Loading...
HomeMy WebLinkAbout2014-06-09 Correspondence ZOO q 2 -soc-c-c-c- k kMs ZokA - c 5c-6 6K. _QAJ TLctj 6A-60 a-k C', cp,- f2 qDP V t-o-JAZ 6�C al( /5 to(-oed 607j1do- aF 1�� &O*er P. HUNTRESS ASSOCIATES I cntcls•cupe Architecture car Lund Planning April 14, 2014 Mr. Judy Tyman, Town Planner Town of North Andover Planning& Community Development 1600 Osgood Street North Andover, MA 01945 Subject: Brooks School, Soccer Field Renovation Dear Ms. Tyman: Enclosed you will find two (2) sets of plans and details for the renovation of an existing soccer field and associated site improvements at the Brooks School in North Andover. As you will see on the attached plans and details all work has been located outside of the Lake Cochichewick Watershed Protection District, and also outside of the 100' buffer zone to the nearest bordering vegetated wetland. The existing survey showing the limits of the Watershed Protection District line was prepared by Marchionda & Associates LP, dated December 6, 2013. The nearest wetlands were delineated by Wetland Preservation, Inc. on November 19, 2013 and have been included on the Marchionda Survey. See attached plans for additional information. We have been working with our Civil Engineer, Barbara J. Thissell, P.E. in the preparation of drainage calculations. The results of those drainage calculations show no increase in peak flow during the 1, 2, 10 & 100 years storm events. The only impervious surfaces being created in this project include pedestrian walkways and viewing areas. There is no plan to expand existing parking areas or roadways as a part of this project. As you will note on the plans, there will be a significant amount of recharge of stormwater associated with the project, and all the DEP stormwater standards have been met. With the exception of a small group of trees on the northeast corner of the field, no additional trees are anticipated to be removed. We have also included a planting and landscape plan in the enclosed drawings. The intent of the planting is to replace those trees being lost, provide shaded areas for the users, and increase the aesthetic value of the site upon arrival from Great Pond Road. The plans have accounted for construction fence around the limit of work, staging areas and the installation of erosion control measures. Construction is anticipated to begin in June of this year, and be complete by September 2014. Given the above, we do not anticipate any required permits through the Town of North Andover. Having said that, I am sure you have questions and I would be happy to work with you throughout 17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fr. 978.470.8890 Nis.Judy Tynan North Andover Planning Board April 11,2014 Page 2 of 2 this process to make sure any concerns raised by the Town of North Andover are addressed. I would be happy to meet with you at your convenience to review the plans and discuss the project in great detail. Thanks again, and please call me to discuss the plans at your convenience. Sincerely, Huntress Associates, Inc. CAkV*O1L- Christian C. Huntress, RLA MA #1178 President CC: Mr. Dean Ellerton - Facilities Director, Brooks School. Barbara J. Thissell P.E. 17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fv. 978.470.8890 HUNTRESS ASSOCIATES 1 cantisciape Archileclure & L,(ind Planning April 16, 2014 Mr. Judy Tyman, Town Planner Town of North Andover Planning& Community Development 1600 Osgood Street North Andover, MA 01945 Subject: Brooks School, Soccer Field Renovation Dear Ms. Tyman: Enclosed you will find two (2) copies of a Land Disturbance Permit Application for the renovation of an existing soccer field and associated site improvements at the Brooks School in North Andover. As you will see on the attached plans and details all work has been located outside of the Lake Cochichewick Watershed Protection District, and also outside of the 100' buffer zone to the nearest bordering vegetated wetland. Thanks for taking the time to meet with me on Monday to review the scope of work. As this scope represents a reduction in the proposed work approved by the Planning Board in 2009, and the work has been moved outside the buffer zones of the watershed and bordering vegetated wetlands, I agree with your decision to review this work administratively. I understand that you may want to have the drainage study reviewed by Lisa Eggleston, and Brooks School does not have any objection with that request. The existing survey showing the limits of the Watershed Protection District line was prepared by Marchionda & Associates LP, dated December 6, 2013. The nearest wetlands were delineated by Wetland Preservation, Inc. on November 19, 2013 and have been included on the Marchionda Survey. See attached plans for additional information. We have been working with our Civil Engineer, Barbara J. Thissell, P.E. in the preparation of drainage calculations. The results of those drainage calculations show no increase in peak flow during the 1, 2, 10 & 100 years storm events. The only impervious surfaces being created in this project include pedestrian walkways and viewing areas. There is no plan to expand existing parking areas or roadways as a part of this project. As you will note on the plans, there will be a significant amount of recharge of stormwater associated with the project, and all the DEP stormwater standards have been met. With the exception of a small group of trees on the northeast corner of the field, no additional trees are anticipated to be removed. We have also included a planting and landscape plan in the enclosed drawings. The intent of the planting is to replace those trees being lost, provide shaded areas for the users, and increase the aesthetic value of the site upon arrival from Great Pond Road. 17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fv. 978.470.8890 Ms. Judy Tyman Noah Andover Planning Board April 16,2014 Page 2 of 2 The plans have accounted for construction fence around the limit of work, staging areas and the installation of erosion control measures. Construction is anticipated to begin in June of this year, and be complete by September 2014. Given the above, we do not anticipate any additional permits through the Town of North Andover. Attached you will find two sets of plans, and I am having the drainage study sent to you directly from our civil under separate cover. You should have that shortly. I would be happy to meet with you at your convenience to review the plans and discuss the project in great detail. Thanks again, and please call me with any questions. Sincerely, Huntress Associates, Inc. V"V440L-- Christian C. Huntress, RLA MA 41178 President CC: Mr. Dean Ellerton- Facilities Director, Brooks School. Barbara J. Thissell P.E. 17 Tewksbury Street-Andover,Massachusetts ph. 978.470.8882 fr. 978.470.8890 /�0� �TDr»� /7 wv" v' ' -`-'`` ,�`^� ~~~ ean ~� � Enright, � &( �� � �� L From: Enright,Jean -~ �L�44/�( �v�/,x ~~.�-«64^~ � ` \^ Sent: Friday,April 18, 2014 10:35AK4 To: 'Chris Huntress';Tvmon,Judy Cc: Be||avence, [urt _ ��6��7��4 /� Subject: RE: Land Disturbance Permit ' - ^ Hi Chris, | have let your submmitta| on my desk. |will be out of the office until next Fdday, k will time stamp them for next Friday if you would like. |f you want todo |t before then you can pick them up. | have added a third set to what you left. one application and plan set should be left at the Clerk's office and the other two retUrned to Planning (all three need the time stamp on the application page), Would you please send an electronic copy tmroe when you have time. Thank you. Jean From: Chris Huntress Sent: Thursday, April 17/ 2014 12:02PM To: TynlVO/ Judy Cc: Enright, Jean; Bd|avaOce, CVdL Subject: Re: Land Disturbance Permit Judy, will do. Do you need meto come back and being itto the clerks office? Chris Sent from nmy |Phnne {}n Apr 17, 2Ul4, at1I:26 AM, "Tymon,Judy" ^ wrote: Chris, Regarding the Land Disturbance permit, it should be stamped in at the clerk's office. You should also send us the electronic files. | think Curt [s going to want to handle it administratively, so there should not bea mailing toabutters. |f you have any questions, give Curt or Jean acall. Judy Judith K8,Tyrnon Town Planner Town of North Andover 12O Main Street North Andover,wA0z845 Phone 978.688.9535 Fax 978.688.9542 Email Web ^|mageOOzipA» Please note the MaSSaChUSettS Secretary of State's office has determined that most emails to and from nILinicipal offices and officials are Please consider the environment before printing this email. 2 Enright, From: Chris Huntress <chrb@huntreooassodatesoom> Sent: Friday, April 1O, 2014II:O2Ak4 To: Enright,Jean Cc: Tvnnmn, Judy; 8e||avaoco, Curt Subject: Re: Land Disturbance Permit Hi Jean, | am away until the 27th. Please time stamp itat your convenience. Chris Sent from noy |Phone OD Apr 1Q, 2O14, at10:34 AM, "EU[ight Jean" « friorthanclover.corp wrote: Hi Chris, | have let your submittal Vnmnydesk. |will be out of the office until next Friday. | will time stamp then) for next Friday K you would like. |f You want todVit before then you can pick Lhernup. | have added a third set to what You left. One application and plan set should be left atthe Clerk's office and the other two returned to Planning (all three need the time stamp on the application page), Would you please send an electronic copy tonne when you have time. Thank you. Jean From: Chris Huntress Sent: Thursday, April 17, 2014 12:02 PM To: TvmoOn, Judy Cc: Enright, Jean; Be||axanca, Curt Subject: Re: Land Disturbance Permit Judy, will do. Do you need meio come back and being itto the clerks office? Chris Sent from my |Phnne (}n Apr 17, 2O14, at11:Z6 AM, '/Tyrnon,Judy" < wrote: Chris, Regarding the Land Disturbance permit, it should be stamped in at the clerk's office. You should also send us the electronic files. |think Curt is going tn want to handle it administratively,sn there should not hea mailing toabutters. |f you have any questions, give Curt or Jean acall. Judy Judith K0.Tynmon Town Planner Town nf North Andover 1 120 Main Street North Andover,MA 01845 Phone 978.688.9535 Fax 978.688.9542 Email 'ty Mgnfr ova nofncsr andover, Web vwwvwv.TownofNorthAndover.com <image001.Jpg> Please note the Massachusetts Secretary of States office has determined that most emails to and from nnrn cipyal offices and officials are public records.For more information please refer to:http:/wwwv.stirstateTn .reslpretpr.J,ftxw wijp)2. Please consider the environment before painting this email. 2 Enright, Jean From: Bellavance, Curt Sent: Wednesday,June 11, 2014 11:43 AM To: Enright,Jean Subject: RE: Environmental Monitor- Brooks As discussed this proposal works for me From: Enright, Jean Sent: Wednesday, June 11, 2014. 8:13 AM To: Bellavance, Curt Subject: FW: Environmental Monitor - Brooks Curt, I am fine with substituting this monitoring for the construction monitor condition if you are. Jean From: Chris Huntress [r IgI t ter_cNiu"ss@il:hires ��_ssoc�ate conil] Sent: Tuesday, June 10, 2014 2:56 PM To: Enright, Jean; Bellavance, Curt Cc: 'Brian Palm'; Dean Ellerton Subject: Environmental Monitor- Brooks Jean, as we discussed, I would like to propose that we include Curt on our weekly Construction Update and Project Notes with site photographs in leiu of the required environmental monitor.This will provide a more detailed review of construction, more frequent updates and less cost to the client. I have attached a sample set of project notes from our work at Central Catholic in Lawrence.This could be a condition of approval in place of the environmental monitor. I would be happy to create a standing paragraph providing a status of the erosion and sediment control on site. Please let me know if this is acceptable....thanks! Chris Christian C. Huntress, RLA President HUNTRESS Spvrts 17 Tewksbury Street Andover, MA 01810 c: 978.758.6290 p. 978.470,8882 f. 978.4708890 www,l,iu ilressassociate corm) . Please mote the MassaChUsehs secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more information{Tease refer to:B d J6ro°v W �a,,_taste' o m��fa 1paeemm mm,o .VaRrt ,. 1 Please consider the environment before printing this email. 2 , Enrii2ht, Jean From: ChhsHuntress <chrb@burtressassoriaYeszomo> Sent: Tuesday,June 1l20l42:56PM To; Enright, Jean; BeUavance, Curt Cc 'Brian Po|nn'; Dean EUerton Subject: Environmental Monitor Brooks Attachments: HAJ-[[HS'Project Notesv.5.pd( Jean, as we discussed, I would like to propose that we include Curt on our weekly Construction Update and Project Notes with site photographs in leiu of the required environmental monitor.This will provide a more detailed review of construction, more frequent updates and less cost to the client. | have attached asample set of project notes from our work at Central Catholic in Lawrence.This could be a condition of approval in place of the environmental monitor. I would be happy to create a standing paragraph providing a status of the erosion and sediment control on site. Please let nne know if this is acceptable....thanks! Chris Christian [|. Huntress, R[A President HUNTRESS -5Port5 17 Tewksbury Street Andover, MAO1O1O C:978.758.6790 p. 87847O.8882 f. g7A.470AA90 Please note the Massactiusetts Secretary of State's office has determined that most ernails to arld ff-0111 Municipal offices and officials are public records, Fof rnore information p|ooxo refer to: LINT[tF- S AssocIATES Project Notes 978.470,8982 To: Br. Richard Caney Prepared Chris Huntress Central Catholic High School by: Huntress Associates, Inc. Project: CCHS—Turf Field Date: May 29, 2014 Cc: Steve Welsh, Director of Facilities. Issue No. 5 David Mermelstein, Trident Ernie DiFiore, Athletic Director Joe Maiato, Green Acres The following are notes from the May 22, 2014 construction meeting with HAI, CCHS and Trident Project Advisors. Attendees: Not Present: Dave Mermelstein,Trident Project Advisors Br. Richard Carey, CCHS Steve Welsh, CCHS Ernie DiFiore,CCHS(Joined ill process) Chris Huntress, HAI Joe Maiato,Green Acres Gino Baroni,Trident Adrian Fluery,Trident 1. CH reviewed meeting notes and outstanding issues from May 22`t'project meeting. 2. GALC provided a price of $3,047.00 to enlarge and modify the dumpster pad and fence enclosure as detailed by HAI. Trident to prepare a CO, DMM requested that GALC provide a breakdown of the labor and materials for the new dumpster enclosure. 3. Trident is coordinating a contract with Rumpf for the building construction, DMM requested a construction schedule and schedule of values from Rumpf. Target date for start of building construction is 6.10.14. GALC is to excavate for the foundation in advance of 6.10.14. HAI to provide a pdf copy of the site plan and architectural plans to GALC to their use and records. Gino Baroni to coordinate with City of Lawrence Inspectional Services for Building Permit and bathroom fixture count issues. Central Catholic High School Project Notes v.5 May 29,2014 Page 2 of 4 4. HAI to review the status of other items needing a foundation and/or building permit, including the retaining walls, grandstand, scoreboard and sports lighting. GALC required to provided stamped structural submittal drawings on all of the above. 5. HAI review the product submittal for the retaining walls. The product submitted was Roman Wall as manufactured by UniLock. CCHS selected the "Granite" color for the project, Trident questioned why an equal product was submitted, GALC to respond. Stamped drawings are typically provided by the manufacturer after the approval of the wall product. 6. HAI reviewed the final synthetic turf layout and approval drawings. Greenfields added the light blue MLax lines to extend all the way across the field on the inside of the 30 yard line. The final drawings reflect this change.No further review required. 7. HAI review the access from Hampshire Street to provide a pedestrian pathway to the field. Due to the anticipated cost of construction of the new walk and stairs CCHS requested that HAI stop any further design and engineering related to this access. CH offered that as we move forward we will insure that the new improvements do not prohibit future installation of stairs,walks and ramps in this location if so desired by CCHS. 8. Construction Update-Progress since last meeting: a. Topsoil removal is complete. b. Debris, brick and coble is noticeable throughout limit of excavation,as anticipated. c. The chamber/void identified by the geophysical survey has been excavated and opened. Several chambers and/ cisterns were found throughout the southeast section of the site. Large granite block has been pulled from the excavation and stockpiled on site. Trident engaged UTS to review the existing condition and make a recommendation. DMM reported that UTS recommended GSI, who performed the original geotechnical investigation, be retained to review and provide recommendations to re-compact and stabilize the subgrade. HAI to contact GSI and schedule a site inspection. d. Block/foundation stone to be reused is being stockpiled by GALL. HAI to coordinate with GALC to find a suitable method for reuse of the block/granite in the landscape areas adjacent to, or within,the project site. Outstanding Items from 5.15.14 9. CH presented the audio system components, layout and materials cost. Components provided by Pro Acoustics at a total cost of$10,817.21. CH stated that to the best of our knowledge this system includes all items required for a working sound and PA system. GALC to provide a cost for installation as outlined on sk-5 dated 5.19.14 and prepared by HAI. CCHS directed HAI to have Pro Acoustics revise the proposal to be addressed to Steve Welsh. CCHS to purchase the audio equipment direct from Pro Acoustics. t Central Catholic High School Project Notes v.5 May 29,2014 Page 3 of 4 Update: SW is in direct contact r►,ith Pro Acoustics. GALL to provide a price to install the audio system, conduits and connections, Cis outlined and discussed. 10. Water & Sewer Connection: CH and DMM requested authorization to have HAI provide utility design for the water and sewer connection for the new building. CH estimated approximately 2 days of time for the design and specification of the utilities. CCHS/Trident directed CH to proceed at Time & materials. CH to have Barbara Thissell P.E. (Civil Engineer) contact SW to review the existing water service locations to determine the most appropriate location to connect to the proposed building. Update: CH to send email with outline of time & materials estimate to DAIt1I BJT to meet with SW on site to review possible connections. Outstanding Items from 5.15.14 1. SW requested that the irrigation cabinet included in the specifications and submittals be eliminated and that the control be placed within the CCHS building. SW to coordinate with JM for the exact location. GALC to provide a deduct CO to CCHS for removal of the stainless steel control cabinet, JM & SW to review the location of the proposed control immediately after our meeting. 2. The existing sports light poles and fixtures are to be removed by GALC and loaded for transport by others. GALC to provide one week advance notice to CCHS to assist in scheduling the transport. Outstanding Items from 5.8.14 1. National Grid Power Line Relocation: a. RC/DMM reported that the Lawrence City Council is reviewing the application for hvo new utility poles in Auburn Street. Both applications are scheduled for final review on 5.20.14. Trident to update the project team on progress. b. DMM has requested NGrid provide a construction schedule for pole and utility line installation. No schedule is yet available. HAI expressed concern that a delay in NGrid's power line relocation could result in a delay to the turf field construction project. Trident to discuss this issue with the Mayor's office to see if assistance could be provided by the City of Lawrence to influence the utility line construction schedule. DMM to coordinate with Gino Baroni and report back to the group. c. Update: DMM stated that NGrid has confirmed that the project is in "Scheduling". DMM to coordinate and contact NGrid, with the assistance of GALC. DMM stated that NGrid construction could occur until after the Lawrence City Council approves the two new utility poles. Central Catholic High School Project Notes v.5 May 29,20t4 Page 4 of 4 d. Update; DMM and SW confirmed that the City of Lawrence approved the NGrid request to install two (2) new utility poles on Auburn Street. SW confirmed that CCHS has sent a check to NGrid to cover the utility back-charges. 3M reviewed location and detail of electric trench and requested two days notice for excavation of the trench to allow NGrid to reconnect main power line, DMM to continue to coordinate with NGrid and provide contact information for the NGrid Trench Inspector to GALL. e. Update: DMM reported an issue has been identified with NGrid Easement Department. Trident to ret>iew the concerns of NGrid and report back regarding next steps. Outstanding Items from 5.1.14 1. ED questioned the location of the scoreboard and would like to explore moving it back to the corner of Auburn and Hampshire Street. HAI to review and provide a sketch. a. 5.8.14 Update: CH reviewed alternative locations of the proposed scoreboard with Trident and CCHS. CCHS agreed that alternative Location `C' is preferred. HAI to revise plans and coordinate with RDK and GALL. CH to report if any additional information is needed. b. Update: CII to review detail for Scoreboard fooling to determine f 1t can be coordinated with turf anchor edge in scrrne location. CH to reevieei,depth a reinforced grid for retaining wall along Hampshire Street card provide original plans to GALC ,for their records. This represents our understanding of the progress to date. Please notify our office immediately of any discrepancies or additional information regarding the above. Thank you for your time and consideration with regard to this matter. .. .. Cent4 CathoHic 1-iilgh Schoof ILaw'&ioe, Maiisachusett.s 6 T:M i Photo,t-Granite Block Excavation Photo 2- Granite Block Excavation °' �/✓Y r � '�'�� ri� l�f u.7o/ N/ r i� r ll)h)9W,G�j JAs�NY�Il fJ�i � f d a � v � r v� 1 ni mw y�v Photo 3-Granite Block Excavation Photo 4-Granite Block Excavation a% IT u w y � d r w i Y Photo,5- nbgrade Conditions Photo 6-Stockpiled Block HUNTRESS ASSOC TES,lNC. 17 fiewli.5Ibu.ury Street Aridover, aSiSac:hfSe.ts ° -470- 8 Cer tu,,V CathooV c Ffig@i Schooa -Lwavirence,t'assadlus^ett;s F �t Photo 7-Stockpiled Block Photo 8- Existing Transformer HUNTRESS ASSOCATES, INC,I 17 Te,, r esb ry Street MrJover,M SSaJIUSeUS 75-470_8,882 5.:29.1 '140 0TEO r n $RC H 5���9 CONSERVATION DEPARTMENT Cotntltunity Developmettf Divisiolt MEMORANDUM DATE: August 19, 2009 TO: Jude Tvmon, Toxvil Planner FROM: Jennifer Hughes, Conservation Administrator SUBJECT: brooks School -- Conservation Commission jurisdiction related to Athletic Field At the request of the'l'olvil of North Andover Planning Board, I have reviewed the plan titled Watershed Special Permit Drawings for Soccer Field Renovations (Brooks School), dated June 5, 2009 and revised July 24, 2009 and conducted site investigations at the Brook School athletic fields. The project as proposed is not jurisdictional to the North Andover Conservation Commission (NACC). Wetland resource areas are greater than 100 feet frOn"I aI1V proposed work on the site. IIl additloil, drainage work preViouSINT ConduCted oil the fields also discharges Vlore. thaI1 100 feet from existing wetland resource areas. This work would not have required a filing with the NACC Under the Massachusetts Wetland Protection Act or Town of North Andover Wetlaiui Bylaw. 1600 Osgood Sheet,NoiIli Amlover,Mossocliuseits 01845 Phone 978.688.9530 fox 978.688.9542 'Wei) www.tovnofnorthnnElover.coni RL F, y, Spring,, 2014HUNTRESS ��vrts kurf i A01 LUCUSO AndoverWorld-United States-MA-Essex Co--North ON Pictometry Online Page 1 of 1 s: W� k }r ua' Brooks Print Date: 04/14/2014 Image Date:0410112012 LeveLCommunity http://pol.pictometiy.com/en-us/app/print.php?title=Brooks&date_fmt=m/d/Y&year=2012.,. 4/14/2014 Pictometry Online Page 1 of 1 r � m r J�It �dP� Brooks Print Date: 04/14/2014 Image Date:04/01/2012 Level:Community i i i littp://pol.pictometry.coiiif en-us/app/print.php?title=Brooks&date_fmt=m/d/Y&year=2012... 4/14/2014