 of 42
1 sif #inn Effective f ate Base Wage Health Pemierl s upplemenfill Total Rate
a
Unemployment
Apprentice- PLU E1RIGA ITTER-Loeat 12(Local 138)
Effective Date- 03/01/2018 s-upplemmmi
Step percent Apprentice Base Wage Health Pension Unemployment Total late
1 35 $17.71 $11.57 $5.72 $0.00 $3 5.00
2 40 $20.24 $11.57 $6.49 $0.00 $38,30
3 55 $27.84 $11.57 $5.91 $0.00 $45.22
4 65 $32.90 $11.57 $10.36 $0.00 $54.93
5 75 $37.96 $11.57 $11.90 $0.00 $61.43
Effective Date- 0 /01/2019 supplemental
Step percent Apprentice Base Wage Health Pension unemployment 'Total Rate
1 35 $18.24 $11.57 $5.72 $0.00 $35.53
2 40 $20.84 $11.57 $6.49 $0.00 $3 8.90
3 55 $28.66 $11.57 $8.82 $0.00 $49.05
4 65 $33.87 $11.57 $10.36 $0.00 $55.80
5 75 $39.OS $11.57 $1 1.90 $0.00 $6 .55
[Notes: 5
Steps are 1 yr
Step 4 with lie$55.15,Step5 with lie$64.74
Apprentice to Juu rney%vurker R-9 tie:1:5
PNEUMATIC CONTROLS(TEMP.) 09/01/2017 $47.11 $9.95 $1 S,74 $0.00 $75.90
09101/201 S $4 S.61 $9.95 $18.74 $0.00 $77.3 0
09/0 f/2019 $50.1 1 $9.95 $119.74 $0.00 $78.80
09/01/2020 $51.61 $9.95 $18.74 $0.00 $50.30
For apprentice rates see"Apprentice-PIP Fr,iTTER"or"PLUI�DEFVPIPEFITTER"
PNEUMATIC DRILL/TOOL OPERATOR 06/01/2018 $33.50 $7.70 $14.02 $0.00 $55.22
LABORERS-ZONE 2 12/01/201 S $34.34 $7.70 $14.02 $0.00 $56.06
06101/2019 $35.21 $7.70 $14.02 $€1.00 $56.93
12/01/ 019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68
12/01/20 0 $37.55 $7.70 $14.02 $0.00 $59,57
06/01/2021 $38.77 $7.70 $14.02 $0.00 $60.49
12101/2021 $39.69 $7.70 $14.02 $0.00 $61,40
For apprentice ruts see"Apprentice-LA ORER"
POWDER MAN&BLASTER 06/01/2018 $34.25 $7.70 $14.02 $0.00 $55.97
1 /01/2018 $35.09 $7.70 $14.02 $0.00 $56.51
06101/ 019 $35,96 $7.70 $14.02 $0.00 $57.68
12/01/2019 $36.92 $7.70 $14.02 $0.00 $55.54
06101/ 020 $37.71 $7.70 $14.02 $0.00 $59.43
12/0112020 $3 8.60 $7.70 $1.4.02 $0.00 $60.32
06/01/20 1 $39.52 $7.70 $14.02 $0.00 $61.24
12101/2021 $40.43 $7.70 $14.02 $0.00 $ 2.15
For apprent'Tce rates see"Apprentice-LABORER"
_g»e Elate:---09/07/201� -----..... -- -- --
tq Wane Request Numbet•: 20180807-059 Page 31 of 42
Classification Effective late Base Waage Health Pension Supplemental Total Rate
Unemployment
POWER S1-1O EL/DE RICK/TRE CMNG MACHTITE 06/01/2018 $47.0 9 $11.00 $15.50 $0.00 $►73.5 9
1210112018 $49.23 $11.00 $15,50 $0.00 $74.73
06/01/2019 $49.33 $11.00 $15.50 $0.00 $75.83
12/011 019 $5 0.48 $11.00 $15.50 $0.00 $76.98
06/01/2020 $51.5 8 $11.00 $15.50 $0.00 $78-08
12101l2020 $52.73 $11.00 $15.50 $0.00 $7923
06/01/2021 $53.83 $11.00 $15.50 $0.00 $80.33
1 270 1/202 1 $54.98 $11.00 $15.50 $0.00 $81.48
For apprentice rates sce"Apprentice-C)PFRA'f NG ENGINI-ERS"
PUMP OPERATOR(CONCRETE) 06101/2018 $47.08 $i 1,00 $15.50 $0.00 $73.58
OPE,RA TING ENGINEER 8 LOCAL 4 1 2101/201 8 $48.23 $11,00 $15.50 $0.00 $74.73
06/01/2019 $49.33 $11.00 $15.50 $0.00 $75.83
12/01/2019 $50.48 $11.00 $15.50 $0.00 $76.98
06/01/2020 $51.58 $11.00 $15.50 $0.00 $78.08
12/01/2020 $52.73 $i i.00 $15.50 $0.00 $79. 3
06/01/2021 $53.53 $11.00 $15.50 $0.00 $80.33
12/01/2021 $54.98 $11.00 $15.50 $0.00 $81.49
For apprentice rates see"Apprentice-OPERATING ENOFNEERS"
P1 JamE**1�ATO ��(DE A.TERIN ,OTHER) 06/01/201 S $31.90 $11.00 `�15.50 $0.00 $59.40
OPERA l TINGI fiNGl(Y�'eyl�llC1 LV Cir`#
12101120 l 8 $32.68 $11.00 $15.50 $0.00 $59.1 8
06/01/2019 $33.43 $11.00 $15.50 $0.00 $59.93
12/01/2019 $34.22 $11.00 $15.50 $0.00 $60.72
06/01/2020 $34,97 $i i m $15.50 $0.00 $61.47
12/01/2020 $35,75 $11.00 $15.50 $0.00 $62.25
06/01/2021 $36.50 $11.00 1$15,50 $0.00 $63.00
12/01/2021 $37.29 $11.00 $15.50 $0.00 $63.79
For apprentice rates see"Apprentice-OPERXfING ENGtNEERS"
READY-MIX CONCRETE DR ER 0510 1/20 1 9 $24.24 $8.49 $12.46 $0.00 $45.19
04/30/2019 $24. 4 $8.49 $12.92 $0.00 $45.65
RECLAIMEI 06/01/2018 $46.61 $1 I.00 $15.50 $0.00 $73.11
OPERATING El Y LlINEii RS lr1J CAL T
i 2/01/2018 $4 7.'75 $11.00 $15.50 $0.00 $74,25
06/01/2019 $45.84 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49.99 $11.00 $15.50 $0.00 $76.48
06/0112020 $51.06 $11.00 $15.50 $0.00 $77.56
12/011020 $52.20 $11.00 $15.50 $0.00 $78.70
06/01/2021 $53.29 $11.00 $15.50 $0.00 $79.79
1 /01/2021 $54.43 $11.00 $15.50 $0.00 $80.93
For apprentice rates see"Apprentice-OPERATING ENGII URSt"
RI-DF--ON MOTORIZED BU66Y OPERATOR 06/0 1120 1 8 $33.50 $7.70 $14.02 $0.00 $55.2
LABORERS-ZONE 2 1 /01/2018 $34.3 4 $7.70 $14.02 $0.00 $56,06
0610 1/20 1 9 $35.21 $7.70 $14.02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $5 8.68
12/01/2020 $37.95 $7.70 $14.02 $0.00 $59.57
06/01/2021 $3 8.77 $7.70 $14.02 $0.00 $60.49
12101/2021 $39.6 S $7.70 $14.02 $0,00 $61.40
-- ----.--
---------- --------- ------ ---------- ----------- --------- ---------
isine Date: 09/0712019 Wane bequest lumber: 20180807-059 Page 32 of 42
classification Effective mate Base age Health Pension Supplemental Total late
t.Tireniptflyment
For apprentice rates see"Apprentice-LABORER"
ROLLE /SPREADER/M LCMN 1 AMNE 06/01/2018 $46.61 $11.00 $15.50 $0.00 $73.11
i 2/01/2018 $47.75 $11.00 $15.50 $0,00 $74.25
06/01/2019 $4U4 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49.98 $11.00 $15.50 $0.00 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77. 6
12/01/2020 $52. 0 $11.00 $15.50 $0.00 $79.70
06/01/2021 $5 3.29 $11.00 $15,5 0 $0.00 $79.79
12/01/2021 $54.43 $11,00 $15.50 $0.00 $80.93
FOT apprentice rates see"Apprentice-OPERATING ENi GINEERS"
ROOFER(1ne.Roofer Waterproofng&Roofer Damproofg) 08/01/2019 $42.36 $11.35 $15.90 $0.00 $69.61
ROOFERS LOCAL 33 02/01/2019 $43.51 $11.35 $15.90 $0.00 $70.76
Apprentice-- ROOFER-Local 33
Effective]Date- 08/01/201 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $21.18 $11.35 $3.69 $0.00 $36.22
2 60 $25.42 $11.35 $15.90 $0.00 $52.67
3 65 $27.53 $11.35 $15.90 $0.00 $54.78
4 75 $31.77 $11.35 $15.90 $0.00 $59.02
5 85 $3 6.01 $11.35 $15.90 $0.00 $63.26
Effective Date- 02/01/2019 Supplemental
Step percent Apprentice Base Wag Health pension Uaempioyme-nt Total Rate
1 50 $21.76 $11.35 $3.69 $0.00 $36,80
60 $ 6.11 $11.35 $15.90 $0,00 $53.36
3 65 $ 8.28 $11.35 $15.90 $0.00 $55,53
4 75 $32.63 $11.35 $15.90 $0.00 $59.88
S 85 $36.98 $11.35 $15.90 $0.00 $64.23
Notes 1:5 2:6-10)the 1:10;Reroofing: 1:4r then 1:1
Step I is 2000 hrs.;Steps 2-5 are 1000 firs.
(Hot Pitch Mechanics'receive$1.00 hr.above ROOFERS
Apprentice to Journeyworker Matto.**
ROOFER SLATE 1 TILE/PRECAST CONCRETE 08101/2018 $42.61 $11.35 $15-90 $0.00 $69.86
ROOFERSLOCAL 33 02101/2019 $43.76 $11.35 $15.90 $0.00 $71.01
For apprentice rates see"Apprentice-ROOFER"
SIEET1 FETAL WORKER 02101/ 018 $44.11 $12. 0 $24.12 $2.41 $82.84
SHEET ETAL WORKEWS'LOCAL 17--A
- _------ ------ ----.....-
---------------- ------------- ------------------------- --------- ----------- ----------
hgiie Date: 09/07/201� Waae Request Number: 20180807-059 page 33 of 42
I
lassifiea#inn Effective Date Page Ruth Pension SupplementalTotat Rate
Uuexniplovnient
Apprentice- SHEET METAL WORKER-Local 17-A
Effective Date-- 02/01/2018 Supplemental
Step percent Apprentice Base Wage Health -Pension Unemployment Total Rate
1 40 $17.64 $12.20 $5.61 $0.00 $3 5.45
2 40 $17.64 $12.20 $5.61 $0.00 $35.45
3 45 $19.85 $12.20 $10.85 $1.29 $44.19
4 45 $19.95 $12.20 $10.95 $.1.29 $44.19
5 50 $22.06 $12.20 $11.80 $1.3 8 $47.44
6 50 $22.06 $12.20 $12.05 $1.39 $47.70
7 60 $26.47 $12.20 $13.70 $1.5+7 $53.94
8 65 $28.67 $12.20 $14.65 $1.67 $57.19
9 75 $3 3.0 9 $12.20 $16.56 $1.56 $63.70
10 85 $37.49 $12.20 $17.96 $2.03 $69.69
..........: . ........ ..._ - -
zNotes:
}
Steps are 6 mos.,
-----
----.._ ...... - - ... ......:.. �..._.__:.- ............. .. _:---__: __.-.. ....._... _ _ -___- _-_ __ _ _ _--____ r .. ......_
Apprentice to Joarneysvorker patio:1:4
SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
PAINTERS LOCAL 35-ZONE 2
Apprentice- SIGN ERECTOR-Local 35 Zone 2
Effective Mite-- 0610112013 Stipplellwiltat
Step percent Apprenfiee Base Wage Health Pension Unemployment Total Rate
1 50 $12,91 $7.07 $0.00 $0.00 $19.98
2 55 $14.20 $7.07 $2.45 $0.00 $23.72
3 60 $15,49 $7.07 $2.45 $0.00 $25.01
4 65 $16.78 $7.07 $2.45 $0.00 $26.3 0
5 70 $19.07 $7.07 $7.05 $0.00 $32.19
6 75 $19.36 $7.07 $7.05 $0.00 $33.48
7 80 $20.65 $7.0+7 $7.05 $0.00 $34.77
9 85 $21.94 $7.07 $7.05 $0.00 $36.06
9 90 $23. 3 $7.07 $7.05 $0.00 $37.3 5
-- -- _..- _ _ --._.._.. . -
Notes:
Steps are 4 mos.
r�
.............. ..........�... �r.�'--_::=i �::..�-...n .-.--.-ii-r •i.......a ............ ...... .....--_.. -..-..,- -;•�:t.�•-� ...........� ..�..�..n.[r .--..--.r.• ...• .. ...tr -i...r_..a ............ -..r._-.n •....__ _• v i }...-i.• ........i..... ..........[._
Apprentice to Jou rneyworker Ratiw l:l
SPECIALIZED EARTH MOVING EQUIP<3 5 TON 12/01I2016 $32.44 $10.91 $10.99 $0.00 $54.24
TEAMSTERS JOINT COUNCIL NO.}0 TONE R
SPECIALIZED EARTH MOVING EQUIP>35 TONS 1 /01/ 016 $32.73 $10.91 $10.89 $0.00 $54.53
TLL_ASTERS jOINT CoUNCIL No.10 TONE B
1-une Tate; 09/0'7/201 9 "------._ Wane Request Number: 20190807-059 Page 34 of 42
classification Effective late fuse Wage Health Pemion Supplemental Total Rate
Unemployment
SPRINKLER FITTER 03/01/2018 $52,00 $9,12 $18.15 $0.00 $79.27
01/01/2019 $53.35 $9.47 $18.35 $0.00 $81.17
03/01/2019 $54.70 $9.47 $18.35 $0.00 $82.52
10/01/2019 $56.05 $9.47 $18.35 $0.00 $83.87
03/01/2020 $57.40 $9.47 $18.35 $0.00 $85.22
10/01/2020 $58,75 $9.47 $18.35 $0.00 $86.57
0370 1/202 1 $60.10 $9.47 $18.35 $0.00 $9 7.92
Apprentice- SPRINKLER FITTER-Local 550(Section R)Zone 2
Effective Date- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35 $18.20 $9.12 $8.90 $0.00 $36.22
2 40 $20.80 $9.12 $8.90 $0.00 $3 8.82
3 45 $23.40 $9,12 $8.90 $0.00 $41.42
4 50 $26,00 $9.12 $8.90 $0,00 $44,02
5 55 $28.60 $9.12 $8.90 $0.00 $46.62
6 60 $31.20 $9.12 $10.40 $0.00 $50.72
7 65 $33.80 $9.12 $10.40 $0.00 $53.32
8 70 $36.40 $9.12 $10.40 $0.00 $5 5.92
9 75 $39,00 $9.12 $10.40 $0,00 $58.52
10 80 $41.60 $9.12 $10.40 $0.00 $61.12
ETfective Date- 1 0/0 1/2018 siippicinvatral
Step percent Apprentice Base Wage Health pension Unemployment Total Rate
1 35 $18.67 $9.12 $8.90 $0.00 $3 .69
2 40 $21.34 $9.12 $8.90 $0.00 $39.36
3 45 $24.01 $9.12 $8.90 $0.00 $42.03
4 50 $26.68 $9.12 $8. 0 $0.00 $44.70
5 55 $29,34 $9.12 $8.90 $0,00 $47.36
6 60 $32,01 $9.12 $10.40 $0.00 $5 L53
7 65 $34.68 $9.12 $10.40 $0.00 $54.20
8 70 $37.35 $9,12 $10.40 $0.00 $5 .87
9 75 $40.01 $9.12 $10.40 $0.00 $5 9.5 3
10 80 $42.68 $9.12 $10.40 $0.00 $62.20
Notes: Apprentice entered prior 9I30/10;
40/45/5 015 5/60/65/70/75/80/85
Steps are 850 hours
App rentice to Jonmerywo rker Ratio:t:3
-------------------- ---------- ------- ------------- ------ -------------- ------
- '719.01
tozui tm Y7gtP, 02/0 size Rea nest Number: 20190807-059 Page 35 of 42
1 ss1 ti��t Effective Date Base ;age Health Pension Supplemental `Total .ate
iiem l{ iinent
STEAD BOILER OPERATOR 06/01/2018 $46.61 $11,00 $15.50 $0.00 $73.11
OPF,RA TING F.NGIN ERE L0CALr
06/01/2019 $48.84 $11,00 $15.50 $0.00 $75.34
12/01/2019 $49.9 9 $11.00 $15.50 $0.00 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.56
12/01/2020 $52.20 $11.00 W.5 0 $0.00 $7 8.70
06/01/2021 $53,29 $11.00 $15.50 $0.00 $79.79
121017 021 $54.43 $11.00 $15,50 $0.00 $90,93
For appreEitice rates see"Apprentice-OPERATTNG ENGINEERS"
TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 06/01/2019 $46.61 $11.00 $15.50 $0.00 $73.11
12/01/2018 $47.75 $11.00 $15.50 $0.00 $74.25
06/01/2019 $48.54 $11.00 $15.50 $0.00 $75.34
12101/2019 $49.98 $11.00 $15.50 $0.00 $76.48
06/01/20 0 $51.06 $11.00 $15,50 $0.00 $77.56
12/01/ 0 0 $52.20 $11.00 $1 ,50 $0.00 $78.70
06/01/2021 $53.29 $11.00 $15.50 $0.00 $79.79
1 /01/2021 $54.43 $11.00 $15.50 $0.00 $80. 3
For,apprentice rates see"Apprentice-OPERATING ENGINEERS"
TELECOM -r T A TT N TECHNICIAN 03/01/2018 $37,61 $13.00' $15.93 $0.00 $6 .54
L'LZrCTRICfAMS LOCAL 103
09/01/ 018 $38.51 $13.00 $15.96 $0.00 $67.47
03/01/2019 $39.40 $13.00 $15.98 $0.00 $69,38
T ----
��snp Date: 09107/201� ----- Watt Request Numbs , 20180807-059 P���3�of��
Classificatiolt Effective Date Base Wage Health Pension
Sti ppiemeatat Total Ptate
unemployment
Apprentice- mLECO MU ICATIO TECI- IC'IAN-Local 103
Effective Date- 03/01/2018 SUppieinentat
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 $15.04 $13.00 $0.45 $0.00 $29.49
40 $15.04 $13.00 $0.45 $0.00 $28.49
3 45 $16.92 $13.00 $12.74 $0.00 $42.66
4 45 $16.92 $13.00 $12.74 $0.00 $42.66
5 50 $18.81 $13.00 $13.03 $0.00 $44.84
6 55 $20.69 $13.00 $13.32 $0.00 $47.01
7 60 $22.57 $13.00 $13.61 $0.00 $49.18
8 65 $ 4.45 $13.00 $13.90 $0.00 $51.35
10 75 $28.21 $13.00 $1 4.48 $0.00 $55.6
Effective Date- 09/01/2018 -suppl rental
Step percent Apprentice Base Wage Health Pension Unemployment 'Total late
1 40 $15.40 $13.00 $0.46 .i 0,00 $28.86
2 40 $15.40 $13.00 $0.46 $0.00 $ 8.86
3 45 $17.33 $13.00 $12,75 $0.00 $43.08
4 45 $17.33 $13.00 $12.75 $0.00 $43.08
5 50 $19.26 $13.00 $13.05 $0.00 $45.31
6 55 $21.18 $13.00 $13.34 $0.00 $47.52
7 60 $23.11 $13.00 $13,62 $0.00 $40_73
a 65 $25,03 $13.00 $13.92 $0.00 $51.95
9 70 $ 6.96 $13.00 $14.21 $0.00 $54.1 f7
10 75 $28,88 $13.00 $14.50 $0.00 $56.38
............. ,------- ...........,. •.y ••........ -.-. .r ..--r < •••, .r . -.-...... ------------. t _.,..� „ ---. ..� - ..e
Notes:
Apprentice to Journe vorker Ratio:1:1
TERRAZZO FINISHERS 08l01l201'9 $51.85 $10.75 $20.66 $0.00 $83.26
02/0112019 $52.49 $10.75 $ 0.66 $0.00 $83. 0
08/01/2019 $53.54 $10.75 $ 0.90 $0.00 $85.39
02/01/2020 $54.49 $10.75 $20.90 $0.00 $86.03
08/01/2020 $55.83 $1 0,75 $20.95 $0.00 $87.53
0 /01/2021 $5 6.4'7 $10.75 $20.95 $0.00 $8 8.17
08/01/ 021 $57.97 $10.75 $21.11 $0.00 $89.73
02/01/2022 $58.46 $10.75 $ 1.11 $0.00 $90.32
ra„p D:Rtt.F ORM' / 1 20 --- -- ------ -- -
Y aee Idea u es1 Number: 20190 907-059 Page 37 of 42
Ia sificatio L,ffective Da to Base Wage Healtb Persian Supplemental Total Rate
Unemploment
Apprentice- TERRAZZO FINISHER--Cowl 3 Marble& Tile
Effective Date- 08/01/2018 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $25.93 $10.75 $20.03 $0.00 $56.71
2 60 $31.11 $10.75 $20.03 $0,00 $61.89
3 70 $36.30 $10.75 $20.03 $0.00 $67.0
4 80 $41.48 $10.75 $20.03 $0.00 $72.26
5 90 $46.07 $10.75 $20.03 $0.00 $77.45
Effective Date- 0 /01/2019 Supplemental
Step percent Apprentice Base Wage Health Pension unemplayment Total Rate
I so $26.25 $10.75 $20,03 $0.00 $57.03
2 60 $31.49 $10.75 $20,03 $0.00 $62.2?
3 70 $36.74 $10.75 $20.03 $0.00 $6 7.52
4 80 $41.99 $10.75 $20.03 $0,00 $7 .77
5 90 $47.24 $10-75 $20.03 $0.00 $78.02
_ ._.::- a_ : ::...........n ...... ...........N m_w, - - .. ............. ........... ......., _ .......... _
Notes:
f
FC
k
S
........ ......
Apprentice to Jou rneywo rker Ratio:t:3
TEST BORING DRILLER 06/01/2018 $39.35 $730 $15.40 $0.00 $62.45
LABORL,'ti.La-F0 UNDA TION AND AM R10:
l 2/01/201 8 $40.30 $7.70 $15.40 $0,00 $63.40
6/0 I/2019 a$41,30 $7.70 $15,40 $0.00 $64,40
12/01/2019 $42.30 $7.70 $15.40 $0.00 $65.40
06/01/2020 $43.29 $7.70 $15.40 $0.00 $66.39
12/01/2020 $44.27 $7.70 $15.40 $0.00 $67.37
06/01/2021 $45.29 $7.70 $15.40 $0.00 $68.3
12/01/2021 $46.30 $7.70 $15.40 $0.00 $69.40
For apprentice rates see"Apprentice-LA'BOP .R"
TESL'BORING DRILLER HELPER 06/01/2018 $38.07 $7.70 $15.40 $0.00 $61,17
L.4B ORx,Rs-FO UNDATION.AND MARIIlfE,
12/01/201 8 $39.02 $7.70 $15.40 $0.00 $62,1 2
0610 1/20 1 9 $40.02 $7.70 $15.40 $0.00 $63.12
12101/2019 $41.02 $7.70 $15.40 $0.00 $64.12
0 /01/2020 $42.01 ST70 $15.40 $0.00 $65.11
12/01/2020 $4 . 9 $7.70 $15.40 $0.00 $6 .09
06/01/2021 $44.01 $7.70 $15.40 $0.00 $6 7.11
12/01/2021 $45.02 $7.70 $15.40 $0.00 $69.1
For apprentice rates see"AppreDtiQe,-LABORER"
i �bvift*•1 .own7no 1 R ace Request Number: 20180807-059 Page 38 of 42
Classification rfl'ective mate Base Wage Health Pension
Supplemental 'Dotal Rate
Ultem 10 meat
TEST BORING LABORER 06/01/2018 $37.95 $7.70 $15.40 $0.00 $61.05
Lei B0REkS,F0 UNDA TION/I ND W R INE l0 1 fr 2 9 {.{7��'L 7r�{'J ��}[ry{'1 [�+1y l'0■0/ykF J��y�J,e0
���4.R1 L��� ��.J� L{+�.�RF .Y 1�.1� L�V.S..F� 4��.1JV
06/01/2019 $39.90 $7T70 $15.40 $0.00 $63.00
12101/2019 $40.90 $7.70 $15,40 $0.00 $64.00
06/01/2020 $41.89 $7.70 $15.40 $0.00 $64.99
12/01/2020 $42.97 $7.70 $15.40 $0.00 $65.97
06/01/2021 $43.89 $7.70 $15.40 $0,00 $66.99
12/01/2021 $44.90 $7.70 $15.40 $0.00 $68.00
For apprentice rates see"Apprentice-LABORER"
TRACTORS/PORTABLE STEAM GENERATORS 06/01/2018 $46.61 $11.00 $15.50 $0.00 $73.11
.[NG ENGINEERS LOCAL 4 12/01/2019 $47.75 $11.00 $15.50 $0.00 $74.25
06/01/2019 $48.84 $11.00 $15.50 $0.00 $75.34
12/01/2019 $49.9 S $11.00 $15.50 $0.00 $76.48
06/01/2020 $51.06 $11.00 $15.50 $0.00 $77.5 6
12/0112020 $52.20 $11.00 $15.50 $0.00 $78.70
06/0112021 $53.29 $11.00 $15.50 $0.00 $79.79
12/01/2021 $54.43 $11.00 $15.50 $0.00 $80.93
For apprentice rates see"Apprentice--OPERATING ENGINEERS"
TRAILERS FOR EARTH 11 OVINCT E MPM E T 12101/2016 $3 3.02 $10.91 $10.89 $0.00 $54.82
TE,AMSTERS jOINT COUNCIL NO IO ZONE B
TUNNEL WORK-COMPRESSED AIR 06/01/2018 $50.23 $7.70 $15.80 $0.00 $73.73
12/01/2018 $51.18 $7.70 $15.80 $0.00 $74.68
06/01/2019 $52.18 $7.70 $15.90 $0.00 $75.69
12/01/2019 $53.18 $7.70 $15.80 $0.00 $76,68
06/0112020 $54.17 $7.70 $15.80 $0.00 $77.67
12/01/2020/2020 L$55.15 $7.70 $15.80 $0.00 $78,65
0610 1/202 1 $56.17 $7.70 $15.80 $0.00 $79.67
12/01/2021 $57.18 $7.70 $4 5.90 $0.00 $80.68
For apprentice rates see"Apprentice-LABORER"
TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 06/01/2018 $52.23 $7.70 $15.80 $0.00 $75.73
LABORERS(COMPRESSED AIR) 12/01/2018 $53.18 $7.70 $15.80 $0.00 $76.68
06/01/2019 $54.18 $7.70 $15.80 $0.00 $77.68
12/01/2019 $55.18 $7.70 $15.80 $0.00 $78.68
06/01/2020 $56.17 $7.70 $15.80 $0.00 $79.67
12/01/2020 $57 L 15 $7.70 $15.80 $0.00 $80.65
06/01/2021 $58.17 $7,70 $15.80 $0.00 $81.67
12/01/2021 $59.18 $7.70 $15.80 $0.00 $82.65
For apprentice rates see"Apprentice-LABORER"
TUNNEL STORK-FREE A1R 06/01/2018 $42.30 $7.70 $15,80 $0.00 $65.80
12/01/2018 $43.25 $7.70 $15.90 $0.00 $66.75
06101/2019 $44.25 $7.70 $15.80 $0.00 $67.75
12/0 t/2019 $45.25 $7.70 $15.80 $0.00 $68.75
06/01/2020 $46. 4 $7.70 $15.80 $0.00 $69.74
12/01/2020 $47.22 $7.70 $15.80 $0.00 $70.72
06/01/2021 $48.24 $7.70 $15.80 $0.00 $7134
12/01/2021 $49.25 $7.70 $15.80 $0.00 $72.75
E'er apprentice rates see"Apprentice-LABORER"
tQcup D.gtet OR/071�.01 - ..._---- -..._--- aife Rcuuest Number, 20180907-059 rage 39 of 42
2
5
Supplemental
I if ica ��� Ef�'ective Da to Base Wage Health Pension Total Rate
�Jnemployment
TUNNEL WORK-FREE AIR(HA .WASTE) 06/01/2018 $44.30 $7.70 $15.90 $0.00 $67.80
06/01/2019 $46.25 $7.70 $15.90 $0.00 $69.75
12/01/2019 $47. 5 $7.70 $15.80 $0.00 $70.75
06/01/2020 $48.24 $7.70 $15.80 $0.00 $71.74
12/01/2020 $49.22 $7,70 $15.80 $0.00 $72.7
06/01/2021 $50.24 $7.70 $15.80 $0.00 $73.74
1 /01/2021 $51.25 $7.70 $15.90 $0.00 $74.75
For apprentice rates see"Apprentice-LABORER"
VAC-HAUL 12/01/2016 $3 .44 $10.91 $10.89 $0,00 $54.24
TEAMSTERS JOINT COUNCIL NO.10 ZOJVE R
WAGON DRILL OPERATOR 06/01/ 018 $33.50 $7.70 $14.02 $0.00 $55M
LABORERS-ZONE 2 12101/2019 $34.34 $7.70 $14,02 $0.00 $56.0
06/01/2019 $3 5.2 t $7.70 $14.02 $0.00 $56.93
12/01/2019 $36.07 $7.70 $14.02 $0.00 $57.79
06/01/2020 $36.96 $7.70 $14.02 $0.00 $58.68
12/01/2020 $37,85 $7.70 $14.02 $0,00 $59.57
06/01/2021 $3 8.77 $7.70 $14.02 $0,00 $60.49
12701/2021 $39.68 $7.70 $14.02 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
WASTE WATER PUMP OPERATOR 06/01/ 018 $47.09 $11.00 $15.50 $0.00 $73.58
OPERA TINC,ENGINEERS L 0 CAL 4
12/01/ 018 $48.23 $11.00 $15.50 $0.00 $74.73
06I01I2019 $49.33 $11.00 $15.50 $0.00 $75.83
12/01/2019 $50.48 $11.00 $15.50 $0.00 $76.98
06/01/2020 $51.58 $11.00 $15.50 $0.00 $79,09
12/01/2020 $52.73 $11.00 $15.50 $0.00 $79.23
06/01/2021 $53.83 $11,00 $15.50 $0.00 $50,33
12/01/2021 $54.98 $11,00 $15.50 $0,00 $81.49
For apprentice rates see"Apprentice-OPERAT[NG ENGINEERS
WATER METER INSTALLER 03/01/2018 $50.61 $11.57 $15.76 $0.00 $77.94
PL UMBERS&GASFI TFR,5 I,0CAL 1-2(Locaf 138)
09101/201 8 $52.11 $11.57 $15,76 $0.00 $79.44
03/01/2019 $53.61 $11.57 $15.76 $0.00 $80.94
09I0112019 $55.11 $11.57 $15.76 $0.00 $92.44
03/01/2020 $56.,61 $11.57 $15.76 $0,00 $83.94
09101/2020 $58.11 $11,57 $15.76 $0.00 $85.44
03101/2021 $59.61 $X 1,57 $15.76 $0.00 $8&94
For apprentice rates see"Apprentice-PLUMBERIPIPEFYYFER"or"PLUM FR/GASF ITT ER"
Outside Electrical-East
CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.91 $0.00 $36.70
OUTSIDE ELECTPJCA L IVORKE'RS-EAST LOCAL 104
For apprentice rates sec"Apprentice-LINEMAN"
CABLE MAN(Underground Duets&Cables) 09/03/2017 $3 8.45 $7.75 $9.53 $0.00 $55.73
0UTaSIDE'ELE'CTRICAL WORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
DRIVER 7 GROUND AN CDL 09/03/2017 $31.66 $7.75 $9.44 $0.00 $48.85
OUTSIDE ELECTRICAL JVORKETRS-EA+S'T LOCAL 104
For apprenke rates see"Apprentice-LINEMAN"
-- - --._..,---- ---------------- ............_---------------------1____....___--------------
1-0e1rA 11-aik, n5z/n-7i,?n 1 k Wage Reauest Number: 20180807-059 Rage 40 of 42
lassifleation Effective Date Base Wage Health Pettsion
Supplemental Total Rate
Unemployment
DR VE,R/GROU MA -Inexperienced(<2000 H•s) 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.3 9
OUTSIDE ELECTRICAL)YO ERS--EASTLOCAL 104
For apprentice rates see"Apprentice-tANl'':�1r1AN"
EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $39.45 $7.75 $13.61 $0.00 $59.81
OUTSIDE E1�ECTRICAL,iflOkKERS-LAST LOCAL 104
For apprentice,rates see"Apprentice-LfNEMANI "
E MRMENT OPERATOR(Class 13 CDL) 09/03/2017 $33.92 $7.75 $10.21 $0.00 $51.88
OUTSIDE ELECTRICAL WORKERS ERS-EASTLOCzIL 104
For apprentice rates see"Apprentice-LMMAN"
ROUNDMA 09/03/2017 $24,98 $7.75 $I.75 $0.00 $34.3 8
OUTS[DE ELECTRICAL MOAK R -EAST LOCAL 104
For apprentice rates see"Apprentice-LE%EMAN`
GROU DMAI -Inexperienced(<2000 Hrs-) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29.71
OUTSIDE ELECTRICAL FYO ERS--EASTLOCAL IN
For apprentice rates see"Apprentice LMEMAN"
JOURNF�'r MA LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59
0UTS'IDE El,ECTRICAL FFOI ERS-EASTLOCAL 104
Apprentice- LINE'M A'(Oul ride Electrical)-East Local 104 f
Effective Date- 09/03/2017 Supplemental
Step p-ercent Apprentice Base Wage Health Pension Unemployment Total Rate
I 60 $27.14 $7.75 $3.31 $0.00 $38.20
2 65 $29.40 $7.75 $3,3$ $0.00 $40.53
3 70 $31.66 $7.75 $3.45 $0.00 $42,86
4 75 $33.92 $7.75 $5.02 $0.00 $46.69
5 80 t$36.18 $7,75 $5.09 $0.00 $49-02
6 85 $38.,45 $7.75 $5,15 $0.00 $51.35
7 90 $40.71 $7.75 $7.22 $0.00 $55. 9
-- ......... __._......, :. :_f ......_......, .. . . .....� .......... ...........
Notes
a
.-..-:........ :,, .�...,,_a., .............. ........._. _.�.------• .. . r r 1 .- .. z.- -: s .....- ..-...�.. ., .... e r r.....v .. ..... --.rc...-,- --..,.--.. .--. ... ....
Apprentice to Journeyworker Ratio.t:2. ...
TELEDATA CABLE SPLICER 02/05/2018 $29.98 $4.70 $3.15 $0.00 $37.83
OUTSIDE ELECTRICAL 1FrORKE,RS-EAS'TLOCAL 10
02/04/2019 $30,73 $4.70 $3.1 7 $0.00 $3$. 0
TELEDATA LINEMANiEQUIR T OPERATOR 05/05/ 018 $28,22 $4.70 $3,10 $0.00 $36.02
OU71YIDE ELECTRICAL WORKERS--EASTLOCAL 104
02l04I201 9 $2$.93 $4.70 $3,14- $0.00 $3 6.77
TELEDATA WIRE IAWNSTA,LLEI TE EMCIA 02105/ 018 $29.22 $4.70 $3.Z 0 $0.00 $36.02
OUTSIDE ELECTRICAL iyo E -EAS T LOCA L 10
021041201 9 $28.93 $4.70 $3.14 $0.00 $3 6.77
TREE TRIMMER 01/3 t/2016 $18.51 $3.5 5 $0.00 $0,00 $22.06
0UTSIDE ELECTRICAL WORKERS--EASE'LOCAL 104
This classification applies only to tree work done:(a)for a utility-company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of
operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or inechanical cutting methods and is not on the ground.
This classification does not apply to wholesale tree refnaval.
TREE TRIMMED GROUNDMAN 01/31/2016 $16,32 $3.55 $0,00 $0.00 $19.87
OUTSIDE ELECTRICAL IVO ERS-EASTLOCAL 104
This classification applies only to tree}nark done:(a)for a utility company,RX.A,cooperative,or railroad or coo[mining company,and(b)for the purpose of
operating,maintaining,or repairing the utility company's equipmemt,and(c)by a person who is►rshig hand or mecharfieal cutting methods and is on the ground. This
classification does not apply to wholesale tree,remnoval.
T �� n ,--- �I �l - l ------- -----...._-- ae Reizes# �tr�nleir� 0100 -059 'age 41 of 42
Supplemental Total Rate
ClasSi���#iun Effective DateBaseWage ��alth Pension ��t�t�t�1��a�����t
Additional Apprentice Information:
Min inium wage rates for apprentices employed on publie works projects are 1 istud above as a percentage of the p re-delerrhined hourly wage rate establislied by the
Comniiss ion er{trader the pro visioTis of the M.G.L.c.149,ss.2-6-27D. A.pprentice ratios are established by the Divisi-on of Apprenticeship Training pursuant to M,G L.
e,231A ss.11 E-1IL.
All apprentices must he registered with the Division of Apprenticeship Trainuig in accordance with M.G.L.c.23,ss. l I E-11L.
All steps are six nionths(1000 hours.)
Ratios are,expressed in allowable number of apprenti(,es to journeymen or fraction thereof,sinless otherwise specified.
** Multiple ratios are listed in the canuiie€at fteld.
* * APP to JM;1:1,2:2,2:3,3A,4:4,4:5,4:6,5-.7,6:7,6:$7 6-9 a 7:10,8:10,8:11,8,,12,9:13,10:13,10:14,etc.
* * APP to JM;1:1,1:2,2:3,2:4,3.5,4:6,4:7,5:8,6:4,6:10,7:11,$:12.,8:13,9:14,10:15,10,16,etc.
--- -------..- ---...- --
.. ------- ----------------- ------------------- ---------- ------ --------- --------
Tumno n!q to,, nR/n nn i R WaLye ec(uest Number: 20 t 80807-059 Page 42 of 42
E RTIFICATIONS
CERTIFICATE OF NON-COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and.
submitted in good faith n w thout collusion or fraud with any other, person. As used in. this
certification., 'the world: "person" shall mean natural. person, business, partnership', corporation,
committee ��i.on 1 r other rani Lion entity r group "inch. i al .
lip
�
-00
JIV �pr. 'imp`"" r � �I�f���.,.:�� ., aid' ��ii;.�?m Date / /Itl ° ..........
Russell R Stiles President b Tempe[ature CorpOmt
Print Name &Title Company Name,
CERTIFICATEOF TAX COMPLIANCE
Pursuant,to Chat r 62C of the,Massachusetts General. Dews, Section.49A , I
Russell, H. Stil,es 7 authorized signatory for Ambient TpMpelrture C
,Fame of individual Name of colintractor
do hereby certifyunder the pains andnalti of perjury that said,contractor has mplied with
all laws of the Commonwealthof Massachusetts, the Nor r, relating t
taxies., per-it or other fees, reporting of employees and contractors, and withholding
remitting child u ort.
Wy, oiu m
9/5/18
u ,fl
u
u^
,,
^
ture -a I--14 Stil President 'Date
Town of North,Andover I °.B, Page 39 of 4
E R
LABOR HARMONY AND OSHA TRAINING RE,QUIREMENTS
The undersigned certi 1 u r penalties, of perjw-y he is able, to furnish labor that can work
i in harmony with, ll other elements, of labor ploy r to be employed at the work
..
nd
that alI erriployees t l y t the w ksit and � the wore will have cow t
OSHA,-approved n tru t o safety and .lt course lasting atleast tee 1hours.
m�
�H1 Date 18,
� S re r rSS � 4 ur ,77� �� _n
air am,0..r
R.usseill H. Stiles President Ambient or1
"rI t Name & Title Company Name
Town of North Andover IFB Page
HVAC M-ain c 'Services
CERTIFICATE OF VOTE
Atadul.yautli r ized meet in,gtie Board off`D�irectorsof'the Ambient Temperature Cur� o�ration
held on 1/27/08 it was
VOTED,, THAT
Russell H. Stiles President
(Name) (Officer)
of-Amblerat Temperature C be and hereby is authorized to execute contracts and bonds, 'in
.1 1 V
the name and on �t)enalf of said Corpo.ration and affix its corporate seal, hereto,
and such execution of any contract or obligation in the. name of Corporation on
its behzlf by such. officer under seal Of— Corporation shall be valid and binding
upon Corporatim
I hereby certify-that I am the clerk. of the above named Corporation and
that Russell H. Stiles 'I S the duly elected officer as above of said
GQ r un and that the above, vote has not, been amended or rescinded and
remains in,full,for and effect as-the at f this contract.,
,September 5, 2018 A
(Date) (Clerk) 'anielle 1411-6
Town,of North Ando'wr I B Page 41 of 43
HVAC Maintenance Services
I
AN/11
CERTIFICATE OF VOTE OF AUTHORIZATION
Date: September 12, 2018
I Danielle Pl Clerk f Ambient Temperawre ,uornoration hereby eb certify that at
tin f the Board f�Directors of SaidCorporation rpor n idulyheld on,the ` du of
January, t which ti,,e a quorum was present and voting throughout,the following
vote was duly passed and i now in fill force andeffect:.
VOTES ThatRussell H. Stiles i s hereby authorized, directed and empowered for the
name and on behalf of this Corporation t.o sign, meal with the corporate seal, execute:,
acknowledge .n deliver all contracts and other obligations of this Corporation; the
execution of any such contract to be validand binding,upon tins, Corporation for all
r and that this vote shall remain_in fill force and effect unless and until the samle
has been altered, amended or revoked by a subsequent vote of such directors and
certificate of such later vote attested by the Clerk of this Corporation..
I further certify that Russell H,. Stiles is duly, l t / pp� int � Pr i nt f said
corporation.
SIGNED
r d (,Corporate,, 1 ,
�
e
Dantoelle, Hartley
Clerk of the Corploration
1A Graf Road o Newburypor,t, MA 01,950Phone 97 -6 6- 660 Fax -6 - 1
1
Tax Com,j�Iia�n�: §49A I certify under the penalt-Ics of pe'rJury that, to-the best of my
knowledge and belief I am "in compliance with all,laws of the C r nw t relating t
taxes,:reporting f m to and contractors,,t r ,, and withholding and remitting 1ld
.
support.
Ambient Temnerature Co!po.ration
ICompany
Russell H. Stiles
Typed NwTie of Personel-77 'zqd to Sign Bid
IN^M
m
0 err
th -ri to Sign Bid,
"President
Title Signatory
14 GrafRoad Newburyport,MA 0 1950
Company,Address
,Company Telephone Company Fax Number
04-3542600 tntr 11112.2.018
Federal . n:ti �..� ion No. Date
114raf Road a N ewburypio rt,l MA 0 1950 a iPl one, 7 -6461-066 'Fax 7 6, -0 1
���� NJ DATE� MfDalYYYlf)
CERTIFICATE OF LIABILITY INSURANCE 9/12/2018
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETVVEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If S U BROOATIO N IS WAIVED, subject to the terms and conditions of the policy, certain policies may require art endorsement. A statement on
this certificate does not confer rights to the certificate holder in lied of such endorsement(s).
PROI DOER CONTACT
NAME;
Marsh&McLennan Agency LLC PHONE
c a E AfN :100 Front 5t, Sty E-MAIL 866-795-8016
Worcester MA 01608 ADDRESS:
INSURER AFFORDING COVF-RAGE NAIL N
INSURERA:Acadia Insurance Company 31825
INSURED AMBIETEMPE INSURER 13.Firemen's Ins.Co.of 1�I�ashirl tor',�� 21784
Ambient Temperature Corp.
14 Henry Graf Jr. Road INSURER 0.
elf bu ryport MA 01950 INSURED a:
INSURER E
INSURER F
COVERAGES CERTIFICATE NUMBER:2881410887 REVISION NOMBER�
THIS IS TO CERTIFY 1-HAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUFD OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TYPE OF INSURANCE ADDL St- POLICY EFF POLICY UP LIMITS
INS.Q MD POLICY NUMBER IMMIDWMI fMODIMY)
A X COMMERCIAL GENERAL LIABILITY CPA0262414 11212018 1/212019 EACH OCCURRENCE $11000.000
D FAMTO RENTED
CLAIMS-MADE [fl OCCUR PREMISES Ea accurren $300,000
MEa EXP{Arty one person} $6,0w
PERSONAL&ADV INJURY $11000100D
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,00D,000
POLICY LOC
PRODUCTS-COMPIOP AGG $2,000,000
OTHER: $
B AUTOMOBILE LIABILITY MAA0324735 1W2018 11212019 COMBINED SINGLE LIMIT $1,000,000
Ea accident)
ANY AkJT❑ BODILY INJURY(Per Person) $
❑MED xSCHEDULED BODILY INJURY(Per ar-cident) $
AUTOS ONLY AUTOS
HIRED x NON-OWNED PROPERTY DAMAGE $
AUTOS ONLY AUTOS ONLY Per accident)
A X UMBRELLA LIAS X OCCUR GUA0262416 112/2018 112/2019 EACH OCCURRENCE $10,000,000
EXCESS LIAR CLAIMS-MADE AGGREGATE $10,000,000
DED L RETENTION$ $
A WORKERS COMPENSATION WPA5081139 112/2018 11212019 X PER
STATI TE 4ROTH-
AND EMPLOYERS'LIABILITY Y 1 N
ANYPROPMTOWPARTNERIEXECUTIVE N E.L.EACH ACCIDENT $500,000
OFF ICE RIM EMBER EXC;LUDFD? N!A
(Mandatary in NH) E.L.DISEASE-EA EMPLOYFF $600,000
If yes,describe under
DESCRIPTION OF OPERATIONS balow E.L.DISEASE-POLICY LIMIT $500,000
A Equipment Floater CPA0262414 11212018 11212019 Leased/Rented $50,000
Installation Fltr Joky Site $300,000
DESCRIPTION OF OPERATIONS l LOCATIONS f VEHICLES (ACORN 101,Additfonal Remarks Schedule,may be attached If mare space its required)
ICE: 1-MAC Maintenance Services for All Municipal and School Buildings
Town of North Andover is included as additional insured as respects the general liability if required by written contract for work performed by the Rained Insured.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
Town of Forth Andover
120 Main Street AUTHORIZED REPRESENTATIVE
North Andover MA 0184 .zr* -. ......_.
Q 1988-2015 AOORD CORPORATION. All rights reserved.
AOORD 26(2016103) The ACORD name and logo are registered marks of ADORD
L.
PA.Y MENT BON,D
Bond No. 848.9
KNOW ALL NIEN BY THESE PRESENTS,t,hat we Ambient Temperature Corporation
Newburyport, MA 01950
with a place of bust ness at 1413rafRoa,d.,
as Primipal (the"'Pi-incipal'"),and United Casualty and Surety Insurance Company
corpo I ration qtcalified to do businessin the Coin nionwealth ofiNvIassac husett's
I , ,wIth a place of Wsittess at
292 Newbury Street,suite 105.,Boston,MA 021,15
B3 SUretv
("the.* Surety"),are heldtind firnity boundmito the'foxvnof North Andover, Massachtis-etts,as Obligee
In the sum of'S Hundred Fifty and no 1 00IL)ollars($66,950-001awrul money of
the United Stags of Aiiiericn, to be paid to the Obligee, for which payinent,well and truly to be niiade, we
bind wirselves,, OUr respective heirs,executo I
r's,adniIti'strators. successors and assigns.,Jointly ami
severaliv., rtrnfly7 by 1:11 ese presents,.
4-
WHEREAS,the Pr nisi pal hAs assumed and made acontract with,the Obhgee,beavi:ng the date of
for the con StIlICU011 Of HVAC Maintenance Services,for All
..M�2n i i 11 r��School Buildings
NOWI1"HE CC)ND114IOthot ,5(mfi.ofiaretich that fthPrinipldtiontrctors
U111der
.said contract shall pay ftm-rill labor peffofl-ned or ftirnisfied mild ffir all materials used or emp loved in said
contract an,d in.canv,-cmd all dulvauthor izcd extensions ot"Ailne,changes or
additions to said contradthat may,hereafter be iiiadel! notice to ibe Suretiv of such niodirications,
alteultions,-e^xtensions(,,)f time",clung es or addltioiis being Ivereb.), waVvedl,the foregoing to incItide., but
not be limited to,any other p(irposes or item s set oult in.and to be SUbject to,the provisions ot.'
Nt
and Chapter 149, Sem"on 19, as amended then assmelmsetts General Laws,. 01apter 33,011 Sect-ion 39?011 5
tlits obligntionsha-11 become mill mid vowel;otherivise.it sMall lviliabi In fiffl, force and virme.
IN wrrNESSMIEREFORE, the 116116pal and Surety fiave hereto sei flicir haiiids and seals tivis
clay 2018
PRINCIPAI. SURETY
Ambient Te l: f,"orporation U nited casualty and Surety Inpiurance Company
014 Po
.Poo"
'feo'd
WWI-
)114 5"
Mark D.Leskanic
'101/
u 'I es Pres,Idei�,,t—5 e stil 11 H. 205 Union Street,
S.Natick, MA 01760
[TI t I el IVSSI
781-559-0568-
>
Atf6st Phonel
Attest,
EN D OF PAYNNIEN-F BOND,
®.
d
.i
`F' ATT011;MEY
NIT, I CASUALTY AND SURETY rNSURANCE e_wUSCASU,ALTYt M M
..
- a
.......5 _ -
. _: _� corporation -
_ - -
a.
K ALL .BEN Bid ' SE PRESE ' h
_.. ..
ss l� s tts, nsuanc
H "sat S r r � vel
the Companies"),do by these presents make,constitute and appoint:
_... Mar ,�Le lcanic,,Matthew Leska �.,Greg ��
... _ .
._.. _ T.
full c r an. i� fi leer�t � � tta ' 's ire Fact 1 is ar P _ _ - p a it rat ca ace ' more tl r� � .� �°� ,
...._
it�mnic 1 and.stead t excc t 1 ow1 d a sand deliver-a �l � ; s r oc s de t ,kin or t �� instruments
mm_
r contracts of sjuretyshipto inchide riders, amendments, and tin eats of surety,providing the bond penalty does not exceed
This Power,of Attorney hall expire without far t er action
..
_ �:=l t,asdtad ltl�Board of l „ � s � �ra t-lame dell� d grad1 t -+ :.
......
Resolved that the President,"T'x asurer� .or"Sep
k �_..�rely be and they aro herby anithor-id and empowered to appoint Attnrneys-irh-p"act o`tlne Company,in its cue and,a
its acts to c cent ai nd acknowledge for and on its_bch If"Suxcty any and all bonds,r.co •' an.ces,,coot cts:,of""ndc it,waivers,oftitation and all other-writings
s
obligator yin the nature theruof with p6wer-to attach thereto the seal off°the Company, Any such Writings so execut d by sbeh ft r-n s-lire-Fa shall b n in
upon d mean aS it the�had been d ekmuted anacknowledged� the regularly elect d Officers of th Corn an"-in their a "roper persons.
........... ..
rat lre a� t officer autl en'zed h Resolutions of this,Board and the Cow � al�� b � . �� U � ��re�- tt�a r e��l rer of
�� �� - ' _...._ ..�. p p
.. +" �..__ �.
_ - - , �.._
�� -b
1 r���. _�, .� .. h at�n th�_r �r thrc+ cl�signature AM �r ificafi6 o either given for the execution, f any,bond,�und�e e� ppe� other� -.- lI � �tt e
_ .mm
r x� a tl� real a re. aeh a "er and tl�e na s f" ern t e ial and,binding,upon whim mile betr�,�- a "b dopt d b� e oa p +y e n i c 1 p °� .. 1�! "� , p
......._ ..... -� = +yrprtt .. ith t aard fierce at e `et a flu in,artall ffie _
...........
IN WITNESS 0,f,the Companies have caused th.i it nt to,be signed and their corporate seals to be hereunto affixed,
this 19th day July,20181 A ,
-_
............................................ ............................ ...............................—... ..................
. T CASUALS. :. P .. .
.
N Y �...... ......... . ...®®
S79U CASU ALTY AND SURETY INSURANCE COMP
,
SRAL
de
{g+ I roe rm„�a,nrr'k�^�' �s 'r RR1�.' r�4 ,
4..17 t Seals_- f ;Mmd _. r� d a X�NP�IY11d+�U�Xti"��"
� � —
1 ►t� tttt
_ Chaqq* . ................
=
-_. _._.�_._®®mm.. b
_
.� fN
' 9:
....
n this 1 th day of July, 2018, before me, Thomas, P. Cam, a , k,, a notate public,personally appeared Io l K Chat k s,, Treasurer of
United Casualty and Surety Insurance Company and, US Casualty and Surety Insurance Company who proved to me oil the basis, o
satisfactory-evidence to
the person h_ s s ssd t �it instrument
acknowledged t+ that executed,t , .
in his auathorizqd � t _ � ha rt s t r �t if m �..
_��
--_
_.
�r �"' ': odor the laws o the Commonwealth o Massachusetts that:the for �i ragr l�is true,axed correct.
WITNESS my land and seal;
(se0
�"Oubkr
............................. .............. .._ Tomas . rr� an .err,, � i ubli
........... i �c ? M 2018
a _
.
d .1� Ch-Fbf prat ° ice. o United Casual and Rum ns ra - E[r� and S' Casualty- .r� S Insurance
- .
'Company do her �rt�� t it t � � � ��d +��° is to and correct o f Power o Attorney, executed b saidCompanies,
wl ich is still in fall ford and effect; furthermore,the resolutions of the B card.of Directors,set out in the Power of Attorney are are full ore,
and effea,
ss,.t .�c d —
. ................. ............ ......
............. . ..........
�."
........ ................... �Qea
waeab
ayTo
In
u
1 1U
,a�l wi"h riri77
, Nall 1 ` ��
-..... p - +_ � -;
'
TO CON