HomeMy WebLinkAbout2020-01-07 Application Prelim Master Plan-DTO-SubDist A-Historic Mill Area x Town of North Andover Planning Department Community&Economic Development Division 120 Main Street North Andover,Massachusetts 01845 Town of North Andover Planning Board Application for Special Permit Please type or print clearly. 1.Petitioner: c h-2fh&Nfy Al r rs L c c Petitioner's Address: Z ,if• Jt/.,::2fideWr Telephone number: 2 r,- 31 X r 7a( 2,Owners of the Land: N l GL C Address: 2-1 nffiin Number of years of ownership: 1 3,Year lot was created: 4.Description of Proposed Project: -PYd/lit 5,Description of Premises: G.Address of Property Being Affected: Z/ Zoning District: - Assessors Map: 1p 9 It f� .............._ Lot M r D L Registry of deeds:Book : Page#: Fyn 7,Existing Lot: Lot Area(Sq.Ft): Building Height: Street Frontage: Side Setbacks: Front Setback: hear Setback: Floor Area Ratio: Lot Coverage: 8.Proposed Lot{if applicable): Lot Area(Sq,Ft): Building Height: Street Frontage: Side Setbacks: s Page I of 3 120 Mein Street,Planning Dept.,North Andover,Massachusetts 01845 Phone 978.488.9335 fax 978.08.9542 Web www.norlliandovermu.gov Front Setback: Rear Setback., Floor Area Ratio: Lot Coverage: 9.Required Lot(as required by Zoning Bylaw): Lot Area(Sq.Ft): Building Height: Street Frontage: Side Setbacks: Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage, 10,Existing Building(if applicable): Ground Floor(Sq.Ff.), of Floors: Total Sq.Ft.: Heigh(: Use: Type of Construction: 11.Proposed Building: Ground floor(Sq.Ft.): f#of Floors: Total Sq.Ft, Height: Use: Type of Construction: 12.Has there been a previous application for a Special Permit from the Planning Board on these premises? If so,when and for what type of construction?. 13,Section 0 A�uguyllalv that Special Permit`Is Being A Requested V N� G (C �i<�g� S 19�-�� ! J46,2P 14.Petitioner and Landowner signature(s): Every application far a Special Permit shall be made on Ibis form,which is ilia official form ofthe Planning Board,Every application shall be filed wilh theTown Clerk's office.It shall be the responsibility ofthe petitioner to fumish all supporting documentation with this application.The dated copy of this application received by the Town Clerk or Planning Office flocs not absolve the applicant front this responsibility.The petitioner shall be responsible for all expenses for tiling and legal notification.Failure to comply whit application requirements,as cited herein and in Fie Planning Board mules and Regulations may trsult in a dismissal by the Planning Board ofthis application as incomplete. Petitioner's Signature: Print or type Homo here: Owner's Signature: Print or type name here: 15.Please list Win of plans and doculnents you will be attaching to this application. S i Page 2 of 3 120 Main Street,Planning Delft.,North Andover,Massachusetts 01845 Phone 978.688.9535 Fox 978,688.9542 Web www.northandoverma.gov f EAST' �r r r . MILL . • #$#I I NORTH ANDOVER December 5,2019 DELIVERED BY HAND Eitan Goldberg,Chair North Andover Planning Board Planning Department 120 Main Street North Andover, MA 01845 RE: Application for Preliminary Sub-District A Master Plan RCG NAM LLC 21 High Street-East Mill,High&Water Streets Assessor's Map 68,Lot 10 and Map 69,Lot 1 Dear Chairman Goldberg and Members of the Board: Enclosed for filing with the Planning Board is a Subdistrict A Preliminary Master Plan for the East Mill. We are filing this together with a Preliminary Subdivision Plan which will subdivide the property into three lots in accordance with the three phases of development of the East Mill. The master plan mirrors the Planned Development District(PDD)plan that RCG NAM LLC has been working on for nearly a decade. Our intent with this application is to bring the property into compliance with the overlay district guidelines. By way of background,RCG worked with the Planning Board to amend the Downtown Overlay District Bylaw to include a new Subdistrict A section for the historic mill area. The bylaw amendment was unanimously approved at the 2015 Annual Town Meeting. The purpose of the Subdistrict A zoning was to provide for a flexible zoning process specifically tailored to the existing mill properties. Up to this point,the development of the East Mill has been guided by our PDD Master Plan. Given we are moving the East Mill into the Subdistrict A overlay district,we are planning to convert the PDD Master Plan to the Subdistrict A Master Plan. Since the acquisition of the East Mill followed by the West Mill,RCG has communicated its Master Plan vision for the properties. As we had indicated throughout our redevelopment process,RCG has continually stressed the need to maintain flexibility in the zoning as RCG incrementally develops the mills as a mixed-use community in a phased approach based upon market demands at the time. This approach is also reflected and supported in the Town's recently adopted Master Plan which calls for a mix of uses to be developed at the property. Up until this point,we have developed the RCG NORTH ANDOVER MILLS, LLC EAST r #oil I NOR`111 RtJUOYER East Mill in accordance with our PDD plan. It is our intent to continue to move forward with this vision under the Subdistrict A guidelines. Attached please find the following as part of our application in accordance with Section 195.18-20.1)Submission and approval of preliminary master plan: 1. Two (2)copies of the locus plan and existing conditions plan 2. Two(2)copies of the Preliminary Master Plan showing the proposed three phases of development as defined below: a. Phase I-Historic Mill development into mixed use complex b. Phase II W East Mill Flats development of 51 residential units c. Phase III-Share parking with future residential development 3. A narrative description of the overall concept for the master plan 4. One Plan set has been filed with the Town Clerk's office 5. An electronic version of the above has been emailed to Monica Gregoire 6. Abutters list We appreciate your time and consideration with regard to this matter and look forward to discussing this with you on January 7. Please feel free to contact me at 617-625-8315 x706 with any further questions or concerns. Sincerely, �s I 4 Tania Hartford Development Manager RCG NAM LLC cc: Monica Gregoire,Staff Planner Town Clerk's Office(By Hand) David Steinbergh,RCG John Sniolak,Attorney Phil Henry,Civil Design Group RCG NORTH ANDOVER MILLS, LLC EAST ' MILL EAST MILL PRELIMINARY MASTER PLAN NARRATIVE SUBDISTRICT A:HISTORIC MILL AREA (Sections 195-18.9 through 195-18.20 of North Andover Zoning Bylaw) TOWN OF NORTH ANDOVER PLANNING BOARD January 7,2019 APPLICANT&OWNER: RCG NORTH ANDOVER MILLS LLC PROPERTY: MAP 69,LOT 1 AND MAP 68,LOT 10 21 HIGH STREET,NORTH ANDOVER 1. INTRODUCTION RCG North Andover Mills LLC(the "Applicant")is requesting approval of a Subdistrict A Preliminary Master Plan in accordance with the Downtown Overlay District- Subdist•ict A:Historic Mill Area. As discussed with the Planning Board during the West Mill Phase I Subdistrict A public hearing,the Board and the Applicant worked together to develop Subdistrict A of the Downtown Overlay District in order to facilitate the redevelopment of the historic mill complex now known as West Mill and East Mill. The proposed Project at East Mill conforms to the intent and purpose of the Subdistrict A provisions of the Zoning Bylaw by encouraging a diverse Unix of uses that preserves the fabric of the existing historic mill structures and blends in new development to promote an active,vibrant community. As a part of this application,RCG is seeking to subject the East Mill,to the provisions of the Downtown Overlay District-Subdistrict A: Historic Mill Area. As a result,no changes are being proposed to the East Mill property and structures thereon as a part of this master plan and it conforms to the current Planned Development District(PDD)Plan that has guided the East Mill redevelopment to date. By way of background,the Applicant is the owner of certain real property consisting of 22.65 acres of land,known as the East Mill, and numbered as 21 High Street(also known as 1 High Street). The site is located at the corner of High Sheet and Water Street,and is designated on the Town Assessor's Maps as Map 69,Lot 1 and Map 68,Lot 10 (the "Property"). The Property currently consists of historic mill buildings with a total of approximately 235,000 square feet that includes a mix of uses including office,research and development,residential,and retail/restaurant as permitted as part of Phases I and II.A of the existing PDD. The Property is shown on an Existing Conditions plan included i1 the Planning Board filing. The Owner acquired the Property by deed from FUCMS 2000-C2 Andover Mills, LLC,dated January 22,2007,recorded with the Essex County North District Registry of Deeds in Book 10601,Page 340. As stated above,this Application micros the multi-phase redevelopment project for which Preliminary Approval of the PDD Special Permit that was issued to the Applicant by a decision,dated January 18,2008. The Preliminary Subdistrict A Master Plan,as further defined below,presents no changes to the PDD. II. PROPOSED PROJECT PHASES The Applicant sees the redevelopment of the property as happening in three phases as shown in the attached plan set. The Phases will be as follows: • Phase I --Historic Mill Building Development Redevelopment of existing mill buildings in a mix of uses and site improvements to facilitate that development as identified in the PDD Master Plan as Phase I and Phase IIA. The phase included conversion of underutilized space into new residential units and improved commercial space as well as increased parking areas,landscaping,stormwater management and streetscape improvments. • Phase II-East Mill Flats Development Construction of a fifty-one (51)unit residential building located adjacent to the existing mill pond,adjustment of existing parking spaces and circulation within the mill complex,and addition of landscaping,lighting, and drainage improvements. This was identified as Phase IIB in the PDD Master PIan. • Phase III-Parking Garage Development The original PDD Master Plan called for 140 new residential units to be built as part of Phase IIB. A portion of those units were permitted as part of East Mill Flats. The remaining 89-units are proposed for Parcel 3,also known as the "Parking Garage Parcel". There are no current plans for this development. II. COMPLIANCE WITH SUBDISTRICT A REQUIREMENTS The following is a summary of the Project's compliance with the requirements of the Dowtown Overlay District,Part 2.Subdistrict A:Historic Mill Area Zoning Overlay District, RCG NORTH ANDOVER MILLS,LLC Page 2 of 4 A. Compliance With Permitted Uses (Section 195-18.13) Section 195-18.13.lists uses withal Subdistrict A which are allowed by right or by special permit. The Preliminary Master Plan complies with these requirements. B. Compliance with Design Guidelines (Section 195-18.15.) Section 195-18.15 provides that redevelopment and new construction within the overlay district shall be designed in a fashion to achieve one or more of the purposes of Subdistrict A described in§195-18.9. The Planning Board and Machine Shop Village District Commission has previously reviewed this the Project area through our prior permitting efforts. All development that has been permitted complies with the guidelines and we anticipate future development to follow the same guidelines. C. Compliance with Dimensional and Density Standards (Section 195-18.16.) Section 195-18.16 establishes the dimensional and density standards required for Projects to be approved under Subdistrict A. The plans attached as well as the following demonstrate compliance with the standards under Section 195-18.16: 1. Setbacks: All the buildings and structures within the Property were in existence as of the date of adoption of this Part 2 of the Zoning Bylaw; therefore, the Project complies with the minimum front yard setback,side yard setback,and rear yard setback of zero. The new building proposed on Lot 2 complies with the setback requirements and any new structures proposed on Lot 3 will also comply. 2. Building height:All buildings and structures on the Property were in existence as of the date of adoption of Part 2 of the Zoning Bylaw; therefore, the building height of buildings and structures shall be deemed to be compliant with building height requirements under this Zoning Bylaw.The new building proposed on Lot 2 complies with the setback requirements and any new structures proposed on Lot 3 will also comply. 3. Floor area ratio: The buildings and structures on the Property and proposed to be built comply or will comply with the maximum floor area ratio of L0 and is thus permitted by right. 4. Extension alteration and reconstruction of existin buildin s and structures: Since there is no proposed extension,alteration or reconstruction proposed on the Property for this application, this Section of Part 2 does not apply. D. Compliance with Site Design Guidelines (Section 195-18.17) Section 195-18.17 establishes site design guidelines required for Projects to be approved under Subdistrict A. The Planning Board and Machine Shop Village District Commission has previously reviewed the property for compliance with RCG NORTH ANDOVER MILLS,LLC Page 3 of 4 design guidelines and any future development will comply with the same review/standards. E. Site and Design Standards (Section 195-18.18) Section 195-18.18 provides site and design standards are applicable to all residential Projects greater than six units,mixed-use and nonresidential property. Work undertaken to date at the East Mill has ensured that all such guidelines have been considered and incorporated,as appropriate,into past renovations or alterations of existing buildings,parking,signage,lighting,landscaping and other improvements as previously reviewed by the Planning Board. F. Sign Master Plan(Section 195-18.19) Section 195-18.19. provides that the Planning Board may approve a comprehensive signage master plan for the Project which,if approved by the Planning Board,may allow for signage which deviates from the specific sign requirements of the Zoning Bylaw,including§ 195-6.6,provided that such signage would,in the opinion of the Planning Board,be consistent with the general purpose and intent of§ 195-18.9.The East Mill sign master plan was approved by the Planning Board as part of the PDD Permitting process. The Applicant has not modified its master plan for signage since approval. IIL NATURAL FEATURES OF THE SITE The Prelimary Master Plan is required to provide a description of the natural features fo the site,including wetlands,floodplains,slopes over 12%,soil conditions,and other features requested by the PIanning Board. The attached survey show the current conditions of the property,including the items above with the exception of soil conditions which were reviewed as part of the East Mill Flats Special Permit approval. The Applicant has spent a considerable amount of time restoring the wetlands around Mill Pond and improving the water flow through the underground culvert and into Osgood Pond adjacent to the West Mill. IV. NEIGHBORHOOD DESCRIPTION The Preliminary Master Plan is required to provide a description of the neighborhood in which the tract lies,including environment, traffic, utilities,and other public facilities and general impact of the master plan upon the Town. Given there is no new development proposed un this master plan outside of what is currently in the East Mill PDD Master Plan,we do not anticipate any further impact than what was studied in the past. Further, the overall mill area has been studied at length as part of the West Mill Definitive Phase 11 Subdistrict A Master Plan and those studies took into account the current and proposed development at the East Mill. Therefore we do not have any additional information to add as part of this Preliminary Master Plan document. RCG NORTH ANDOVER MILLS,LLC Page 4 of 4