HomeMy WebLinkAbout2016-07-05 PB Meeting 2016-05-17 fti-eT
Objective
• EMW solar. 2.4 Rooftop; 3.6 Ground Mount. No Canopies.
• All ground mounts to west and northwest of building. Modular
• Demolish over a dozen buildings, tanks, and pads
• Reroof 3001000 sf (Bldgs 20/21 and 70)
• Relocate NETTS to south lot
• File 12 site plan Immediately
• In service by Dec 31,, 2016
l
1
IIII, I
" g
lilililitlx' ���
c
dif
M o°
o
CL
u
0
' w N m z
J\
_
Demo and Improve ����
Industrial Facilities and
Equipment
ate,
---------------------
Demolition:
Coding Towers, Tanks,
and Outbuildings
,u
hw
X /a
9 �
,
I � ill
rr r
4-J
af11
/If ® C2. v7
~'
/
r
f li
%Ari Ii � J%Afy��i
f
' h1T
4-J
V)
O O
(U 'J
4-J b.0
l jyj 0
w a
t
lip, ;`
_
s
4
w
v
Ground Mount Solar: ,
Paved and Demo'd
Areas
F \
ti
Ground Mount Solar.
Low-Profile (3` tall)
Ballasted or Pinned to Ground
Modular