Loading...
HomeMy WebLinkAboutFinal Construction Notes - Consultant Review - 1565 SALEM STREET 7/12/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1565 Salem Street MAP: 106.B LOT: 3 INSTALLER: Buddy Watson DESIGNER: Vladimir Nemchenok – Merrimack Engineering PLAN DATE: final revision 05.11.2021 BOH APPROVAL DATE ON PLAN: 05.21.2021 INSPECTIONS TANK INSPECTION: 6.8.2021 S.Casey DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 6/22/21 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 6/8/2021 Stone all set, 6 Inches in hole – S. Casey 6/22/21 – Original building sewer maintained for about 10’ from house, then transition to Sch 40 PVC. D. Ottenheimer SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction / 2-piece (circle one) If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle / effluent filter installed (circle one) If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum 24 inch diameter Pipe penetrations appear watertight using rubber boots / hydraulic cement (circle one) Comments: 6/22/21 – Inlet tee not under tank opening. To be removed and replaced. D. Ottenheimer DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) Retaining wall material, location and height if specified on plan Comments: 6.10.2021 and 6.11.2021 – with overdig 50’ x 25’ C layer B.L. 10 yr 4/6 about 48” 6.11.2021 corrections made – pass FINAL GRADE Final cover as per plan Loamed Seeded Comments: 3 covers to grade & hydro seeded – S. Casey DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 98.08 HR = 2.49 HI = 100.57 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 5.09 95.15 96.70 Septic Tank IN 5.19 95.05 94.95 Septic Tank OUT 5.58 94.66 94.70 Distribution Box IN 5.87 94.37 94.35 Distribution Box OUT 6.08 94.16 94.18 Lateral 1 BEGINNING 6.10 94.14 94.10 Lateral 1 END 6.35 93.89 93.90 Lateral 2 BEGINNING 6.10 94.14 94.10 Lateral 2 END 6.33 93.91 93.90 Lateral 3 BEGINNING 6.08 94.16 94.10 Lateral 3 END 6.33 93.91 93.90