Relocation of Peabody House
Brooks School
North Andover, Massachusetts
March 2, 2000
Contents
Application Form
Narrative
USGS Sheet
Exhibit 1 Campus Map
Building Elevations - Cannon Architects
Overview Plan, 1" = 50' (in pocket)
Drainage Area Plan (in pocket)
Drainage Calculations (with separate index)
Rist-Frost-Shumway Engineering, P.C,
71 Water Street
Laconia, New Hampshire 03246
603-524-4647
Fax 603-528-7653
jn 00-4231
Town of Forth Andover Planning Board
S:,
A Y
Please type or print clearly.
1. Petitioner: Brooks School
Address: 1160 Great Pond Road North A MA G1845
Telephone number: (978) 725-6212
2, owners of the Land: same
Address:
Telephone number:
Number of years of ownership: 72 wears
3. Location of Property: 1160 Great Pond Road
Zoning District:�R-1 , with WPD overlay
Assessors: v1ap: 90C Lot #: 25 and Map 103, Lot 28
Registry of Deeds: Book #:: 530 Page :: 290
4. Existing Lot:
Lot Area (Sq.Ft.): 7,187,000 Building Height: Varies
Street Frontage: 3,500 Side Setbacks: 70' B.Lgew House
Front Setback: 240' Hock, ey Rink Rear Setback: house
Floor Area Ratio: .06 Lot Coverage: _ng
�. Proposed Lot:
Lot Area (Sq.Ft.): Same Building Height: gnmp
Street Frontage: Same_ Side Setbacks: Same
Front Setback: Same Rear Setback: game
Floor Area Ratio: Same Lot Coverage: Same
6. Required Lot (as required by Zoning Bylaw):
Lot Area (Sq.Ft.): 87,120 Building Height:
Street Frontage: 175' Side Setbacks: 3n t
Front Setback: 30' Rear Setback: 301
Floor Area Ratio: N/A Lot Coverage: _ N/A
7. Existing Building:
Ground Floor (Sq. Ft.): 38 existing bldg4 of Floors:
Total Sq. Ft.: on campus Height:
Use: Type of Construction:
$. Proposed Building: (Relocated Peabody House)
Ground Floor (Sq. Ft.): 4555 # of Floors: 2
Total Sq, Ft.: 8600 Height: 3.—
Use: Dormitory with 2 faculty Type of Construction:Wood Frame; fully sprinklered
residences
9. Petitioner and Landowner signature(s):
Every application for Site Plan Review shall be made on this form which is the official
form of the Planning Board. Every application shall be filed with the Town Clerk's Office.
It shall be the responsibility of the petitioner to furnish all supporting documentation with
this application. The dated copy of this application received by the Town Clerk or
Planning Office does not absolve the applicant from this responsibility. The petitioner
shall be responsible for all expenses for filing and legal notification. Failure to comply
with application requirements, as cited he xn the Planning Board Rules and
regulations may result in a dismiss y the PI g Board of this application as
incomplete.
Petitioner's Signature:
Print or type name here: Bruce Wallin, tuAin M
Owner's Signature: Owner
Print or type name here:
BROOKS SCHOOL CAPITAL BUILDING PROGRAM
Narrative for Site Plan Review Application
March 3, 2000
Relocation and Additions to Peabody House
Introduction
Brooks School is a private boarding school located on Great Pond Road in North Andover. See
Exhibit I for an overall campus map. Most of the property is zoned R-2, and a portion of the
campus is in zone R-1 in the Watershed Protection District for Lake Cochichewick.
The School is in the midst of a major building program intended primarily to upgrade and improve
its facilities but not increase student population. The program will continue to proceed in stages,
and each step will proceed through the necessary permitting processes at the appropriate times.
Elements in the program are:
1. The Campus Center/Dining Hall project - a dining hall and student center.
2. Replacement of the main overhead campus electrical service with an underground service.
3. A new Maintenance Facility - to replace an existing building to be removed.
4. A new Athletic Facility - to attach to the existing hockey rink
5. Renovations and additions to the Headmaster's House.
b. Relocation of the Peabody House dorm and the small Manual Training building.
7. Upgrading underground campus utilities.
Status of the Building Pro ram
The Campus Center/Dining Hall project has received Planning Board approval and construction is
about to begin. The electrical service construction was completed in the fall of 1999. The
Maintenance Building received Planning Board and Conservation Commission approval, and
construction has recently begun.
The Peabody House project is the subject of this application.
The Athletic Facility and utility upgrade projects are in the planning stage. The other program
elements await commencement of design.
Peabody House Project
With this application, site plan approval for the Peabody House project is sought. Plans
submitted herewith are as follows:
Dwg Title By
C1 Existing Conditions and Demolition Plan Rist-Frost-Shumway Engr.
C2 Site Grading, Utility, and Layout Plan "
C3 General Notes and Civil Details "
C4 Civil Details "
Architectural Elevations Cannon Architects
Peabody House is a two story structure presently located just north of the new Campus
Center/Dining Hall near the intersection of Main Street and Service Road in the heart of the
campus. The north and south wings of the building were originally separate structures with
basements. Later the middle portion was constructed which tied everything together into one
building. There is no basement under the middle portion. The north and south wings are faculty
residences and the middle portion is a student dormitory.
Peabody House must be moved to make room for the Athletic Facility project. It will be set on a
new concrete foundation at the west end of Service Road beyond the Hettinger House garages,
just to the south of Russell House. Hettinger and Russell are also dormitories with faculty
residences. The new building will have a full basement, accessible from the rear yard. The
distance of the move is about 1000 feet - see site locus plan for the relationship of the existing
location to the new one.
The project also includes separating the structure in two places and inserting two symmetrical
additions. The total building floor area will increase from 7150 sq ft to 8600 sq ft. The additional
space allows for upgrading egress to meet the building code and for larger common areas for
students.
Stormwater
The new site is located in the Watershed Protection District, whereas the existing site is not.
Although there will be an increase in roof area due to the additions, there will be significantly
more pavement removed at the old site than added at the new site, resulting in a net decrease in
impermeable surface area. Thus the post-development peak rate of stormwater runoff from the
campus will be less than the pre-development rate. For the same reason, post-development
groundwater recharge will exceed pre-development recharge. Thus the peak attenuation standard
and the recharge standard are naturally met.
To meet the treatment standard, a hooded catch basin to trap oil and grease will be installed
adjacent to the new driveway. Flow will be directed from that basin through a"Downstream
Defender" vortex treatment device to reduce suspended solids. The effluent will daylight to a
grassy Swale adjacent to the proposed athletic fields south of the site. (The proposed site plan for
those fields has been submitted to the Town for determination of permitting requirements).
Drainage calculations are included herein.
Parkin
A campus-wide parking study was prepared in 1999 and submitted to the Town which contains an
overall parking plan coordinated with the capital building program. Four new parking spaces are
planned for the use of the faculty at the new Peabody House location, whereas the existing
Peabody House has no specifically dedicated parking spaces.
Utilities
A new pad-mounted electric transformer will be placed adjacent to the building as part of the
underground service project. Also as part of that project, a new natural gas main will provide fuel
for heating. The existing steam system in the building will be converted to gas-fired boilers.
Water supply will be tapped into the existing main in the area. Hydrant flow tests indicate
adequate delivery for a gravity sprinkler system to be retrofitted. The two sanitary sewer service
lines from the building will connect easily by gravity to the existing 8-inch sanitary sewer running
behind the new location. This sewer connects ultimately with the town collection system.
New street lights will be placed in a straight line along the north side of the Service Road as part
of the underground service project. The last two lights will be on the site of the relocated
Peabody House. The poles and fixtures will be the same as for the Dining Hall project - the
School has adopted these as the campus-wide lighting standard.
Waiver of Bounda Surve
The project is located on the School's 165-acre property on the west side of Great Pond Road.
The nearest portion of the project to adjacent property is over 1000 feet distant. It is requested
that the requirement for a boundary survey be waived.
Waiver of Traffic Sty
This project is basically the relocation of an existing building. There will be no new staff or
students associated with the project, and thus no increase in traffic. It is requested that the
requirement for a traffic study be waived.
Fiscal Impact
Demand for added public services will be negligible.
The campus is already connected to the Town water and sewer systems. No off-campus
upgrading of those systems or new infrastructure construction is required.
The project will have no impact on tax revenues, as the School is exempt from property taxes.
Given the distance to neighbors and the nature of the project, it is reasonable to expect that the
Peabody House relocation will have no effect on adjacent property values.
Community Impact
The proposed project is entirely consistent with the long-established campus and surrounding
neighborhood.
......... . .......
hh ..............................................................ii.
ell
-.�, t✓kl /1lIV �'• +Ir` +) 'i• \�J It ,L� I � � io11N• ,. ', � +I ti � ._1_ .�! L '� �}• ' � L`-w / -_1} . 4�irJ �
/� /// �� }}rJ( �1- �II-� -1 \ �,•, ��w�} I y� J 1} �•• .r I fr `,, �/e ,,.�" -�-I ! I�7� .. ', � � \ ��!\fir/r )
/ 1. � _`7(}l j J 1 1 )� �\�k�y� �}�j � •��`E O m I�- ti+ a�b, `1��� -/ \}:. !� J� i s'�{� I� �� �� { �['(!i�
, (l •� 1,� 3g r - i •'� ):' O� 15 � '.o � I'' P � � !1 Csf�( �;�1, / �/ � ��� vv �-T
� � (� � lt r •tip•-� 1 • ti ��}•�.,� � � ���if 4•%� . � � '�,'�I - Oli� l j'11' �. � ����,�`����}�I� (rr
! �\• r ,`I.�'. ,4+ 1. � }\'.�j' '�� •,, �IW ,[ � �•}� �' S 16 I�+ I'I 1 }� � r {' {'� I ('T, 4�r ����•��1J e' ) ��\
• •I � ., 7 - � ', „ :'I � + � �l !�} , �� '�` J`! , ry -: 1 � t, ' • }' ��r� 1 �}�I� it, --- _, ,�,\ v -.,Q ill
�! �!, J>> � � 1 �(�� r l 1 r♦ ( I, l 1 -� � ," % a 3! r� -C l �� '` 7 I 1 I � u � \s\] \\.J
_ 41 , ��, � f ,�I p•,)�'- I ) ,• '� � ' t ,(I :e/� %i (�k �,� , '�.� ' . .S}7�)1t I , � -I_ ��r" _��_ Il\ �� "�i.
��./ I � �b .•l ��; <.. I I {i I�I -�(, ^�+� l,�`,�? ° '•+ I 7,. �' J I• �.- � r+..." � -rt ` l
o i ((' •� w 1 � o I+` 40 .��� � !�-S.(•tl,i?��} � �llji j��! �:: - k 111 f Sf ���II 11 I 1 I��\�1lJ/J f. ro -�`1t 1 �1 1�`t.
!r al .fig O� `" 1 f r r�{'� � � /' r`3• ) I �-� / ;1: 1 �, \{''/�_ /�, C� �\1 ( I �' �
��� ��'� �(\/ ! �%, 1�,•` •,)' I�, / �+ } r}�� I` •� `v 'l. '�• •' �1 I 1 Of� I,I�r I { S' � ( ( �1 J� � I:��� {� 1 Y
' 1 {
,
� � �1� "�� �!�_ (k !,('�. )� �)�' I� _�� ` -1 pp _ 1) __._.-`��-rl�----�� '-� +'—�. :T— �i -rf- 1 - ,�c /) ",`J ti ��o,,f,•.
(. � _ 't, - — � ��, I �, �, . 1 � ��, I! (o as I , E 1j J , ( �rr� �� ,. �� -q�'r�l-' 't•
! ( I'� `G�"� 1 �l��' �Ay I�'� � �� j � } 1,' 1 •� ��SC/�'' L,J '"L
ram` � E t rr i• � � •� .'
�� �.1/% 7� � � } [l I r i�' • �. I�'112c�'! r..I• S \ I� 1 � .0�� � ,Y �P� (�c, �.
:--, �� �`E \ M�• 1t .• i , I rl:� '¢
} L>-
/%�, S r �r �Iy7 )l�f- -�� Yr , `I �• /� } ���_- r ,r� \ \' i l,<'I`3 ��o I-"�lre r -�5 % r IS .�'
,`P�''
I
"� �J �C� ,� 1� 'I� + �� ` " '' � ��)'I 11}�t � ��I r ")�I•, .�'1���,1�t`� ��4' �5te`���a +r f � k(jk .� �,//r, �. E�4s —�1 + :�
�/� m�. (f}I E1 19 _�l'1)�)L�•t����1 � }-11- Y 1 �'°F ` ` L. _ •\� I`,, � (1 .�`: �:Y�r;.
:•� ( ��S,,�� `O _ . ��r I p � �. � i`�tl�,���� r,' � �, �j; f I .� ! 'rrro � •�} o � l r -•�. •°�• � -�
� �° I _�.�_. �/- yy�If(f�{•�t- \ !_� ` J� t I'� 1} 'n\ I '7rl �� �^:4 S r(J `•.�•• •�� ; ;. t,.��•
1,J ( O_ 5 ,_��.�a i I� m 1, 1 � T/ �q � � '1' � � �♦
`:.• r� watla�na. � � � I.7.1 `�1
Cd:7
_n.
'
` ��• - �_.)'I.� 111��� tc�.�•"ice
- _T. ,
rf� =wry
. ) 1... ..1
,�'it
i $IFi
'1F E !' Lake Cachichewick
•� U 'r >� F :r i, �;�� �;I• c a I.� �FrEt
rr�' a•�Hi + , 14< L -
'� I . ; S��F �I �,til F I i ! .7 E , ,I ��ji•� �i �i`i n
► i I (I l
t��,,�.,�fli.���.����� ���� ����i�}�1� Sf� � r I fi ...f7�'�I� s•. .1�!��1 '
EXHIBIT 1 -
BROOKS SCHOOL,
......................................................................... .