North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 740 Forest Street MAP: 105.D LOT: 0034
INSTALLER: Mark Finn - 978-857-5161 permit # 59011 vp
DESIGNER: John Morin — Morin-Cameron Group Inc 978-777-8586
PLAN DATE: 12.18.2020, revised 03.17.2021
BOH APPROVAL DATE ON PLAN: 04.02.2024
INSPECTIONS
TANK INSPECTION: tank existing see attached letter
DATE OF BED BOTTOM INSPECTION-4/20/2021 , 04/23/2021
DATE OF FINAL CONSTRUCTION INSPECTION: 5/24/21
DATE OF FINAL GRADE INSPECTION:6/7/2021
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
® Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments: 5/24/21 — D. Ottenheimer: Laundry waste pipe was intercepted and
tied into the main building sewer pipe just outside the septic tank. Contractor
reports water service line does not ru where shown on the design plan and was
not encountered during installation. Contractor was informed of plan requirement
to have existing septic tank examined by a System Inspector to determine if it
can be re-used or not.
SEPTIC TANK
® Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
❑ Inlet tee installed, centered under access port
® Outlet tee installed, centered under access port
(gas baffle)
❑ inch cover to within 6" of finish grade
installed over one access port
❑ Hydraulic cement around inlet & outlet
Comments: 5/24/21 — D. Ottenheimer: If current tank is to remain, required
installation of riser to grade over inlet, examination of tank by System Inspector,
and hydraulic cement around outlet pipe
DISTRIBUTION-BOX
❑ Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required)
® Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
® Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan -
Monday 4/26
® 40 Mil HDPE barrier installed
® Laterals installed and ends connected to
header (and vented if impervious material
above)
® Elevations of laterals and chambers installed as on
approved plan
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments: S. Casey — 4.20.2021 LxW of bottom of bed @ 53x24, needs to be
56x26. Rocks/tree branches/limbs in bottom of bed. Hole needs to be fixed for
inspection. John Morin verified enginee had been out.
S. Casey — 04.23.2021 — 56 '12' x 27', rocks pulled, Will on site. Sand coming
Monday.
5/24/21 — D. Ottenheimer: SAS authorized to be backfilled
FINAL GRADE 6.7.2021 S. Casey
® Loamed
® Seeded
❑ Cover per plan
Comments: Noted rock wall on site — not on plan. John Morin noted not a
retaining wall.
DOCUMENTS NEEDED
® Certification of Installation Form submitted
By engineer and signed and dated by
Engineer and installer
® As-Built Plan
BM = 97.00
HR = _2.88
HI = 99.88
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Building Sewer OUT
Septic Tank IN
Septic Tank OUT
Distribution Box IN 3.96 95.59 95.47
Distribution Box OUT 4.15 95.40 95.30
Lateral 1 TOP 4.36 95.19 95.22
Lateral 1 INVERT 4.56 94.99 95.00
Lateral 2 TOP 4.35 95.20 95.22
Lateral 2 INVERT 4.58 95.01 95.00
Lateral 3 TOP 4.35 95.20 95.22
Lateral 3 INVERT 4.58 94.97 95.00
Lateral 4 TOP 4.36 95.19 95.22
Lateral 4 INVERT 4.58 94.97 95.00
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
Final Construction Inspection - 740 Forest Street
3 messages
Daniel Ottenheimer<dano@millriverconsulting.com> Mon, May 24, 2021 at 5:08 PM
To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Brian, Steve, Toni -
The final construction inspection form is attached to this email.
The soil absorption system and distribution box construction was found to be acceptable and the installer was authorized
to backfill around that area.
Several issues were noted around the septic tank, as follows:
• The design plan calls for System Inspector to examine the existing tank to determine if it is acceptable to remain in
use or if it needs to be replaced. This was never completed and the installer just assumed the existing tank could be re-
used. I explained to the installer that a System Inspector would need to make that determination. He reports he will make
that happen.
• If the current tank is to remain in use there are several items in need of attention:
o A manhole to grade is needed over the inlet side of the tank because there are two pipes tied in
together outside the tank and this is a risk point for clogging
o The pipe exiting the tank did not appear to be a fully watertight connection with the tank and will need
to be secured with hydraulic cement
Additionally, the water line was reported to not run in the location shown on the design plan. I have let the engineer know
to depict the water line location correctly on the as-built and to depict the two building sewer pipes on the as-built plan, if
they are not already shown.
I know Steve is out for the week so I have instructed the installer to keep me apprised.
Best,
Dan
Daniel Ottenheimer, PE
President
m
f MILL RIVER CONSULTING
Creative Solutems for Laid DevOopment
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
Member: National Society of Professional Engineers, New England Water Environment Association, Yankee Onsite
Wastewater Association, Massachusetts Environmental Health Association
,i Construction Notes -740 Forest Street.doc
375K
Brian LaGrasse <blagrasse@northandoverma.gov> Tue, May 25, 2021 at 8:17 AM
To: Daniel Ottenheimer<dano@millriverconsulting.com>
Cc: Stephen Casey<scasey@northandoverma.gov>, "Toni Wolfenden (tolfenden@northandoverma.gov)"
<tolfenden@northandoverma.gov>
Thanks Dan
[Quoted text hidden]
Brian J. LaGrasse, CEHT
Director of Public Health
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9540
Fax 978.688.8476
Email blagrasse@northandoverma.gov
Web www.northandoverma.gov
Toni Wolfenden <tolfenden@northandoverma.gov> Tue, May 25, 2021 at 8:17 AM
To: Brian LaGrasse <blagrasse@northandoverma.gov>
Cc: Daniel Ottenheimer<dano@millriverconsulting.com>, Stephen Casey<scasey@northandoverma.gov>
received.
Thank you,
Toni K. Wolfenden
Health Department Assistant
978-688-9540
(;acid Jrnage002.jpg@O1 CD02A1.85A49B40
[Quoted text hidden]
image001.jpg
4K
R. JENKINS & SONS
Title V Inspections / Mini Backhoe Services
58 PLEASANT ST. ROWLEY MA. 01969
978-314-0503
To whom it may concern,
The Se,t;c tank located at ? ^ rest, Street North Anal ., J
r 4v Forest, t ItiGr�h r�iiu�JJc Eii good condition with no
evidence of leakage. Tank size is 1,500 in volume (10'x5'x5'dp.)
It is 4' below grade with risers to grade,24'' Dia. Plastic domed Covers are screwed down for
safety.
Tank is a H2O (heavy duty) tank
Inlet baffle in good condition, outlet tee is new . Liquid was level with bottom of outlet invert.
'e7 e
Ron Jenkins qeQ
SI4268 �'` 0�1
OF EPP�
Y