HomeMy WebLinkAboutConstruction Notes - septic repair pipe from foundation to tank - Consultant Review - 1476 SALEM STREET 7/19/2021 North Andover Health Department
(ormunity and Economic Development Division
QNSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 1476 Salem Street MAP: 106.A LOT: 18
INSTALLER: Todd Bateson — 978-815-2708
INSPECTIONS
61018 vp — S. Casey
Pipe from foundation to tank
SEPTIC TANK
Building sewer in continuous grade, on
compacted firm base
E] Cleanouts per plan
E:1 Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
(� Water tightness of tank has been achieved by
visual testing
Inlet tee installed, centered under access port
Outlet tee installed, centered under access port
(gas baffle/effluent filter)
......__ inch cover to within 6" of finish grade
installed over one access port
Hydraulic cement around inlet & outlet
Comments: