Loading...
HomeMy WebLinkAboutContract #: 1466 - From: 09-15-2021 To: 07-01-2022 - TEC, Inc. - Planning TOWN OF NORTH ANDOVER STANDARD SHORT FORM CONTRACT DOCUMENT CONTRACT NO: 14Av Contractor Legal Name: To Department Name: TEC, Inc. Town of North Andover Contractor Address: Mailing Address: 146 Dascomb Road 120 Main Street Andover,MA 01810 North Andover,MA 01845 Contractor Vendor ID: Rate(if applicable): 18954 Not to exceed $38,000.00 Contract start date: Contract End Date: September 15,2021 July 1, 2022 Description of Scope(Attach support documentation) See attached Scope of Work Contract Signatures: Approved as tothe availability of ALL REQUIRED DOCUMENTS AGREES TO PROVIDE THE— appropriations ATTACHED GOODS OR SERVICES AS INDICATED IN ACCORDANCE In the amount of WITH THESE CONTRACT DOCUMENTS AS DEFINED IN TEN R1 AND OVER STANDARD CONTRACT GENERAL CONDITIONS Fi gee Direct�q Department Head: Contractor: j ———------ n. re ur ig Signa+t T rd ea�t Date: Date: Date: 9 Town Manager: Town Counsel: k— ............... Signature Sigriatt re Date,--.................................................................................................... Date: °")-Ii............ 0 11111m1o11111­­mam­........... mmiawnu...................................—...........wrvmmmoiu SCOPE OF WORK MassDOT Complete Streets Funding Program: Project Prioritization Plan TEC will compile, review and analyze information from various Town Departments. Information that is anticipated to be available, but not be limited to, will include: ® Capital Investment Plans b. Master Plans & Studies c. Network Gap Analysis (Ped & Bike) d. Roadway Maintenance Plan e. Pavement Management Plan f. Private Development Projects g. ADA Assessments h. Bicycle and Pedestrian Assessments 1. Roadway Safety Audits, The above information will be analyzed to include any complete streets ideas and needs from previous work completed by the Town and identify opportunities to Include them in the Project Prioritization Plan. 1 TEC will utilize available GIS information, Google/Bing aerial imagery, and field visits to depict existing pedestrian and bicycle infrastructure town-wide. Infrastructure will include inventories of: sidewalks (width / condition / buffer), ADA-compliant ramps at intersections, bicycle lanes and trails. Once the existing infrastructure is compiled, assessments will be performed to identify opportunities for improvements. Additionally, the following information will be included within the mapping to further establish a criteria and ranking process for priority projects: a. Qg9bgkm: mapping of schools, recreational areas, activity centers, elderly housing, town facilities, to center, local business areas, and density of residential areas b. Cr A5b_Da a: ta from A collect available pedestrian and bicycle crash da MassDOT to identify the town's most dangerous intersections/roadways c, �A Tran i ® map all MVRTA bus stops Once the above information is mapped, it will be utilized to identify network gaps in the existing infrastructure as they relate to bicycle and pedestrian demands. This mapping information will be eauoundation for establishing the need, demands and identifying opportunities for enhanced multi-modal projects. 3. h dal ° u Pr r I uwu° n of h Pr Pri at` n P T C will establish a al for selection of priorityprojects i information outlinedin Task c the Town's Complete rCommittee. methodology will also be based on the following par include priority destinatlons, safety and mobffity beneilt, prewous / and feasibility. c is approvedTown, ill prepare a Project i 1 in standardcel format to address the following needs: Afuld-Alodal SRfety, ADA Accessibility, Pedestrian SafetyMobility, Bicycle Safety and Mobility, i ' ns Prioritization I ill include I (1 ) ear plan minimum. 4µ Priori r ' i e i utilize i i i to identify prio ° roje locations u to sync up to the Project Prioritization I 5. QDQggLuAl PI AM: T C will prepare u (3) conceptual plans or renderings for the top priorityo o assist with meetings with the Ton and community outreach. Conceptual6. Construction_CoIL an I S hed lin TEC will prepare conceptual construction cost estimatesduration u e to be included i i the Projectiori iz io I or at least fifteen (15) projects. 7. rots C se TEC will help facilitate series of meetings to invite ici a ion and input from various Town Departments, Boards & Committees, general public and other stakeholders that would include but not be limitedtote following, a® Kick off meetingi Ton to compile all existing data, identify the To n's vision and goals, priority areas and prepare fora public informational meeting b® Public informational meeting #1 in the format o solicit one- on-one ideas from the general public cro Coordination meedng withthe Town to finalize the projectprioritization plan d. Public informational i in the format of a workshopto review project rior °nation plan Meetings shall be considered //inc/usi if others are requiredthe Town MMMO—f #V /ern° lro r rr n z t o r°o an® 15 (rain) y ear plan (min)(MassDOTXcel format) 2. Supportiqg Graphics., i n 'i ns Map, Priority Projects ConceptslRendelings 3. Constructlon Estimates and Schedules 2 0 .............w............... ........ ....................... S ct4Vule 2f W rk.- Mileston ass ...... fic e art iubmit Technical Assistance Grant J_$,38,000 —5/-1/21 _X Process&Award Technical Assistance Contract 9/1/21 9/30/21 X is Off Meeting 10/1/21 X X Compilation of Existing Info& Mapping 10/1/21 11/15/21 X Public Info Meeting#1 11/15/21 DRAFT Prioritization Plan 11/15/21 1/15/22 X Public In Meeting --1/15/272 - X X FINAL Prioritization Plajn 1/15/22 2/,28/22 X .............. tio s P OT Submit Prioritization Plan to LMasii)OT 3/1/22 3 TOWN OF NORTH ANDOVER STANDARD CONTRACT GENERAL CONDITIONS' Article 1. Definition of Terms: The following terms in these Contract Documents shall be construed as follows: 1."Town"shall mean the Town of North Andover,Massachusetts 2. "Contract,Agreement,and Contract Documents"shall include the Town's Standard Contract General Conditions,the Invitation for Bids,Requests for Proposals or other solicitations,the contractors response including Contract Certifications and Applications excluding any language stricken by the Town as unacceptable and including any negotiated statements of work contemplated by the solicitation,Technical Proposals,Contractor's Price Proposals,Perfon-nance Bonds,which documents are incorporated herein by reference. Any conflict between the Town's standard contract general conditions and the Contractor's bid proposal or any other submission will be resolved in favor of the Town's standard contract general conditions which shall preempt all other submittals. 3. "Contractor"shall mean the individual,partnership,corporation or other entity to which this Contract is awarded. Article I.Performance: The Contractor shall provide the services to undertake and perform all appropriate tasks described in the Contract Documents. The Contractor shall upon written request remove from Town premises or work sites and replace all individuals in the Contractor's employ whom the Town determines to be disorderly, careless or incompetent or to be employed in violation of the to of this Contract, Performance under this contract shall include services rendered,obligations due,costs incurred good and deliverable proved and accepted by the Town. The Town shall have a reasonable opportunity to inspect all goods and delivers,services perfortned by and work product of the Contractor and accept or reject such goods,deliverable,services or work product. Article 111.Time of Performance:.The Contractor shall commence work immediately upon execution of this Agreement. If the Contractor fails to work at a reasonable speed or stops work altogether without due cause,as determined by the Town,the Town may give notice in writing to proceed with the work or to carry on more speedily. Three days after presentation of the notice if the work is not proceeding to the satisfaction of the Town, the Contractor shall be considered in default in the performance of the Contract. This Agreement may be extended or renewed upon agreement of the parties and only upon execution of written agreement. Article IV. Revisions in the Work to be Performed: If the Town requires revisions or other changes to be made in the scope or character of the work to be perfortned,the Town will promptly notify Contractor.For any changes to the scope of work,the Contractor shall notify the Town of associated costs in writing. The Contractor shall make the necessary changes only upon receipt of a written acceptance of the costs and a written request from Town. The Contractor shall not be compensated for any services involved in preparing changes that are required for additional work that should have been anticipated by Contractor in preparation of the bid documents as reasonable determined by the Town. Article V. Pavment for Services: The Town shall make payment to the Contractor as on the schedule and based on the milestones and deliverables set forth in the Contract Documents or on a periodic basis. Article Vt. OwnershW,and Confidentiality gjhjjjtEk!JWork Products: All information,data, reports, studies,designs,drawings,specifications,materials,computer programs,documents,models, inventions,equipment, and any other documentation,product of tangible materials to the extent authored or prepared pursuant to this Contract(collectively,the"`Materials""), shall be the property of the'rown,, All Contractor proprietary,rights shall be detailed in the Contract Documents. At the completion or tern.iination of this Contract copies of all original Materials shall be promptly turned over to the Town, Once the Town has paid for a particular Material.ownership vests in 'Town and the Contractor must provide such Materials to l`own within ten(10)business days orthe Town's request for the same without cost to the Town., The Town may use the Materials with respect to construction, maintenance,repair,alteration,expansion,modification and reconstruction of the Project at any time and from time to time, The Town may use the Materials produced,generated or compiled by the Contractor for another project, provided the Contractor shall not be responsible for changes made to the drawings,plans,or specifications without the Contractor's authorization,nor for the Town's use of the drawings,plans or specifications on another project, The Town agrees,to the extent permitted by law,to hold the Contractor harmless from any claims, losses arising out of any use or changes to the Materials by the Town or its representatives during any other construction not a part of this contract. The Contractor shall not use such materials for any purposes other than the purpose of this Contract These Standard Contract General Conditions apply to contracts procured pursuant to M.G.L.c.30B or for exempt good and services. without prior written consent of the Town. Article VII. Release of Town: The Contractor agrees that acceptance of what the Town tenders as the final payment for final services under this Agreement shall be deemed to release oft e Town forever from all claims, demands,and liabilities arising from,out of, or in any way connected with this Agreement, The Contractor shall execute a release if asked to by the Town. Article VIII. Indemnification: The Contractor shall indemnify,defend and hold harmless the Town and all of its officers,agents and employees,with counsel acceptable to the Town,from all suits,claims,demands, losses and liabilities brought against them or based upon or arising out of any act or omission of the Contractor,its agents, officers,employees, or subcontractors in any way connected to this Agreement. The Contractor agrees that it shall be solely responsible forte conduct,health,and safety of its employees during the to of this contract and shall of the Town harmless for any injuries,damages or losses incurred by its employees while working on this project, The Contractor's agreement to indemnify the To shall not be deemed to be released,waived or modified in any respect by reason of any surety or insurance provided by the Contractor under the Agreement, Article IX Insurance: The Contractor shall secure and maintain insurance adequate to meet its obligations hereunder and shall provide the To with certification of such,The Contractor shall at its own expense maintain motor vehicle liability insurance policies,workers compensation,and general liability coverage.For Contracts for professional services,the Contractor shall carry professional liability or Errors and Omissions liability insurance with a minimum limit of S1,000,000.00 per occurrence,S2,000,000.00 aggregate with a maximum deductible of $25,000.00. Article X.Assignment: " The Contractor shall not assign,transfer,delegate or subcontract any interest in this Agreement without the prior written consent of the Town. Article I. Relationship with the Town: All services to be performed under the terms of this contract will be rendered by the Contractor as an indepeneat Contractor. one of the terms of this contract shall create a principle- agent,master-servant or employer-employee relationship between the Town and the Contractor, The Contractor shall have no capacity to bind the Town in any contract nor to incur liability on the part of the Town and if the Contractor employs or proposes to employ any person during the term oft is contract,the employment or proposal shall not obligate the Town in any manner to any such employee. Article XII.Compliance with Laws and Contractors Responsibilities: The Contractor certifies that it and its subcontractors has complied with all applicable laws and is eligible to work in the Commonwealth of Massachusetts and that it is in compliance with Federal and State Tax laws. The Contractor shall not discriminate against any employee,or applicant for employment because of race,age,color,religious creed sexual orientation or identification,handicap,ancestry, sex or national origin, The Contactor will in all solicitations or advertisement form employees placed by or on behalf of the contractor,state that all qualified applicants will receive equal consideration for employment without regard to race,age,color,religious creed,sexual orientation or identification, handicap,ancestry sex or national origin. If applicable,as determined by the Massachusetts Department of Labor Standards,the Contractor shall comply with the Massachusetts Prevailing Wage an shall cause its subcontractors to comply with M.G.L.c. 149,s.2713,which requires that a true and accurate record be kept of all person employed on a project for which the prevailing wage rates are requires. The Contractor shall and shall cause its subcontractors to submit weekly copies or their weekly payroll records to the City,the extent the Prevailing Wage is applicable. If an employer,the Contractor certifies compliance with applicable state and federal employment laws and regulations,including but not limited to minimum wages and prevailing wages programs and payments, unemployment insurance and contributions,workers compensation and insurance,child labor laws,human trafficking,fair labor practices,civil rights laws,non-discrimination laws and any and all other applicable laws, The Contractor agrees to be responsible for and warranty the work of its subcontractors listed in the Contract Documents and to ensure their compliance with all applicable legal,quality and perforinance requirements of the Contract Documents, The Contractor may not use subcontractors not named in the Contract Documents without the prior written consent of Town,which will not unreasonably be withheld. The Contractor agrees to pay all debts for labor and/or services and materials contracted by it,if any,and for the rental of any office space,equipment or machinery hired by it,if any,for and on account for the services to be performed hereunder, The Contractor shall not take any action that causes any public official to be in violation of the to Ethics Law,M.G.L.c.268A. The Contractor certifies that it and its subcontractors are not currently debarred or suspended by the U. S.government, the Commonwealth or any of its subdivisions,and that it nor any of its subcontractors have been subject to a federal or state criminal or civil judgement,administrative citation,order for violation of M.G.L.c. 149,s. 151 or the Fair Labor Standards Act within three years prior to the date of the contract. The Contractor certifies that it has not declared bankruptcy. 2 Article X111. Seven bility: In the event any provision of this Agreement is found by a court of appropriate jurisdiction to be unlawful or invalid,the remainder of the Agreement shall remain and continue in full force and effect, Article XIV. Termination of Agreement: The Town may terminate this Agreement upon immediate written notice should the Contractor fail to perform substantially in accordance with the terms of the Agreement with no fault attributable to the other. In the event of a failure to materially perform by the Contractor the notice of such breach shall be accompanied by the nature of the failure,and the Town shall set a date at least 10 days later by which Contractor shall cure the failure° if the Contractor fails to cure within the time as may be required by the notice,the Town may at its option,terminate the Agreement. The Town may terminate this agreement without cause at any time,effective seven days beyond a termination date stated in a written notice of termination. In the event of termination,the Contractor shall be compensated for work product and services performed prior to the date of termination. In no event shall the Contractor be entitled payment for any services performed after the effective date of termination,and under no circumstances shall the total price exceed the contract price. Article V. Governing Low and Jurisdiction: This Agreement shall be governed by the laws of the Commonwealth of Massachusetts. Any actions arising out of this contract shall be brought in a state or federal court in the County of Essex,Commonwealth of Massachusetts,which shall have exclusive jurisdiction thereof. 3 CERTIFICATIONS CERTIFICATE OF NON-COLLUSION The undersigned certifies under penalties of perjury that our bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural ers® , business, partnership, corporation, committee, ® , club or other organization, entity, or group of individuals. Signature. Date— qtq�002' Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I _Lnat',4,r, A ry authorized signato for Name qjlndividual Name oftontractor do hereby certify under the pains and penalties of pedury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the To of North Andover, relating to taxes,permit or other fees, reporting of employees and contractors,and withholding and remitting child support. Signature to 4 CERTIFICATE OF VOTE At a duly authorized ineeting the Board of Directors oft held on IaO (9 it was VOTED, THAT MIL v�YN A, 0 C'4)e t"f1ficer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said -I`k r and affix its corporate seal hereto; and such execution of any contract or obligation in tename of on its behalf by such officer under seal of.............. ald and bg up shall be v, i in in on I hereby certify that I am the clerk of the above named c, -z:; -and that A0 A0%4WIS 64A) is the duly elected officer as above of said . ..... and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. �70 Z' ............ (Date) (Clerk) ".0 0% 0 2