HomeMy WebLinkAbout2016-10-04 SemiAnnual Stormwaer Inspection Report 4/1/2019 21 1 figh Street,Suite 207
S'.f0JtM.'WA"'J.""J-�'.R. DIVISION North Andover,NIA 01845
Tel 978.794.54(A)
OF CI VIE DESIGN GROUP,IJ,C www.cdgengiiiecritig.com
SEMIANNUAL STORMWATER INSPECTION REPORT
(Sheet 1/1)
Site: West Campus Date(s): 04-01-2019
Address: 1 High Street, N. Andover, MA Time: 10:00 am
Inspector: Joseph Connolly Weather: Clear 400
CATCH BASINS
Unit Date Sediment Oil Grate Last
# Inspected (inches) (inches) Cleaned Attention Recommended
C13-1 04-01-19 3 none ok 01-02-15
C13-2 04-01-19 - none ok unknown converted to manhole cover
C13-3 04-01-19 9 none ok 01-02-15
CB-7 04-01-19 <1 none ok 01-02-15
C13-8a 04-01-19 - none ok unknown full of leaves and debris
C13-9 04-01-19 1 none attn. unknown unable to locate due to leaves and trash
CB-10 04-01-19 1 none attn. unknown unable to locate due to leaves and trash
C13-1 1 04-01-19 1 none attn. unknown unable to locate due to leaves and trash
CB-12 04-01-19 1 none attn. unknown unable to locate due to leaves and trash
CB-14 04-01-19 5 none ok 01-02-15
C13-1 5 04-01-19 26 none ok 01-02-15 clean catch basin
CB-17 04-01-19 16 none ok 01-02-15
CB-18 04-01-19 7 none ok 01-02-15
CB-1 9 04-01-19 13� none attn. unknown buried by leaves and sediment—clear grate
inspe'diorls n'idiikuianm mrllplian("(" (;0111111prcirfl rosidential in(J: 0631 11,11,111idpM