June 28, 1999
Heidi Griffin �
Planning Board f "R"
Town Hall Annex
27 Charles Street 1 �
North Andover, MA 01845
RE: Engineering Reviewt p,NNtiN
Brook School
Site Plan
Dear Ms. Griffin:
In response to your request, Coler &c Colantonio, Inc, has reviewed the supplemental
submittal package for the above referenced site. Our efforts included a comparison of
information submitted with respect to the requirements of the North Andover Zoning
Bylaws. In addition, we visited the site on June 24, 1999 to observe existing conditions.
The submittal package included the following information:
Plans Entitled
• "Plan Set for Brooks School- Dining Hall and Campus Center
Improvements", located in North Andover, Mass." Prepared by RFS
Engineering, consisting of twelve sheets dated 4/30/W and Received June 30,
1999.
m "Site Plan Application, Hydrology Report and submittal letter" dated June
1999."Prepared by RFS Engineering and Received June 30, 1999.
During our site visit, we observed utility construction in the vicinity of the proposed
dining hall. We also traced the relative portions of the drainage system including the
outlets to and from the wetland and detention pond. The outlet pipe to the wetland was
observed to be approximately 90% submerged. An observation of the existing wetland
areas indicated several feet of freeboard to the elevation of Great Pond Road.
101 Accord Park Drive _ 781-982.5400
Norwell, MA 02061-1685 Pax: 781-982-5490
Zabi>zg�ylnw:
1. Section 8.3) 5.) e.)ii) A waiver from the boundary survey is being requested.
2. Section 83) 5.)e.) v.)Proposed spot grades should be included on the plans.
3. Section 8.3) 5.)e.) vii.) The Vortemh Model 5000,which was selected, is note
adequately sized for the proposed flows without a bypass manhole. Catch basins Q
should not be directly linked.The time of concentration analysis indicates sheet flow � �
in excess of 350'. This condition is not consistent with NRCS recommendations for
New England. The pre construction peak flows have not been maintained under post ,(
construction conditions, however the development will most likely not have.a
significant impact on the capacity of the currently proposed system. It is our
understanding that this is the first of several developments proposed at this site and
the culmination of all these developments may have an impact on the system. It is our
recommendation that the entire system is modeled for the final development
conditions and the cumulative runoff volumes and flows are indicated as proposals
are made. The proposed catch basins are indicated as being linked, it is recommended
that they be connected via manholes. All existing catch basins and inverts located
within the construction limits should be labeled.
'If 4� Section 8.3) 5.)e.)Ix.)A,waiver from the building height limitation is being
W requested.
u
5. Section 8.3) 5.)e.) x.)Reportedly, there will be no net increase in the required
parking spaces. The Planning Board should review this issue.
6
3 b. Section 8.3) 5_) e_)xi_) It is unclear if a Notice of Intent Application should be filed in
conjunction with this application. The location of abutting or impacted wetlands
should be indicated.
7. Section 8.3)5.)e.) xvi.)The method and location of refuse enclosure should be
indicated,
8. Section 8.3) 5.)e.) xviii.) See comment# 3.
j' 9. Section 8.3)5_)e.)xix) Reportedly, there will be no net increase in traffic volumes.
The Planning Board should review this issue.
10, Section 8.3) 5.)e.) xxii)Typically reviewed by the town.
11.Section 8.3) 5.) e.) xxiii.)Typically reviewed by the town..
We appreciate the opportunity to assist the Planning Board on this project and hope that
ibis information is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER & COLANTONIO, INC.
hn C. Chessia, P.E.
XC: RFS Engineexing
Jim Rand,DPW
SEP-02-1999 THIS 05: 18 PH COLE' `ND COLANTONIO FAX NO. 7819825490 P. 09/11
COLER
F-N,sNr-(-'RR AND 20CNn.I�T3
September 2, 1999
Heidi Griffin
Planning Board
Town Hail Annex
27 Charles Street
North Andover, MA 01845
RE: Supplemental Engineering Review
Brook School
Site Plan
Dear Ms. Griffin:
In response to your request, Coler & Colantonio, Inc. has reviewed the supplemental
submittal package for the above referenced site. Our efforts included a comparison of
inforrtttttion submitted with respect to the retluirements of the North Andover Zoning
Bylaws. In addition, we visited the site on June 24, 1999 to observe existing conditions.
The submittal package included the following information:
Plans Entitled
Letter of Response for Brooks School, North Andover dated August 13, 1999.
Zoning Bylaw:
1. Section 8.3)5.)e,)ii) A Waiver from the bQL1nda1ry survey is being requested.
No further commem.
2. Section 8.3) 5.)e.) v.)Proposed spot grades should be included on the plans.
Satisfactorily addressed.
3. Section 8.3) 5.)e.)vii.) The Vortech Model 5000, which was selected, is not
adequately sized for the proposed flaws without a bypass manhole. Catch basins
should not be directly linked. The time of concentration analysis indicate;, sheet flow
in excess of 350'. This condition is not consistent with MRCS recommendations for
101 Accord Park Drive 781-982-5400
Norwell, MA 02061-1685 Pax: 781-982-5490
SEP--02--1999 THU 05' 18 Pal COLEr' '.ND COLANTONIO FAX NO. 7819825490 P. 10/11
t
New England. The pre construction peak flows have not been maintained under post
Construction conditions, however the development will most likely not have a
significant impact on the capacity of the currently proposed system. It is our
understanding that this is the first of several developments proposed at this site and
the culmination of all these developments inay have an impact on the system. It is our
recommendation that the entire system is modeled for the final development
conditions and the cumulative runoff"volumes and flows are indicated as proposals
are made.The proposed catch basins are indicated as being linked, it is recommended
that they be connected via manholes. All existing catch basins and inverts located
within the construction limits should be labeled.
The selected Vortechnics.system is satisf ictory for the intended use. Catch basin
linking, although commonly designed in the past it is►got current standard
engineering practice. Due to increased flow velocities and turbulence, upgrades to
eliminate link-fd systems should he considered where feasible, Our comment
regarding the length vf'sheet flo;v is related ro ti►ne of concentration
calculrations.3.50 feet of sheer flow is not standard engineering practice in this area.
The Planning Board may ivaive the requirement to model the entire drainage system
for this phase of work.
4. Section 8.3)5.) e.) Ix.)A waiver from the building height limitation is being
requested.
Reportedly, a variance was approved by the ZBA opt August 10, 1999_
5. Section 8.3)5.)c.)x.)Reportedly, there will be no net increase in the required
parking spaces.The Planning Board should review this issue.
No fatrther comment.
G. Section 8.3) 5.)e.) xi.)It is einclear if a Notice of Intent Application should be filed in
conjunction with this application. The location of abutting or impacted wetlands
should be indicated.
Reportedly, this issue has been discussed and resolved with The Conservation
Co►zamission_
7. Section 8.3) 5.) e.) xvi.)The method and location of refuse enclosure should be
indicated.
The Planning hoard may choose to waive this requirement.
A. Section 8.3)5.)e.)•xviii.)See comment#3.
No,further comment.
SEP--02--1999 THU 05: 19 PH COLEr 'ND COLANTONIO FAX NO, 7819825490 P. 11/11
9. Section 8.3)5.)e.) xix)Reportedly, there will be no net increase in traffic volumes_
The Planning Board should review this issue,
No f irther comment. .
10, Section 8.3) 5.) e,)xxii)Typically previewed by the town.
11. Section 8.3)5.)c.)xxiii.)Typically reviewed by the town.
We appreciate the opportunity to assist the Planning )hoard on this project and hope that
this information is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very tr«ly yours,
ER & COLANTONIO, INC.
c
John C. Chessia,P.E.
XC: RFS Engineering
Jim band,DPW