Loading...
HomeMy WebLinkAbout2016-07-05 O & M Plan 6/27/16 R OPERATION AND MAINTENANCE PROGRAM for EXISTING STORMVW'ATER MANAGEMENT SYSTEM Located at 1600 OSGOOD STREET NORTH ANDOVER, MASSACHUSETTS Applicant: Osgood Solar, LLC 1600 Osgood Street North Andover, Massachusetts 01845 Prepared by: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts 01915 (978) 299-0447 June 27, 2016 Project Name: Osgood Solar, LLC Solar Development Owner Name: Ozzy Properties, Inc. 1500 Osgood Street North Andover, Massachusetts Q 1845 Party Responsible for {Maintenance: Ozzy Properties, Inc. Long-Term Inspection and Maintenance Measures Erosion Control Eroded sediments can adversely affect the performance of the stormwater management system. Eroding or barren areas should be immediately re--vegetated. Inspection and Maintenance of Catch Basins The catch basins shall be inspected once per year and at the end of the foliage and snow removal seasons, and if necessary, any maintenance shall be performed so that it functions as designed. The basins shall be cleaned once per year, or when sediment in the bottom of the sump reaches 1/ the depth from the bottom of the invert of the lowest pipe in the basin. Inlet and outlet outlet pipes should be checked for clogging. Debris and Litter Removal Trash may collect in the BMP's, potentially causing clogging of the facilities. All debris and litter shall be removed when necessary, and after each storm event. Sediment and debris collected from vacuuming and/or sweeping should be disposed of at a permitted waste disposal facility. Avoid disposing of this material on site, where it could be washed into the proposed subsurface infiltration systems. Parking Lot Sweeping Upgradient portions of the northern solar array shall be swept annually in the early Spring (Exhibit A). Sweeping shall be conducted with a high efficiency vacuum or regenerative air sweeper rather than a mechanical broom sweeper. V I!q!gxa . 4 to �� ■ �� AA��\�A�\���� ��V ` A\� A V v � � vA f� STORMWATER MANAGEMENT AFTER CONSTRUCTION INSPECTION SCHEDULE AND EVALUATION CHECKLIST PROJECT LOCATION: 1600 Osgood St, North Andover MA WEATHER: Inspection Required Inspection Fallow-up Date Inspector .Area Inspected Frequency if,BMP Comments Recommendation Inspection Required (yes/no) Catch basins 14nnually and-4fter Major Storm Events (1) Refer to the Massachusetts Stormwater Handbook, Volume Two: Stormwater Technical Handbook (February 2008) for recommendations regarding frequency for inspection and maintenance of specific BMP's. (2) Inspections to be conducted by a qualified professional such as an environmental scientist or civil engineer. Limited or no use of sodium chloride salts, fertilizers or pesticides recommended. Other notes: (Include deviations from: Con. Comm. Order of Conditions, PB Approval, Construction Sequence and Approved Plan) Stormwater Control Manager: ..........................