Loading...
HomeMy WebLinkAboutSeptic - full repair - Correspondence - 740 FOREST STREET 8/12/2021 -�`l0 tOCUS.I J'b �' V�ro� k>[ >*Nt JLP�t7( �`1 Lg/ZI f. i r tl�W�i��11O���y r.. .•• ' 3 W7- rv^ e h ��r NOR ", OVER Massachu Stephen Casey<scasey@northandoverma.gov> 740 Forest Street 3 messages Stephen Casey <scasey@northandoverma.gov> Tue, Jul 6, 2021 at 3:29 PM To: John Morin <John@morincameron.com> Cc: mark finn <markfinn.huntergroup@gmail.com> Hi John, I wanted to reach out as we never received the 3 hard copies of the as-built plan for 740 Forest Street. We also never received the signed installation certificate from both you (or the engineer from The Morin-Cameron Group) and the installer. Please submit 3 hard copies of the as-built plan and the signed certificate of installation as soon as possible. We did receive the tank verification for the existing tank. I also CC'd the installer on this email as well. Any questions, please let me know. Best, Stephen Casey Jr. Health Inspector Town of North Andover John Morin <john@morincameron.com> Tue, Jul 6, 2021 at 3:44 PM To: Stephen Casey<scasey@northandoverma.gov> Cc: mark finn <markfinn.huntergroup@gmail.com>, Will Schkuta <will@morincameron.com> Hi Stephen, We are waiting for Mark Finn to provide us proof that the garbage grinders have been removed. Then we will submit the as-built plan and the certification. Thanks John Sent from my iPhone On Jul 6, 2021, at 3:29 PM, Stephen Casey<scasey@northandoverma.gov> wrote: [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Stephen Casey <scasey@northandoverma.gov> Tue, Jul 6, 2021 at 3:52 PM To: John Morin <john@morincameron.com> Cc: mark finn <markfinn.huntergroup@gmail.com>, Will Schkuta <will@morincameron.com> Great,thank you for the update John. [Quoted text hidden] R. JENKINS & SONS Title V Inspections / Mini Backhoe Services 58 PLEASANT ST. ROWLEY MA. 01969 978-314-0503 To whom it may concern, The Septic tank located at ?4L Forest Street worth Ar'�dv`✓cr in good condition with no evidence of leakage. Tank size is 1,500 in volume (10'x5'x5'dp.) It is 4' below grade with risers to grade,24'' Dia. Plastic domed Covers are screwed down for safety. Tank is a H2O (heavy duty) tank Inlet baffle in good condition, outlet tee is new . Liquid was level with bottom of outlet invert. Ron Jenkins S 14268 R. JENKINS & SONS Title V Inspections / Mini Backhoe Services 58 PLEASANT ST. ROWLEY MA. 01969 978-314-0503 71 I IA 1z3 M t� . 2 � Z "7 yAp Net !a .5,e iz - NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Final Construction Inspection - 740 Forest Street 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Mon, May 24, 2021 at 5:08 PM To: 'Brian Lag rasse (blagrasse@north andoverma.gov)" <b lag rasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni - The final construction inspection form is attached to this email. The soil absorption system and distribution box construction was found to be acceptable and the installer was authorized to backfill around that area. Several issues were noted around the septic tank, as follows: • The design plan calls for System Inspector to examine the existing tank to determine if it is acceptable to remain in use or if it needs to be replaced. This was never completed and the installer just assumed the existing tank could be re- used. I explained to the installer that a System Inspector would need to make that determination. He reports he will make that happen. • If the current tank is to remain in use there are several items in need of attention: o A manhole to grade is needed over the inlet side of the tank because there are two pipes tied in together outside the tank and this is a risk point for clogging o The pipe exiting the tank did not appear to be a fully watertight connection with the tank and will need to be secured with hydraulic cement Additionally, the water line was reported to not run in the location shown on the design plan. I have let the engineer know to depict the water line location correctly on the as-built and to depict the two building sewer pipes on the as-built plan, if they are not already shown. I know Steve is out for the week so I have instructed the installer to keep me apprised. Best, Dan Daniel Ottenheimer, PE President .aa Vim. MILL RIVER CONSULTING Creative Solutions for land rvvelopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com Member: National Society of Professional Engineers, New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association c Construction Notes -740 Forest Street.doc 375K The Morin-Cameron GROUP, INC. REG�w�� March 17, 2021 pN WN�F N Mr. Brian J. LaGrasse Director of Public Health 120 Main Street North Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan —740 Forest Street (Map 105D, Lot 34) Dear Brian: We are in receipt of your review of the septic design for the above referenced property dated January 21, 2021. Please find enclosed the following: • 3 sets of the revised Sanitary Disposal System Repair Plans • Application for Local Upgrade Approval (Form 9A) On behalf of Stuart Thompson, The Morin-Cameron Group, Inc. has prepared the following responses to your comments. For your convenience the response comments are numbered in the same order and correlate to the numbered comments in your letter: 1. A local upgrade approval application (Form 9A) has been included for a reduction in setback between the proposed effluent line and the existing water service crossing. It should be noted that the existing effluent line crosses the water service. The proposed effluent line shall be sleeved for a distance of 10' on each side of this crossing. A note for the local upgrade has been added to Sheet 1 of 2 and the profile has been revised to reflect the water service and sleeve on Sheet 2 of 2. 2. The plan view (Sheet 1 of 2) has been revised to show benchmarks within 50-75 feet of the proposed facility. 3. The existing septic tank is located 13' from the foundation wall and is proposed to be re- used. If replacement is required, the tank will be replaced in the same location at existing inverts. A dimension depicting the distance from foundation wall to tank has been added to the plan view (Sheet 1 of 2). 4. Notations stating "Outlet distribution lines shall be level for a minimum of the first two feet of their length" and "All outlets of the distribution box shall be equal to each other and located at least two inches below the invert elevation of the inlet" have been added to the notes on the distribution box detail (Sheet 2 of 2). CIVIL ENGINEERS • LAND SURVEYORS • ENVIRONMENTAL CONSULTANTS • LAND USE PLANNERS 66 Elm Street, Danvers, MA 01923 978.777.8586 FAX 978.774.3488 Providing Professional Services Since 1978 www.morincameron.com Mr. Brian LaGrasse March 17, 2021 Page 2 5. The distribution box detail has been revised to show "9" min., 36" max." cover (Sheet 2 of 2). 6. The soil evaluator has discussed the submitted soil testing forms with Mill River Consulting. It has been agreed upon that the submitted forms are sufficient and DEP forms 11 and 12 will not be required. 7. The leach bed detail has been revised to show 12" min., 36" max." cover (Sheet 2 of 2). 8. The perforated pipe shown on the leach bed detail has been revised to show "3/8" - 5/8" ORIFICE (TYP)". (Sheet 2 of 2). We trust these responses satisfy your questions and concerns. If you have any additional questions, please do not hesitate to contact our office. Sincerely, THE MORIN-CAMERON GROUP, INC. John M. Morin, PE Principal JMM/kmm Attachments cc: Stuart Thompson X:\Thompson,Stu art\401 7\Docs\BOH\Response Comments.docx NORTH ANDOVER Massachusets Toni Wolfenden <twolfenden@northandoverma.gov> Fwd: 740 Forest St 1 message Stephen Casey <scasey@northandoverma.gov> Thu, Mar 25, 2021 at 10:48 AM To: Toni Wolfenden <tolfenden@northandoverma.gov> ---------- Forwarded message --------- From: Andrew Barnum <andrewbarnum@hotmail.com> Date: Thu, Mar 25, 2021 at 10:45 AM Subject: 740 Forest St To: scasey@northandoverma.gov<scasey@northandoverma.gov> Stephen, For your records, here's my contact info as the new owner at 740 Forest St. Andrew &Jessica Barnum andrewbarnum@hotmail.com 619-458-0024 Stephen Casey Jr. Health Inspector Town of North Andover GCS o 5G J -D4 h m� NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Revised plan review - 740 Forest Street 2 messages Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Mar 29, 2021 at 11:39 AM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> The revised plan meets the standards in Title 5 and the local regulations and we would recommend approval. Note there is a Local Upgrade Approval request accompanying this submission for reduced setback from sewer line to water line. A draft approval letter is attached should you wish to use it. Please let me know any questions you might have. Thanks, Dan Daniel Ottenheimer, PE President V. MILL RIVER CONSULTING (:restive Solutiom for Laid Ikvdopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com Member: National Society of Professional Engineers, New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association Approval Letter-740 Forest Street(3-29-21).doc 398K Toni Wolfenden <tolfenden@northandoverma.gov> Mon, Mar 29, 2021 at 11:43 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> received. Toni K. Wolfenden Health Department Assistant 978-688-9540 [;�cid:image002.jpg@O1 CD02A1.85A49B40 [Quoted text hidden] image001.jpg 4K