HomeMy WebLinkAboutSprinkler Inspection Report - Inspection - 490 MAIN STREET 10/15/2020 A.S.A.P. Sprinkler LLC SPRINKLER INSPECTION REPORT PAGE 1
6 Progress Ave, Unit #3
TyngSbDro, Ma. 0187 Phone 978-649-4945 Fax 978-649-9445
Company Name r Contact
Street - -- ycln � ✓� T. city.__ Lb ,d.czb6t-le- K -state�Q_
Date of Trip Test Technician D c Date f�-
Owners Section(To be answered by owner or occupants
A. Explain any occupancy hazard changes since the previous inspection.
B. Describe fire protection modifications made since the last inspection.
C. Describe any fires since the last inspection
D. When was the system piping last checked for stoppage,corrosion or foreign material?
E.When was the dry-piping system last checked for proper pitch?
F.Are dry valves adequately protected from freezing?
Inspector's Section(All responses reference current inspection)
1. GENERAL YES NO
a. Is the building occupied?
r
b.Are all systems in service?
c. Is there a minimum of 18 in clearance between the top Of storage and sprinkler deflector?
d. In areas protected by wet system,does the building appear to be properly heated in ail areas including blind
attics and perimeter areas,where accesible?Do all exterior openings appear to be protected against freezing
2. CONTROL VALVES(See Item 14) XXXXK XX XXXXXXXXK
a.Are all sprinkler system control valves and all other valves in appropriate position?
b.Are all control valves in the open position and locked,sealed or equipped with tamper?
3.WATER SUPPLIES(see Item 14) XXXXXXXXK XXXXXXXXX
a.Was a water flow test of main drain made at the sprinkler riser?
4.TANKS,PUMPS, FIRE DEPARTMENT CONNECTIONS XXXXXXXXK XXXXXXXXX
a.Are fire pumps,gravity tanks,reserviors and pressure tanks in good condition and maintained?
b.Are FD connection in satisfactory condition,couplings free,caps in place&check valves tight?
Are they accessible and visible?
S.WET SYSTEMS(See item 13) XXXXXXXXX XXXXXXXXX
a.Are cold weather valves(OS&Ys In the appropriate open Or closed position?
b. Have anti-freeze system solutions been tested?
c.Were the antifreeze test results satisfactory?
6. DRY SYSTEMS(See Items 10-14) XXXXXXXXX XXXXXXXXX
a. Is the dry valve in service?
b.Are the air pressure&priming water level in accordance with the manufacturers instructions?
c.Were the antifreeze test results satisfactory?
d.Wire law points drained daring the inspection?
e. Did quick-opening devices operate satisfactory?
f. Did the dry valve trip properly during the trip pressure test?
g. Did the heating equipment in the dry-pipe valve room operate at the time of inspection?
7,SPECIAL SYSTEMS(See item 16) XXXXXXXXX XXXXXXXXX
a. Did the deluge or pre-action valves operate properly during testing?
b. Did the heat-responsive devices operate properly during testing?
c. Did the supervisory alarm service test satisfactory?
8.ALARMS XXXXXXXXX XXXXXXXXX
a. Did water motor and gong test satisfactory?
b. Did electric alarm test satisfactory?
c. Did supervisory alarm service test satisfactory?
9.SPRINKLERS XXXXXXXXX XXXXXXXXX
a.Are all sprinklers free from corrosion, loading or obstruction to spray discharge?
b.Are sprinklers over 50 years old,thus requiring sample testing?
c. Is stock of spare sprinklers available?
d. Does the interior condition Of sprinkler system appear to be satisfactory
e.Temperature.Are sprinklers of proper temperature rating for their location?
A.S.A.P.Sprinkler LLC INSPECTION REPORT Page 2
6 Progress Ave. Unit#3
Tyngsboro,Ma.01879
Phone:978-649-4945 Fax 978-649-9445
Wet Systems No? � / ake and model?
Dry Systems No? Make and model?
Special Systems No? Type?
Make and Model Condition
10.Date dry-pipe valve trip tested(control valve partially open)
11.Date dry-pipe valve trip tested(control valve fully open)
12.Date quick-opening device tested
13.Date deluge or preaction valve tested
14.See Control Valve Maintenance Table,
Control Valves Number Type Open Secured Closed Signs Abnormalities
City Connection Control S e ?.S
Tank Control
Pump Control
Sectional Control
- C
System Control ® •� G�' __
Other Control
Water Pressure? TankL/L PSI Fire Pump ,AA6
Water flow test? l (If none made WHY?)
16.Heat Responsive Device
Test Method If l f
Type of Equipment
Manufacturer
Test Results:
Valve# A S C D E _F Valve
Valve# A F C D E^_F Valve# A E C D E,,,_,_F
Valve# A B g D E^_F Valve# f3 C D E^,Valve# A E3 D EF Valve
Auxiliary Equipment:No? Type? Location? Test Result?
17.Explhq any"No"answers and comments: o.
r
18.Adjustments or corrections made during this inspection:
19.Although these comments are not the result of an engineering review,the following desirable improvements are recommended.
Technician C)Z License CustSignature/date �7�