HUNTRESS ASSOCIATES
I cntcls•cupe Architecture car Lund Planning
April 14, 2014
Mr. Judy Tyman, Town Planner
Town of North Andover
Planning& Community Development
1600 Osgood Street
North Andover, MA 01945
Subject: Brooks School, Soccer Field Renovation
Dear Ms. Tyman:
Enclosed you will find two (2) sets of plans and details for the renovation of an existing soccer
field and associated site improvements at the Brooks School in North Andover. As you will see
on the attached plans and details all work has been located outside of the Lake Cochichewick
Watershed Protection District, and also outside of the 100' buffer zone to the nearest bordering
vegetated wetland.
The existing survey showing the limits of the Watershed Protection District line was prepared by
Marchionda & Associates LP, dated December 6, 2013. The nearest wetlands were delineated by
Wetland Preservation, Inc. on November 19, 2013 and have been included on the Marchionda
Survey. See attached plans for additional information.
We have been working with our Civil Engineer, Barbara J. Thissell, P.E. in the preparation of
drainage calculations. The results of those drainage calculations show no increase in peak flow
during the 1, 2, 10 & 100 years storm events. The only impervious surfaces being created in this
project include pedestrian walkways and viewing areas. There is no plan to expand existing
parking areas or roadways as a part of this project. As you will note on the plans, there will be a
significant amount of recharge of stormwater associated with the project, and all the DEP
stormwater standards have been met.
With the exception of a small group of trees on the northeast corner of the field, no additional
trees are anticipated to be removed. We have also included a planting and landscape plan in the
enclosed drawings. The intent of the planting is to replace those trees being lost, provide shaded
areas for the users, and increase the aesthetic value of the site upon arrival from Great Pond Road.
The plans have accounted for construction fence around the limit of work, staging areas and the
installation of erosion control measures. Construction is anticipated to begin in June of this year,
and be complete by September 2014.
Given the above, we do not anticipate any required permits through the Town of North Andover.
Having said that, I am sure you have questions and I would be happy to work with you throughout
17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fr. 978.470.8890
Nis.Judy Tynan
North Andover Planning Board
April 11,2014
Page 2 of 2
this process to make sure any concerns raised by the Town of North Andover are addressed. I
would be happy to meet with you at your convenience to review the plans and discuss the project in
great detail.
Thanks again, and please call me to discuss the plans at your convenience.
Sincerely,
Huntress Associates, Inc.
CAkV*O1L-
Christian C. Huntress, RLA MA #1178
President
CC: Mr. Dean Ellerton - Facilities Director, Brooks School.
Barbara J. Thissell P.E.
17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fv. 978.470.8890
HUNTRESS ASSOCIATES
1 cantisciape Archileclure & L,(ind Planning
April 16, 2014
Mr. Judy Tyman, Town Planner
Town of North Andover
Planning& Community Development
1600 Osgood Street
North Andover, MA 01945
Subject: Brooks School, Soccer Field Renovation
Dear Ms. Tyman:
Enclosed you will find two (2) copies of a Land Disturbance Permit Application for the
renovation of an existing soccer field and associated site improvements at the Brooks School in
North Andover. As you will see on the attached plans and details all work has been located
outside of the Lake Cochichewick Watershed Protection District, and also outside of the 100'
buffer zone to the nearest bordering vegetated wetland.
Thanks for taking the time to meet with me on Monday to review the scope of work. As this
scope represents a reduction in the proposed work approved by the Planning Board in 2009, and
the work has been moved outside the buffer zones of the watershed and bordering vegetated
wetlands, I agree with your decision to review this work administratively. I understand that you
may want to have the drainage study reviewed by Lisa Eggleston, and Brooks School does not
have any objection with that request.
The existing survey showing the limits of the Watershed Protection District line was prepared by
Marchionda & Associates LP, dated December 6, 2013. The nearest wetlands were delineated by
Wetland Preservation, Inc. on November 19, 2013 and have been included on the Marchionda
Survey. See attached plans for additional information.
We have been working with our Civil Engineer, Barbara J. Thissell, P.E. in the preparation of
drainage calculations. The results of those drainage calculations show no increase in peak flow
during the 1, 2, 10 & 100 years storm events. The only impervious surfaces being created in this
project include pedestrian walkways and viewing areas. There is no plan to expand existing
parking areas or roadways as a part of this project. As you will note on the plans, there will be a
significant amount of recharge of stormwater associated with the project, and all the DEP
stormwater standards have been met.
With the exception of a small group of trees on the northeast corner of the field, no additional
trees are anticipated to be removed. We have also included a planting and landscape plan in the
enclosed drawings. The intent of the planting is to replace those trees being lost, provide shaded
areas for the users, and increase the aesthetic value of the site upon arrival from Great Pond Road.
17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fv. 978.470.8890
Ms. Judy Tyman
Noah Andover Planning Board
April 16,2014
Page 2 of 2
The plans have accounted for construction fence around the limit of work, staging areas and the
installation of erosion control measures. Construction is anticipated to begin in June of this year,
and be complete by September 2014.
Given the above, we do not anticipate any additional permits through the Town of North Andover.
Attached you will find two sets of plans, and I am having the drainage study sent to you directly
from our civil under separate cover. You should have that shortly. I would be happy to meet with
you at your convenience to review the plans and discuss the project in great detail.
Thanks again, and please call me with any questions.
Sincerely,
Huntress Associates, Inc.
V"V440L--
Christian C. Huntress, RLA MA 41178
President
CC: Mr. Dean Ellerton- Facilities Director, Brooks School.
Barbara J. Thissell P.E.
17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fr. 978.470.8890
/�0� �TDr»� /7
wv" v' ' -`-'`` ,�`^� ~~~
ean
~� �
Enright, �
&( �� � �� L
From: Enright,Jean -~ �L�44/�( �v�/,x ~~.�-«64^~
� ` \^
Sent: Friday,April 18, 2014 10:35AK4
To: 'Chris Huntress';Tvmon,Judy
Cc: Be||avence, [urt _ ��6��7��4 /�
Subject: RE: Land Disturbance Permit
' - ^
Hi Chris,
| have let your submmitta| on my desk. |will be out of the office until next Fdday, k will time stamp them for next Friday if
you would like. |f you want todo |t before then you can pick them up. | have added a third set to what you left. one
application and plan set should be left at the Clerk's office and the other two retUrned to Planning (all three need the
time stamp on the application page), Would you please send an electronic copy tmroe when you have time. Thank you.
Jean
From: Chris Huntress
Sent: Thursday, April 17/ 2014 12:02PM
To: TynlVO/ Judy
Cc: Enright, Jean; Bd|avaOce, CVdL
Subject: Re: Land Disturbance Permit
Judy, will do. Do you need meto come back and being itto the clerks office?
Chris
Sent from nmy |Phnne
{}n Apr 17, 2Ul4, at1I:26 AM, "Tymon,Judy" ^ wrote:
Chris,
Regarding the Land Disturbance permit, it should be stamped in at the clerk's office. You should also
send us the electronic files. | think Curt [s going to want to handle it administratively, so there should
not bea mailing toabutters. |f you have any questions, give Curt or Jean acall.
Judy
Judith K8,Tyrnon
Town Planner
Town of North Andover
12O Main Street
North Andover,wA0z845
Phone 978.688.9535
Fax 978.688.9542
Email
Web
^|mageOOzipA»
Please note the MaSSaChUSettS Secretary of State's office has determined that most emails to and from nILinicipal offices and officials are
Please consider the environment before printing this email.
2
Enright,
From: Chris Huntress <chrb@huntreooassodatesoom>
Sent: Friday, April 1O, 2014II:O2Ak4
To: Enright,Jean
Cc: Tvnnmn, Judy; 8e||avaoco, Curt
Subject: Re: Land Disturbance Permit
Hi Jean,
| am away until the 27th. Please time stamp itat your convenience.
Chris
Sent from noy |Phone
OD Apr 1Q, 2O14, at10:34 AM, "EU[ight Jean"
« friorthanclover.corp wrote:
Hi Chris,
| have let your submittal Vnmnydesk. |will be out of the office until next Friday. | will time stamp then)
for next Friday K you would like. |f You want todVit before then you can pick Lhernup. | have added a
third set to what You left. One application and plan set should be left atthe Clerk's office and the other
two returned to Planning (all three need the time stamp on the application page), Would you please
send an electronic copy tonne when you have time. Thank you.
Jean
From: Chris Huntress
Sent: Thursday, April 17, 2014 12:02 PM
To: TvmoOn, Judy
Cc: Enright, Jean; Be||axanca, Curt
Subject: Re: Land Disturbance Permit
Judy, will do. Do you need meio come back and being itto the clerks office?
Chris
Sent from my |Phnne
(}n Apr 17, 2O14, at11:Z6 AM, '/Tyrnon,Judy" < wrote:
Chris,
Regarding the Land Disturbance permit, it should be stamped in at the clerk's
office. You should also send us the electronic files. |think Curt is going tn want to
handle it administratively,sn there should not hea mailing toabutters. |f you have any
questions, give Curt or Jean acall.
Judy
Judith K0.Tynmon
Town Planner
Town nf North Andover
1
120 Main Street
North Andover,MA 01845
Phone 978.688.9535
Fax 978.688.9542
Email 'ty Mgnfr ova nofncsr andover,
Web vwwvwv.TownofNorthAndover.com
<image001.Jpg>
Please note the Massachusetts Secretary of States office has determined that most emails to and from nnrn cipyal
offices and officials are public records.For more information please refer to:http:/wwwv.stirstateTn .reslpretpr.J,ftxw wijp)2.
Please consider the environment before painting this email.
2
Enright, Jean
From: Bellavance, Curt
Sent: Wednesday,June 11, 2014 11:43 AM
To: Enright,Jean
Subject: RE: Environmental Monitor- Brooks
As discussed this proposal works for me
From: Enright, Jean
Sent: Wednesday, June 11, 2014. 8:13 AM
To: Bellavance, Curt
Subject: FW: Environmental Monitor - Brooks
Curt,
I am fine with substituting this monitoring for the construction monitor condition if you are.
Jean
From: Chris Huntress [r IgI t ter_cNiu"ss@il:hires ��_ssoc�ate conil]
Sent: Tuesday, June 10, 2014 2:56 PM
To: Enright, Jean; Bellavance, Curt
Cc: 'Brian Palm'; Dean Ellerton
Subject: Environmental Monitor- Brooks
Jean, as we discussed, I would like to propose that we include Curt on our weekly Construction Update and Project
Notes with site photographs in leiu of the required environmental monitor.This will provide a more detailed review of
construction, more frequent updates and less cost to the client. I have attached a sample set of project notes from our
work at Central Catholic in Lawrence.This could be a condition of approval in place of the environmental monitor.
I would be happy to create a standing paragraph providing a status of the erosion and sediment control on site.
Please let me know if this is acceptable....thanks!
Chris
Christian C. Huntress, RLA
President
HUNTRESS Spvrts
17 Tewksbury Street
Andover, MA 01810
c: 978.758.6290
p. 978.470,8882
f. 978.4708890
www,l,iu ilressassociate corm)
.
Please mote the MassaChUsehs secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more
information{Tease refer to:B d J6ro°v W �a,,_taste' o m��fa 1paeemm mm,o .VaRrt ,. 1
Please consider the environment before printing this email.
2
,
Enrii2ht, Jean
From: ChhsHuntress <chrb@burtressassoriaYeszomo>
Sent: Tuesday,June 1l20l42:56PM
To; Enright, Jean; BeUavance, Curt
Cc 'Brian Po|nn'; Dean EUerton
Subject: Environmental Monitor Brooks
Attachments: HAJ-[[HS'Project Notesv.5.pd(
Jean, as we discussed, I would like to propose that we include Curt on our weekly Construction Update and Project
Notes with site photographs in leiu of the required environmental monitor.This will provide a more detailed review of
construction, more frequent updates and less cost to the client. | have attached asample set of project notes from our
work at Central Catholic in Lawrence.This could be a condition of approval in place of the environmental monitor.
I would be happy to create a standing paragraph providing a status of the erosion and sediment control on site.
Please let nne know if this is acceptable....thanks!
Chris
Christian [|. Huntress, R[A
President
HUNTRESS -5Port5
17 Tewksbury Street
Andover, MAO1O1O
C:978.758.6790
p. 87847O.8882
f. g7A.470AA90
Please note the Massactiusetts Secretary of State's office has determined that most ernails to arld ff-0111 Municipal offices and officials are public records, Fof rnore
information p|ooxo refer to:
LINT[tF- S AssocIATES
Project Notes
978.470,8982
To: Br. Richard Caney Prepared Chris Huntress
Central Catholic High School by: Huntress Associates, Inc.
Project: CCHS—Turf Field Date: May 29, 2014
Cc: Steve Welsh, Director of Facilities. Issue No. 5
David Mermelstein, Trident
Ernie DiFiore, Athletic Director
Joe Maiato, Green Acres
The following are notes from the May 22, 2014 construction meeting with HAI, CCHS and
Trident Project Advisors.
Attendees: Not Present:
Dave Mermelstein,Trident Project Advisors
Br. Richard Carey, CCHS
Steve Welsh, CCHS
Ernie DiFiore,CCHS(Joined ill process)
Chris Huntress, HAI
Joe Maiato,Green Acres
Gino Baroni,Trident
Adrian Fluery,Trident
1. CH reviewed meeting notes and outstanding issues from May 22`t'project meeting.
2. GALC provided a price of $3,047.00 to enlarge and modify the dumpster pad and fence
enclosure as detailed by HAI. Trident to prepare a CO, DMM requested that GALC provide
a breakdown of the labor and materials for the new dumpster enclosure.
3. Trident is coordinating a contract with Rumpf for the building construction, DMM requested
a construction schedule and schedule of values from Rumpf. Target date for start of building
construction is 6.10.14. GALC is to excavate for the foundation in advance of 6.10.14. HAI
to provide a pdf copy of the site plan and architectural plans to GALC to their use and
records.
Gino Baroni to coordinate with City of Lawrence Inspectional Services for Building Permit
and bathroom fixture count issues.
Central Catholic High School
Project Notes v.5
May 29,2014
Page 2 of 4
4. HAI to review the status of other items needing a foundation and/or building permit,
including the retaining walls, grandstand, scoreboard and sports lighting. GALC required to
provided stamped structural submittal drawings on all of the above.
5. HAI review the product submittal for the retaining walls. The product submitted was Roman
Wall as manufactured by UniLock. CCHS selected the "Granite" color for the project,
Trident questioned why an equal product was submitted, GALC to respond. Stamped
drawings are typically provided by the manufacturer after the approval of the wall product.
6. HAI reviewed the final synthetic turf layout and approval drawings. Greenfields added the
light blue MLax lines to extend all the way across the field on the inside of the 30 yard line.
The final drawings reflect this change.No further review required.
7. HAI review the access from Hampshire Street to provide a pedestrian pathway to the field.
Due to the anticipated cost of construction of the new walk and stairs CCHS requested that
HAI stop any further design and engineering related to this access. CH offered that as we
move forward we will insure that the new improvements do not prohibit future installation of
stairs,walks and ramps in this location if so desired by CCHS.
8. Construction Update-Progress since last meeting:
a. Topsoil removal is complete.
b. Debris, brick and coble is noticeable throughout limit of excavation,as anticipated.
c. The chamber/void identified by the geophysical survey has been excavated and
opened. Several chambers and/ cisterns were found throughout the southeast section
of the site. Large granite block has been pulled from the excavation and stockpiled on
site. Trident engaged UTS to review the existing condition and make a
recommendation. DMM reported that UTS recommended GSI, who performed the
original geotechnical investigation, be retained to review and provide
recommendations to re-compact and stabilize the subgrade. HAI to contact GSI and
schedule a site inspection.
d. Block/foundation stone to be reused is being stockpiled by GALL. HAI to coordinate
with GALC to find a suitable method for reuse of the block/granite in the landscape
areas adjacent to, or within,the project site.
Outstanding Items from 5.15.14
9. CH presented the audio system components, layout and materials cost. Components provided
by Pro Acoustics at a total cost of$10,817.21. CH stated that to the best of our knowledge
this system includes all items required for a working sound and PA system. GALC to
provide a cost for installation as outlined on sk-5 dated 5.19.14 and prepared by HAI. CCHS
directed HAI to have Pro Acoustics revise the proposal to be addressed to Steve Welsh.
CCHS to purchase the audio equipment direct from Pro Acoustics.
t
Central Catholic High School
Project Notes v.5
May 29,2014
Page 3 of 4
Update: SW is in direct contact r►,ith Pro Acoustics. GALL to provide a price to install the
audio system, conduits and connections, Cis outlined and discussed.
10. Water & Sewer Connection: CH and DMM requested authorization to have HAI provide
utility design for the water and sewer connection for the new building. CH estimated
approximately 2 days of time for the design and specification of the utilities. CCHS/Trident
directed CH to proceed at Time & materials. CH to have Barbara Thissell P.E. (Civil
Engineer) contact SW to review the existing water service locations to determine the most
appropriate location to connect to the proposed building.
Update: CH to send email with outline of time & materials estimate to DAIt1I BJT to meet
with SW on site to review possible connections.
Outstanding Items from 5.15.14
1. SW requested that the irrigation cabinet included in the specifications and submittals be
eliminated and that the control be placed within the CCHS building. SW to coordinate with
JM for the exact location. GALC to provide a deduct CO to CCHS for removal of the
stainless steel control cabinet, JM & SW to review the location of the proposed control
immediately after our meeting.
2. The existing sports light poles and fixtures are to be removed by GALC and loaded for
transport by others. GALC to provide one week advance notice to CCHS to assist in
scheduling the transport.
Outstanding Items from 5.8.14
1. National Grid Power Line Relocation:
a. RC/DMM reported that the Lawrence City Council is reviewing the application for
hvo new utility poles in Auburn Street. Both applications are scheduled for final
review on 5.20.14. Trident to update the project team on progress.
b. DMM has requested NGrid provide a construction schedule for pole and utility line
installation. No schedule is yet available. HAI expressed concern that a delay in
NGrid's power line relocation could result in a delay to the turf field construction
project. Trident to discuss this issue with the Mayor's office to see if assistance could
be provided by the City of Lawrence to influence the utility line construction
schedule. DMM to coordinate with Gino Baroni and report back to the group.
c. Update: DMM stated that NGrid has confirmed that the project is in "Scheduling".
DMM to coordinate and contact NGrid, with the assistance of GALC. DMM stated
that NGrid construction could occur until after the Lawrence City Council approves
the two new utility poles.
Central Catholic High School
Project Notes v.5
May 29,20t4
Page 4 of 4
d. Update; DMM and SW confirmed that the City of Lawrence approved the NGrid
request to install two (2) new utility poles on Auburn Street. SW confirmed that
CCHS has sent a check to NGrid to cover the utility back-charges.
3M reviewed location and detail of electric trench and requested two days notice for
excavation of the trench to allow NGrid to reconnect main power line, DMM to
continue to coordinate with NGrid and provide contact information for the NGrid
Trench Inspector to GALL.
e. Update: DMM reported an issue has been identified with NGrid Easement
Department. Trident to ret>iew the concerns of NGrid and report back regarding next
steps.
Outstanding Items from 5.1.14
1. ED questioned the location of the scoreboard and would like to explore moving it back to
the corner of Auburn and Hampshire Street. HAI to review and provide a sketch.
a. 5.8.14 Update: CH reviewed alternative locations of the proposed scoreboard with
Trident and CCHS. CCHS agreed that alternative Location `C' is preferred. HAI to
revise plans and coordinate with RDK and GALL. CH to report if any additional
information is needed.
b. Update: CII to review detail for Scoreboard fooling to determine f 1t can be
coordinated with turf anchor edge in scrrne location. CH to reevieei,depth a reinforced
grid for retaining wall along Hampshire Street card provide original plans to GALC
,for their records.
This represents our understanding of the progress to date. Please notify our office
immediately of any discrepancies or additional information regarding the above. Thank you
for your time and consideration with regard to this matter.
.. .. Cent4 CathoHic 1-iilgh Schoof ILaw'&ioe, Maiisachusett.s
6
T:M
i
Photo,t-Granite Block Excavation Photo 2- Granite Block Excavation
°' �/✓Y r � '�'�� ri� l�f u.7o/ N/ r i� r ll)h)9W,G�j JAs�NY�Il fJ�i
� f
d a � v �
r v�
1 ni
mw y�v
Photo 3-Granite Block Excavation Photo 4-Granite Block Excavation
a%
IT
u
w y �
d
r
w
i
Y
Photo,5- nbgrade Conditions Photo 6-Stockpiled Block
HUNTRESS ASSOC TES,lNC. 17 fiewli.5Ibu.ury Street Aridover, aSiSac:hfSe.ts ° -470- 8
Cer tu,,V CathooV c Ffig@i Schooa -Lwavirence,t'assadlus^ett;s
F
�t
Photo 7-Stockpiled Block Photo 8- Existing Transformer
HUNTRESS ASSOCATES, INC,I 17 Te,, r esb ry Street MrJover,M SSaJIUSeUS 75-470_8,882 5.:29.1
'140
0TEO
r n
$RC H 5���9
CONSERVATION DEPARTMENT
Cotntltunity Developmettf Divisiolt
MEMORANDUM
DATE: August 19, 2009
TO: Jude Tvmon, Toxvil Planner
FROM: Jennifer Hughes, Conservation Administrator
SUBJECT: brooks School -- Conservation Commission jurisdiction related to Athletic Field
At the request of the'l'olvil of North Andover Planning Board, I have reviewed the plan titled
Watershed Special Permit Drawings for Soccer Field Renovations (Brooks School), dated June 5, 2009
and revised July 24, 2009 and conducted site investigations at the Brook School athletic fields. The
project as proposed is not jurisdictional to the North Andover Conservation Commission (NACC).
Wetland resource areas are greater than 100 feet frOn"I aI1V proposed work on the site.
IIl additloil, drainage work preViouSINT ConduCted oil the fields also discharges Vlore. thaI1 100 feet
from existing wetland resource areas. This work would not have required a filing with the NACC
Under the Massachusetts Wetland Protection Act or Town of North Andover Wetlaiui Bylaw.
1600 Osgood Sheet,NoiIli Amlover,Mossocliuseits 01845
Phone 978.688.9530 fox 978.688.9542 'Wei) www.tovnofnorthnnElover.coni
RL
F,
y,
Spring,, 2014HUNTRESS ��vrts
kurf i A01
LUCUSO
AndoverWorld-United States-MA-Essex Co--North
ON
Pictometry Online Page 1 of 1
s:
W�
k }r
ua'
Brooks
Print Date: 04/14/2014
Image Date:0410112012
LeveLCommunity
http://pol.pictometiy.com/en-us/app/print.php?title=Brooks&date_fmt=m/d/Y&year=2012.,. 4/14/2014
Pictometry Online Page 1 of 1
r
� m
r J�It �dP�
Brooks
Print Date: 04/14/2014
Image Date:04/01/2012
Level:Community
i
i
i
littp://pol.pictometry.coiiif en-us/app/print.php?title=Brooks&date_fmt=m/d/Y&year=2012... 4/14/2014