Loading...
HomeMy WebLinkAbout- Permits #NACC #279 - 60 CAMPBELL ROAD 7/14/2021 CONSERVATION DEPARTMENT Community & Economic Development Division Jaines Heider Heider Budding Assoc,LLC Tewksbuiy, NIA 01876 July 15, 2021 60 Campbell Road, North Andover Abandonment of Septic System, Connection to Town Sewer Conservation Conditions of Approval, NACC #279 Pursuant to section 4.4.2 (A) of the North Andover Wetlands Protection Regulations,James Heider of Heider Building Assoc.,LLC, on behalf of the homeowner Mang--bong Ma, filed for a small project for work proposed at 60 Campbell Road,North Andover, The proposed work includes abandonment of existing septic system and connection to Town sewer. Work description includes the existing sewer stub will be excavated and a Sewer line will be installed from the street to the house in an approximately 2.5-foot trench with crushed stone around the pipe. The existing tank will be pumped, cleaned and crushed in place per tank abandonment regulations under,Title 5. Excavated trench soils will be backfilled before the end of each day. Once complete,disturbed lawn areas will be re-seeded and leaf litter will be returned to disturbed wooded areas. During the July 14,2021 public meeting,the North Andover Conservation Cormnission found this project to qualifl,as a Small Project Permit and voted unanimously to approve this project as proposed under Category "D"subject to compliance with the conditions listed below.The project is approved only as it relates to the Conservation Commission and any and all other approvals should be obtained by the applicant/homeowner. All work shall conform.to the following: RECORD DOCUMENTS: Small Project Filing Including: Application Checklist, Project Narrative by Heider Building Associates Existing As-Built Septic Plan annotated by Heider Assoc. to show proposed work, Aerial GIS map The following conditions are hereby mandated: CONDITIONS: 1. Prior to any work, 8" mulch socks (staked&overlapped) shall be installed between areas of disturbance and wetlands (both wetland systems) and shall be inspected by Conservation Department. 2. A post-construction siteinspection shall be scheduled with the Conservation Department to,verify project compliance and stabilized conditions before erosion controls can be removed. 3. This permit shall expire one ear from the date of issuance. 120 Alain Street,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978,688,9542 Web wmv.lmttp://%vNvw.northandovcrma.gov Should you have any question or comments regarding the contents of this letter,please do not hesitate to contact the undersigned at 978.688.9530.Thank you for your anticipated cooperation with this matter. Respectfully, NORY"ANDOVER'01;ARVATIONDEPAWMENT 9. 7 Amy It. IvIaxn r Conservation Administrator 60 Calwpbell Road Swill Project Petwit jujI 15, 2021 Page 2 oj'2 120 Main Street,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web v^"v.http://,%vNv\v.tiortliandoverma.gov Heider Building Associates Over 40 Years of customer commitment Date July 2,2021 PO Box 217 Tewksbury, MA 01876 Phone 978-851-2652 To: NACC for review to allow house sewer tie in. RE: Construction sequence for installing sewer at 60 Campbell road North Andover, MA. 01845 Approx. Location of new sewer line: From the existing sewer stub at the edge of the property to the existing soil pipe at the back of the house approximately 2.5'deep. - Complete project is expected to take 3 days - Install erosion control measures - Excavate existing sewer stub, putting excavated soil away from wetland, to be used as backfill prior to end of day. - Install sewer line from the street to the house, install crushed stone around pipe. Each day any soil excavated will be used as backfill by days end. -Existing septic tank will be pumped, cleaned, and crushed in place as per tank abandonment regulations under Title 5. No stockpiling of material will be within 50'of wetland areas. After completion of sewer connection; Slope to the road will be landscaped with grass seed, then, layered with leafy&wooded coverage in kind to what is currently on the slope. -The existing lawn around the house will be learned & hydroseeded.silt sock at edges where washout could occur can be added. w � .axv�msmmmrcarary uva�wxKvc:xrv�„»... tl Cal ioal o /Vo . nJ10 velv. f Existing As-built septic plan 1973 r 1 Mars'b berg �M 80, Lamoh field tobe r abandoned ICY Saptle t0k to bA" "' w aband"� d parr-5 afa�e Prwwlruseai 6 rrave . House U60 nv,cfv lirora 54 Sewer Contractor IEelder Building Associates I.CC Jim Helder 978,606,1435 r Vm4l]iv driveway Sower stub location � r � r p vM° (A 54 ~ v .. �4 Campbell road W od e'd Marsh 50" -� proposed suer E7xCFt'ItatlOn . Town of North Andover.MA June 27,2021. MUM bverlay 60 Campbell rd �i� A'f'l�r M�•4��'+uM�"�f�F.�•/r �� M,.e 0 p. 4' y� Pp n y .�y♦Fyn y� 4 pp Yl ° it 8 ','iQt�.t3•t�tt tt�•tt Qt ,�t ` aseptic Is 801fraan marsh b0z' A ,. 41 �r sewef , w� / e corm i" lo61^° ° se, M .. f Wt?cp t'ttt"S L� P� � I �� 14i�,41d1fJ�rN-b+�rq. ° � 1L�aCtr�M ro J , V" 4. ,r";o a of^.lad^4 r rl "crWinfomMon Print map scale IS approximate. PraPOW Critical layout or measurement Lwmtma rya GMPataa.ROA0 tw eta=no•o"• activifies should not be done using aria reltoutce. MAP FOR REFERENCE ONLY NOT,A LEGAL.DOCUMENT or tao,anduw%UA ui*es m Maims and ktosrtar s,-pressed rar tad,cbmoemha the v or ac curacy cf the QtS datifees on this mtw.' Q.�fkt4Ou st y t dww as®dolt'meals