HomeMy WebLinkAboutSprinkler Inspection Report - Inspection - 3/25/2021 � q A.S.A.P. Sprinkler LLC SPRINKLER INSPECTION REPORT PAGE 1 6 Progress Ave. Unit #3 Tyngsboro, Ma. 01 79 41 Phone 978-649-4945 Fax 978-649-9445 Company Name f r 'L/ Contact !� Street C( / State/ Date of Tri Test Technir*, laieal i Date Owners Section(To be answered by owner or occupant) A.Explain any occupancy hazard changes since the previous inspection. z 8 B. Describe fire protection modifications made since the last inspection. C. Describe any fires since the last inspection 4 /� 0. When was the system piping last checked for stoppage,corrosion or foreign material? /'�'<�Iy$ - G✓.z E.When was the dry-piping system last checked for proper pitch? 1,y`l/-- r/cl,rgl ✓/ F.Are dry valves adequately protected from freezing? > Inspector's Section(All responses reference current inspection) 1. GENERAL YES NO a. is the building occupied? b.Are all systems in service? c. Is there a minimum of 18 in clearance between the top of storage and sprinkler deflector? d. In areas protected by wet system,does the building appear to be properly heated in all areas including blind attics and perimeter areas,where accesible?Do all exterior openings appear to be protected against freezing 2.CONTROL VALVES(See Item 14) XXXXXXXXX XXXXXXXXX a.Are all sprinkler system control valves and all other valves in appropriate position? b.Are all control valves in the open position and lacked,sealed or equipped with tamper? 3.WATER SUPPLIES(see Item 14) XXXXXXXXX XXXXXXXXX a.Was a water flow test of main drain made at the sprinkler riser? 4.TANKS,PUMPS, FIRE DEPARTMENT CONNECTIONS XXXXXXXXX XXXXXXXXX a.Are fire pumps,gravity tanks,reserviors and pressure tanks in good cutidon and maintained? � b.Are FD connection in satisfactory condition,couplings free,cap in plaC� check valves tight? Are they accessible and visible? S. WET SYSTEMS(See item 13) f„ — XXXXXXXXX XXXXXXXXX a.Are cold weather valves(OS&Y) in the appropriate open or closed p sition? b. Have anti-freeze system solutions been tested? c.Were the antifreeze test results satisfactory? 6. DRY SYSTEMS(See Items 10-14) XXXXXXXXX,,/ XXXXXXXXX a. Is the dry valve in service? b.Are the air pressure&priming water level In accordance with the manufacturers instructions? c.Were the antifreeze test results satisfactory? . d.Wire low points drained during the inspection? e. Did quick-opening devices operate satisfactory? f, Did the dry valve trip properly during the trip pressure test? g. Did the heating equipment in the dry-pipe valve room operate at the time of inspection? 7.SPECIAL SYSTEMS(See item 16) XXXXXXXXX XXXXXXXXX a. Did the deluge or pre-action valves operate properly during testing? b. Did the heat-responsive devices operate properly during testing? c. Did the supervisory alarm service test satisfactory? 8.ALARMS J p7 XXXXXXXXX XXXXXXXXX a. Did wait�moW and gong test satisfactory?/ b. Did electric alarm test satisfactory? c. Did supervisory alarm service test satisfactory? 9.SPRINKLERS XXXXXXXXX XXXXXXXXX a.Are all sprinklers free from corrosion,loading or obstruction to spray discharge? b.Are sprinklers over 50 years old,thus requiring sample testing? c. Is stack of spare sprinklers available? d. Does the interior condition of sprinkler system appear to be satisfactory e.Temperature.Are sprinklers of proper temperature rating for their location? A.S.A.P.Sprinkler LLC INSPECTION REPORT Page 2 6 Progress Ave. Unit#3 Tyngsboro, Ma.01879 Phone:978-649-4945 Fax 978-649-9445 ,Y40ty�s No?1 Make and model? Dry Systems No? Make and model? / Special Systems No? Type? Make and Model Condition 10.Date dry-pipe valve trip tested(control valve partially open) 11.Date dry-pipe valve trip tested{control valve fully open) 12.Date quick-opening device tested 13.Date deluge or preaction valve tested 14.See Control Valve Maintenance Table. Control Valves Number Type Open Secured Closed Signs Abnormalities City Connection Control _ S Tank Control Pump Control Sectional Control System Control 12f� lid �S Other Control Water Pressure? ( Tank 11 P51 Fire Pump Water flow test? (If none made WHY?) tv 16.Heat Responsive Device Test Method Type of Equipment Manufacturer Test Results: Valve# A 8 CD E �F Valve D EF Valve# A a C D E__F Valve# A B C D E _F Valve# A B C D E___F Valve# A B C D E _F Value# A B C D. Valve# A B C D E__F Auxiliary Equipment:No? Type? Location? Test Result? 17.Explain any"No"answers and comments: 18.Adjustments or corrections made during this inspection: > o. 19.Althou h these comment are not the result of an engineering review,the following desirable improvements are recommended. r j g Technician � License____.J �� �Cust 5i nature/date �,c,._�___ � .�/.,�`��:.,) i Dry Pipe Valve 1 Pre-Action Test Report A.S.A.P. SPRINKLER, LLC 6 PROGRESS AVE., UNIT#3, TYNGSBORO, MA Ol$79 . 978-649-4945 - Fax: 978-649-9445 1 Company Name:_(ft. i�t� l urn ( Contact: Street: City' r�"�'C! ,�'7f't ti,�r�&��'flg State: ' Date of Trip Test: - '«d" " Technician: '_W Date: Note:Before any dry pipe valve is trip tested,the water supply line to it should be thoroughly flushed,the two inch drain below the valve should be opened wide,and water at full pressure should be discharged long enough to clear the pipe of any accumulation of scale or foreign material.The DRIP VALVE on the dry pipe valve should be checked before tripping the pipe valve to see that it is operating properly. VALVESDRY PIPE • SYSTEM NO-[ NO SYSTEM NO Valve Serial# rrJDC? +i` Manufacturer(Name) l ":q, . Valve Model Valve Size Controlling(Location) j ! it. c r ,. Sprinklers(Numbers) Date Last Trip Tested? Date Last Operated? / Pressure(Air) Before Test(Water) Sizeliocation of Valve Was Gate Valve Opened Wide During Test fl . Air(Air Pressure), r �, TdpA (Water) At(Time) a i to C :��' � ]�- - If System Flooded,Time If Flooded Water Reached ',f Test Opening Performance 3 Valve Cond Int of Body Moving Parts Rubber Facing C✓ Seats , Reset? Did Alarms Operate @ Trip Test `- All Low Pain Drains Blown Out? H2O Control Valve OpenlSealed fr Alarm Con.Valve Open/Sealed d Quick Opening Devices Device Serial Number Manufacturer(Name) TypeAnd Model Air Pressure In tapper Chamber Quick Opening Device Tripped at Performance Left In Sery Open/Seated? Sprinkler Deficiency Report % : ' A.S.A.P. SPRINKLER, LLC / Customer Name: �;%�i'� 6 PROGRESS AVE., UNIT#3 TYNGSBORO, MA 01879 Address 978-649-4945 d"y Fax 978-649-9445 Telepha4 *)- 19%1--/%CI( 5C 67 Contact SHIP DATE PURCHASE ORDER# SALES REPRESENTATIVE SHIP VIA TERMS TAX ID QTY. ITEM # DESCRIPTION UNIT PRICE TOTAL ,- � .., ,i f,)r Uw,.m✓ YR C;` ��v` �.r � ..„y .-7 7 da, c':.c,+e r" S +3` . /�`�°r""�r�rso-� ..✓ .. WC. COMMENTS: SUB TOTAL I=IMPAIRMrnrm TAX C= CRITICAL NCB r� JgpW MISCELLANEOUS R=RECOMM NDATION TOTAL On this date, the above equipment was maintained in accordance with the procedures of the adopted editions of the NFPA!.7 authority having jurisdiction,and the manufacturer's manual.These procedures were a ecuted with the results indicated above. Service Techifician Lic. No. Date Time A.M. P.M. Customerg"yAuthorized Agent