Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 20 OLYMPIC LANE 7/21/2021 r V-'ec North Andover Heallth Department tammunity and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 20 Olympic Lane MAP: 106.BB LOT:. 103 INSTALLERS John DiVincenzo 978-372-7471 INSPECTIONS Permit 61126 dbox & pipe from tank to dbox DISTRIBUTION-BOX M Installed on stable stone base H-20 D-Box t Inlet tee (if pumped or >0.08'Pfoot) Hydrauilic cement around inlet & outlets Observed even distribution Speed levelers provided (net required) Schedule 40 PVC Pipe .* *4a,, "w„ I