HomeMy WebLinkAbout2011-05-17 Correspondence Enright,
From: Tymon, Judy
Sent: Wednesday, April 20. 20113:29PKH
To: Enright, Jean
| Subi�c�� Message| ~ ~
� John,
� After John Simons' arrival at the Planning Board's meeting last night, thanewu* more discussion about your project and
there was an agreement that the Board should require a Site Plan Review,through a more abbreviated process than
what they usually require. They asked metmcommunicate to you that they would like you to proceed as follows:
File a Site Plan Review application (the latest version is on our web site)You can submit the site plan in whatever form it
imcurnant|yin, asvve||asosetmfe|evatinnsfnonntheanchitect. VVeon|yneednnefuUsizeandthnee11"X17" p|ans,
plus aPDFof the plans, |fpossible.
The application fee and the outside consultant review fees will be waived
Notice to abutters will be required, along with an advertisement in the newspaper—we will create the newspaper ad
and you will need to provide itto the Eagle Tribune by Thursday April 28 1h |n order for ittobe advertised two weeks
before the meeting.
TheP|anningBnardheadnDcantakep|aceonK4ay17�»us |ongasvvereceivetheappUcadonbyMondayAphi25.
At the Planning Board hearing,you will not need to have your civil engineer or architect present. At the meeting,there
will been opportunity for any abutters to ask questions.
There will be a draft decision ready for the Board's review at that meeting and they should be able to make a decision at
that meeting,
The Board wants to follow the procedures that have been followed for all educational institutions in the past, including
the Town of North Andover's Schools. VVe have required an abutters notification @s well au the news paper
advertisement in the past, but all of the fees and outside reviews have been waived. |f you have any questions about
any of this, let nnm know—thanks.
Judy Tymon, AICP
Town Planner
Town of North Andover
l6OO Osgood St,
North Andover, M4 01845
978'688'9535
......... ______~_______�~�����
Please note the MaSSaChUSCUS SOCI-etmy of State's Office has determined that most emails to and f(0111 alLfflidpal OffiCOS a(ld OffidalS Me'IAIIAC records.Fot more
infowoaVonv|maoo refer to: .
Please consider the mn,imomvot before pxm/n0 tills nmmi|,
,Enright, Jean
From: John roukaeohouiorg]
Sent: Monday, 25 20112:22PN1
To: Enright, Jean
Cc: TymVn. Judv Karen Young
Subject: FVV: PDF files
Attachments: brooks dorm -A2O2.pdf; brooks dorm -A2O1.pdf
Hi jean:
Please disregard the previously sent elevation plans.They were a progress rendering.The attached represents the
accurate elevations.
| am on my way down to drop off
1) The handcopy site plans...one full size and three 11°x17"versions
2) The herdcopy elevation plans...one full size and three 11°xV"versions
3} The above files have been sent electronically
4) The site plan review application has been submitted asVf4/21/2U11
5) | will hand deliver the abutter envelopes and assessor's abutters list now.
6) We have made arrangernents with the Lawrence eagle Tribune to run the notifications on 5/3/2011 and
5/10/2011.
1 hope I captured all the requirements and please let me know if I missed anything,
Regards,
John
From: Tony Barletta
Sent: Monday/ April 25, 2011 11:42AM
To: John Tr0Vago
Cc: "Rob BnamhaU"
Subject: PDF files
John,
Attached are full size PDFfiles. | have included C2\ sheets of plans and QU sheets ofelevations. They can be printed ata
reduced size hq fit on11x17. but they will not betoscale. | have cleaned the drawings opa bit by removing keys and tags
for clarity.
Let meknow if there are any questions.
Tony
zvrly Barletta
Rom BnamuAj.i. Aucu/zoczo
w Park Street
Andover,Massachusetts
omm
alephmne: nx-7vmea
Facsimile: 978-74*965"
1
1a1�� It AhC�' tId°1ltw,1,��
QONS"IRUC TION C ON]" O'1,
FINAL AFFIDAVIT
To: Gerald Brown
Inspector of Buildings
iti , Brooks School-Chase Hall I)or►nitory-No►ili.Andoyg M_AOI ,4_
Permit#
1,as the design professional and Architect of record, hereby certify that I have performed all required inspections and reviewed
all pertinent data relative to the above referenced project.
I further certify that all work performed under my supervision conforms to the requirements of the MSBC 780 CMR-s 8'"edition
and all pertinent laws,ordinances and regulations,to the best of illy knowledge.
1�^
�
A �, A. Robert A. Bra►nhall,AIA
r, Registered Architect_MA Reg. No.8200
cc
Rob Bramhall Architects
14 Park Street
� #CF Andover, MA 01810
978-749-3663
On this 19" clay of emu,-20I 2,before me,the undersigned notary public,personally appeared
Robert A. Braml all,. I.-proved to me through satisfactory evidence of identification,to be the
person who signed the preceding or attached document in my presence,and who swore or affirmed to
me that the contents of the document are truthful and accurate to the best of his/her knowledge and belief,
tie
My Commission expires 11 01
,CO IAA h Of Ma
to
Notary t'uA?N4,GMflmtNl�atl�lW'h 4t h4id>�iG'tMd� Aarwitxecr Pit lw;rc Ixuac�tt:a
My 09moOfti area FAy 11,2010 I 01810
I'cIcphonc:978"1,19 3663
Vac imilc:97.8 7,1")961i9
~
'
CONSTRUCTION CONTROL
FINAL AFFIDAVIT
To: Gerald Brown
Inspector ofBuildings
RE: Brooks School-Chase Hall Dormitory- North Andover MA 0 1845
Pennh #
|, as the design professional and Civil Engineer cfrecord, hereby certify that I have pmrfo,rna] all
required inspections and reviewed all pertinent data relative tothe Civil Engineering portions of
the above referenced project.
| further certify that all work performed under my supervision conforms to the requirements of the
k4SBC 780 CMR— 8" edition and all pertinent |owo/ ordinances and regulations, to the best of mny
knowledge.
OF
OIAN U John L. Scott, P.E.
V
Professional Engineer - MA Reg. No. 29134
SC Tr Rimt-Frost-5hunnwmy Engineering, P.C.
0 CIVIL
No.20134 71 Water Street
Laconia, NH 03246
GIST 603-524'4647
NAL
On this �
day of Auciust, 2012, ore nnm, the undersigned notary public, personally
proved to me through satisfactory evidence of
identification, to be the person who signed the preceding at- attached document in my presence,
and who swore or affirmed to me that the contents of the document are truthful and mccu*ohy to
the best o{ his/tier knowledge and belief.
Beformrne
CL
RHONDABLACK|E.Notary Public
My Commission expires xpimoMnnnhO4.8O1U
i
i
i
FINAL CONSTRUCTION AFFIDAVIT
MECHANICAL
To: Permit No.
Re: Brooks School- New Dormitor 1160 Great fond Road North Andover MA 01845
Ward:
In accordance wi(h Section t 16.2.2 of the Massachusetts State Building Code, 1, EWA, Galle,NegLslrnllo►e No. 48162,
being it registered Mechimical Froressional Engineer hereby certify that I curt responsible for the construction phase
services for the above referenced prQiect mechanical Systems.
To the best of my knowledge, the building was constructed in accordance with the plans and specifications prepared
and/or arnended by(his office subject to punch list items. Furthermore,the buildingappears to have been constructed in
accordance with the provisions of780 CMR.
Erik Gath -48162
jVk OF414ss� PROFESSIONAL ENGINEER-MASS. REG.NO.
o �y BLW Engineers, Inc,
�S ERIK M.
LATH COMPANY
c� o-48162 At
N 311 Great Road, P.O. Box 1551, Littleton, MA
No. F3 t G
soF pF T1 ADDRESS
ASS/p A E 978.486.4301
PHONE
Comma mealth of Massachusetts
County of Middlesex
On this f 7th day of July 2012, before me, the undersigned notary public, personally appeared
Iirik Gatti , proved to me through satisfactory evidence of identification, which were
Personal Knowleft,e__ _____—to be (lie person who signed the preceding or attached document in my
presence,and who Swore or affirmed to the that Ilic contents of the document arc (ruihful and accur-ate to the best of
his/her knowledge and belief.
Bekbr me,
DONNA P. HAGEN$
NOTARY PUBLIC
COMMONWEALTH OF MASSADJUSEM
October 24,2014 w Arty Commission t=xpires tkt,24,2014
My Commission expires
r� a\ BLAKE O f { ..q, drte�•n.t uit Tn•en1
HORSE 7
s
rm��\ AllftayT-
O°y1 v
SmokS$dwd
jp1 9� at .r fin, It
Nam\ JY.i ✓,F. `a_.u.ip..
. `•Ar r Y ,r do-+ ..L� l 1 � - »•
r n
F Y a W M•�M[� \V
4 � V•M `�
• / a r • \
TiROA • "" \�! • �i n
36. AREL " \\\
rt— r AGE HOUSE ��' ` o=
M.
aururG BOARD
ASBURN
- W /
HOUSE ' a ...,,
n v r•,�
APPROVED BY NORTH ANDOVER
a s PLANNING BOARD �
-
CWL
OfAPM W-V-E No.2D134
S1QNA[.
•
SLAKE 4 •» r�t�rnt+a�
HOUSE Y ....,r..F
New Dormkmy
m F.
a wr xw.a
`j4f
tall
V.V Wi'YT,. � J . ♦
AREL
F � wan
w"awn
�G HOUSE
PLANING HOARD
ASSURN
` V s
• r,.w, •: HOUSE(n r.
r �
n
�M F APPROVED BY NORTH ANDOVER
so PLANNING BOARD �
scour
CML
f No.2S#34
�ss10NAL �'� C2
i
I
I .ti
FINAL CONSTRUCTION AFFIDAVIT
ELECTRICAL
To: Permit No:
Re: Or 01845
Ward:
In accordance with Section 1 16.2.2 of the Massachusetts State Building Code, I, Jahn C. Pierga, Registration No.
48291,being a registered Electrical Professional Engineer hereby certify that I am responsible for the construction phase
services for the above referenced project elech•ical systems.
To the best of my knowledge,the building was constructed in accordance with the plans and specifications prepared
and/oramended by this office subject to punch list items. Furthermore,the building appears to have been constructed in
accordance with the provisions of 780 CMR,
John C.Pierga-48291
ENGINEER- MASS. REG,NO.
o����Ztt Or1�ss4�y BLW Engineers, Inc.
JOHN C. G
PIERGA , ` COMPANY
ELECTRICAL -`
No.48291 311 Great Road,Post Office Box 1551,Littleton,MA 01460
ADDRESS
Fss �
978.486.4301
PHONE
Commonwealth of Massachusetts
County of Middlesex
On this 17th day of Jul , 2012, before me, the undersigned notary public, personally appeared
John C. PieEga ,proved to me through satisfactory evidence of identification,which were
Personal Knowledge _, to be the person whose name is signed on the preceding or attached
document,and who swore or affirmed to me that the contents of the document are truthful and accurate to the best of
his/her knowledge and belief.
Befor me
DONNA P. HAGENS
NOTARY PUBLIC
October 24,2014 COMMONWEALTH OF MASSACHUSETTS
My Co��misstan Expires Oct.24,2014
My Commission expires