Loading...
HomeMy WebLinkAbout2016-07-05 PB Meeting 2016-06-07 Parking Analysis 1 OFFICE TENANTS Leased Space(GFA) 12 Parking Requirements DUCHARME&SHEEHY 165 ETROLZ INC 2768 PH CANN ASSOCIATES 13,574 FH CANN TRAINING ROOMS 2,760 FIRE PRO INCORPORATED 4,501 HENRYTROEMNER 354 KEMMCARE,INC 598 HUDSON DESIGN GROUP 9,964 HYEDRO 250 ME TECHNOLOGIES 3,321 MICHAEL FELTZ 145 MIKE THOMPSON 167 MOBILE MINI 1,159 MVP COLLEGE FUNDING 294 NATIONAL MENTOR HOLDINGS,LLC 23,675 NEXUS STAFFING SPECIALISTS 182 NLTECHNOLOGY 2,118 NRT BUS COMPANY 1650 ORGANIC WASTE MANAGEMENT 1,403 PANELCLAW,INC OFFICE 4,883 RICHARD SHAUGHNESSY,D/B/A AVC SEM 250 STROUD 4,883 TOWN OF NORTH ANDOVER 5,673 URSA BUSINESS SOLUTIONS 137 WATTS WATER TECHNOLOGIES 10542 WATTS WATER TECHNOLOGIES-DATACE 10,801 ZUCCHETTI 1,209 Firebird Semiconductor 2,747 Karen Weinberg 140 Tom kins Corp 880 Dr.Vincent Greeno 145 TOTAL OFFICE 111,338 334.35 2 MANUFACTURING OPHIR OPTRONICS 38,821 NETWORK ALLIES 23,527 JESSICA'S BRICK OVEN 63,800 MOBILE MINI 4,620 PANELCLAW,INC MANUFACTURING 12,923 CABOT WOODWORKING&DESIGN 5,032 HANDFORGED WORKS 3,S00 Legacy Medical Solutions 5,005 TOTAL MANUFACTURING 157,228 314.46 �} ;�..� f � i a o} �.` R y .. {,' Parking Analysis 3 RECREATIONAL HUGHES ENTERTAINMENT,INC d/b/a LAS 17,820 COMMUNITY THEATER OF ANDOVER 10,014 CROSSFIT 6,420 ERIC SCHNEIDER D/B/A FLATFACE FINGER 3,960 KRIS KEENE 500 THE DANCE NETWORK,INC 5,110 TOTAL RECREATIONAL 43,824 262.94 4 RETAIL CORPORATECHEFS 6,345 YANKEE CLIPPER COUNCIL-BSA 2,054 TOTAL RETAIL 8,399 50.39 5 EDUCATIONAL NEW ENG LAN DTRACIOR-TRAILER/HVAC 12,690 TOTAL EDUCATIONAL 12,690 76.14 6 WAREHOUSE/DISTRIBUTION ADCCO,INC 12,254 BARIL CORPORATION 2,500 ESSEX DIRECT 400 FH CANN STORAGE ROOM 175 FIRE PRO I NCORPORATE D STO RAGE 692 HUGHES ENTERTAINMENT,INC d/b/a LAS 400 INTERNATIONAL MEDICAL EQUIPMENT Ci 163,277 LIST LOGISTICS 180,694 PAN ELCLAW,INC STORAGE 2,772 SUNCAPSULE 91915 U N ICCO 80 Heritage Packing 978 Tompkins Corp 4247 TOTAL WAREHOUSE/DISTRIBUTION 378,384 378.38 TOTAL BUILDING LEASED 711,863 1,417 June 7, 2016 Osgood Solar Presentation Outline 1. Solar Plan Overview 2. Department Review a. Building b. Fire c. Conservation 3. Considerations for Site Plan Review a. Parking b. Storm water c. Wetlands/Notice of Intent d. Traffic and signs e. Landscape f. Lighting g. Airport/Mass. Dept. of Transportation h. Utilities i, Safety 4. Updates to Project 5. Time Constraints 6. Outstanding Deliverables and Next Steps }�{� z G - ,. �k �'' . r �� k°� "y `� > ti � _ � ,_ m .. ,� eIDP ww I u J r �} a h "AL", Onh ij%&,%Aar Bear III Fiat Roof Mounting System NA MENEM IE 4, a y a9 E E System Level Approach Low-cost mounting components provide savings early in the project development process. However, when you are looking to lower the total installed cost, from delivery to a fully wired system, details make the difference. Polar Bear' Ill combines critical system features,A-to-Z project support, and long-term product reliability into a single low-cost platform.The system components, delivery, and installation procedures have been jointly designed to deliver a lower total cost and better service experience. f ,.��ar�aerl flatfroof systRrns and �flmbi�aes then ,� Y ='r a + . v � ./ a '. / /✓ Cam%' r ": pane ffffff panelclaw.com c aw a Polar Bear III Flat Roof Mounting System pane ffffff 10 Degree C awo ®op n Specifications Applications Ballast Tra yr Claw Flat roof (max slope 5') Fully ballasted or mechanically attached Module Tilt Angle III I IIVY m 1 O 10 nominal Module Orientation Landscape � Module Attachment Support Standard module mounting holes Trusted Roof Integrity Three Components Basic Wind Speed Polar Bear' III reduces potential long- Support Up to 120 mph term roof damage with fully captured pp • Easy-to-handle components that (>120 mph by ballast, integrated roof protection pads and a system design that allows for free weigh less than 2.5 pounds approval) • Integrated recycled rubber roof Wind Exposure water flow. protection pads Category Accelerated Construction • Pre-drilled holes for wire B and C The engineered design emphasizes management cabling options (p by approval) built-in features to improve construction efficiencies: Ballast Tray Seismic • Three major components, light- • Angled fit with locking end-tab to Compatibility weight and easy to move fully capture ballast blocks C, ©, E and F • Pre-installed bolts to quickly mount • Hemmed edges and chamfered Shading Ratio Ballast Trays corners prevent wiring from coming 2.3:1 and 2.7:1 • Single-module tilt-up to facilitate into contact with sharp edges platform load must-have access to roof, wiring and Claw —1.9-8 psf maintenance • Attachment to module using Warranty and Safety and Reliability standard module mounting holes Certifications Polar Bear III is the product of • UL 2703 certified for electric bonding 25 year warranty PanelClaw's data-driven test program to and grounding UL 2703 certification improve PV reliability. Polar Bear III is proven technology based on hundreds of megawatts of project experience. Made in USA © 2014 PanelClaw, Inc. (978) 688.4900 1 sales@panelclaw.com Printed on recycled paper