HomeMy WebLinkAbout2015-01-06 Correspondence DTO SP 312/2016 Town of North Andover Mail-Fwd:Revisions to West Mill Center Lot Plan North Andover
NOR "ANPPWR
Massachu�� , Jean Enright<jen rig ht@northandoverm a.gov>
Fwd: Revisions to West Mill Center Lot Plan North Andover
1 message
Rebecca Oldham <roldham@northandoverma.gov> Wed, Mar 2, 2016 at 11:31 AM
To: Jean Enright <jendght@northandoverma.gov>
Rebecca Oldham
Staff Planner
Toy,n of North Andover
1600 Osgood Street,Suite 2043)
North Andover,MA 01845
Phone: 978.688.9535
Fax: 976.688.9542
Email: ROldham@northandoverma.gov
i Forwarded message
From: Jean Enright<jenright@northandoverma.gov>
Date: Mon, Feb 22, 2016 at 1:46 PM
Subject: Fwd: Revisions to West Mill Center Lot Plan North Andover
To: Rebecca Oldham <roldham@northandoverma.gov>
-- Forwarded message
From: Jennifer Hughes <jhughes@northandoverma.gov>
Date: Mon, Feb 22, 2016 at 1:22 PM
Subject: Re: Revisions to West Mill Center Lot Plan North Andover
To: Seth Zeren <szeren@.-cg-llc.com>
Cc: Lisa Eggleston <Iisa@egglestonenvironmental.com>, "Enright, Jean" <J E n rig ht@townofnorthandover.com>, "Hughes, Jennifer"
<JHughes@to,,vnofnorthandover.com>, David Steinbergh <dsteinbergh@rcg-lIc.com>, Jon Ford <jford@horsleywitten.com>
The next commission meeting would be March 9.
On Mon, Feb 22, 2016 at 1:14 PM, Seth Zeren <szeren@rcg-lIc.com> wrote:
https://maCti.google.com/mail/L,VO/?ui=2&ik=7c2eff6265&view=pt&search=inbox&th=152c6el2l46id24f&siml=153382badO28c9eO 1/5
3/212016 Town of North Andover Mail-Fwd:Revisions to West Mill Center Lot Plan North Andover
Thank you Lisa.
Jean and Jennifer, what's the earliest meeting date that we can schedule with Planning Board and ConCom?
Thanks,
seth
From: Lisa Eggleston [mailto:lisa@egglestonenvironmental.com]
Sent: Monday, February 22, 2016 12:36 PM
To: Seth Zeren; Enright, Jean; Hughes, Jennifer
Cc: David Steinbergh; Jon Ford
Subject: Re: Revisions to West Mill Center Lot Plan North Andover
Jean and Jennifer,
I have reviewed the February 4th letter and revised plans from Horsley Witten Group, and also discussed the drainage revisions with
Jon Ford. The design calculations for the revised bioretention systems were not part of my review, however it is my understanding
that the revised design does provide the required pretreatment and treatment volumes in the basins consistent with the approved
plan.
I do not have any issues with the design revisions proposed and concur that they can be considered minor and insignificant with
respect to the Wetland Bylaw.
I would further add that white the proposed revisions do simplify the design somewhat, the project will still require a good deal of
construction oversight to ensure that it is built as designed.
Please Let me know if you have any additional questions.
hftps://mail.google.com,,'Mail,'u/O/?ui=2&i k=7c2eff6265&view=pt&search=inbox&th=152c6e121461 d24f&sim[=I 53382badC,28c9eO 2/5
322/2016 Town of North Andover Mail-Fwd:Revisions to west Mill Center Lot Plan North Andover
Lisa D. Eggleston, P.E.
Eggleston Environmental
32 Old Framingham Rd, Unit #29
Sudbury, MA 01776
Tel 508.259.1137
From: Seth Zeren <szeren@rcg-llc.com>
Rafe: Monday, February 8, 2016 at 11:19 AM
To: Lisa Eggleston <Iisa@egglestonenvironmental.com>, "Enright, Jean" <JEnright@townc,northandover.com>, Jennifer Hughes
<Jl,ughes townofno handover.com>
Cc: David Steinbergh <dsteinbergh@rcgallc.corm>, Jon Ford <jford horsleywitten.cor >
Subject: Revisions to West Mill Center Lot Plan North Andover
Hello Lisa,
Now that the building is down in the center of our site in North Andover and we have further developed our construction drawings, we have identified a
number of improvements in the proposed stormwater system. I've spoken with the Town of North Andover and they would like you to weigh in on the
changes. I've attached a letter from our engineer discussing the changes and the proposed drawings. I'd like to find a time for you and Jon to touch
base, this week ideally, to go over them. Please let us know your availability.
Thanks again
Seth Zeren
Development Manager
RCG LLC
17 Ivaloo St Suite 100
Somerville,MA 02143
https://mail.google.comimail/u./012ui=2&i k=7c2eff6265&vi ew=pt&search=i nbox&th=152c6el2l46l d24f&si m l=153382bad028c9eO 315
3/2/2016 Town of North Andover Mail-Fwd:Revisions to West Mill Center Lot Plan North Andover
617-625-8315(office)
617-284-2164 (direct)
860-707-5553 (cell)
617-625-8345(fax)
Jennifer A. Hughes
Conservation Administrator
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 078.688. 530
Fax 978,688.9542
Email jhughes@northandoverma.gov
Web www.northandoverma.gov
https:i'/m ail.rgoogle.com,mai I/Ld0/2ui=2&ik=7c2eff6265&view=pt&search=ink&th=152c&el2l461d24f&sire I=I53382badO28c9eo 4/5
3/212016 Town of North Andover Mail-Fwd:Revisions to West Mill Center Lot Plan North Andover
Sincerely,
Jean Enright
Assistant Director
Community and Economic Development
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover, MA 01845
Phone 978.688.0533
Fax 978,688,9542
Email: jenHaht@townollnorthandover.com
Web: ;v ,v.To\,vnotNorthAndover.com
cid:image001.jpg('",
https:,I/mail.google.com,mail/ulo,?ui=2&ik=7c2ef€6265&view=pt&search=inbox&th=152c6el2i461d24f&sim1=153382bad028c9e0 �f
Horsley Wit#en Group
Sustainable Environmental Solutions
55 Dorranee Street-Suite 403•Providence,RI 02903
401.272-1717 horsleywh(en.com Or��lq,iu r
711A1r79/J��'
February 4, 2016
Via ernail
Ms.Jennifer Hughes
Town of North Andover
1600 Osgood Street, Suite 2035
North Andover, MA 01845
Re: West Mill Redevelopment,4 High Street, North Andover- Design Update
DEP File V NE-242-1629
Dear Ms. Hughes:
On behalf of RCG, LLC,the Horsley Witten Group, Inc. (HW) is submitting the enclosed revised civil
design plans for redevelopment of the existing West Mill Complex on High Street for review of
modifications, and as a request for determination as a minor and insignificant project change.The North
Andover Conservation Commission issued an Order of Conditions for the project on February 12, 2015
and an Amended Order of Conditions on July 23, 2015.Since issuance of the Amended Order of
Conditions,the project design has progressed to bid and construction documents.As part of this
process,the design has been simplified to address value engineering changes and design coordination
items.
The following design modifications have been made to simplify the design, improve constructability, and
reduce cost:
® Minor parking,grading, and sidewalk changes were made to reduce cost and coordinate with
modifications to building entry locations and elevations. Changes include the elimination of a
curb bumpout along Building 5; enlargement of curb bumpouts on the northwest and southwest
end of the center of the site; removal of the proposed sidewalk ramp and stairs near the
western entrance to Building 5; and adjustment to the sidewalk layout in front of Building 36
and former Building 37.
® Bioretention system 4 was relocated approximately 30 feet west to accommodate the minor
adjustments to site layout noted above.
® Bioretention systems 2A, 2B, and 2C were consolidated into one bioretention system.
s Bioretention systems 6 and 7 were combined into a single bioretention system (renamed system
6)to simplify the design.An emergency overflow is proposed to connect to the existing twin
culverts via the existing drainage structure DMH 1.1.0 and existing pipe connection.
• Bioretention systems 4, 5, and 6 were modified from Type 2 to Type 1 (see details on Sheet C-
10)to replace the linear channel forebays with typical forebays,thus simplifying the design and
reducing cost.The adjusted design provides the approved pretreatment volume.
® The proposed linear channel bioretention pretreatment detail was modified, replacing the
concrete forebay with metal plate with a trench drain pan for simplicity and to reduce cost.The
pretreatment function is identical to the approved design.
Ms.Jennifer Hughes 2 of 2
West Mill Redevelopment
• The design of the site's center greenspace was simplified.The proposed bioretention system 5
berms and double underdrain pipe was edited to provide a single vegetated drainage area with
an underdrain.
• The extent of the proposed block retaining walls in the center of the site was reduced.
• The proposed wooden deck and associated ramp systems were deleted to reduce cost.
• Additional annotation and detail was added throughout the plan set for constructability.
It is our request that the updated Construction Documents be processed as a minor and insignificant
Modification per Section 8.4 of the North Andover Wetland Protection Regulations and Condition 41 of
'i the Amended Order of Conditions.The plan changes are consistent with the approved design.The
revised plan does not result in an adverse impact to the wetland resource areas or to water quality at
Osgood Pond.
Compared to the previously approved design,the submitted modified design includes conversion of
more impervious area within the overall limit of disturbance to vegetated area,conversion of more
impervious area within the 50-foot No Build Zone to vegetated area,and conversion of more impervious
area within the 100-foot Wetland Buffer Zone to vegetated area. No substantive changes to the
approved design are proposed within the 25-foot No Disturb Zone.
As with the original and Amended NOI filings,the vast majority of the proposed work will occur within
existing disturbed and/or impervious areas. No work will occur within wetland resource areas. Pre-
development and post-development drainage analysis points have not changed compared to the
approved design. Consistent with the approved design, all bioretention areas are sized to treat the 0.S-
inch storm event at a minimum,and the 1-inch storm event to the maximum extent practicable, for
water quality treatment. Consistent with the approved design, post-development peak discharge rates
do not exceed pre-development peak discharge rates due to the reduction in impervious cover.An
erosion and sedimentation control barrier has already been implemented as part of approved
demolition activities to protect downgradient resource areas,and construction-related impacts will be
minimized and restored upon completion of construction.
Revised Civil Sheets C-1 through C-13 last revised December 2015 are enclosed.Stamped hard copies
and the required $200 filing fee for this Modification Request will be provided under separate cover.
If you have any questions or require any additional information, please do not hesitate to contact me
I directly.
I Sincerely,
i
HORSLEY WITTEN GROUP, INC.
r
Jonathan A. Ford, P.E.
Senior Project Manager—Community Design
° Enclosures
cc: Seth Zeren & David Steinbergh, RCG LLC
1.
I
6/24/2016 Town of North AnOyer Mail-Fwd:West Mill Center Lot Project Update and Minor Changes
NO ORAN 0,,,OVER
Rebecca Oldham <roldham@northandoverma.gov>
massachu!
vo.........
............. --------- ...............
Fwd: West Mill Center Lot Project Update and Minor Changes
1 message
----------
Jean Enright <jenright@northandoverma.gov> Tue, Jun 21, 2016 at 11:46 AM
To: Rebecca Oldham <roldham@northandoverma.gov>
Please keep a hard copy in the file with the other minor modification documents. Thanks
---------- Forwarded message ----------
From: Lisa Eggleston <1isa@egg9estorierivironnientaA,cory,i>
Date: Tue, Jun 21, 2016 at 11:32 AM
Subject: Re: West Mill Center Lot Project Update and Minor Changes
To: Seth Zeren <szeren@rcg-llc.corn>, Jennifer Hughes <jhughes@ruoirtlhiaridoverrria,gov>
Cc: David Steinbergh <dsteinbergh@rcg-Hc,corn>, Jon Ford <jford@horsleyMttein,corn>, Eric Kfoury
<ekfoury@northmidoveirnia.gov>, Jean Enright <jenhght@r)orttia�idover:ina.gov>, Bernadette Curran
<bCLirrain@nortl'iandoveirma,,gov>, Julie Vondrak <jvondrak@yahoo.corn>, "phi I.henry@cdgengi needng.com"
<phi L henry@cdgeirigi neeh lig.corn>
Jean and Jennifer,
I have reviewed these proposed modifications and the 6/14/16 summary letter from Horsely Witten and concur
that they are minor changes that will not impact the proposed stormwater management on the site. I
recommend approval.
Please let me know if you have any questions or need anything else.
Lisa D. Eggleston, P.E.
Eggleston Environmental
32 Old Framingham Rd, Unit#29
Sudbury, MA 01776
Tel 508.259,1137
From: Seth Zeren <szeren@rCg-Ilc,corn>
Date:Tuesday,June 14, 2016 at 4:36 PM
To:Jennifer Hughes<jllLpghes@r)orthandoverrna.gov>, Lisa Eggleston <fisa@ egg lestone nv4-oin rIne rita 1.com>
Cc: David Steinbergh <dstelnbergh@rcg-llc.com>,Jon Ford<jford@IBiou�slleywitteri.coryi>, Eric Kfoury
<ekfoury@noirtl,iiandoverma,,gov>,Jean Enright<jenright@inoirthandoveirma.gov>, Bernadette Curran
<bcurran@northandoverma.gov>,Julie Vondrak<jvondrak@yahoo.corn>, "plhil,henry@cdgeiigirieering.com"
<phil.henry@cdgengineering.cod,-n>
Subject: West Mill Center Lot Project Update and Minor Changes
Hello Jennifer and Lisa,
Please find attached plans and an explanatory letter regarding some additional tweaks that we would like to
make to the center lot drainage system. We completed our underground investigations a couple weeks back
and came across several other hidden conditions that made it infeasible to move forward to way that we had
originally proposed (chiefly other underground pipes that we didn't want to disturb). We worked to find simple
solutions which would preserve the intent and outcomes of the original design which are presented here.
Overall, the changes seem to result in less construction impact to the pond and a simpler system. We hope
that these can be processed through a similar administrative review process as the previous modifications.
https://maiI.google.com/mai1/?ui=2&ik=ab4f3cb798&view=pt&search=inbox&th=15573a484302f3ef&sim1=15573a484302f3ef 1/3
6t24/2016 Town of North Andover Mail-Fwd:West Mill Center Lot Project Update and Minor Changes
Now that we have resolved these issues we're really cooking on site work and expect to complete the bulk of
the site work by August with plantings to follow in the fall.
Thanks,
Seth Zeren
Development Manager
RCG LLC
17 Ivaloo St Suite 100
Somerville,MA 02143
617-625-8315(office)
617-284-2164 (direct)
860-707-5553(cell)
617-625-8345(fax)
Sincerely,
Joan Enright
Assistant Director
Community and Economic Development
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 97&6W9533
Fax 976.688.9542
Email: jenrught@towsiofnorthandover.com
Web: www.TownofNorthAndover.com
littps://mail.google.com/majl/?ui=2&ik=ab4f3cb798&view=pt&searGh=inbox&th=15573a4&4302f3ef&sirnI=15573a484302f3ef 213
Horsley Wiften Group
Sustainable Environmental Solutions
55 Dorronce Street•Suite 403•Providence,R102903
401-272-1717 M horsteywitten.com
June 14, 2016
Via email
Ms.Jennifer Hughes
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover, MA 01845
Re: West Mill Redevelopment, 4 High Street, North Andover- Design Update
DEP File# NE-242-1629
Dear Ms. Hughes:
On behalf of RCG, LLC, the Horsley Witten Group, Inc. (HW) is submitting the enclosed Bioretention
Clarification Sketch dated June 14, 2016 for redevelopment of the existing West Mill Complex on High
Street for review of modifications, and as a request for determination as a minor and insignificant
project change.The North Andover Conservation Commission issued an Order of Conditions for the
project on February 12, 2015 and an Amended Order of Conditions on July 23, 2015. Since issuance of
the Amended Order of Conditions,the project design has progressed to bid and construction
documents, and construction has commenced. As part of the construction process, additional
bioretention clarification requests and contractor field design coordination items have arisen.
The following design clarifications and modifications have been made to simplify the design and improve
constructability:
® Due to a conflict with existing underground electrical and other underground utility lines near
the existing cooling tower,the drainage pipe routing from bioretention systems BIO-1, BIO-4,
and BIO-7 was revised as noted below and as shown on the Bioretention Clarification Sketch:
a The existing pipe connection to the 60-inch culvert was field located and verified to be
in acceptable condition for reuse per the approved plans (the approved plans show this
connection from EX-DMH-1.1.0 on C-6).
o Existing pipe from the existing drainage manhole in the loop to the connection at the
culvert was field located and verified to be in acceptable condition for reuse per the
approved plans (the approved plans show this connection on C-6 from the manhole in
the loop to EX-DMH-1.1.0 and from EX-DMH-1.1.0 to the culvert).
o Per field investigation,the existing manholes along this pipe run (EX-DMH-1.1.0 and
another structure not shown on the plans)were found to be in poor condition. New
DMH-1.1.0 and DMH-1.2.0 are proposed to replace these structures. DMH-1.2.0
location and rim is designed as an emergency overflow from the central greenspace BIO-
5 per the approved plans.
o Pipe overflow from BIO-1 is proposed to connect to an existing 18-inch pipe utilizing the
existing outfall at Osgood Pond, thus eliminating the previously proposed Outlet-1 and
reducing construction impact near Osgood Pond.
o Pipe overflow from BIO-4 is proposed to run east to connect to new DMH-1.1.1 due to
the conflict with existing underground utility lines near the cooling tower.
Ms.Jennifer Hughes 2 of 2
West Mill Redevelopment
• Additional detail and annotation was added to clarify proposed bioretention grading and pre-
treatment weir locations for all systems.The design of these systems was not modified as part
of the clarification.
It is our request that the Bioretention Clarification sketch be processed as a minor and insignificant
Modification per Section 8.4 of the North Andover Wetland Protection Regulations and Condition 41 of
the Amended Order of Conditions. The plan changes are consistent with the approved design.The
revised plan does not result in an adverse impact to the wetland resource areas or to water quality at
Osgood Pond.
As with the original and Amended NOI filings, the vast majority of the proposed work will occur within
existing disturbed and/or impervious areas. No work will occur within wetland resource areas. Pre-
development and post-development drainage analysis points have not changed compared to the
approved design, and the proposed site layout has not changed. Consistent with the approved design,
all bioretention areas are sized to treat the 0.5-inch storm event at a minimum, and the 1-inch storm
event to the maximum extent practicable,for water quality treatment. Consistent with the approved
design, post-development peak discharge rates do not exceed pre-development peak discharge rates
due to the reduction in impervious cover. An erosion and sedimentation control barrier has already
been implemented as part of approved demolition activities to protect downgradient resource areas,
and construction-related impacts will be minimized and restored upon completion of construction.
A stamped hard copy and the required $200 filing fee for this Modification Request will be provided
under separate cover.
If you have any questions or require any additional information, please do not hesitate to contact me
directly.
Sincerely,
HORSLEY WITTEN GROUP, INC.
Jonathan A. Ford, P.E.
Senior Project Manager—Community Resign
Enclosures
cc: Seth Zeren & David Steinbergh, RCG LLC
.... ..........................
IX
f �TaREB ELLY TmxnrcRCX
I \ aFcwow arve Pnvexexr -
I cuw*lorvn nccar dam. ; e
1� swrcoowxc tic _I,wla•cx MATCH LINE—
Y
I cL
x^
oxc Dorm 7,$ Taco.- L ��, ., I
i
nv /s,. iaR OF + 1 ow dill i Ov[RFIoW WEIa // G 1w der:
V
nVE
LL �
i
�^ w3
. uvCn lE 5 TP... - NVan;n }I L \�\ /' TC�frQ6 :9 a xI
f_ µ
r� ['nx 6r.0 nNlidtn[Tio[�ic,�rx "`+`�"_ s �b xI 1 \ �. axtuap TCP�w.LL 1 Yo,o iB, 1B. INLST BOA
' '. nape YORw com�Ecr cx 11 - -
oK wPRavcocmra_ ` L.
NuµTNN CX VICOVl1 wn,x AOR[iP,e'P Rc ' I -1 avCP iW I
e•wpC + F1Ll➢KRIry RrvCRraF[:I. E I hh--
rrxvour�em -e �ePIFY xuXTUR cx PunLn \ 1
--1 GcxcL�x EaR
W w
r.
=
Tdz
..RYLC NraflRwvi w L7J IS7H... J/ _ 77)) 1 R^`� I z S Q
®.
F rQ�� wt -._.,o _ sr Nore FRoxulo '' wcPPsiowwTm i O t
nTc ti
nP
q / ,
nP f MATCH LINE 1 wrtrr oW� i ,�i" I a
ReuBEex
wNNecTla NF
Er.0 4/ z
o BtoB FORE6AY OVERFLOW J 1 II //pp Tc;exa t wcau�wvwER I ' I Twiuxll`wnurRrn. p CO ul
IINI[T. R+a NGRCO 1 OP OF CURD L z z !�^•
a I ^'r rwvwl°sr R cL.r of I I io rarax wnR F'O 4 w
xoT[R- I I fr MV Nid YT FROM NO 51,9 rt, E - w U
q� rlCt�p v[P�try wy[yla Ri r=[nRX:wp xaT FY[kOM[[R SArry II�� � O
L t n Ct•�kdCs[sqx, lb i :IIW9UTT°AC '.: GVLPf ; I � W �
ono[oxwpLy- O .
/ ��eo„PdF �I PAWmaNfRaM I e fY _m
/ } DROP cu'0 g +lae ro �„ I tEr eBa O
T.eos �
1 � Tpn OF WrLL IYO+ I
=5 [L NN 1MPIN!INIX Ll,Rtk I , 1 a h S
o«a E [cx wnl ovcRFLowwclR
TC B16 TOR CF I F/+�
-I n•Iry to �l —f^ .�__..� cam- pVLpiwWWCIR- I `ij `S
oc J` Toalls
9�?vU.Lr ._
J . y FwW WCR w1� saXLunv 6fnd li INLVTxLvmB aVYOwwtlR' / y 1 oandM Osc a We
1 CfR [L Ab G03. 8^e Ia ' / 'R4VCI�TOf LV�RM
U
� sow
w� 6t1 R 1 TO TOPM WCIR-. . �/ PP PFwIyI, I //1 I x0/Or acavC ��r,�s�
nt +.,8 I TtlC`6t.1 I /'r I CL.Y4.4
L°tBn I
Y9.Y - � ® Xa wTpPOF � i O cXELK path LwGR %
J Ir MAP OvfPFwwWLIR 1 fL f I /i I l/ �� 3
IN I iVM[ EF9, ; •• ICw vCPlh Cw,x � POFwALL 1 �/ _ 3N SPY' /�i I
Ps. Tceoa 1 � i� I
1pPOF aVPV 9Mn 1.leY04wt,2C- � T �-/ I
_� tRK O O G w/LFl i IP l C� kN w-0n co VR {/ 9lLalIL^ 1
. �
Z rA O - RLtt/.q EV'^PPC /d 1r INV aVTri� '/ 2-
ru xex: : vn Lw tr wG' 1 TC Ey9 al0 wcw 1// 1 e%
POROayrTC 1 Ba + cl'ea I Ixp E a IX"'�ry�
itOW
o x3da , IN9xFRax Bb 'n1.8
xa F:IMeluo a� wEla� �R 1 �� fTPi OAu PtcVxTCv iFr:cc Fcum,`� ` I 4 N¢�„I�r
v tTxiYw',Y.�s'F , e PfaW✓«Y'1Nwk f i
. ti W e oLVw' Cvl
BIO S FOREBAY OVERFLOW
N-T8104 FOREBAY OVERFLOW BeO 5d 6 FOREBAY OVERFLOW
moX.�uP.Pna�w aw.w.oc cuFOR r:ao GRAPHIC SCALE
lurcrinouo ocw Paxeo oXolan or iulucouTnYBRouc+rtTara ce
° ocI NenETclviwnulo coaco.,r..r 1axalo. 14077
ralsnxcxulwwLxceiou.Tnx,scfa.lu+Tr.Rssw-•wosweRTs
L nolml ue[uopaTCr Ta rN[ pnr•.0 ,..,,.,
ouwlR.Wru�Pc�PRii",F,I`nL a`iR F�Fio�nnwTurvnr PITr 1 IRcrl-tB Fc¢T $K 6.14.16.1
rvPnwe see xoic=