HomeMy WebLinkAbout- Permits #NACC #279 - 60 CAMPBELL ROAD 7/14/2021 CONSERVATION DEPARTMENT
Community & Economic Development Division
Jaines Heider
Heider Budding Assoc,LLC
Tewksbuiy, NIA 01876 July 15, 2021
60 Campbell Road, North Andover
Abandonment of Septic System, Connection to Town Sewer
Conservation Conditions of Approval, NACC #279
Pursuant to section 4.4.2 (A) of the North Andover Wetlands Protection Regulations,James Heider of
Heider Building Assoc.,LLC, on behalf of the homeowner Mang--bong Ma, filed for a small project for work
proposed at 60 Campbell Road,North Andover, The proposed work includes abandonment of existing
septic system and connection to Town sewer. Work description includes the existing sewer stub will be
excavated and a Sewer line will be installed from the street to the house in an approximately 2.5-foot trench
with crushed stone around the pipe. The existing tank will be pumped, cleaned and crushed in place per tank
abandonment regulations under,Title 5. Excavated trench soils will be backfilled before the end of each day.
Once complete,disturbed lawn areas will be re-seeded and leaf litter will be returned to disturbed wooded
areas.
During the July 14,2021 public meeting,the North Andover Conservation Cormnission found this project to
qualifl,as a Small Project Permit and voted unanimously to approve this project as proposed under Category
"D"subject to compliance with the conditions listed below.The project is approved only as it relates to the
Conservation Commission and any and all other approvals should be obtained by the applicant/homeowner.
All work shall conform.to the following:
RECORD DOCUMENTS: Small Project Filing Including:
Application Checklist,
Project Narrative by Heider Building Associates
Existing As-Built Septic Plan annotated by Heider Assoc. to show
proposed work,
Aerial GIS map
The following conditions are hereby mandated:
CONDITIONS:
1. Prior to any work, 8" mulch socks (staked&overlapped) shall be installed between areas of disturbance
and wetlands (both wetland systems) and shall be inspected by Conservation Department.
2. A post-construction siteinspection shall be scheduled with the Conservation Department to,verify
project compliance and stabilized conditions before erosion controls can be removed.
3. This permit shall expire one ear from the date of issuance.
120 Alain Street,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978,688,9542 Web wmv.lmttp://%vNvw.northandovcrma.gov
Should you have any question or comments regarding the contents of this letter,please do not hesitate to
contact the undersigned at 978.688.9530.Thank you for your anticipated cooperation with this matter.
Respectfully,
NORY"ANDOVER'01;ARVATIONDEPAWMENT
9.
7
Amy It. IvIaxn r
Conservation Administrator
60 Calwpbell Road
Swill Project Petwit
jujI 15, 2021
Page 2 oj'2
120 Main Street,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web v^"v.http://,%vNv\v.tiortliandoverma.gov
Heider Building Associates
Over 40 Years of customer commitment
Date July 2,2021
PO Box 217
Tewksbury, MA 01876
Phone 978-851-2652
To: NACC for review to allow house sewer tie in.
RE: Construction sequence for installing sewer at
60 Campbell road
North Andover, MA. 01845
Approx. Location of new sewer line: From the existing sewer stub at the edge of the property to the
existing soil pipe at the back of the house approximately 2.5'deep.
- Complete project is expected to take 3 days
- Install erosion control measures
- Excavate existing sewer stub, putting excavated soil away from wetland, to be used as backfill prior to end
of day.
- Install sewer line from the street to the house, install crushed stone around pipe. Each day any soil
excavated will be used as backfill by days end.
-Existing septic tank will be pumped, cleaned, and crushed in place as per tank abandonment regulations
under Title 5.
No stockpiling of material will be within 50'of wetland areas.
After completion of sewer connection; Slope to the road will be landscaped with grass seed, then, layered
with leafy&wooded coverage in kind to what is currently on the slope.
-The existing lawn around the house will be learned & hydroseeded.silt sock at edges where washout could
occur can be added.
w
� .axv�msmmmrcarary uva�wxKvc:xrv�„»...
tl
Cal ioal o
/Vo . nJ10 velv.
f Existing As-built septic plan 1973
r
1
Mars'b berg
�M
80,
Lamoh field tobe r
abandoned ICY
Saptle t0k to bA" "' w
aband"� d parr-5
afa�e
Prwwlruseai 6 rrave .
House U60 nv,cfv lirora
54
Sewer Contractor
IEelder Building Associates I.CC
Jim Helder 978,606,1435
r Vm4l]iv
driveway
Sower stub location �
r � r
p vM°
(A 54 ~ v
.. �4
Campbell road W od e'd Marsh 50"
-� proposed suer
E7xCFt'ItatlOn .
Town of North Andover.MA June 27,2021.
MUM bverlay 60 Campbell rd
�i� A'f'l�r M�•4��'+uM�"�f�F.�•/r �� M,.e
0
p.
4'
y�
Pp
n
y .�y♦Fyn y� 4 pp Yl
°
it
8 ','iQt�.t3•t�tt tt�•tt Qt ,�t `
aseptic Is 801fraan
marsh b0z'
A ,. 41
�r
sewef ,
w� /
e corm i" lo61^° °
se, M
.. f Wt?cp t'ttt"S L� P�
� I
�� 14i�,41d1fJ�rN-b+�rq. ° � 1L�aCtr�M
ro
J ,
V" 4. ,r";o a of^.lad^4
r rl
"crWinfomMon Print map scale IS approximate.
PraPOW Critical layout or measurement
Lwmtma rya GMPataa.ROA0
tw eta=no•o"• activifies should not be done using
aria reltoutce.
MAP FOR REFERENCE ONLY
NOT,A LEGAL.DOCUMENT
or tao,anduw%UA ui*es m Maims and
ktosrtar s,-pressed rar tad,cbmoemha the v or
ac curacy cf the QtS datifees on this mtw.'
Q.�fkt4Ou st
y t dww as®dolt'meals