HomeMy WebLinkAbout97 AppletonStreet Permit Plans 25556 - Plans - 97 APPLETON STREET 6/23/2017 eL
MASTER FAMILY ROOM
BEDROOM
4' SLDG DR. FIRST FLOOR PLAN
7.
(EXISTING)
e
OWN TO
[c, 0 REF BMT,
71-9) STOVE (-2'-2'")
r
a
_ V STEP DOWN
KITCHEN DO\J)'N-
BEDROOM
L.. DO
I
L.. • CARPORT
BEDROOM BATH LIVING ROOM
I
I
i
I
L. TUB o
t S I-1'1/1 R I
I
I
II PLANS FOR
LUNDY RESIDENCE
97 ,A PPLETON STREET
NORTH ANDOVER, MA
SCALE:114"=1'p" DATE:6123/17
irk�0a
i
00 FIN-
00
FINIS -- 1ST FLO, a
I�
I
LJ
FINISH BASEMENT FLOOR
ELEVATIONFRONT
(EXISTING)
PLANS FOR
LUNDY RESIDENCE
97 APPLETON STREET
FORTH ANDOVER, MA
SCALE 114"=V-0" DATE:6/23/17
6{
..........
EXISTING CARPORT ROO
FINISH 1ST FLOOR
9
L I LJ
LELEVATION
(EXISTING),
PLANS FOR
LUNDY RESIDENCE
97 APPLETON STREET
NORTH ACNDOVER, MA
SCALE:1l4"=V-0" DATE:6/23117
[EITTT7
LLJ
FINISH 1ST FLOOR
FINISH 1ST FLOOR - -
ti
(MAIN DWELLING)
FINISH BASEMENT FLOOR
(ADDITION)
REAR A
(EXISTING)
PLANS FOR
LUNDY RESIDENCE
97 APPLETON STREET
NORTH ANDOVER, MA
SCALER/4"=V-0" [SATE:6123117
TREATED WOOD
DECK FRAMING
WEATHER RESISTANT DECKING NOTE *:
STRUCTURAL ENGINEERING PROVIDED BY OTHERS
I
MASTER LIVING R STAIRS TO
FINISH GRADE
BEDROOM
FRENC C)E
DOORS
CK
(NEW) EW(2) D.H. WINDOW UNITS
�..�, AILING—T
w
NSULATE FULL DEPTH
4, SLDG DR. EW FULL ITCHEN OF EXISTING FRAMING n.
VISION GLASS CASEMENT � CAVITY
DOOR WINDOW 211
6L I
.z
Q
" -
w
ui
J ' SKYLIGHT Q � ANTRY �
E ISTIIRS > i--- 9 1 I CABINETSTA a U?
G) jI I EMOVE EXISTING WALL. Lu
BECRIVi ' ° --- ; �I PROVIDE NEW BEAD
v ITCHENI _ — FIRST FLOOR PLAN
---BASE DINING ROOM (PROPOSED)
— NEW 2 D.H.
CABINETS
Jam" (BELOW) WINDOWS Q
EXISTING WALL S D
TO REMAIN 7� — w
�. E "I`I = IGHT SWITCHES
y LIGHT SWITCHES COUNTER � cn
,�.
STRUCTURAL � = ------MATCH EXISTING Q
" `• REMOVE EXISTING WALL. FRAMING WALL THICKNES
PROVIDE NEW BEAM CONNECTION AT THIS WALL.
L. II EQUAL EQUAL I
(9II
BEDROOMj TV--,,, 1 I EW WALLS
BATH FAMILY ROOM
PORCH i SHOWN SHADED
aI (TYPICAL)
II � li
�+ I TREATED 4 X 4
rL� , DOUBLE 2 X I SUPPORT POST,
SUPPORT POST ENCLOSE IN
Al�LING
FINISH EXTERIOR
I TRIM,
I I
I
NEW BEAM I EW STAIRS TO
I FINISH GRADE PLANS FOR
L _ _ _ _ ——————
EMOVEEXISTING LUNDY RESIDENCE
CARPORT ROOF
STRUCTURE 97 APPLETON STREET
NORTH ,ANDOVER, MA
SCALE:1/4" 1'-t3" DATE:6/23117
a
EXISTING CH'IMNEI'
XISTING ROOFSTRUCTURE TO
REMAIN.
EW SEAL
EMOVE EXISTING
CARPC)RT R4�C1F
STRUCTURE THIS
AREA.
EW D.H. WINDOWS (2)
Ll I I Li-Li
MATCH EXISTING HEIGHT X 2" +l- WIDE
lu Efl
EW STRUCTURAL POST
FINISH � ST FL ���.
EW DULL VISION
' GLASS DOOR UNIT
I I
I I
I I
I I
I I
(MAIN DWELLING) I I
FINISH BASEMENT FLOORFRU L
12^' DIA. POURED CONCRETE PIER..-'/
GALVANIZED POST ANCHOR
MIN.4' FROST COVER
4 X 4 TREATED WOOD POST
PLANS FOR
LUNDY
97 APP LETON STREET
NORTH ANDOVER, MA
SCALE:1f4"=1'-0" DATE:6/23/17
0
PROPOSED EXISTING
a
EXISTING ROOF
STRUCTURE TO
REMAIN
EXISTING CHIMNEY OOF CRICKET
AT CHIMNEY
FLASHIN
EW SKYLIGHT
EXISTING ROOF �, ", ( (BEYOND)
(BEYOND)
EW D.H. WINDOWS
MATCH TO EXISTING UNIT
REMOVE EXISTING CARPORT ; ,
AT REAR OF EXISTING
EW DOOR (BEYOND)
ROOF THIS AREA LIVING ROOM
, EW DECK ,
NEW BEAM: OWNER TO VERIFY
SIZE.
4 X 4 STRUCTURAL POST. _-EXISTING DWELLING
TREATED WOOD.
(BEYOND)
FINISH 'IST FLOOR
lull
7777,77-71
. s
I I
OPERABLE/SCREENED
CRAWL SPACE VENTS
(MAIN DWELLING)
FINISH BASEMENT FLOOR L_J I I
- I I
12"DIA. POURED CONCRETE PIER.
GALVANIZED POST ANCHOR
MIN. 4'FROST COVER 12"DIA. POURED CONCRETE PIER.
4 4 TREATED WOOD POST GALVANIZED POST ANCHOR
NEW POURED CONRETY STEP BOTTOM1\,�EXISTING FOUNDATION MIN..4" FROST COVER
FOOTING AND FOUNDATION OF FOOTING AS 4 x 4 TREATED WOOD POST
REQUIRED.
ELEVATIONRIGHT
PLANS FOR
LUND,Y RESIDENCE
97 APPLETON STREET
NORTH ANDOVER, MA
SCALE:114"=1'-0" DATE:6/23117
NEW CASEMENT WINDOW UNIT.
2 - 24" WIDE X 42" tea- HIGH. EW SKYLIGHT
NEW D.H. WINDOW UNIT.
MATCH TO EXISTING UNIT AT REAR
WALL OF EXISTING LIVING ROOM
GUTTER AT ROOF AREA
ABOVE DECK AND DOORS
Ellr
f
LLLJ
I'
FINISH 1ST FLOOR FINISH 1ST FLOOR
E-Lil
z
..
M I I I I I I
I I I I I I I
(MAIN DWELLING)
I I I I I I I FINISH BASEMENT FLOC
NEW DECK---' L L_J L_J L_J
12"DIA. POURED CONCRETE PIER. (ADDITION)
GALVANIZED POST ANCHOR
MIN.4' FROST COVER
4 X 4 TREATED WOOD POST
I
'REAR
L V
PLANS FOR
LU'ND,Y RESIDENCE
97 APPLETON STREET
NORTH ANDOVER, MA
SCALE:114"=1'O", DATE:6/23/17
"r
DOUBLE TOP PLATE.
CUT IN "BIRDS MOUTH".
FRAMING CONNECTOR
IDLE VENT
ASPHALT SHINGLES EW"STUB" WALL:
2 X 4 TOP & BOTTOM PLATES
EXISTING ROOF STRUCTUR
2X4AT16" O.C.
TO REMAIN PLYWOOD EACH FACE
2 X 4 AT 16" O.C. GWB ON
1 X 3 STRAPPING
MATCH EXISTIN � ---..� .�_� �"�-- -_°_°�
"'" 2X8AT16" O.C.
EAVES DETAIL
REMOVE EXISTIN'C --- _.
CARPORT ROOF AT
THIS AREA NEW BEAM
3/4" T&G PLYWOOD. R-49 INSULATION XISTING ',t�'ALL STRUCTURE
TYPICAL NEW EXTERIOR WALL NAIL & GLUE TO FRAMING TO REMAIN. PROVIDE NEW
SIDING TO MATCH EXISTING INSULATION TO FULL DEPTH
BUILDING WRAP s& R-30 INSULATION ONTINUOUS OF STUD POCKET.
ZIP SYSTEM SHEATHING THERMAL &All
2 X 6 AT 16" O.C. BRIDGING,AT BLOCK BETW N :
R-20 FIBERGLAS INSULATION CENTER SPAN JOISTS
TYPICAL SILL DETAIL.:
VAPOR BARRIER / `~, R BOLTS/STRAPS` ANCHOR AT4"O.C. FINISH 1ST FLOOR
GWB 2 X 8 AT 16' O.C.
SILL SEAL FOAM INSULATION
DOUBLE 2 X 6 TREATED SILL
4 X 4 STRUCTURAL POST Rf CRAWL SPACE CONTINUOUS RIBBON JOIST
P.T. 2 X 6 AT 16" O.C.
2 X 6 CLEAT SECURED
7 VAPOR BARRIER TO WALL STRUCTURE
J10
XISTING 2 X 6 AT 16` O.C.
P.T. BEA "5. FOUNDATION R-30 INSULATION (MAIN DWELLING)
WALLS
=:.. PLYWOOD EACH SIDE. FINISH BASEMENT FLOOR
e �
CONCRETE PIER 2 # 6 REBAR 0E ACCESS OPENING
TOP & BOT. —T--���
20" X 10"' REMOVE ALL ORGANIC
V.I.F. ADEQUATE SOILS FROM CRAWL
POURED CONCRETE SOIL BEARING SPACE AREA
FOOTING CAPACITY
TYPICAL CROSS SECTION
PLANS FOR
LUNDY RESIDENCE
97 APPLETON STREET
NORTH ANDOVER, MA,
SCAL,E:1/4"-1'-0" (PATE:6/23/17