Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Brooks SWPP
Enright, Jean From: Bellavance, Curt Sent: Tuesday,June 03, 2014 8:39 AM To: Enright, lean Subject: FW: Brooks School - NPDES/SWPPP, Attachments: BROOKS-swppp 60214.pdf FY12— From: Chris Huntress [ fi xo £Wn re _ate o , ales o;F] Sent: Monday, June 02, 2014 8:15 PM To: Bellavance, Curt; Lisa Eggleston Cc: Barbara J Thissell; Dean Ellerton Subject: Brooks School - NPDES/ SWPPP Curt& Lisa,attached is a pdf copy of the SWPPP, This was filed with EPA through the NPDES application. A copy will be retained on site throughout construction. Please let rye now if you have any questions. Chris From: Chris Huntress [r aii c.chris@�',un essay ociates.cc ] Sent: Monday,June 2, 2014 8:09 PM To: 'Bellavance, Curt; Lisa Eggleston ( s-2;a r s p ,r n;r taLCOM) _..— _ Cc: Barbara J Thissell (r:,ICadar`nd =r� i 'ssell co ); Dean Ellerton (f _ t m broc,,ksschool o, ) Subject: Brooks School - Peer review Comments Curt & Lisa, attached is a letter and plans providing revisions and additional information requested in your last letter dated May 4, 2014. 1 will print and send hard copies to Lisa for her review. Let me know if the Town would like the same printed copies for their files. I will send a PDF copy of the SWPPP in a separate email to follow. Thanks, and please let me know if you have any further questions. Chris Christian C. Huntress, RLA President HUNTRESS �arts 17 Tewksbury Street Andover, MA 01810 c: 978.758.6290 p. 978.470.8882 f. 978.4708890 e to'`Ai1 .`q.iin_3 s 3 VL+`=.+'.t le°.7.cu[1d 1 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more information please refer to p/`x: r_sec state a use ei taint. Please consider the environment before printing this email. 2 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL - NORTH AND OVER, MA Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Brooks -coo 1160 Great Pond Road North Andover, MA 01845 . ,6 214 SWPPP Prepared For: Green Agree Landscape & Construction Joseph Barbosa 21 Malbone Street Lakeville, MA 02347 . 3.66 - Phone 0 . 3. 2 - Fax SWPPP Prepared By: Huntress Associates, lno.. Gratin C. Huntress 17 Tewksbury' Street Andover, MA 01810 . . 8882 chris@huntressassociates.com SWPPP Preparation Date: May 2014 Estimated Project Dates: Project Start Date: 00/02 2014 Project Completion Date: 00!2 i 2014 EPA SWPPP Template, Version 1.0 i Stonnvvofer Pollution Prevention Plan (SVVPPP) BROOKS SCHOO&-NORTWANDOVER, MA Contents SECTION l: CONTACT INFORMATION/RESPONSIBLE PARTIES...................................................................l l] 0penztor(s) /Subconfroctor(s)...................................................................................................... l 12 SfonnvvoterTeorn............ ................................................................................................................ l SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING..................................................................2 2] Project/Site Information..................................................................................................................2 2.2 Discharge Information.....................................................................................................................3 2.3 Nature of the Construction Activity..............................................................................................5 2.4 Sequence and Estimated Dates nf Construction Activities......................................................5 2.5 Allowable Non-3|ormvvo|ev Discharges ....................................................................................... 6 2.6 Site Maps........................................................................................................................................... 6 SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS........................7 3] Endangered Species Protection ................................................................................................... 7 3.2 Historic Preservation.........................................................................................................................8 3.3 Safe Drinking Water Act Underground Injection Control Requirements............................... lO SECTION 4: EROSION AND SEDIMENT CONTROLS....................................................................................ll 4] Natural Buffers cv Equivalent Sediment Controls...................................................................... ll 4.2 Perimeter Controls......................................................................................................................... l2 4.3 Sediment Tnzck-Out....................................................................................................................... l3 4.4 Stockpiled Sediment cv Soil.......................................................................................................... l3 4] Minimize Dust.................................................................................................................................. l4 4.6 Minimize the Disturbance of Steep Slopes................................................................................. l4 47 Topsoil .............................................................................................................................................. l5 4.8 SoUConopoction -----------------------------------------. lJ 49 Storm Drain Inlets............................................................................................................................ l6 4]0 Constructed 5|onnvvo1er Conveyance Channels.................................................................... l6 4] 1 Sediment Basins.............................................................................................................................. l7 4]2 Devvohering Practices...................................................................... ............................................. l7 4]3 Site Stabilization.............................................................................................................................. l7 SECTION 5: POLLUTION PREVENTION STANDARDS...................................................................................l9 5] Potential Sources of Pollution....................................................................................................... l9 5.2 Spill Prevention and Response..................................................................................................... l9 5.3 Fueling and Maintenance of Equipment or Vehicles..............................................................2U 5.4 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes...........20 5.5 Washing of Applicators and Containers used for Paint Concrete or Other Materials......22 SECTION 6: INSPECTION AND CORRECTIVE ACTION...............................................................................23 6] Inspection Personnel and Procedures........................................................................................23 62 Corrective Action ..........................................................................................................................23 6.2 Delegation of Authority ................................................................................................................23 SECTION 7: TRAINING................................................................................................................................24 SECTION 8: CERTIFICATION AND NOTIFICATION.....................................................................................26 SVVPPP APPENDICES...................................................................................................................................26 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL--NORTH N VF . MA SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES 1.1 Operator(s) /Subcontractor(s) Operator(s): d Green Acres Landscape tern nstruiction, Joseph ph Baroosa 21 Malt to e Street Lakeville, MA 02347 508,823.6699 Brooks School Dean EIlerton. Director of Operafions 1160 Great Pond Roam North Andover, MA 0184 978,725-6 j4 Subcontractor(s): Sprint Tun Aggregate Industries, Inc Suite 11--B 1 01 Turnoike Street. South Coast ARernafi e Power Scoreboard enterprises 244 Keene Rosa 274 Fruit Street Ac shne€ MA 02743 Mansfietri, MA 02048 Bee y....ineemu 3 b,Poet ster Street Natick A 01760 Emergency 24-Hour Contact: Greed Acres Landscape Construction Joseph Mauto 7 74.980.8091 cell;t 1.2 Stormwater Team SWPPP Developer Stormwater Designer Huntress Associates. nc- Barbara J. Thi self P. , Inc. hrisfion C. Huntress ILIA Barl�o-s tt ThisseP r.- 978.470 8882 781.001.8008 chris@IlLfiitressassociates.com Q±3jt CC�iba bara,thissell. r'a=m EPA SWPPP Template, Version 1.0 1 Shonnvvoter Pollution Prevention Plan (SWFPP) BROOKS SCHOOL- NORTH ANDOVER, MA SECTION 2: SITE EVALUATION,ASSESSMENT,AND PLANNING 2.7 Pro/eotlSite /nformohon Project Name and Address Project/Si1eName: BROOKS SCHOOL Project Street/Locotion: 1160Great Pond Road City: North Andover State: Massachusetts ZIP Code: O1@4S County or Similar Subdivision: Northern Essex ProjecfLotUude/iong|tude (Us* one of three possible formats, and specify method) Latitude: Longitude: l. 42"42 ' 38" N (degrees, minutes, seconds) l. 71 " 5 '24^VV(degrees' minutes, seconds) Method for determining |uhtude/|nngitude: F-1 USGS topographic mop (specify scale: EPA Web site GPS [� �� 0ther (p|eosespodfy): Gooqke Earth Horizontal Reference Datum: F-1NAD27 [] NAD83orYYCS84 Unknown |f you used uU.C.GI topographic map,what was the scale? Additional Project Information Is the project/site located on Indian country lands, or located on o property ofreligious or cultural significance toon Indian tribe? || Yes ZNo If yes, provide the name of the Indian tribe associated with the area of Indian country (including the name of Indian reservation if applicable), orif not in Indian country, provide the name of the Indian tribe associated with the property: n/o If you are conducting earfh-disturbing activities in response to a public emergency, document the cause of the public emergency (e.g., natural disaster, extreme flooding conditions), information substantiating its occurrence (e.g., state disaster declaration), and a description of the construction necessary to reestablish effective public services: n/0 Are you applying for permit coverage as a "federal operator" as defined in Appendix A of the 2012 CGP? Fl Yes M No EPA 3YVPPPTemplate, Version 1.0 2 Stormwafer Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVER, MA 2.2 Discharge Information Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? ❑ Yes ❑ No Are there any surface waters that are located within 50 feet of your construction disturbances? ❑ Yes ® No EPA SWPPP Template, Version 1.0 3 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL— NORTH ANDOVER, MA Table 1 —Names of Receiving Waters Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 (note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters) 1. Brooks chool Irrigation Pond 2. 3. 4. 5. 6. [Include additional rows as necessary.] Table 2—Impaired Waters /TMDLS Answer the following for each surface water listed in Table 1 above) If you answered yes,then answer the following: Is this surface Has a TMDL water listed as What pollutant(s) are causing been Pollutant(s) for which "impaired"? the impairment? completed? Title of the TMDL document there is a TMDL 1. ❑YES ® NO ❑YES ® NO Nutrients: Pho horn 2. ❑YES ❑ NO ❑YES ❑ NO 3. ❑YES ❑ NO ❑YES ❑ NO 4. ❑YES ❑ NO ❑YES ❑ NO 5. ❑YES ❑ NO ❑YES [:]-NO 6. ❑YES ❑ NO ❑YES ❑ NO Describe the methods) you used to determine whether or not your project/site discharges to an impaired water: Review of EPA Water Quality Assessment and MassDEP web sites. Table 3—Tier 2, 2.5, or 3 Waters Answer the following for each surface water listed in Table 1 above) Is this surface water designated If you answered yes,specify which as a Tier 2,Tier 2.5, or Tier 3 Tier (2,2.5, or 3) the surface water is water? designated as? (see Appendix F) 1. ❑YES ® NO 2. ❑YES ❑ NO 3. ❑YES ❑ NO 4. ❑YES ❑ NO 5. ❑YES ❑ NO 6. ❑YES ❑ NO EPA SWPPP Template, Version 1.0 5 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVER. ESA. 2.3 Nature of the Construction Activity Instructions(see CGP Parts 1.3.c and 7.2.2): - Provide a general description of the nature of the construction activities at your project. - Describe the size of the property (in acres) and the total area expected to be disturbed by the construction activities (in acres), construction support activities covered by this permit (see Part 1.3.c of the permit), and the maximum area expected to be disturbed at any one time. General Description of Project Provide a general description of the construction project: T-he Brooks School Athletic Field construction prole^;, included the conversion of a natural grass athletic field to synthetic turf. The scope of work also includes electrical upgrades to existing sportslighting, net; walkways. storage b0ding and vielwing areas. Size of Construction Project What is the size of the property (in acres), the total area expected to be disturbed by the construction activities (in acres), and the maximum area expected to be disturbed at any one time? The overau campus is approximately 23 acres In size The athletic field construction will impact approximately 2.0 acre' t-t Nlo' fore than 2.0 acres (-hf_!wM be disturbed at one tir'ne [Repeat as necessary for individual project phases.] Construction Support Activities (only provide if applicable) Describe any construction support activities for the project (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) Erosion ContrcL Gvou,n sc._,es a r c. •b f _ 3 t rez e 2.e s �s D o;� f°,� �f. �l ra : . MA 0209 f !'fEl ;t?at-,riaE ggru,ga;e:rE€s. slrc,e`—1101 Turnpike Street f'tou:�!€.?:ot1, tv t A;020t2 .Fon r to Aagreaate 9n`.d'Jstnes -- 1101 Tue C[1`ike Sbreet Stoug C", , MA € 2072 >oncre'e x Asp a," Aggregate ind_ — €01 1 urnpike Street Stoughton, MA 02072 2.4 Sequence and Estimated Dates of Construction Activities GYENE iw DIESCMPTlON OF PHASE ■ xci,& Erosion Control installation 6,10912014 Site Sub-con'tractor Mobilization 6109/20-14 ■ Site. Dernoktion /09/20 t'.:e. ® storm Drainage 7f2t201 ° 1 0 x;v G^ m pletlon 0F12 1`2:14 EPA SWPPP Template, Version 1.0 5 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER, MA 2.5 Allowable Non-Stormwater Discharges List of Allowable Non-Stormwater Discharges Present at the Site Type of Allowable Non-Stormwater Discharge Likely to be Present at Your Site? Discharges from emergency fire-fighting activities ❑YES ® NO Fire hydrant flushin s ❑YES ® NO Landscape irrigation ® YES ❑ NO Waters used to wash vehicles and equipment ❑YES ® NO Water used to control dust ®YES ❑ NO Potable water includinguncontaminated water line flushin s ❑YES ® NO EI Routine external building wash down ❑YES ® NO Pavement wash waters ❑ YES ® NO Uncontaminated air conditioning or compressor condensate ❑YES ® NO Uncontaminated, non-turbid discharges of ground water or spring water ❑ YES ® NO Foundation or footing drains ❑YES ® NO Construction dewatering water ❑YES ® NO 2.6 Site Maps See Appendix,A for the Site Maps, Site Mans are Included by reference into the SIAIPPP. x-1 Existing Conditions Plan SP-1 Site preparation P ia,n L_1 Layout& Materials Plan I_-2 Grading & Drainage Plan i__g Preliminary Irrigation Plan L-4 Planting Plan & Details L-5 Site Enlargement Plan & Details i 0 Preliminary Storage Building Details L-7 Adhletic Field Construction Details L-8 Athletic Field Construction Details E0.0 Electrical Legend &Schedule F0,1 Electrical Specifications E1,0 Electrical Site Plan E2.0 Electrical Detail EPA SWPPP Template, Version 1.0 6 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL OOLL-NORTH TH ANDOVER, MA SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS 3.1 Endangered Species Protection Eligibility Criterion Under which criterion listed in Appendix D are you eligible for coverage under this permit? ® A ❑ B El ❑ D ❑ E For reference purposes, the eligibility criteria listed in Appendix D are as follows: Criterion A. No federally-listed threatened or endangered species or their designated critical habitats) are likely to occur in your site's "action area" as defined in Appendix A of this permit. Criterion B. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally- listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion,there must be no lapse of NPDES permit coverage in the other operator's certification. By certifying eligibility under this Criterion,you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C,you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NOI form. Criterion C. Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any Stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification,you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with your NOI. Criterion D. Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally- designated critical habitat,and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion E. Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either: EPA SWPPP Template, Version 1.0 7 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER,ETA i. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat;or ii, written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion F. Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally-listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NO]. Supporting Documentation Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows: For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's action area (as defined in Appendix A of the permit). Check the applicable source of information you relied upon: ❑ Specific communication with staff of the U.S. Fish &Wildlife Service or National Marine Fisheries Service. ❑ Publicly available species list. ® Other source: Estimated Habitats of Fare Wetlands, Wildlife and Certified Vernal Foots- Massachusetts Natural Heritage Wiidlife A-tl s. (Oliver G=S data) For criterion B, provide the Tracking Number from the other operator's notification of permit authorization: Provide a brief summary of the basis used by the other operator for selecting criterion A, B, C, D, E, or F: For criterion C, provide the following information: Also, provide a brief summary of the basis used for determining that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat: For criterion D, E, or F, attach copies of any letters or other communication between you and the U.S. Fish & Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities. 3.2 Historic Preservation Appendix E, Step 1 Do you plan on installing any of the following stormwater controls at your site? Check all that EPA SWPPP Template, Version 1.0 8 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH DO E , MA apply below, and proceed to Appendix E, Step 2. ❑ Dike ❑ Berm ® Catch Basin ❑ Pond ® Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, Swale, etc.) ® Culvert ® Other type of ground-disturbing stormwater control: Ubs� ice drainage belov,,field. (Note: If you will not be installing any ground-disturbing stormwater controls, no further documentation is required for Section 3.2 of the Template.) Appendix E, Step 2 If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? ® YES ❑ NO ® If yes, no further documentation is required for Section 3.2 of the Template. ® If no, proceed to Appendix E,Step 3. Appendix E, Step 3 If you answered no in Step 2, have you determined that your installation of subsurface earth- disturbing stormwater controls will have no effect on historic properties? ❑ YES ❑ NO If yes, provide documentation of the basis for your determination. If no, proceed to Appendix E,Step 4. Appendix E, Step 4 If you answered no in Step 3, did the State Historic Preservation Officer (SHPO),Tribal Historic Preservation Office (THPO), or other tribal representative (whichever applies) respond to you within 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? ❑YES ❑ NO If no, no further documentation is required for Section 3.2 of the Template. If yes, describe the nature of their response: ❑ Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. ❑ No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. ❑ Other: EPA SWPPP Template, Version 1.0 9 Srormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH AND V R, M 3.3 Safe Drinking Water Act Underground Injection Control Requirements Do you plan to install any of the following controls? Check all that apply below. ❑ Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) ❑ Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow ❑ Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) EPA SWPPP Template, Version 1.0 10 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL.- NORTH A DOVE , MA MM SECTION 4: EROSION AND SEDIMENT CONTROLS 4.1 Natural Buffers or Equivalent Sediment Controls Buffer Compliance Alternatives Are there any surface waters within 50 feet of your project's earth disturbances? ❑ YES ® NO (Note- if no, no further docu 'entation is required for the SWPPP Template Check the compliance alternative that you have chosen: ❑ I will provide and maintain a 50-foot undisturbed natural buffer. (l141ote (I)- You rust show the 50-toot boundary line of the n-atu€o buffer on your site mop,) (Note (2): You must sh'avv on your site map how o€i discharges from your coniistnucfi disturbances through the natural butter area will first be treated by the site's e.osron an,d sediment controls. Aiso, show on the site reap arry velocrf dissipation, devices ,used to pre',ient erosions ,vil in the natural buffer area.) ❑ I will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls,which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. (Note 11): You roust st'Qow the boundary line of the natural butter on your site map. (Note- (22n. You roust show,on your site reap how ofi discharges front YOUr Coristnuction disturbo ices through the natural buffer area will first be freatea by the site's erosion and se iimtent controls. Also, shove or-N the site reap any velocity dissipation devices used to prevent erosion within the natural buffer area.) ❑ It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore I will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. ❑ I qualify for one of the exceptions in Part 2.1.2.1.e. (If you have checked this box, provide information on the applicable buffer exception that applies, below.) Buffer Exceptions Which of the following exceptions to the buffer requirements applies to your site? ❑ There is no discharge of stormwater to the surface water that is located 50 feet from my construction disturbances. [mote: if this exception applies: no further documentation is rea ss e ', Nor Section 4A of the mpl' te..) ❑ No natural buffer exists due to preexisting development disturbances that occurred prior to the initiation of planning for this project. ''€Note (1): If this exception app€:es, no further documentation ion required for Section 4.1 of the Template-) [Nate, (2): there "on e natural buffer exssfs but p ''ions of the area "v-4-h,n€ 5 €eef of the su-rTQCe water are occupied by preexisting development distUrb noes, you ust sttl comply vvith the one of the -GP Part 1121.a complionce olternat€gyres.) EPA SWPPP Template, Version 1.0 11 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER, MA F] For a "linear project" (defined in Appendix A), site constraints (e.g., limited right-of-way) make it infeasible for me to meet any of the CGP Part 2.1.2.1.a compliance alternatives. ❑ The project qualifies as "small residential lot" construction (defined in Part 2.1.2.1.e.iv and in Appendix A). For Alternative I (see Appendix G, Part G.2.3.2.a): For Alternative 2 (see Appendix G, Part G.2.3.2.b): ❑ Buffer disturbances are authorized under a CWA Section 404 permit. (Nole, (I): If'this ex-ceptior. applies, no further documentation is required for Section 4.1 of fh-e Template-) (Note (2): This exception only applies to the limits of disturbance authorized under the Section 404 Permit, and does not apply to any upland portion of the construction project-) ❑ Buffer disturbances will occur for the construction of a water-dependent structure or water access area (e.g., pier, boat ramp, and trail). (Note (1)- If this-exception applies, no further documentation is required for Section 4-1 Of the Template-) 4.2 Perimeter Controls General ■ Erosion control Farriers will be placed along the do%ilm-gradient po�lbon of the site as indicated on the project plans, Additional erosion control barriers wfl!be placed at the lirnit of worik as needed and in any sensitive areas as work progresses. Specific Perimeter Controls Perimeter Control # I Perimeter Control Description Hay waddles, silt fence and catch basin filters shall be installed along the iowest portions of the site as indicated on the project plans prior to any work commencing on site.Additional waddles and sflt fence shall be installed as needed and as per the written specifications. The on-site stormwater system that is to remain shall remain functional at all times throughout construction- if necessary, the contractor shelf install temp-orary swales andlor berms to prevent stormwater runcrif from flowing toward the roadway dudrig construction. Installation dune 9. 2014 Maintenance Requirements 1- Sedirnent behind the erosion control device shall be checked twice each month and after each hea-vy rain- Slit shail be removed if greater than 6 in. deep, Z or of erosion control device shall be checked bsoce each month or more frequently as required. Damaged andlor, deteriorated ;teens shall be replaced. Erosion control devices shall be maintained in place and in effective condition. 3. Hay bates shall be inspected frequently and maintained or replaced as required to maintain both their effectiveness and -essentially their original condition. Underside of bales shall be kept in close contact with the earth belovi at all times, as required to prevent water from washing beneath bales. 4. Sediment deposits shall be disposed of off-site, in a location and manner which wkI not cause sediment EPA SWPPP Template, Version 1.0 12 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-- t O T 1 ANDOVER, M. n Er`:B�sa.rtce e,searft:i'sre- 4.3 Sediment Track-Out General 4 construction enfr ar ce/exit shalt be instal'€,edd at the entrance to the site from. In addition, c mechanical sweeper and pilot..: truck will be ava la i``to keep,the site dear,and minimize the tracking of material beyond he limit of work. Specific Track-Out Controls Track-Out Control # 1 Track-Out Control Description The construction entranceshall consist of aminimum 0" depth of 2„ stone over a lab irafl filter fabric. Installation Prior to any construction activity, Maintenance Requirements 1, edin a- t behind the erosion control device shah be checked ed twice each onth and after each he2.u'sd -ain :ail'shall be removed if greaterthanEi in. deep. 2 condition of erosion control device, sh2 1 be checked twice each month or more frequently as required, arnaged and/or deteriorated €terns shale be replaced. Erosion control devices shall be maintaSr9e, Cn p'ace and in effective condition , Hay bales shali 'oe inspected frequently anti amps t%a=fled or replaced as required to maintain both their effectiveness and essentiarly their onginai condition..edition... Umbel";pipe of bales sftal's be kept in close contact with the earth below at adl times, as required to prevent water from washing beneath bales. 4. Sediment deposits shall be disposed of i site, in a location and manner xalshich ,Mill not cause sediment nuisance elsewhere, 4.4 Stockpiled Sediment or Soil General See € of, ,below from section 011,568 ERO lONI CONTROL of tri project spedficc`'.tiot`ts. Specific Stockpile Controls 1. Cut and t¢l` stripes and stockpiled materials shalf be protected to proved' erosion Slopes sr"ace to pro acted with permanent erosion prote-ction v;rhen erasion exposure period is expected to be piteater than or eQU31 tO SiX n"fon.ths, and temporary erosion protection when erosbn exposure period is expected to be less than six-months, J_ Per-manent erosion pFtote&t tr€ shal, e acconnpkshed by seeding tr:Y:lth gross and covering with an eiosion protection maltsriaL as apparolrtate for prevailin condif€ons_ 6. Temporary erosion protection shall z e arc co[ra,3dtslted by covering with an, erosion protection materia appropriate for prevailing oxncd,fUorts. Except where specified slope is indicated on Drawings, fill slopes shall be limited to a grade of 3'1 (fao€isantal_ verthcai)cut slopes shall be Ir`n',ited'to a grade o€2:1. Stockpile Control # 1 Stockpiled Sediment/Soil Control Description eedirto and slope stabil zatEt`n as per sec„c4on 01568 EROSION CONTROL of the pCo ect specifications- EPA SWPPP Template, Version 1.0 13 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL—NORTH ANDOVER, MA Installation As needed & on-going. Maintenance Requirements Sediment behind the erosion control device shall be checked twice each month and after each heavy rain_ Siltshall be removed if greater than 6 in. deep. Condition cil erosion control dewce shall be checked Nuice each month or more frequently as required, Damaged and/or deteriorated items shall be replaced. Erosion control devices shall be maintained in place and in effective condition. Hay bales shall be inspected frequently and maintained or replaced as required to maintain both their effectiveness and essentialwy their original condition. Underside of bales shall be kept in close contact with the earth belorvt at all tirnes, as required to prevent water from washing beneath bales. Sediment deposits shall be disposed of off- site, in a location and manner which will not cause sediment nuisarice elsewhere- 4.5 Minimize Dust General Dust control will be rninirnized by mechanically applied dust control rneasures and use of water trucks as appropriate. Specific Dust Controls Dust Control # I Dust Control Description During the construction period, the Contractor shall take special meas. res including, but not limited to, wetting do-unin to control dust on site, in order to prevent annoyanceland or damage to adjacent property, whether public or pnvate. Ca�ciurn chloride or any other chemical material may not be used on subgrades of areas to be seeded or planted. The Contractor shall take all necessary rneasures to keep streets over which equipment and service for project travel, clean and tree from dirt, dust. mud and debris from resulting 1 '0 construction operations. The actions taken shall meet the requirements of all parties having jurisdiction. Installation As needed &on-gc&ig_ Maintenance Requirements As noted above and further outfined in Section 02200 EARTHWORK at the project specifications- 4.6 Minimize the Disturbance of Steep Slopes General Cut and fRI-slopes and stockpiled matenals shall be protected to prevent erosion. Slopes shall be protected with permanent erosion protection when erosion exposure period is expected to be greater than or equal to six months, and temporary erosion protection when erosion exposure period is expected to be less than six Months, Specific Steep Slope Controls EPA SWPPP Template, Version 1.0 14 Stormwater Pollution Prevention Plan (SWPPP) WOKS SCHOOL- NORTH ANDOVE , MA Steep Slope Control # 1 Steep Slope Control Description Perrnans€fit e;.:oav, `2 €otc- flan .`sha'U be accompPshed by seeding with grass and covering '+f th an erosion protection material, as appropriate for-prevaihng conditions T empot any erosoin protection shall be acr ornplisi e d by covering wi`Cta an erosion protection rnat^erial appropriate for prevailing condit6ons. Except where specified slope is indicated on Drawings, j±'sl slopes shall be limited to a grade of 3: (horizontal vertical) cut dopes shall be: filmiteoi to a praoe of :1 Installation As needed &on-going- Maintenance Requirements Refer to Section 0 1568 EROSION r,ONTROL for audit€on%4s information. The project m annual is 4f[dud 3d by reference vi the !1-,f PP- 4.7 Topsoil General Existing topsoil not to be re-used on Site shall e removed by the contractor. Specific Topsoil Controls Topsoil Control # 1 Topsoil Control Description Topsoil stockpiles to be stab9kzed asoutkned in section 4.4, above. Installation As needed & on- in Maintenance Requirements Topsoil sioc p les to be traintasned as outlined in section 4-`', abovee, [Repeat as needed for individual topsoil controls.] 4.8 Soil Compaction General Caution st'ou d be exercised to r?iEnimize or rliri"t€nate travel over areas previously overed with topsorl- T'op .wil € ,ich becomes cons p cti dad � excessive construction activity shafo stripped p d, r € ���nd e to � �,tte z e dv` €r.3 �d and re-spread, o, !oosened as directed by the Landscaper Architect Specific Soil Compaction Controls Soil Compaction Control# 1 Soil Compaction Control Description Immediately after appr vaf of subgrade, including in tail tin of tree draining fill, evenly wear; and lightly compact approved topsoil to finish grades as ind``ated on the Drawings. Do not :spread topsost which is in EPA SWPPP Template, Version 1.0 15 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL—NORTH AND OVER,MA a muddy or frozen condition. Handle no topsoil when dry or above the plastic hmit. Install a minimum of six (F) unches of topsoil to lawn areas unless otherwise indicated on the Drawings. When possible, spreading of topsoil shall be performed from the center of the lawn area to the peril ;ter_ may use alternate spreading pattern as approved in writing by the Landscape Architect. Caution should be exercised to minimize or eliminate travel over areas previously covered with topsoil. Topsoil which becomes compacted due to excessive construction activity shall be stripped and re-spread, or loosened as directed by the Landscape Architect at no additional cost to the Owner. Installation As needed &on-going. Maintenance Requirements As noted above, 4.9 Storm Drain Inlets General New and existing drainage structures shall have catch basin filters (silt sacks) installed to catch sediments and solids prior to their entering the storm drainage system. Specific Storm Drain Inlet Controls Storm Drain Inlet Control # I Storm Drain Inlet Control Description Catch basin filters (silt sacks) shall be placed at all inlets to drainage structures as structures are instafled. Out et protection work shall be constructed before runoff is allowed to enter the drainage system. Construction and location of catch basin filters shall be as indicated on the Drawings. Installation As needed & on-going. Maintenance Requirements Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is corriprorriised, Where there is evidence of sediment accumulation adjacent to the Wet protection rrreaSUre,the:contractor rnust remove the deposited sediment by the end of the sarne worie,day in which it is found or by the end of the foilovjing work day if removal by the same work day is not feasible, 4.10 Constructed Stormwater Conveyance Channels General New HD PE underdrains and piping to be installed as conveyance channels. Specific Conveyance Channel Controls Stormwater Conveyance Channel Control # I Stormwater Conveyance Channel Control Description The stormwater from the turf field shall move vertically through the field cross-section until it is intercepted by the HDPE underdrains below the field. The stons water will move from the underdrains to a collector pipe on each side of the field,through a manhole with-engineered weir, and into the existing drainage system- EPA SWPPP Template, Version 1.0 16 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL - NORTH ANDOVER, M :e storm water must pass through a €ea t r1bovo layer o'differ fabric prfi`~r to entering the existing stor-mviater oU.let system Installation June 2014 Maintenance Requirements o€ 4.11 Sediment Basins General None, 4.12 Dewatering Practices General No dewattiring is anticipated as this project is working above the id,_ntihed Or0U nr water etevations. Should .``et;, at""'",.'€in be required, the contractor is required to folfow the requirements +bet ow as identified Er? Section Specific Dewatering Practices Dewatering Practice # I Dewatering Practice Description °t``.,_.ep excavation continuously free of water from all sources wt OLA extra cost to the Owner.ner. rt?vid r["Mama€n and operate pumps ps and relater e:,uioi`i"lenL including inn standby equOrtrenf of s ffiden' capacity ?o keep excavations free of i i Water at all times and under any and ail contingencies that may arise: until the c s n leticiw of the Conlract. Dispose of Leaner through temporary pipelines or ditches with dis<char e five SUitable outfall points as outlined below. Prevent €ros[on of suri`C ur ding a€easProtect roads aria other:.:r improvements on !he site. Build t or r tt[verts €f required-ire d f `:or'r�p' e='on of de'4,�.ateri t , f._.itov ernporary facilities and rectore n bgrad and darnaced areas. Installation s deeded- &on oinQ, Maintenance Requirements t yiih backwash wflier, -either I auf it away for -_rrcaal Or r'_Urn, is ko the beginning of the trea®ir"sent process: and re i ace and clean the filter media used ir, d eat.ring devices w"+herf the pressure differential egUeIc or exceeds the manufacturer's specifications. 4.13 Site Stabilization Site Stabilization Practice (only use this if you are not located in an arid, semi-arid, or drought-stricken area) EPA SWPPP Template, Version 1.0 17 Storrnwaier Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER, MA Z vegetative ❑ Non-Vegetative ❑ Temporary N Permanent Description of Practice &J a wRI be stain ized with loarn. seed and plantings- Refer to record dTawings for landscape and irrigation plans. Installation 7.1214 Maintenance Requirements As recommended by project Landscape Architect. EPASWPPP Template, Version 1.0 18 Stormwater Pollution Prevention Plan (SWPPP) BROOKS CHOOt s NORTH 1 OV , PAA SECTION 5: POLLUTION PREVENTION STANDARDS 5.1 Potential Sources of Pollution Construction Site Pollutants Pollutants or Pollutant Constituents Location on Site Pollutant-Generating Activity (or reference SWPPP site map (that could be discharged if where this is shown) exposed to stormwater Clearing & Grubbing Sediment Topsoil to be removed from within limit of work. Grading Sediment See Grading Plan, attached. Landscaping Sediment, Nitrogen & Lawn & Plant beds. Phosphorus Hydraulic Fluid & Fuels Mineral Oils Leaking hoses and loose clamps. Glue &Solvents Polymer & epoxies PVC pipe, turf glue Gas & Diesel Fuel Petroleum, Oil & Grease Throughout limit of work. 5.2 Spill Prevention and Response A s it s-evenlion and response tearn will by designated by the site operator or site superintendent- Iri addition, the faik-ki,.rig preictices will be f ilr=ved for spill d Setup; Information: ,-_-PUfi'h:tU ers teC'vo rinne tded methods ods for spill cleanup will be dearly posted, and site pe s y .x,_l w;!Hhe made, aware of the vrojedUreS and Iocatfon of the information and clear-Up, Uppl es. " e nr �f �l and =,;� t h e necessary f r p r t be � � t � f r: me: k� `fir i": �aset[a-� d �,.tipt.,gri. ;.� s to,-�lJi€ cl a.2 ;,� �vt.. ,. "'s �a �l_e a.m times. E`.tC?S`?t ere and pirate tar, ilE indude but not be limited to brooms, shrivels, rags, gloves, goggles, -absorbent rnater€ass(sand, 4%.Ai ust, etc,)and plastic or r ri'..t l trash containers specifically designed for this s_rrsose The materials and equi,pr lent neeceesan for spill`;earnup wfl be dependent upon the nature and q €antfty of the material stored on the;site_ F e once:Art spiky will be c ear'€ed up im"C1c=diat2ely upon discovery. Safety The spit area w€Fr be kept well ventilated, and personnel will wear appropriate;` rob7 cfbfie clothing to prevent irtiuri from contact with hazardous su stances_ Re f.porting Spit s o. toxic or hazardous material(if sr ,,:3"ent o, the site)wW be -eloo to d to the appropriate slate or local gcnvernmernt agency, regardless of size. Record Keeping-The spit'prev,,rition plan wiR be modified to ind ode measures to rat`7reverit this type of still from recurring a ..a-�' improved Cr "i`I pt lr^ description r ¥re o r r sng = `a ., prove, ethod.,for earring Lis a t___LEre tilt s. -< o each sagals„. hat r-a see ` and the cleanup measures used tt.;l be kept with he p an_ �,b eap e .�c f a ��Eai{ttk3, relu �:. ou�urw EPA SWPPP Template, Version 1.0 19 Sforrnwafer Pollution Prevention Plan (SWPPP) BROOKS SCHOOL—NORTH ANDOVER,ETA that is equal to or exceeds a reportable quantity (RQ)as defined under either 40 CFR Part 110- 40 CFR Part 117. or 40 CFR Part 302. sw personnel must notify the National Response Center(NRC)at 1-800- 424-8802 as soon as knowledge of the discharge is obtained. Additionally, releases exceeding an RQ as identified in the Massachusetts Contingency Plan (310 CMR 40,0000) must be reported to tore MA DEP. The local fire department should also be informed- 5.3 Fueling and Maintenance of Equipment or Vehicles General Several types ol vehicles and equipment mil be Used on-site throughout the project, including graders, scrapers, excavators, loaders, trucks and trailers, backhoes, and forklifts, With the exception of refueling, which wifl take place on paved surfaces, all major equipmentArehide maintenance w0l be per off-site. Specific Pollution Prevention Practices Pollution Prevention Practice # I Description If necessary, only minor equipment maintenance will occur on-site,All equipment fluids generated frorn maintenance activities will be disposed of into designated drums stored on spill pallets. Absorbent. spill- cleanup materials and spill kits will be available at the combined staging and materials storage area. Refueling of construction vehicles will occur on paved surfaces only. Installation Drip pans will be placed under ail equipment receiving maintenance. (if necessary,.) Maintenance Requirements Eaupmant will be inspected daily. 5.4 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes 5.4.1 Pesticides, Herbicides, Insecticides, Fertilizers, and Landscape Materials General ■ Pesticides, fertilizers, herbicides and insecticides are not anticipated. If needed they shall only be applied by licensed professionals at rates recommended by the rnanufacturer and required by law. Specific Pollution Prevention Practices Pollution Prevention Practice # I Description Once applied,fertilizer mill be worked into the soil to limit exposure to storm water- The fertilizer wiU be stored in a covered area, and any partiaUy Used bags will be transferred to a sealable bin to avoid spills Installation As needed I&I on-going. 5.4.2 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals General EPA SWPPP Template, Version 1.0 20 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVER, MA Not a pfical le. No Diesel Fuel- o.i. €ydrautic f':..ids or other such products w l be stared n s e Specific Pollution Prevention Practices 5.4.3 Construction and Domestic Waste (NoTe. Examples"s E huhpackaging'rn. ena~ s, scr ` moons€ru ion ma€erir:€s masonry productsl timber, pipe and el. _triccil cuttings, plosticS,styrofoam, concrete, and other frosh or building rnaleo ala. General All waste materials will be col acted and 64cised of into rnetaf trash drEmpster 4. Du€ pste s will have secure watertight Ii . be placed away frarn'.ntor `aJater conveyances and drains, and meet at i liederal, state and municipal regulations Only trash and construction debris from the site will be deposited in the dumpstar. No construction rnatedals wiii be o,.trie on-site, AP personnell will be instructed, dudnQ tailgate training sessions, regarding Uhe-correct disposal of trash and construction debris Notices that state these practices will be posted F> the;o.fic trailar and the indi vi da,`al who r°r'twtt"tages day-today site operations will De responsible for seeing that these , r<ar$ices are toll , ed. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description Site Dui Aster Installation Dtampster will be located with construction, staging area_ Dumpster a,ili be secure and only used by authorized worker's for vvaste generated by this waUhvitpt. Maintenance Requirements Dili npaters` iU be inspected twice a week ek aired €r iti"mute".y afto'srorrn events. The dumlaster will be emptied a r"tin€rrt€M of or'i.--e ca week or eadl cer as required. 5.4.4 Sanitary Waste General Partable sanita€y units nisi,iss'pravi emod for use by all workers s throughout the 'life of the project. licensed s=hnPtar"y waste management .retractor fl. regularly collect all 4canittary waste from the pw'ta`le units Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description Portable toilets` its be se€s :ot au d uni l meeting ;rrcal, State arid l"ederai requirsments. Installation Installation As needed&=on c- n . Maintenance Requirements Waste for the portable aile"s`vzolf be collected=mianimura of three urnes a week The toilets will be inspected weekiy for sign of ieaking, Oilets that"are leaking will be removed from the site and replaced. EPA SWPPP Template, Version 1.0 21 Slormwaler Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER,MA. 5.5 Washing of Applicators and Containers used for Paint, Concrete or Other Materials Concrete irucks w0i wash out or discharge surplus concrete or drum wash water at the site in the staging area Cancrete pours will not be conducted dunna or before an anticipated storm event, ConcTete mixer trucks and chutes wifl be washed in the deaignate,',area or concrete will be roped sposed of off-site- Specific Pollution Prevention Practices Pollution Prevention Practice # I Description The washout area will be constructed before concrete POUrS OCCUr On the site, if required, The washOLIt area will be Imed with a plastic sheet(6 mils thick)free of any holes or tears Signs will be posted marking designa'hed washout areas to enSUre the concrete equipments operators use the proper facility. Installation As needed&on-going Maintenance Requirements The washout area w0l be'Mspected daily to ensure all crjnacrote washing is being discharges to the washout area and no tears or leaks are present, When the Iternporary washout is full or no longer neededfor the project, the hardened concrete be removed and disposed of legaity. 6 b MIL RE NI PZLTEFH`fLE%.E OTF_%711 F FELT ER FA9PFC MOM 1_11111G [USTAI I 5-_70EEN RUEP +�—; 47 OR E,'_XL4L LC05BLY FL,ACM FAEFIC AND1,STRAW HALE 3ARWER CV-F-R S2DAMENTATMA SASN, ST-44CTI��E A10 SE)CURELY (HIGH FL9W> ZW GPV, ,'i ANai3REa 14 PL-4CE %1TH SAGEUSE CC4CREPTE 3ARz;MR FOR, STAKE TO ALLM FASY REMOVAL BASIN' WAU j�UIZILRE 2F *MiCREE 'NASTE LQWY FLCW < 3W ��,U) U,$E -_-T- 'SALE FILTER B,,1RRRFIER FCR E,.4SN WALL 57FRUC'FLAE R EPA SWPPP Template, Version 1.0 22 3tonnwoterPo||u1ion Prevention Plan (SVVPPP) BROOKS SCHOO-L- ����HANDOVER' MA SECTION 6: INSPECTION AND CORRECTIVE ACTION 6.7 Inspection Personnel and Procedures Personnel Responsible for Inspections Joseph K4aiato- Green Acres Landscape & Construction Co.. Inc. Note: All personnel conducting inspecfions must be considered a "qualified person." CGP Part 4.1.1 clarifies that a "qualified person" is a person knowledgeable in the principles and practices of erosion and sediment controls and pollution prevention, who possesses the skills to assess conditions at the construction site that could impact stormwater qualify, and the skills to assess the effectiveness of any stormwotercontrols selected and installed io meet the requirements ofthis permit. Inspection Schedule Specific Inspection Frequency Inspections will be conducted by the responsible personnel at least once every seven days and within 24 hours of a rain event producing at least 0.5 inches sit rainfall or greater within a 6 hOUr period, Inspection Report Forms Copy of inspection report |s included in Appendix D 6.2 Corrective Action Personnel Responsible for Corrective Actions Joseph K8aiato- Green Acres Landscape & Construction Co., Inc. Corrective Action Forms A copy of the corrective action report form is located in appendix E. 6.3 Delegation ofAuthority Duly Authorized Representative(s) or Posit|on(s): Green Acres Landscape & Construction Joseph K4aieto, Project Manager 21 KXe|boneStree1 Lakeville, K8AO2347 GO8823G89B- Phone 5Q882375O3- Fax EPA 3YVPPP Template, Version 1.8 23 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER, MA SECTION 7:TRAINING Table 7-1: Documentation for Completion of Training Name Date Training Completed EPA SWPPP Template, Version 1.0 24 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH N OV I , M SECTION 8: CERTIFICATION AND NOTIFICATION I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Title: Signature: Date: EPA SWPPP Template, Version 1.0 25 Sformwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER,MA SWPPP APPENDICES Attach the following documentation to the SWPPP: Appendix A-Site Maps Appendix B-Copy of 2012 CGP Appendix C-NOI and EPA Authorization Email Appendix D-Inspection Form Appendix E-Corrective Action Form Appendix F-SWPPP Amendment Log Appendix G-Subcontractor Certifications/Agreements Appendix H-Grading and Stabilization Activities Log Appendix I-Training Log Appendix J-Delegation of Authority EPA SWPPP Template, Version 1.0 26 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL.- NORTH AiNDOVE , MA Appendix A-Site Maps EPA SWPPP Template, Version 1.0 C a I UBE' • / 0Me Great pifld Rd' 'i, 4-1 r, r,w,rF�art�,n�LL �e'r1 J •? HUNTRESS :5 Brooks School Landscape Architects & Planners Storm Water Prevention Polution Plan 17 Tewksbury Street-Andover, MA 01810 NPDES/SWPPP May 2014 ! OLIVER:--. MassGIS's Onfine Mapping Toot m t w_t il I j alp ;,. `r !$, }`n Y U "-Tie.La)r- r l rrt, ti N.Stater .. 1J rSLS Z410 1 1) -oaalzl 3nd lrt3 lr a ta,reE L ,tI yQf�ei".aU,xR,Re F_�Usit t! YailLral ReScarce_ j !1 _r�.•ar°rertEi terrlrg( Skr rn2nr5,irk."_„ ,: ;}� =Ird l3h�S:diiira netraE cert l^-ayem: Active D,�Ea L Tem !vh_ttc,alI Jrvie Kall ,_m,._al IN all c r<;CV P SvEat,,naMea iri E�J cia) via EC T Ri,jt-E ,. .taES3&j tts ,1P'tE =�.�v5llrtatatlHatltacz vRa 4ll,tlllPe'.__. FLaif.t,.aC,.aG.tl"F.3e .._r18E �! � 7, t=Yzjar'ilz arT souks ! �� t �a ���� Inter ryt��-{i�ttsta e Ft f, =C,, tI'HEP Ldm=_�-ad Habit=is of R..e wlildFe t3 is !yJ �a SZnS ,e ar NHES:P Prior,_}F aEi;=of Rare Spades £ , msarI-e Aepvt a map Vm, I caBefiPP s I Brooks School Landscape Architects & Planners 1160 Great Pond Road 17 Tewksbury Street-Andover, MA 01810 North Andover, MA 01845 June 2, 2014 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL a-NORTH ANDOVER, MA Appendix B-Copy of 2012 CGP EPA SWPPP Template, Version 1.0 Construction General Permit (CGP) National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities In compliance with the provisions of the Clean Water Act, 33 U.S.C. §1251 et.seq., (hereafter CWA or the Act), as amended by the Water Quality Act of 1987, P.L. 100-4, "operators" of construction activities (defined in Part 1.1.a and Appendix A) that meet the requirements of Part 1.1 of this National Pollutant Discharge Elimination System (NPDES) general permit, are authorized to discharge pollutants in accordance with the effluent limitations and conditions set forth herein. Permit coverage is required from the "commencement of earth-disturbing activities" (see Appendix A) until "final stabilization" (see Part 2.2). This permit becomes effective on February 16, 2012. This permit and the authorization to discharge expire at midnight, February 16, 2017. Signed and issued this 16'h day of February,2012 Signed and issued this 16th day of February,2012 H. Curtis Spalding William K. Honker, P.E. Regional Administrator, Region 1 Acting Director, Water Quality Protection Division, Region 6 Signed and issued this 16'h day of February,2012 John Filippelli Signed and issued this 16th day of February,2012 Director, Division of Environmental Planning & Karen Flournoy Protection, Region 2 Director,Wetlands and Pesticides Division, Region 7 Signed and issued this 16th day of February,2012 Josh C. Font Signed and issued this 16'h day of February,2012 Acting Division Director,Carribbean Melanie L. Pallman Environmental Protection Division, Region 2, Acting Assistant Regional Administrator, Office of Caribbean Office Partneships and Regulatory Assistance, Region 8 Signed and issued this 16'h day of February,2012 Signed and issued this 16'h day of February,2012 Catherine A. Libertz Nancy Woo Assistant Director,Water Protection Division, Deputy Director, Water Division, Region 9 Region 3 Signed and issued this 16th day of February,2012 Signed and issued this 16'h day of February,2012 Michael J. Lidgard James D. Giattina Acting Director, Office of Water and Director,Water Protection Division, Region 4 Watersheds, Region 10 Signed and issued this 16th day of February,2012 Tinka G. Hyde Director, Water Division, Region 5 The signatures are for the permit conditions in Parts 1 through 9 and Appendices A through K. Construction Permit CONTENTS l. HOW TO OBTAIN PERMIT COVERAGE UNDER THE CGP.....................................................................l l]. ELIGIBILITY CONDITIONS REQ|REDOF ALL PROJECTS. ................................................................l 12. ELIGIBILITY CONDITIONS THAT APPLY DEPENDING (]N TYPE [)F PROJECT..............................2 1.2]. Eligibility for Emergency-Related Construction Activities. ..........................................2 12.2. Water Quality Standards-Eligibility for New Sources. ................................................2 12.3. DischorgingtoWatemwithHighWoferQuo|Uy-EligibUdyforNew Sources. ................................................................................................................................3 1.2,4. Use odCuhonic Treatment Chemicals............................................................................3 l.3. Types ofDischarges Authorized Under the CGP........................................................................3 l.4. SUBMITTING YOUR NOTICE[)F INTENT (NO|).................................................................................4 1.4]. How tu Submit Your NOi............................. .....................................................................4 1,4.2. Deadlines for Submdfing Your N0 and Your Official Date ofPermit Covenzge-----------------------------------------..5 1.4.3. Your Official End Date cd Permit Coverage..................................................................6 1.4.4. Continuation of Coverage for Existing Pennitheeo After the Permit Expires............6 1.4.6. PnonmdoresforDonio| ufCoveruge--------------------------J 1.5. REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE............................................ 2. EFFLUENT LIMITATIONS APPLICABLE TD ALL DISCHARGES FROM CONSTRUCTION SITES................8 2]. EROSION AND SEDIMENT CONTROL REQUIREMENTS..................................................................8 2]J. General Requirements Applicable to All Construction Sites......................................8 2].2. Erosion and Sediment Control Requirements Applicable to All Sites.....................10 2].3. Requirements Applicable Only to Sites Using These Specific Stonnvvo1er Controls...............................................................................................................................lJ 22. STABILIZATION REQUIREMENTS......................................................................................................l7 2.2]. Deadlines for|ndkaf ing and Cornp|ehng3tobi|izut ion...............................................l7 22.2. Chferin for Stabilization....................................................................................................20 23. POLLUTION PREVENTION REQUIREMENTS....................................................................................2l 2.3]. Prohibited Discharges......................................................................................................2l 2.3.2. General Maintenance Requirements. .........................................................................2l 2.3.3. Pollution Prevention Standards .....................................................................................22 2.3.4. Emergency Spill Notification...........................................................................................2J 2.3.5. Fertilizer Discharge Restrictions ----------------------------'2J 3. WATER QUALITY-BASED EFFLUENT LIMITATIONS...............................................................................26 3]. GENERAL EFFLUENT LIMITATION TO MEET APPLICABLE WATER QUALITY STANDARDS.........26 3.2. DISCHARGE LIMITATIONS FOR IMPAIRED WATERS.....................................................................26 3.2]. Identify If You Discharge TuAn Impaired Water .......................................................26 3.22. Requirements for Discharges to Sediment or Nufrienf-Impaired Waters...............27 33. DISCHARGES TO WATERS IDENTIFIED AS TIER 2'TIER 2.5' OR TIER 3.........................................27 3.3]. Identify if You Discharge too Tier 2'Tier 2.5, or Tier 3 Water ...................................27 Page Construction General Permit (CGP) 3.3.2. Requirements for New Projects Discharging to Tier 2, Tier 2.5, or Tier 3 Waters.................................................................................................................................27 4. INSPECTIONS.......................................................................................................................................28 4.1. SITE INSPECTIONS.............................................................................................................................28 4.1.1. Person(s) Responsible for Inspecting Site.....................................................................28 4.1.2. Frequency of Inspections................................................................................................28 4.1.3. Increase in Inspection Frequency for Sites Discharging to Sensitive Wafers.........28 4.1.4. Reductions in Inspection Frequency. ...........................................................................29 4.1.5. Areas that Need to Be Inspected.................................................................................30 4.1.6. Requirements for Inspections.........................................................................................30 4.1.7. Inspection Report. ............................................................................................................31 4.2. INSPECTIONS BY EPA.......................................................................................................................32 5. CORRECTIVE ACTIONS.......................................................................................................................33 5.1. "CORRECTIVE ACTIONS" DEFINED...............................................................................................33 5.2. REQUIREMENTS FOR TAKING CORRECTIVE ACTION. ................................................................33 5.3. CORRECTIVE ACTION REQUIRED BY EPA....................................................................................33 5.4. CORRECTIVE ACTION REPORT......................................................................................................33 6. STAFF TRAINING REQUIREMENTS. ......................................................................................................35 7. STORMWATER POLLUTION PREVENTION PLAN (SWPPP)...................................................................36 7.1. GENERAL REQUIREMENTS. .............................................................................................................36 7.1.1. Requirement to Develop a SWPPP Prior to Submitting Your NOI. ...........................36 7.2. SWPPP CONTENTS...........................................................................................................................36 7.2.1. Stormwater Team. ............................................................................................................36 7.2.2. Nature of Construction Activities...................................................................................36 7.2.3. Emergency-Related Projects..........................................................................................37 7.2.4. Identification of Other Site Operators. .........................................................................37 7.2.5. Sequence and Estimated Dates of Construction Activities.....................................37 7.2.6. Site Map..............................................................................................................................37 7.2.7. Construction Site Pollutants. ...........................................................................................38 7.2.8. Non-Stormwater Discharges...........................................................................................39 7.2.9. Buffer Documentation.....................................................................................................39 7.2.10. Description of Stormwater Control Measures. .......................................................39 7.2.11. Pollution Prevention Procedures....................................................................................40 7.2.12. Procedures for Inspection, Maintenance, and Corrective Action.........................41 7.2.13. Staff Training. .....................................................................................................................41 7.2.14. Documentation of Compliance with Other Federal Requirements.......................41 7.2.15. SWPPP Certification..........................................................................................................42 7.2.16. Post-Authorization Additions to the SWPPP. ................................................................42 7.3. ON-SITE AVAILABILITY OF YOUR SWPPP.......................................................................................42 7.4. REQUIRED SWPPP MODIFICATIONS..............................................................................................43 Page ii Construction General Permit (CGP) 7.4.1. List of Conditions Requiring SWPPP Modification. ......................................................43 7.4.2. Deadlines for SWPPP Modifications...............................................................................43 7.4.3. SWPPP Modification Records.........................................................................................43 7.4.4. Certification Requirements.............................................................................................43 7.4.5. Required Notice to Other Operators............................................................................43 8. HOW TO TERMINATE COVERAGE. .....................................................................................................44 8.1. MINIMUM INFORMATION REQUIRED IN NOT. .............................................................................44 8.2. CONDITIONS FOR TERMINATING PERMIT COVERAGE..............................................................44 8.3. HOW TO SUBMIT YOUR NOT. .........................................................................................................44 8.4. DEADLINE FOR SUBMITTING NOTS. ...............................................................................................45 8.5. EFFECTIVE DATE OF TERMINATION OF COVERAGE...................................................................45 9. PERMIT CONDITIONS APPLICABLE TO SPECIFIC STATES, INDIAN COUNTRY LANDS, OR TERRITORIES.........................................................................................................................................46 APPENDIX A- DEFINITIONS AND ACRONYMS...................................................................................A-1 APPENDIX B - PERMIT AREAS ELIGIBLE FOR COVERAGE..................................................................B-1 APPENDIX C-SMALL CONSTRUCTION WAIVERS AND INSTRUCTIONS .........................................C-1 APPENDIX D- ENDANGERED SPECIES ACT REQUIREMENTS...........................................................D-1 APPENDIX E- HISTORIC PROPERTY SCREENING PROCESS...............................................................E-1 APPENDIX F- LIST OF TIER 3,TIER 2, AND TIER 2.5 WATERS ..............................................................F-1 APPENDIX G- BUFFER GUIDANCE ....................................................................................................G-1 APPENDIX H -2-YEAR, 24-HOUR STORM FREQUENCIES...................................................................H-1 APPENDIX I -STANDARD PERMIT CONDITIONS...................................................................................1-1 APPENDIX J - NOTICE OF INTENT (NOI) FORM AND INSTRUCTIONS ...............................................J-1 APPENDIX K- NOTICE OF TERMINATION (NOT) FORM AND INSTRUCTIONS ................................ K-1 Page iii Construction General Permit (CGP) 1. HOW TO OBTAIN PERMIT COVERAGE UNDER THE CGP. To be covered under this permit, you must meet the eligibility conditions and follow the requirements for applying for permit coverage in this Part. ELIGIBILITY CONDITIONS REQIRED OF ALL PROJECTS. Only those projects that meet all of the following eligibility conditions may be covered under this permit: a. You are an "operator" of the construction project for which discharges will be covered under this permit; Note: For the purposes of this permit, an "operator"is any party associated with a construction project that meets either of the following two criteria: 1. The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications;or 2. The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions(e.g., they are authorized to direct workers at a site to carry out activities required by the permit). Subcontractors generally are not considered operators for the purposes of this permit. Note: Where there are multiple operators associated with the some project, all operators are required to obtain permit coverage. The following applies in these situations: 1. If one operator has control over plans and specifications and a different operator has control over activities at the project site, they may divide responsibility for compliance with the terms of this permit as long as they develop a group SWPPP(see Part 7.1.1), which documents which operator has responsibility for each requirement of the permit. 2. If an operator only has operational control over a portion of a larger project(e.g., one of four homebuilders in a subdivision), the operator is responsible for compliance with all applicable effluent limits, terms, and conditions of this permit as it relates to the activities on their portion of the construction site, including protection of endangered species, critical habitat, and historic properties, and implementation of control measures described in the SWPPP in the areas under their control. 3. You must ensure either directly or through coordination with other permittees, that your activities do not render another party's pollutant discharge controls ineffective. 4. If the operator of a "construction support activity" (see Part 1.3.c) is different than the operator of the main construction site, that operator is also required to obtain permit coverage. b. Your project: i. Will disturb I or more acres of land, or will disturb less than 1 acre of land but is part of a common plan of development or sale that will ultimately disturb I or more acres of land; or ii. Your project's discharges have been designated by EPA as needing a permit under§ 122.26(a)(I)(v) or§ 122.26(b)(15)(ii); C. Your project is located in an area where EPA is the permitting authority (see Appendix B); Page 1 of 60 Construction General Permit (CGP) d. Discharges from your project are not: i. Already covered by a different NPDES permit for the same discharge;or ii. In the process of having coverage under a different NPDES permit for the same discharge denied, terminated, or revoked.], 2 e. You are able to demonstrate that you meet one of the criteria listed in Appendix D with respect to the protection of species that are federally-listed as endangered or threatened under the Endangered Species Act (ESA) or federally-designated critical habitat; f. You have completed the screening process in Appendix E relating to the protection of historic properties and places; and g. You have complied with all requirements in Part 9 imposed by the applicable state, Indian tribe, or territory in which your construction activities will occur. 1.2. ELIGIBILITY CONDITIONS THAT APPLY DEPENDING ON TYPE OF PROJECT. You must also satisfy, if applicable, the conditions in Parts 1.2.1 through 1.2.4 in order to obtain coverage under this permit. 1.2.1. Eligibility for Emergency-Related Construction Activities. If you are conducting earth-disturbing activities in response to a public emergency (e.g., natural disaster, widespread disruption in essential public services), and the related work requires immediate authorization to avoid imminent endangerment to human health, public safety, or the environment, or to reestablish essential public services, you are authorized to discharge on the condition that a complete and accurate NOI is submitted within 30 calendar days after commencing earth-disturbing activities (see Table 1) establishing that you are eligible under this permit. You are also required to provide documentation in your SWPPP to substantiate the occurrence of the public emergency. 1.2.2. Water Quality Standards- Eligibility for New Sources. If you are a "new source" (as defined in Appendix A), you are not eligible for coverage under this permit for discharges that EPA, prior to authorization under this permit, determines will cause, have the reasonable potential to cause, or contribute to an excursion above any applicable water quality standard. Where such a determination is made prior to authorization, EPA may notify you that an individual permit application is necessary in accordance with Part 1.4.5. However, EPA may authorize your coverage under this permit after you have included appropriate controls and implementation procedures designed to bring your discharge into compliance with water quality standards. In the absence of information demonstrating otherwise, EPA expects that compliance with the stormwater control requirements of this permit, including the requirements applicable to such discharges in Part 3.2,will result in discharges that will not cause, have the reasonable potential to cause, or contribute to an excursion above any applicable water quality standard. Parts 1.l.d.i and 1.1.d.ii do not include sites currently covered under the 2003 or 2008 CGPs,which are in the process of obtaining coverage under this permit, and sites covered under this permit,which are transferring coverage to a different operator. Notwithstanding a project being made ineligible for coverage under this permit because it falls under the description of Parts 1.1.d.i or 1.1.d.ii,above, EPA may waive the applicable requirement after specific review if it determines that coverage under this permit is appropriate. Page 2 of 60 Construction General Permit (CGP) 1.2.3. Discharging to Waters with High Water Quality-Eligibility for New Sources. If you are a "new source" (as defined in Appendix A), you are eligible to discharge to a Tier 2,Tier 2.5, or Tier 3 water only if your discharge will not lower the water quality of the applicable water. In the absence of information demonstrating otherwise, EPA expects that compliance with the stormwater control requirements of this permit, including the requirements applicable to such discharges in Part 3.3.2,will result in discharges that will not lower the water quality of the applicable water. See list of Tier 2,Tier 2.5, and Tier 3 waters in Appendix F. Note: Your project will be considered to discharge to a Tier 2, Tier 2.5, or Tier 3 water if the first surface water to which you discharge is identified by a state, tribe, or EPA as a Tier 2, Tier 2.5, or Tier 3 water. For discharges that enter a storm sewer system prior to discharge, the first surface water to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system. 1.2. . Use of Cationic Treatment Chemicals. If you plan to use cationic treatment chemicals (as defined in Appendix A),you are ineligible for coverage under this permit, unless you notify your applicable EPA Regional Office in advance and the EPA office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. 1.3. Types of Discharges Authorized Under the CGP. The following is a list of discharges that are allowed under the permit provided that appropriate stormwater controls are designed, installed, and maintained: a. Stormwater discharges, including stormwater runoff,snowmelt runoff, and surface runoff and drainage, associated with construction activity under 40 CFR § 122.26(b)(14) or§ 122.26(b)(15)(i); b. Stormwater discharges designated by EPA as needing a permit under 40 CFR § 122.26(a)(I)(v) or§ 122.26(b)(15)(ii); c. Stormwater discharges from construction support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) provided: i. The support activity is directly related to the construction site required to have permit coverage for stormwater discharges; ii. The support activity is not a commercial operation, nor does it serve multiple unrelated construction projects; iii. The support activity does not continue to operate beyond the completion of the construction activity at the project it supports; and iv. Stormwater controls are implemented in accordance with Part 2 and, if applicable, Part 3,for discharges from the support activity areas. d. The following non-stormwater discharges from your construction activity, provided that,with the exception of water used to control dust and to irrigate areas to be vegetatively stabilized, these discharges are not routed to areas of exposed soil on your site and you comply with any applicable requirements for these discharges in Part 2: i. Discharges from emergency fire-fighting activities; Page 3 of 60 Construction General Permit (CGP) ii. Fire hydrant flushings; iii. Landscape irrigation; iv. Water used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes; v. Water used to control dust; vi. Potable water including uncontaminated water line flushings; vii. Routine external building washdown that does not use detergents; viii. Pavement wash waters provided spills or leaks of toxic or hazardous materials have not occurred (unless all spill material has been removed) and where detergents are not used. You are prohibited from directing pavement wash waters directly into any surface water,storm drain inlet, or stormwater conveyance, unless the conveyance is connected to a sediment basin, sediment trap, or similarly effective control; ix. Uncontaminated air conditioning or compressor condensate; x. Uncontaminated, non-turbid discharges of ground water or spring water; A. Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and xii. Construction dewatering water that has been treated by an appropriate control under Part 2.1.3.4; and e. Discharges of stormwater listed above in Parts a, b, and c, or authorized non- stormwater discharges in Part d above, commingled with a discharge authorized by a different NPDES permit and/or a discharge that does not require NPDES permit authorization. 1.4. SUBMITTING YOUR NOTICE OF INTENT(NOI). To be covered under this permit,you must submit to EPA a complete and accurate NOI prior to commencing construction activities. The NOI certifies to EPA that you are eligible for coverage according to Part 1.1 and 1.2, and provides information on your construction operation and discharge. Note: All "operators" (as defined in Appendix A) associated with your construction project, who meet the Part 1.1 eligibility requirements, and who elect to seek coverage under this permit, are required to submit an NOI. Note: There are two exceptions to the requirement to submit the NOI prior to the commencement of construction activities: (1) for emergency-related projects, and(2) for new projects scheduled to commence construction activities on or after February 16,2012, but no later than March 1,2012. For these two types of projects, the NOI must be submitted within 30 calendar days after the commencement of earth-disturbing activities(see Part 1.4.2). Note: You must complete the development of a Stormwater Pollution Prevention Plan (SWPPP) consistent with Part 7 prior to submitting your NOI for coverage under this permit. 1.4.1. How to Submit Your NOI. You are required to use EPA's electronic NOI system, or"eNOI system", to prepare and submit your NOI. Go to wv\,rw.e�ov/npde5Lstormwater/cgQenoi to access the eNOI system and file an NOI. If you have a problem with the use of the eNOI system, contact Page 4 of 60 Construction General Permit (CGP) the EPA Regional Office that corresponds to the location of your site. If you are given approval by the EPA Regional Office to use a paper NOI, and you elect to use it, you must complete the form in Appendix J. 1.4.2. Deadlines for Submitting Your NOI and Your Official Date of Permit Coverage. Table 1 provides the deadlines for submitting your NOI and your official start date of permit coverage,which differ depending on when you commence construction activities. The following terms are used in Table 1 to establish NOI deadlines: a. New project-a construction project that commences construction activities on or after February 16, 2012. b. Existing project-a construction project that commenced construction activities prior to February 16, 2012. C. New operator of a new or existing project-an operator that through transfer of ownership and/or operation replaces the operator of an already permitted construction project. Table 1 NOI Submittal Deadlines and Official Start Date for Permit Coverage. Type of Deadlines for Operators to Submit Official Start Date for Permit Construction NOI Coverage Project New project You must submit your NOI at least You are considered covered under 14 calendar days prior to this permit 14 calendar days after commencing earth-disturbing EPA has acknowledged receipt of activities. your NOI on the Agency's website Exception: If your project qualifies ( `/,opa, ov Water c as an "emergency-related project" g2no�search), unless EPA notifies you under Part 1.2.1, you must submit that your authorization has been your NOI by no later than 30 delayed or denied. calendar days after commencing Exception: If your project qualifies as earth-disturbing activities. an "emergency-related project" Exception: If you are scheduled to under Part 1.2.1, you are considered commence construction activities provisionally covered under the on or after February 16, 2012, but terms and conditions of this permit no later than March 1, 2012, you immediately, and fully covered 14 must submit your NOI by no later calendar days after EPA has than 30 calendar days after acknowledged receipt of your NOI, commencing earth-disturbing unless EPA notifies you that your activities. authorization has been delayed or denied. Exception: If you are scheduled to commence construction activities on or after February 16, 2012, but no later than March 1, 2012, you are considered provisionally covered under the terms and conditions of this permit immediately, and fully covered 14 calendar days after EPA has acknowledged receipt of your NOI, unless EPA notifies you that your Page 5 of 60 Construction General Permit (CGP) Type of Deadlines for Operators to Submit Official Start Date for Permit Construction NOI Coverage Project authorization has been delayed or denied. Existing project You must submit your NOI by no You are considered covered under later than May 16, 2012.3 However, this permit 14 calendar days after if you have not previously obtained EPA has acknowledged receipt of coverage under an NPDES permit, your NOI on the Agency's website you must submit your NOI (v✓wwa.gov nrJdeslsiorr7�waier_c immediately. c noisearch), unless EPA notifies you that your authorization has been delayed or denied.4 New operator of a You must submit your NOI at least You are considered covered under new or existing 14 calendar days before the date this permit 14 calendar days after project the transfer to the new operator EPA has acknowledged receipt of will take place. your NOI on the Agency's website (www,eoa. ov/r�pdes/story-nwater/c gmioisearch), unless EPA notifies you that your authorization has been delayed or denied. Note: If you have missed the deadline to submit your NOI, any and all discharges from your construction activities will continue to be unauthorized under the Clean Water Act until they are covered by this or a different NPDES permit. EPA may take enforcement action for any unpermitted discharges that occur between the commencement of earth-disturbing activities and discharge authorization. Note: Discharges are not authorized if your NOI is incomplete or inaccurate or if you were never eligible for permit coverage. 1.4.3. Your Official End Date of Permit Coverage Once covered under this permit,your coverage will last until the date that: • You terminate permit coverage consistent with Part 8; or • Your discharges are permitted under a different NPDES permit or a reissued or replacement version of this permit after expiring on February 16, 2017; or • For existing projects that continue after this permit has expired, the deadline has passed for the submission of an NOI for coverage under a reissued or replacement version of this permit and you have failed to submit an NOI by the required deadline. 1.4.4. Continuation of Coverage for Existing Permittees After the Permit Expires. If this permit is not reissued or replaced prior to the expiration date, it will be administratively continued in accordance with the Administrative Procedure Act and 3 For existing projects located in the following areas, NOls must be submitted no later than 90 days after the date of permit issuance: the State of Idaho (except Indian country);and areas in the State of Washington, except Indian country,subject to construction by a Federal Operator. 4 Note that if you are currently covered under the 2003 or 2008 CGP,this coverage continues until your coverage under this permit begins,provided you have submitted an NOI by the deadline. Page 6 of 60 Construction General Permit (CGP) remain in force and effect for discharges that were covered prior to expiration. If you were granted permit coverage prior to the expiration date,you will automatically remain covered by this permit until the earliest of: • Your authorization for coverage under a reissued or replacement version of this permit following your timely submittal of a complete and accurate NOI requesting coverage under the new permit; or Note: If you fail to submit a timely NOI for coverage under the reissued or replacement permit, your coverage will terminate on the date that the NOi was due. • Your submittal of a Notice of Termination; or • Issuance or denial of an individual permit for the project's discharges; or • A final permit decision by EPA not to reissue a general permit, at which time EPA will identify a reasonable time period for covered dischargers to seek coverage under an alternative general permit or an individual permit. Coverage under this permit will terminate at the end of this time period. EPA reserves the right to modify or revoke and reissue this permit under 40 CFR 122.62 and 63, in which case you will be notified of any relevant changes or procedures to which you may be subject. 1.4.5. Procedures for Denial of Coverage. Following your submittal of a complete and accurate NOI, you may be notified in writing by EPA that you are not covered, and that you must either apply for and/or obtain coverage under an individual NPDES permit or an alternate general NPDES permit. This notification will include a brief statement of the reasons for this decision and will provide application information. Any interested person may request that EPA consider requiring an individual permit under this paragraph. If you are already a permittee with coverage under this permit, the notice will set a deadline to file the permit application, and will include a statement that on the effective date of the individual NPDES permit or alternate general NPDES permit, as it applies to you, coverage under this general permit will terminate. EPA may grant additional time to submit the application if you request it. If you are covered under this permit and fail to submit an individual NPDES permit application or an NOI for an alternate general NPDES permit as required by EPA, then the applicability of this permit to you is terminated at the end of the day specified by EPA as the deadline for application submittal. EPA may take appropriate enforcement action for any unpermitted discharge. If you submit a timely permit application, then when an individual NPDES permit is issued to you or you are provided with coverage under an alternate general NPDES permit,your coverage under this permit is terminated on the effective date of the individual permit or date of coverage under the alternate general permit. 1.5. REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE. You must post a sign or other notice conspicuously at a safe, publicly accessible location in close proximity to the project site. At a minimum, the notice must include the NPDES Permit tracking number and a contact name and phone number for obtaining additional project information. The notice must be located so that it is visible from the public road that is nearest to the active part of the construction site, and it must use a font large enough to be readily viewed from a public right-of-way. Page 7 of 60 Construction General Permit (CGP) 2. EFFLUENT LIMITATIONS APPLICABLE TO ALL DISCHARGES FROM CONSTRUCTION SITES You are required to comply with the following effluent limitations in this Part for discharges from your site and/or from construction support activities (see Part 1.3.c). Note: If your project is an "existing project" (see Part 1.4.2.b) or if you are a "new operator of an existing project" (see Part 1.4.2.c), and it is infeasible for you to comply with a specific requirement in this Part because (1) the requirement was not part of the permit you were previously covered under(i.e., the 2003 or 2008 CGP), and (2) because you are prevented from compliance due to the nature or location of earth disturbances that commenced prior to February 16, 2012, or because you are unable to comply with the requirement due to the manner in which stormwater controls have already been installed or were already designed prior to February 16, 2012, you are required to document this fact in your SWPPP and are waived from complying with that requirement.This flexibility applies only to the requirements in Parts 2.1, and 2.3.3 through 2.3.5(except for Parts 2.3.3.1, 2.3.3.2b, 2.3.3.3c.i, and 2.3.3.4). This only applies to those portions of your site that have already commenced earth-disturbing activities or where stormwater controls implemented in compliance with the previous permit have already been installed. Part 2 includes the following types of requirements: • Erosion and Sediment Control Requirements (Part 2.1) • Stabilization Requirements (Part 2.2) Pollution Prevention Requirements (Part 2.3) 2.1. EROSION AND SEDIMENT CONTROL REQUIREMENTS. You must design, install, and maintain erosion and sediment controls that minimize the discharge of pollutants from earth-disturbing activities. To meet this requirement,you must comply with the following provisions. 2.1.1. General Requirements Applicable to All Construction Sites. 2.1.1.1 Area of Disturbance. You are required to minimize the amount of soil exposed during construction activities. You are also subject to the deadlines for temporarily and/or permanently stabilizing exposed portions of your site pursuant to Part 2.2. 2.1.1.2 Design Requirements. a. You must account for the following factors in designing your stormwater controls: i. The expected amount, frequency, intensity, and duration of precipitation; ii. The nature of stormwater runoff and run-on at the site, including factors such as expected flow from impervious surfaces, slopes, and site drainage features. If any stormwater flow will be channelized at your site, you must design stormwater controls to control both peak flowrates and total stormwater volume to minimize erosion at outlets and to minimize downstream channel and streambank erosion; and iii. The range of soil particle sizes expected to be present on the site. b. You must direct discharges from your stormwater controls to vegetated areas of your site to increase sediment removal and maximize stormwater Page 8 of 60 Construction General Permit (CGP) infiltration, including any natural buffers established under Part 2.1.2.1, unless infeasible. Use velocity dissipation devices if necessary to prevent erosion when directing stormwater to vegetated areas. 2.1.1.3 Installation Requirements. a. Complete installation of stormwater controls by the time each phase of earth-disturbance has begun, unless infeasible. By the time earth-disturbing activities in any given portion of your site have begun, unless infeasible, you must install and make operational any downgradient sediment controls (e.g., buffers or equivalent sediment controls, perimeter controls, exit point controls, storm drain inlet protection) that control discharges from the initial site clearing, grading, excavating, and other land-disturbing activities. Note: Where it is infeasible to install stormwater controls prior to the initial earth disturbance, it is EPA's expectation that it will be a rare circumstance that will prevent the operator from installing such controls immediately following the initial earth disturbance. Following the installation of these initial controls, all other stormwater controls planned for this portion of your site and described in your SWPPP must be installed and made operational as soon as conditions on the site allow. Note: The requirement to install stormwater controls prior to earth-disturbance for each phase of the project does not apply to the earth disturbance associated with the actual installation of these controls. b. Use good engineering practices and follow manufacturer's specifications. You must install all stormwater controls in accordance with good engineering practices, including applicable design specifications. Note: Design specifications maybe found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances. Any departures from such specifications must reflect good engineering practice and must be explained in your SWPPP. 2.1.1.4 maintenance Requirements. a. You must ensure that all erosion and sediment controls required in this Part remain in effective operating condition during permit coverage and are protected from activities that would reduce their effectiveness. b. You must inspect all erosion and sediment controls in accordance with the applicable requirements in Part 4.1, and document your findings in accordance with Part 4.1.7. If you find a problem (e.g., erosion and sediment controls need to be replaced, repaired, or maintained), you must make the necessary repairs or modifications in accordance with the following schedule: i. Initiate work to fix the problem immediately after discovering the problem, and complete such work by the close of the next work day, if the problem does not require significant repair or replacement, or if the problem can be corrected through routine maintenance. ii. When installation of a new erosion or sediment control or a significant repair is needed, you must install the new or modified control and make it operational, or complete the repair, by no later than 7 calendar days from the time of discovery where feasible. If it Page 9 of 60 Construction General Permit (CGP) is infeasible to complete the installation or repair within 7 calendar days,you must document in your records why it is infeasible to complete the installation or repair within the 7-day timeframe and document your schedule for installing the stormwater control(s) and making it operational as soon as practicable after the 7-day timeframe. Where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP,you must modify your SWPPP accordingly within 7 calendar days of completing this work. 2.1.2. Erosion and Sediment Control Requirements Applicable to All Sites. 2.1.2.1 Provide Natural Buffers or Equivalent Sediment Controls. (These requirements only apply when a surface water is located within 50 feet of your project's earth disturbances). Note: EPA does not consider stormwater control features (e.g., stormwater conveyance channels, storm drain inlets, sediment basins) to constitute "surface waters"for the purposes of triggering the requirement to comply with this Part. Note: Areas that you do not own or that are otherwise outside your operational control may be considered areas of undisturbed natural buffer for purposes of compliance with this part. You must ensure that any discharges to surface waters through the area between the disturbed portions of the property and any surface waters located within 50 feet of your site are treated by an area of undisturbed natural buffer and/or additional erosion and sediment controls in order to achieve a reduction in sediment load equivalent to that achieved by a 50-foot natural buffer. Refer to Appendix G (Buffer Guidance) for information to assist you in complying with this requirement, and to Part 2.1.2.1 e for exceptions to this requirement. a. Compliance Alternatives. You can comply with this requirement in one of the following ways: i. Provide and maintain a 50-foot undisturbed natural buffer; or Note: If your earth disturbances are located 50 feet or further from a surface water, then you have complied with this alternative. ii. Provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls,which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer; or iii. If it is infeasible to provide and maintain an undisturbed natural buffer of any size, you must implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. Note: For the compliance alternatives in Parts 2.1.2.1 a.i and 2.1.2.1a.ii, you are not required to enhance the quality of the vegetation that already exists in the buffer, or provide vegetation if none exists(e.g., and and semi-arid areas). You only need to retain and protect from disturbance the natural buffer that existed prior to the commencement of construction. Any preexisting structures or impervious surfaces are allowed in the natural buffer provided you retain and Page 10 of 60 Construction General Permit (CGP) protect from disturbance the natural buffer area outside the preexisting disturbance. Similarly, for alternatives 2.1.2.Io.ii and 2.1.2.1 o.iii, you are required to implement and maintain sediment controls that achieve the sediment load reduction equivalent to the undisturbed natural buffer that existed on the site prior to the commencement of construction. In determining equivalent sediment load reductions, you may consider naturally non-vegetated areas and prior disturbances. See Appendix G for a discussion of how to determine equivalent reductions. You must document the compliance alternative you have selected in your SWPPP, and comply with the applicable additional requirements described in Parts 2.1.2.1 b and 2.1.2.1 c below. The compliance alternative selected above must be maintained throughout the duration of permit coverage, except that you may select a different compliance alternative during your period of permit coverage, in which case you must modify your SWPPP to reflect this change. b. Additional Requirements for the Compliance Alternatives in Parts 2.1.2.1a.i and 2.1.2.1a.ii. If you choose either of the compliance alternatives in Parts 2.1.2.1 a.i or 2.1.2.1 a.ii above, throughout your period of coverage under this permit,you must comply with the following additional requirements: i. Ensure that all discharges from the area of earth disturbance to the natural buffer are first treated by the site's erosion and sediment controls, and use velocity dissipation devices if necessary to prevent erosion caused by stormwater within the buffer; ii. Document in your SWPPP the natural buffer width retained on the property, and show the buffer boundary on your site plan; and iii. Delineate, and clearly mark off,with flags, tape, or other similar marking device all natural buffer areas. C. Additional Requirements for the Compliance Alternatives in Parts 2.1.2.1a.ii and 2.1.2.1a.iii. If you choose either offhe compliance alternatives in Parts 2.1.2.1 a.ii and 2.1.2.1 a.iii,you must document in your SWPPP the erosion and sediment control(s) you will use to achieve an equivalent sediment reduction, and any information you relied upon to demonstrate the equivalency. d. Additional Requirement for the Compliance Alternative in Part 2.1.2.1 Will. If you choose the compliance alternative in Part 2.1.2.1 a.iii, you must also include in your SWPPP a description of why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size. e. Exceptions. i. If there is no discharge of stormwater to surface waters through the area between your site and any surface waters located within 50 feet of your site, you are not required to comply with the requirements in this Part.This includes situations where you have implemented control measures,such as a berm or other barrier, that will prevent such discharges. Page 1 1 of 60 Construction General Permit (CGP) ii. Where no natural buffer exists due to preexisting development disturbances (e.g., structures, impervious surfaces) that occurred prior to the initiation of planning for the current development of the site,you are not required to comply with the requirements in this Part, unless you will remove portions of the preexisting development. Where some natural buffer exists but portions of the area within 50 feet of the surface water are occupied by preexisting development disturbances, you are required to comply with the requirements in this Part. For the purposes of calculating the sediment load reduction for either Part 2.1.2.1 a.ii or 2.1.2.1 a.iii above, you are not expected to compensate for the reduction in buffer function from the area covered by these preexisting disturbances. See Appendix G for further information on how to comply with the compliance alternatives in Part 2.1.2.1 a.ii or 2.1.2.1 a.iii above. If during your project,you will disturb any portion of these preexisting disturbances, the area disturbed will be deducted from the area treated as natural buffer.For"linear construction projects" (see Appendix A), you are not required to comply with the requirements in this Part if site constraints (e.g., limited right-of-way) prevent you from meeting any of the compliance alternatives in Part 2.1.2.1 a, provided that, to the extent practicable, you limit disturbances within 50 feet of the surface water and/or you provide supplemental erosion and sediment controls to treat stormwater discharges from earth disturbances within 50 feet of the surface water. You must also document in your SWPPP your rationale as to why it is infeasible for you to comply with the requirements in Part 2.1.2.1 a, and describe any buffer width retained and/or supplemental erosion and sediment controls installed. iv. For"small residential lot" construction (i.e., a lot being developed for residential purposes that will disturb less than 1 acre of land, but is part of a larger residential project that will ultimately disturb greater than or equal to 1 acre),you have the option of complying with the requirements in Appendix G (Part G.2.3). v. The following disturbances within 50 feet of a surface water are exempt from the requirements in this Part: • Construction approved under a CWA Section 404 permit; or • Construction of a water-dependent structure or water access area (e.g., pier, boat ramp, trail). You must document in your SWPPP if any of the above disturbances will occur within the buffer area on your site. 2.1.2.2 Install Perimeter Controls. a. Installation Requirements: You must install sediment controls along those perimeter areas of your site that will receive stormwater from earth- disturbing activities.5 5 Examples of perimeter controls include, but are not limited to,filter berms,silt fences, and temporary diversion dikes. Page 12 of 60 Construction General Permit (CGP) For linear projects with rights-of-way that restrict or prevent the use of such perimeter controls, you must maximize the use of these controls where practicable and document in your SWPPP why it is impracticable in other areas of the project. b. Maintenance Requirements: You must remove sediment before it has accumulated to one-half of the above-ground height of any perimeter control. 2.1.2.3 Minimize Sediment Track-Out. You must minimize the track-out of sediment onto off-site streets, other paved areas, and sidewalks from vehicles exiting your construction site. To comply with this requirement, you must: a. Restrict vehicle use to properly designated exit points; b. Use appropriate stabilization techniquesb at all points that exit onto paved roads so that sediment removal occurs prior to vehicle exit; C. Where necessary, use additional controls7 to remove sediment from vehicle tires prior to exit; and d. Where sediment has been tracked-out from your site onto the surface of off-site streets, other paved areas, and sidewalks,you must remove the deposited sediment by the end of the same work day in which the track- out occurs or by the end of the next work day if track-out occurs on a non-work day. You must remove the track-out by sweeping,shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked- out sediment into any stormwater conveyance (unless it is connected to a sediment basin,sediment trap, or similarly effective control), storm drain inlet, or surface water. Note: EPA recognizes that some fine grains may remain visible on the surfaces of off-site streets, other paved areas, and sidewalks even after you have implemented sediment removal practices. Such "staining"is not a violation of Part 2.1.2.3. 2.1.2.4 Control Discharges from Stockpiled Sediment or Soil. For any stockpiles or land clearing debris composed, in whole or in part, of sediment or soil, you must comply with the following requirements: Note: For the purposes of this permit, sediment or soil stockpiles are defined as the storage for multiple days of soil or other sediment material to be used in the construction project. a. Locate the piles outside of any natural buffers established under Part 2.1.2.1 a and physically separated from other stormwater controls implemented in accordance with Part 2.1; b. Protect from contact with stormwater (including run-on) using a temporary perimeter sediment barrier;$ b Examples of appropriate stabilization techniques include the use of aggregate stone with an underlying geotextile or non-woven filter fabric, or turf mats. 7 Examples of additional controls to remove sediment from vehicle tires include, but are not limited to, wheel washing, rumble strips, and rattle plates. 8 Examples include berms,dikes,fiber rolls,silt fences,sandbag,gravel bags, or straw bale. Page 13 of 60 Construction General Permit (CGP) C. Where practicable, provide cover or appropriate temporary stabilization to avoid direct contact with precipitation or to minimize sediment discharge; d. Do not hose down or sweep soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance (unless connected to a sediment basin,sediment trap, or similarly effective control), storm drain inlet, or surface water; and e. Unless infeasible, contain and securely protect from wind. 2.1.2.5 Minimize Dust. In order to avoid pollutants from being discharged into surface waters, to the extent feasible,you must minimize the generation of dust through the appropriate application of water or other dust suppression techniques. 2.1.2.6 Minimize the Disturbance of Steep Slopes. You must minimize the disturbance of "steep slopes" (see definition in Appendix A). Note: The permit does not prevent or prohibit disturbance on steep slopes. For some projects, disturbance on steep slopes may be necessary for construction (e.g., a road cut in mountainous terrain). If a disturbance to steep slopes is required for the project, EPA would recognize that it is not economically achievable to avoid the disturbance to steep slopes. However, in cases where steep slope disturbances are required, minimizing the disturbances to steep slopes consistent with this requirement can be accomplished through the implementation of a number of standard erosion and sediment control practices,such as by phasing disturbances to these areas and using stabilization practices designed to be used on steep grades. 2.1.2.7 Preserve Topsoil. You must preserve native topsoil on your site, unless infeasible. Note: Some projects may be designed to be highly impervious after construction, and therefore little or no vegetation is intended to remain. In these cases, preserving topsoil at the site would not be feasible. Some sites may not have space to stockpile topsoil on site for later use, in which case, it may also not be feasible to preserve topsoil. Note: Stockpiling of topsoil at off-site locations, or transfer of topsoil to other locations, is an example of a practice that is consistent with the requirements in this Part. 2.1.2.8 Minimize Soil Compaction. In areas of your site where final vegetative stabilization will occur or where infiltration practices will be installed, you must either: a. Restrict vehicle/ equipment use. Restrict vehicle and equipment use in these locations to avoid soil compaction; or b. Use soil conditioning techniques. Prior to seeding or planting areas of exposed soil that have been compacted, use techniques that condition the soils to support vegetative growth, if necessary and feasible. 2.1.2.9 Protect Storm Drain Inlets. If you discharge to any storm drain inlet that carries stormwater flow from your site directly to a surface water (and it is not first directed to a sediment basin,sediment trap, or similarly effective control), and you have authority to access the storm drain inlet,you must: Page 14 of 60 Construction General Permit (CGP) a. Installation Requirements. Install inlet protection measures9 that remove sediment from your discharge prior to entry into the storm drain inlet. Note: Inlet protection measures can be removed in the event of flood conditions or to prevent erosion. b. Maintenance Requirements. Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, you must remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible. 2.1.3. Requirements Applicable Only to Sites Using These Specific Stormwater Controls. You are required to comply with the following requirements if you will install any of the following stormwater controls at your site: 2.1.3.1 Constructed Stormwater Conveyance Channels. Design stormwater conveyance channels to avoid unstabilized areas on the site and to reduce erosion, unless infeasible. Minimize erosion of channels and their embankments, outlets, adjacent streambanks, slopes, and downstream waters during discharge conditions through the use of erosion controls and velocity dissipation devices10 within and along the length of any constructed stormwater conveyance channel, and at any outlet to provide a non-erosive flow velocity. 2.1.3.2 Sediment Basins. If you install a sediment basin ,you must comply with the following: a. Design requirements. i. Provide storage for either (1) the calculated volume of runoff from a 2-year, 24-hour storm (see Appendix H), or (2) 3,600 cubic feet per acre drained; ii. When discharging from the sediment basin, utilize outlet structures that withdraw water from the surface in order to minimize the discharge of pollutants, unless infeasible; Note: EPA believes that the circumstances in which it is infeasible to design outlet structures in this manner are rare. Exceptions may include areas with extended cold weather, where surface outlets may not be feasible during certain time periods (although it is expected that they would be used during other periods). If you have determined that it is infeasible to meet this requirement, you must provide documentation in your SWPPP to support your determination. iii. Prevent erosion of (1) the sediment basin using stabilization controls (e.g., erosion control blankets), and (2) the inlet and outlet using erosion controls and velocity dissipation devices; and 9 Examples of inlet protection measures include fabric filters,sandbags,concrete blocks,and gravel barriers. 10 Examples of velocity dissipation devices include check dams,sediment traps,riprap, or grouted riprap at outlets. Page 15 of 60 Construction General Permit (CGP) iv. Sediment basins must be situated outside of surface waters and any natural buffers established under Part 2.1.2.1 a, and must be designed to avoid collecting water from wetlands. b. Maintenance requirements. Keep in effective operating condition and remove accumulated sediment to maintain at least '/2 of the design capacity of the sediment basin at all times. 2.1.3.3 Use of Treatment Chemicals. If you are using polymers,flocculants, or other treatment chemicals at your site, you must comply with the following minimum requirements: a. Use conventional erosion and sediment controls prior to and after the application of treatment chemicals. Use conventional erosion and sediment controls prior to chemical addition to ensure effective treatment. Chemicals may only be applied where treated stormwater is directed to a sediment control (e.g., sediment basin, perimeter control) prior to discharge. b. Select appropriate treatment chemicals. Chemicals must be selected that are appropriately suited to the types of soils likely to be exposed during construction and discharged to locations where chemicals will be applied, and to the expected turbidity, pH, and flow rate of stormwater flowing into the chemical treatment system or area. C. Minimize discharge risk from stored chemicals. Store all treatment chemicals in leak-proof containers that are kept under storm-resistant cover and surrounded by secondary containment structures (e.g., spill berms, decks, spill containment pallets), or provide equivalent measures, designed and maintained to minimize the potential discharge of treatment chemicals in stormwater or by any other means (e.g., storing chemicals in covered area or having a spill kit available on site). d. Comply with state/local requirements. Comply with relevant state and local requirements affecting the use of treatment chemicals. e. Use chemicals in accordance with good engineering practices and specifications of the chemical provider/supplier. You must also use treatment chemicals and chemical treatment systems in accordance with good engineering practices, and with dosing specifications and sediment removal design specifications provided by the provider/supplier of the applicable chemicals, or document specific departures from these practices or specifications and how they reflect good engineering practice. f. Ensure proper training. Ensure that all persons who handle and use treatment chemicals at the construction site are provided with appropriate, product-specific training. Among other things, the training must cover proper dosing requirements. g. Comply with additional requirements for the approved use of cationic chemicals. If you have been authorized to use cationic chemicals at your site pursuant to Part 1.2.4, and the authorization is conditioned on your compliance with additional requirements necessary to ensure that the use of such chemicals will not cause an exceedance of water quality standards, you are required to comply with all such requirements. Page 16 of 60 Construction General Permit (CGP) h. Provide proper SWPPP documentation. You must include documentation in your SWPPP consistent with Parts 7.2.6.9 and 7.2.10.2 on the specific chemicals and chemical treatment systems you will use, and how you will comply with the requirements in this Part. 2.1.3.4 Dewatering Practices. You are prohibited from discharging ground water or accumulated stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, unless such waters are first effectively managed by appropriate controls." Uncontaminated, non-turbid dewatering water can be discharged without being routed to a control. You must also meet the following requirements for dewatering activities: a. Discharge requirements. L Do not discharge visible floating solids or foam; ii. Use an oil-water separator or suitable filtration device (such as a cartridge filter) that is designed to remove oil, grease, or other products if dewatering water is found to contain these materials; iii. To the extent feasible, utilize vegetated, upland areas of the site to infiltrate dewatering water before discharge. In no case will surface waters be considered part of the treatment area; iv. At all points where dewatering water is discharged, comply with the velocity dissipation requirements of Part 2.1.3.1; v. With backwash water, either haul it away for disposal or return it to the beginning of the treatment process; and vi. Replace and clean the filter media used in dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications. b. Treatment chemical restrictions. If you are using polymers, flocculants, or other treatment chemicals to treat dewatering water, you must comply with the requirements in Parts 2.1.3.3. 2.2. STABILIZATION REQUIREMENTS. You are required to stabilize exposed portions of your site in accordance with the requirements of this Part. Note: For the purposes of this permit, "exposed portions of your site"means areas of exposed soil that are required to be stabilized. Note that EPA does not expect that temporary or permanent stabilization measures to be applied to areas that are intended to be left unvegetated or unstabilized following construction (e.g., dirt access roads, utility pole pads, areas being used for storage of vehicles, equipment, or materials). 2.2.1. Deadlines for Initiating and Completing Stabilization. 2.2.1.1 Deadline to Initiate Stabilization. You must initiate soil stabilization measures immediately whenever earth-disturbing activities have permanently or temporarily ceased on any portion of the site. Examples of appropriate controls include, but are not limited to,sediment basins or sediment traps, sediment socks, dewatering tanks, tube settlers,weir tanks, or filtration systems (e.g.,bag or sand filters) that are designed to remove sediment. Page 17 of 60 Construction General Permit ICGP1 Note: Earth-disturbing activities have permanently ceased when clearing and excavation within any area of your construction site that will not include permanent structures has been completed. Note: Earth-disturbing activities have temporarily ceased when clearing, grading, and excavation within any area of the site that will not include permanent structures will not resume (i.e., the land will be idle) for a period of 14 or more calendar days, but such activities will resume in the future. The 14 calendar day timeframe above begins counting as soon as you know that construction work on a portion of your site will be temporarily ceased. In circumstances where you experience unplanned or unanticipated delays in construction due to circumstances beyond your control(e.g., sudden work stoppage due to unanticipated problems associated with construction labor, funding, or other issues related to the ability to work on the site;weather conditions rendering the site unsuitable for the continuation of construction work) and you do not know at first how long the work stoppage will continue, your requirement to immediately initiate stabilization is triggered as soon as you know with reasonable certainty that work will be stopped for 14 or more additional calendar days. At that point, you must comply with Parts 2.2.1.1 and 2.2.1.2. Note: For the purposes of this permit, EPA will consider any of the following types of activities to constitute the initiation of stabilization: I. prepping the soil for vegetative or non-vegetative stabilization; 2. applying mulch or other non-vegetative product to the exposed area; 3. seeding or planting the exposed area; 4. starting any of the activities in # 1 —3 on a portion of the area to be stabilized, but not on the entire area;and 5. finalizing arrangements to have stabilization product fully installed in compliance with the applicable deadline for completing stabilization in Parts 2.2.1.2 and 2.2.1.3. This list of examples is not exhaustive. Note: The term "immediately"is used to define the deadline for initiating stabilization measures. In the context of this provision, "immediately"means as soon as practicable, but no later than the end of the next work day, following the day when the earth-disturbing activities have temporarily or permanently ceased. 2.2.1.2 Deadline to Complete Stabilization Activities. As soon as practicable, but no later than 14 calendar days after the initiation of soil stabilization measures consistent with Part 2.2.1.1 12,you are required to have completed: a. For vegetative stabilization, all activities13 necessary to initially seed or plant the area to be stabilized; and/or b. For non-vegetative stabilization, the installation or application of all such non-vegetative measures. 72 EPA may determine,based on an inspection carried out under Part 4.2 and corrective actions required under Part 5.3,that the level of sediment discharge on the site makes it necessary to require a faster schedule for completing stabilization. For instance,if sediment discharges from an area of exposed soil that is required to be stabilized are compromising the performance of existing stormwater controls, EPA may require stabilization to correct this problem. 13 For example,such activities might include,but are not limited to,soil conditioning,application of seed or sod, planting of seedlings or other vegetation,application of fertilizer,and, as deemed appropriate, watering. Page 18 of 60 Construction General Permit (CGP) 2.2.1.3 Exceptions to the Deadlines for Initiating and Completing Stabilization. a. Deadlines for projects occurring in and or semi-arid areas, or drought- stricken areas. These requirements apply if (1) your site is located in an and area, a semi-arid area, or a drought-stricken area, as these terms are defined in Appendix A, (2) construction will occur during the seasonally dry period or during a period in which drought is predicted to occur, and (3) you are using vegetative cover for temporary or permanent stabilization. You may also comply with the deadlines in Part 2.2.1.1 instead. The deadlines for these types of projects are as follows: i. Immediately initiate, and within 14 calendar days of a temporary or permanent cessation of work in any portion of your site complete, the installation of temporary non-vegetative stabilization measures to the extent necessary to prevent erosion; ii. As soon as practicable, given conditions or circumstances on your site, complete all activities necessary to initially seed or plant the area to be stabilized; and iii. If construction is occurring during the seasonally dry period, indicate in your SWPPP the beginning and ending dates of the seasonally dry period and your site conditions. You must also include the schedule you will follow for initiating and completing vegetative stabilization. b. Deadlines for projects that are affected by circumstances beyond the control of the permittee that delay the initiation and/or completion of vegetative stabilization as required in Parts 2.2.1.1 and/or 2.2.1.2. If you are unable to meet the deadlines in Parts 2.2.1.1 and/or 2.2.1.2 due to circumstances beyond your control 14, and you are using vegetative cover for temporary or permanent stabilization, you may comply with the following stabilization deadlines instead: i. Immediately initiate, and within 14 calendar days complete, the installation of temporary non-vegetative stabilization measures to prevent erosion; ii. Complete all soil conditioning, seeding,watering or irrigation installation, mulching, and other required activities related to the planting and initial establishment of vegetation as soon as conditions or circumstances allow it on your site; and Note: You are required to have stabilized the exposed portions of your site consistent with Part 2.2.2 prior to terminating permit coverage under Part 8.2. iii. Document the circumstances that prevent you from meeting the deadlines required in Parts 2.2.].]and/or 2.2.1.2 and the schedule you will follow for initiating and completing stabilization. C. Deadlines for sites discharging to sensitive waters. For any portion of the site that discharges to a sediment or nutrient-impaired water (see Part 3.2) or to a water that is identified by your state, tribe, or EPA as Tier 2,Tier 2.5, or Tier 3 for antidegradation purposes (see Part 3.3), you are required 14 Examples include problems with the supply of seed stock or with the availability of specialized equipment, unsuitability of soil conditions due to excessive precipitation and/or flooding. Page 19 of 60 Construction General Permit ICGP) to complete the stabilization activities specified in Parts 2.2.1.2a and/or 2.2.1.2b within 7 calendar days after the temporary or permanent cessation of earth-disturbing activities. Note: If you qualify for the deadlines for initiating and completing stabilization in Part 2.2.1.3a or b, you may comply with the stabilization deadlines in Part 2.2.1.3a or b for any portion of your site that discharges to a sensitive water. 2.2.2. Criteria for Stabilization. To be considered adequately stabilized,you must meet the criteria below depending on the type of cover you are using, either vegetative or non-vegetative. 2.2.2.1 Vegetative Stabilization. a. For all sites, except those located in and or semi-arid areas or on agricultural lands. i. If you are vegetatively stabilizing any exposed portion of your site through the use of seed or planted vegetation,you must provide established uniform vegetation (e.g., evenly distributed without large bare areas),which provides 70 percent or more of the density of coverage that was provided by vegetation prior to commencing earth-disturbing activities. You should avoid the use of invasive species; ii. For final stabilization, vegetative cover must be perennial; and iii. Immediately after seeding or planting the area to be vegetatively stabilized, to the extent necessary to prevent erosion on the seeded or planted area,you must select, design, and install non-vegetative erosion controls that provide cover(e.g., mulch, rolled erosion control products) to the area while vegetation is becoming established. b. For sites located in and or semi-arid areas, or drought-stricken areas. If you are located in an and or semi-arid area, or a drought-stricken area, as these terms are defined in Appendix A, you are considered to have completed final stabilization if both of the following criteria are met: i. The area you have seeded or planted must within 3 years provide established vegetation that covers 70 percent or more of the density of vegetation prior to commencing earth-disturbing activities; and ii. In addition to seeding or planting the area to be vegetatively stabilized, to the extent necessary to prevent erosion on the seeded or planted area,you must select, design, and install non-vegetative erosion controls that provide cover for at least 3 years without active maintenance by you. C. For sites located on land used for agriculture. Disturbed areas on land used for agricultural purposes (e.g., pipelines across crop or range land, staging areas for highway construction) that are restored to their pre- construction agricultural use are not subject to these final stabilization criteria. Areas disturbed that were not previously used for agricultural activities, and areas that are not being returned to preconstruction agricultural use, must meet the conditions for stabilization in this Part. Page 20 of 60 Construction General Permit (CGP) 2.2.2.2 Non-Vegetative Stabilization. If you are using non-vegetative controls to stabilize exposed portions of your site, or if you are using such controls to temporarily protect areas that are being vegetatively stabilized, you must provide effective non-vegetative cover15 to stabilize any such exposed portions of your site. 2.3. POLLUTION PREVENTION REQUIREMENTS. You are required to design, install, and maintain effective pollution prevention measures in order to prevent the discharge of pollutants. Consistent with this requirement, you must: ® Eliminate certain pollutant discharges from your site (see Part 2.3.1); ® Properly maintain all pollution prevention controls (see Part 2.3.2); and ® Comply with pollution prevention standards for pollutant-generating activities that occur at your site (see Part 2.3.3). These requirements apply to all areas of your construction site and any and all support activities covered by this permit consistent with Part 1.3.c. 2.3.1. Prohibited Discharges. You are prohibited from discharging the following from your construction site: 2.3.1.1 Wastewater from washout of concrete, unless managed by an appropriate control as described in Part 2.3.3.4; 2.3.1.2 Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials, unless managed by an appropriate control as described in Part 2.3.3.4; 2.3.1.3 Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 2.3.1.4 Soaps, solvents, or detergents used in vehicle and equipment washing; and 2.3.1.5 Toxic or hazardous substances from a spill or other release. 2.3.2. General Maintenance Requirements. You must ensure that all pollution prevention controls installed in accordance with this Part remain in effective operating condition and are protected from activities that would reduce their effectiveness. You must inspect all pollutant-generating activities and pollution prevention controls in accordance with your inspection frequency requirements in Parts 4.1.2 or 3.2.2.1 to avoid situations that may result in leaks, spills, and other releases of pollutants in stormwater discharges to receiving waters, and must document your findings in accordance with Part 4.1.7. If you find that controls need to be replaced, repaired, or maintained, you must make the necessary repairs or modifications in accordance with the following: 2.3.2.1 Initiate work to fix the problem immediately after discovering the problem, and complete such work by the close of the next work day, if the problem does not require significant repair or replacement, or if the problem can be corrected through routine maintenance. 15 For temporary stabilization, examples of temporary non-vegetative stabilization methods include,but are not limited to,hydromulch and erosion control blankets. For final stabilization, examples of permanent non- vegetative stabilization methods include, but are not limited to,riprap, gabions,and geotextiles. Page 21 of 60 Construction General Permit (CGP) 2.3.2.2 When installation of a new pollution prevention control or a significant repair is needed,you must install the new or modified control and make it operational, or complete the repair, by no later than 7 calendar days from the time of discovery. If it is infeasible to complete the installation or repair within 7 calendar days, you must document in your records why it is infeasible to complete the installation or repair within the 7 calendar day timeframe and document your schedule for installing the stormwater control(s) and making it operational as soon as practicable after the 7 calendar day timeframe. Where these actions result in changes to any of the pollution prevention controls or procedures documented in your SWPPP,you must modify your SWPPP accordingly within 7 calendar days of completing this work. 2.3.3. Pollution Prevention Standards. You are required to comply with the pollution prevention standards in this Part if you conduct any of the following activities at your site or at any construction support activity areas covered by this permit (see Part 1.3.c): • Fueling and maintenance of equipment or vehicles; • Washing of equipment and vehicles; • Storage, handling, and disposal of construction materials, products, and wastes; and • Washing of applicators and containers used for paint, concrete, or other materials. The pollution prevention standards are as follows: 2.3.3.1 Fueling and Maintenance of Equipment or Vehicles. If you conduct fueling and/or maintenance of equipment or vehicles at your site,you must provide an effective means of eliminating the discharge of spilled or leaked chemicals, including fuel, from the area where these activities will take place.16 To comply with the prohibition in Part 2.3.1.3, you must: a. If applicable, comply with the Spill Prevention Control and Countermeasures (SPCC) requirements in 40 CFR 112 and Section 311 of the CWA; b. Ensure adequate supplies are available at all times to handle spills, leaks, and disposal of used liquids; C. Use drip pans and absorbents under or around leaky vehicles; d. Dispose of or recycle oil and oily wastes in accordance with other federal, state, tribal, or local requirements; e. Clean up spills or contaminated surfaces immediately, using dry clean up measures where possible, and eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge; and f. Do not clean surfaces by hosing the area down. 16 Examples of effective controls include, but are not limited to, locating activities away from surface waters and stormwater inlets or conveyances,providing secondary containment(e.g.,spill berms, decks,spill containment pallets)and cover where appropriate, and/or having spill kits readily available. Page 22 of 60 Construction General Permit (CGP) 2.3.3.2 Washing of Equipment and Vehicles. a. You must provide an effective means of minimizing the discharge of pollutants from equipment and vehicle washing,wheel wash water, and other types of washing;17 and b. To comply with the prohibition in Part 2.3.1.4,for storage of soaps, detergents, or solvents, you must provide either (1) cover (e.g., plastic sheeting or temporary roofs) to prevent these detergents from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas. 2.3.3.3 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes. You must minimize the exposure to stormwater of any of the products, materials, or wastes specified below that are present at your site by complying with the requirements in this Part. Note: These requirements do not apply to those products, materials, or wastes that are not a source of stormwater contamination or that are designed to be exposed to stormwater. To ensure you meet this requirement,you must: a. For building products18: In storage areas, provide either (1) cover (e.g., plastic sheeting or temporary roofs) to prevent these products from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas. b. For pesticides, herbicides, insecticides, fertilizers, and landscape materials: i. In storage areas, provide either (1) cover (e.g.,plastic sheeting or temporary roofs) to prevent these chemicals from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas; and ii. Comply with all application and disposal requirements included on the registered pesticide, herbicide, insecticide, and fertilizer label. c. For diesel fuel, oil, hydraulic fluids, other petroleum products, and other chemicals: i. To comply with the prohibition in Part 2.3.1.3, store chemicals in water-tight containers, and provide either (1) cover(e.g., plastic sheeting or temporary roofs) to prevent these containers from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas (e.g., spill kits), or provide secondary containment (e.g., spill berms, decks, spill containment pallets); and ii. Cleanup spills immediately, using dry clean-up methods where possible, and dispose of used materials properly. Do not clean 17 Examples of effective controls include, but are not limited to, locating activities away from surface waters and stormwater inlets or conveyances and directing wash waters to a sediment basin or sediment trap, using filtration devices,such as filter bags or sand filters, or using other similarly effective controls. 18 Some examples of building products that are typically stored at construction sites include, but are not limited to, asphalt sealants, copper flashing,roofing materials, adhesives,concrete admixtures. Page 23 of 60 Construction General Permit (CGP) surfaces or spills by hosing the area down. Eliminate the source of the spill to prevent a discharge or a continuation of an ongoing discharge. d. For hazardous or toxic waste 19: i. Separate hazardous or toxic waste from construction and domestic waste; ii. Store waste in sealed containers,which are constructed of suitable materials to prevent leakage and corrosion, and which are labeled in accordance with applicable Resource Conservation and Recovery Act (RCRA) requirements and all other applicable federal, state, tribal, or local requirements; iii. Store all containers that will be stored outside within appropriately- sized secondary containment (e.g., spill berms, decks, spill containment pallets) to prevent spills from being discharged, or provide a similarly effective means designed to prevent the discharge of pollutants from these areas (e.g., storing chemicals in covered area or having a spill kit available on site); iv. Dispose of hazardous or toxic waste in accordance with the manufacturer's recommended method of disposal and in compliance with federal, state, tribal, and local requirements; and v. Clean up spills immediately, using dry clean-up methods where possible, and dispose of used materials properly. Do not clean surfaces or spills by hosing the area down. Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge. e. For construction and domestic waste20: Provide waste containers (e.g., dumpster or trash receptacle) of sufficient size and number to contain construction and domestic wastes. In addition,you must: (1) On work days, clean up and dispose of waste in designated waste containers; and (2) Clean up immediately if containers overflow. f. Forsanitary waste: Position portable toilets so that they are secure and will not be tipped or knocked over. 2.3.3.4 Washing of Applicators and Containers used for Paint, Concrete, or Other Materials. To comply with the prohibition in Parts 2.3.1.1 and 2.3.1.2, you must provide an effective means of eliminating the discharge of water from the washout and cleanout of stucco, paint, concrete, form release oils, curing compounds, and other construction materials. To comply with this requirement, you must: 19 Examples of hazardous or toxic waste that may be present at construction sites include,but are not limited to, paints,solvents, petroleum-based products,wood preservatives, additives, curing compounds, acids. <o Examples of construction and domestic waste include,but are not limited to,packaging materials,scrap construction materials, masonry products,timber, pipe and electrical cuttings, plastics,Styrofoam, concrete, and other trash or building materials. Page 24 of 60 Construction General Permit (CGP) a. Direct all washwater into a leak-proof container or leak-proof pit. The container or pit must be designed so that no overflows can occur due to inadequate sizing or precipitation; b. Handle washout or cleanout wastes as follows: i. Do not dump liquid wastes in storm sewers; ii. Dispose of liquid wastes in accordance with applicable requirements in Part 2.3.3.3; and iii. Remove and dispose of hardened concrete waste consistent with your handling of other construction wastes in Part 2.3.3.3; and C. Locate any washout or cleanout activities as far away as possible from surface waters and stormwater inlets or conveyances, and, to the extent practicable, designate areas to be used for these activities and conduct such activities only in these areas. 2.3.4. Emergency Spill Notification. You are prohibited from discharging toxic or hazardous substances from a spill or other release, consistent with Part 2.3.1.5. Where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302 occurs during a 24-hour period, you must notify the National Response Center (NRC) at (800) 424-8802 or, in the Washington, DC metropolitan area, call (202) 267-2675 in accordance with the requirements of 40 CFR Part 1 10,40 CFR Part 117, and 40 CFR Part 302 as soon as you have knowledge of the discharge.You must also,within 7 calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of the release.State, tribal, or local requirements may necessitate additional reporting of spills or discharges to local emergency response, public health, or drinking water supply agencies. 2.3.5. Fertilizer Discharge Restrictions. You are required to minimize discharges of fertilizers containing nitrogen or phosphorus. To meet this requirement,you must comply with the following requirements: 2.3.5.1 Apply at a rate and in amounts consistent with manufacturer's specifications, or document departures from the manufacturer specifications where appropriate in Part 7.2.7.3 of the SWPPP; 2.3.5.2 Apply at the appropriate time of year for your location, and preferably timed to coincide as closely as possible to the period of maximum vegetation uptake and growth; 2.3.5.3 Avoid applying before heavy rains that could cause excess nutrients to be discharged; 2.3.5.4 Never apply to frozen ground; 2.3.5.5 Never apply to stormwater conveyance channels with flowing water; and 2.3.5.6 Follow all other federal, state, tribal, and local requirements regarding fertilizer application. Page 25 of 60 Construction General Permit (CGP) 3. WATER QUALITY-BASED EFFLUENT LIMITATIONS. 3.1. GENERAL EFFLUENT LIMITATION TO MEET APPLICABLE WATER QUALITY STANDARDS Your discharge must be controlled as necessary to meet applicable water quality standards. You must also comply with any additional requirements that your state or tribe requires you to meet in Part 9. In the absence of information demonstrating otherwise, EPA expects that compliance with the conditions in this permit will result in stormwater discharges being controlled as necessary to meet applicable water quality standards. If at any time you become aware, or EPA determines, that your discharge is not being controlled as necessary to meet applicable water quality standards, you must take corrective action as required in Part 5.2.1, and document the corrective actions as required in Part 5.2.2 and Part 5.4. EPA will also impose additional water qualify-based limitations on a site-specific basis, or require you to obtain coverage under an individual permit, if information in your NOI, or from other sources indicates that your discharges are not controlled as necessary to meet applicable water quality standards.This includes situations where additional controls are necessary to comply with a wasteload allocation in an EPA established or approved TMDL. 3.2. DISCHARGE LIMITATIONS FOR IMPAIRED WATERS If you discharge to a surface water that is impaired for (1) sediment or a sediment- related parameter,such as total suspended solids (TSS) or turbidity, and/or (2) nutrients, including impairments for nitrogen and/or phosphorus,you are required to comply with the requirements in Part 3.2.2. Note: For the purposes of this Part, "impaired waters"are waters identified as impaired on the appropriate CWA Section 303(d) list, or waters with an EPA-approved or established TMDL. Your construction site will be considered to discharge to an impaired water if the first surface water to which you discharge is identified by a state, tribe, or EPA pursuant to Section 303(d) of the CWA as not meeting an applicable water quality standard, or is included in an EPA-approved or established total maximum daily load(TMDL). For discharges that enter a storm sewer system prior to discharge, the first surface water to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system. If you discharge to an impaired water that is impaired for a parameter other than a sediment-related parameter or nutrients, EPA will inform you if any additional limits or controls are necessary for your discharge to be controlled as necessary to meet water quality standards, including for it to be consistent with the assumptions of any available wasteload allocation in any applicable TMDL, or if coverage under an individual permit is necessary in accordance with Part 1.4.5. If during your coverage under a previous permit,you were required to install and maintain stormwater controls specifically to meet the assumptions and requirements of an EPA-approved or established TMDL (for any parameter) or to otherwise control your discharge to meet wafer qualify standards, you must continue to implement such controls as part of this permit. 3.2.1. Identify If You Discharge To An Impaired Water. If you discharge to an impaired water, you must provide the following information in your NOI: • A list of all impaired waters to which you discharge; • The pollutants) for which the surface water is impaired; and Page 26 of 60 Construction General Permit (CGP) • Whether a TMDL has been approved or established for the waters to which you discharge. 3.2.2. Requirements for Discharges to Sediment or Nutrient-Impaired Waters. If you discharge to a surface water that is impaired for (1) sediment or a sediment- related parameter(e.g., total suspended solids (TSS) or turbidity) and/or (2) nutrients (e.g., nitrogen and/or phosphorus), including impaired waters for which a TMDL has been approved or established for the impairment, you are required to comply with the following stormwater control requirements, which supplement the requirements applicable to your site in other corresponding parts of the permit 3.2.2.1 Frequency of Site Inspection. You must conduct inspections at the frequency specified in Part 4.1.3. 3.2.2.2 Deadline to Complete Stabilization. You must comply with the deadlines for completing site stabilization as specified in Part 2.2.1.3c. 3.2.2.3 State and Tribal Requirements. You must comply with any additional state or tribal impairment-related requirements included in Part 9. EPA will also impose additional water quality-based limitations on a site-specific basis, or require you to obtain coverage under an individual permit, if it is determined that the controls in the Part will not be sufficient to control discharges consistent with the assumptions and requirements of an applicable wasteload allocation of an approved or established TMDL or to prevent the site from contributing to the impairment. 3.3. DISCHARGES TO WATERS IDENTIFIED AS TIER 2,TIER 2.5, OR TIER 3. 3.3.1. Identify if You Discharge to a Tier 2,Tier 2.5, or Tier 3 Water. If you discharge to a water identified by a state, tribe, or EPA as Tier 2,Tier 2.5, or Tier 3 water,you must provide on your NOI a list of waters identified as Tier 2, Tier 2.5, or Tier 3 to which you discharge. See Appendix F for a list of Tier 2 and 3 waters in Idaho, Massachusetts, New Hampshire, and New Mexico. Note: For the purposes of this permit, you are considered to discharge to a Tier 2, Tier 2.5, or Tier 3 water if the first surface water to which you discharge is identified by a state, tribe, or EPA as Tier 2, Tier 2.5, or Tier 3. Tiers 2,2.5 and 3 refer to waters either identified by the state as high quality waters or Outstanding National Resource Waters under 40 CFR §131.12(a)(2) and (3). For discharges that enter a storm sewer system prior to discharge, the surface water to which you discharge is the first surface water that receives the stormwater discharge from the storm sewer system. 3.3.2. Requirements for New Projects Discharging to Tier 2, Tier 2.5, or Tier 3 Waters. For new projects, if you will discharge to a Tier 2,Tier 2.5, or Tier 3 water,you are required to comply with the requirements in Parts 4.1.3 (inspection frequencies) and 2.2.1.3c (stabilization deadlines), and, if applicable, Part 9 (relevant state or tribal requirements). In addition, on a case-by-case basis, EPA may notify operators of such new projects or operators of existing projects with increased discharges that additional analyses, stormwater controls, or other permit conditions are necessary to comply with the applicable antidegradation requirements, or notify you that an individual permit application is necessary in accordance with Part 1.4.5. Page 27 of 60 Construction General Permit (CGP) 4. INSPECTIONS. 4.1. SITE INSPECTIONS. 4.1.1. Person(s) Responsible for Inspecting Site. The person(s) inspecting your site may be a person on your staff or a third party you hire to conduct such inspections. You are responsible for ensuring that the person who conducts inspections is a "qualified person." Note: A "qualified person"is a person knowledgeable in the principles and practice of erosion and sediment controls and pollution prevention, who possesses the skills to assess conditions at the construction site that could impact stormwater quality, and the skills to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit. 4.1.2. Frequency of Inspections. At a minimum, you must conduct a site inspection in accordance with one of the two schedules listed below, unless you are subject to Part 4.1.3 or Part 4.1.4: 4.1.2.1 At least once every 7 calendar days; or 4.1.2.2 Once every 14 calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater. To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.1.7.1 d. Note: Inspections are only required during the project's normal working hours. Note: You are required to specify in your SWPPP which schedule you will be following. Note: "Within 24 hours of the occurrence of a storm event"means that you are required to conduct an inspection within 24 hours once a storm event has produced 0.25 inches, even if the storm event is still continuing. Thus, if you have elected to inspect bi-weekly in accordance with Part 4.1.2.2 and there is a storm event at your site that continues for multiple days, and each day of the storm produces 0.25 inches or more of rain, you are required to conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the end of the storm. 4.1.3. Increase in Inspection Frequency for Sites Discharging to Sensitive Waters. For any portion of the site that discharges to a sediment or nutrient-impaired wafer (see Part 3.2) or to a water that is identified by your state, tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes (see Part 3.3), instead of the inspection frequency specified in Part 4.1.2, you must conduct inspections in accordance with the following inspection frequencies: 4.1.3.1 Once every 7 calendar days; and 4.1.3.2 Within 24 hours of fhe occurrence of a storm event of 0.25 inches or greater. To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that Page 28 of 60 Construction General Permit (CGP) measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.1.7.1 d. Note: Inspections are only required during the project's normal working hours. Note: "Within 24 hours of the occurrence of a storm event"means that you are required to conduct an inspection within 24 hours once a storm event has produced 0.25 inches, even if the storm event is still continuing. Thus, if there is a storm event at your site that continues for multiple days, and each day of the storm produces 0.25 inches or more of rain, you are required to conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the end of the storm. Note: If you qualify for any of the reduced inspection frequencies in Part 4.1.4, you may conduct inspections in accordance with Part 4.1.4 for any portion of your site that discharges to a sensitive water. 4.1.4. Reductions in Inspection Frequency. Your inspection frequency may be reduced as follows: 4.1.4.1 For Stabilized Areas. You may reduce the frequency of inspections to once per month in any area of your site where the stabilization steps in Parts 2.2.1.2a and 2.2.1.2b have been completed. If construction activity resumes in this portion of the site at a later date, the inspection frequency immediately increases to that required in Parts 4.1.2 or 4.1.3, if applicable. You must document the beginning and ending dates of this period in your records. 4.1.4.2 For Arid, Semi-Arid, or Drought-Stricken Areas. You may reduce the frequency of inspections to once per month and within 24 hours of the occurrence of a storm event of 0.25 inches or greater if your site is located in an arid, semi-arid, or drought-stricken area, as these terms are defined in Appendix A, and construction is occurring during the seasonally dry period or during a period in which drought is predicted to occur. You must document that you are using this reduced schedule and the beginning and ending dates of the seasonally dry period in your SWPPP.To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.1.7.1 d. Note: Inspections are only required during the project's normal working hours. Note: "Within 24 hours of the occurrence of a storm event"means that you are required to conduct an inspection within 24 hours once a storm event has produced 0.25 inches, even if the storm event is still continuing. Thus, if there is a storm event at your site that continues for multiple days, and each day of the storm produces 0.25 inches or more of rain, you are required to conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the end of the storm. 4.1.4.3 For Frozen Conditions. a. If you are suspending earth-disturbing activities due to frozen conditions, you may temporarily suspend inspections on your site until thawing conditions (see Appendix A) begin to occur if: Page 29 of 60 Construction General Permit (CGP) i. Runoff is unlikely due to continuous frozen conditions that are likely to continue at your site for at least 3 months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain on snow events) make discharges likely, you must immediately resume your regular inspection frequency as described in Parts 4.1.2 or 4.1.3, if applicable; ii. Land disturbances have been suspended; and iii. All disturbed areas of the site have been temporarily or permanently stabilized in accordance with Part 2.2. b. If you are still conducting earth-disturbing activities during frozen conditions, you may reduce your inspection frequency to once per month if: i. Runoff is unlikely due to continuous frozen conditions that are likely to continue at your site for at least 3 months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain on snow events) make discharges likely,you must immediately resume your regular inspection frequency as described in Parts 4.1.2 or 4.1.3 if applicable; and ii. Except for areas in which you are actively conducting earth- disturbing activities, disturbed areas of the site have been temporarily or permanently stabilized in accordance with Part 2.2. You must document the beginning and ending dates of this period in your SWPPP. 4.1.5. Areas that Need to Be Inspected. During your site inspection,you must at a minimum inspect the following areas of your site: 4.1.5.1 All areas that have been cleared, graded, or excavated and that have not yet completed stabilization consistent with Part 2.2; 4.1.5.2 All stormwater controls (including pollution prevention measures) installed at the site to comply with this permit; 4.1.5.3 Material,waste, borrow, or equipment storage and maintenance areas that are covered by this permit; 4.1.5.4 All areas where stormwater typically flows within the site, including drainageways designed to divert, convey, and/or treat stormwater; 4.1.5.5 All points of discharge from the site; and 4.1.5.6 All locations where stabilization measures have been implemented. You are not required to inspect areas that, at the time of the inspection, are considered unsafe to your inspection personnel. 4.1.6. Requirements for Inspections. During your site inspection,you must at a minimum: 4.1.6.1 Check whether all erosion and sediment controls and pollution prevention controls are installed, appear to be operational, and are working as intended to minimize pollutant discharges. Determine if any controls need to be replaced, repaired, or maintained in accordance with Parts 2.1.1.4 and 2.3.2; Page 30 of 60 Construction General Permit (CGP) 4.1.6.2 Check for the presence of conditions that could lead to spills, leaks, or other accumulations of pollutants on the site; 4.1.6.3 Identify any locations where new or modified stormwater controls are necessary to meet the requirements of Parts 2 and/or 3; 4.1.6.4 At points of discharge and, if applicable, the banks of any surface waters flowing within your property boundaries or immediately adjacent to your property, check for signs of visible erosion and sedimentation (i.e., sediment deposits) that have occurred and are attributable to your discharge; and 4.1.6.5 Identify any and all incidents of noncompliance observed. 4.1.6.6 If a discharge is occurring during your inspection, you are required to: a. Identify all points of the property from which there is a discharge; b. Observe and document the visual quality of the discharge, and take note of the characteristics of the stormwater discharge, including color, odor, floating, settled, or suspended solids, foam, oil sheen, and other obvious indicators of stormwater pollutants; and C. Document whether your stormwater controls are operating effectively, and describe any such controls that are clearly not operating as intended or are in need of maintenance. 4.1.6.7 Based on the results of your inspection, initiate corrective action under Part 5. 4.1.7. Inspection Report. 4.1.7.1 Requirement to Complete Inspection Report. You must complete an inspection report within 24 hours of completing any site inspection. Each inspection report must include the following: a. The inspection date; b. Names and titles of personnel making the inspection; C. A summary of your inspection findings, covering at a minimum the observations you made in accordance with Part 4.1.6; d. If you are inspecting your site at the frequency specified in Part 4.1.2.2, Part 4.1.3, or Part 4.1.4.2, and you conducted an inspection because of rainfall measuring 0.25 inches or greater,you must include the applicable rain gauge or weather station readings that triggered the inspection; and e. If you have determined that it is unsafe to inspect a portion of your site, you must describe the reason you found it to be unsafe and specify the locations that this condition applied to. 4.1.7.2 Signature Requirements. Each inspection report must be signed in accordance with Appendix I, Part 1.11 of this permit. 4.1.7.3 Recordkeeping Requirements. You are required to keep a current, copy of all inspection reports at the site or at an easily accessible location,so that it can be made available at the time of an onsite inspection or upon request by EPA. For purposes of this permit,your inspection reports may be kept electronically if the records are: a. In a format that can be read in a similar manner as a paper record; Page 31 of 60 Construction General Permit (CGP) b. Legally dependable with no less evidentiary value than their paper equivalent; and C. Accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be, if the records were stored in paper form. Note: See Section IX.1.7 of the Fact Sheet for a discussion on ways to ensure that electronic records satisfy this requirement. See Appendix I, Part 1.11.5 for requirements relating to electronic signature of these documents. All inspection reports completed for this Part must be retained for at least 3 years from the date that your permit coverage expires or is terminated. 4.2. INSPECTIONS BY EPA. You must allow EPA, or an authorized representative of the EPA, to conduct the following activities at reasonable times: 4.2.1. Enter onto areas of your site, including any construction support activity areas covered by this permit (see Part 1.3.c), and onto locations where records are kept under the conditions of this permit; 4.2.2. Access and copy any records that must be kept under the conditions of this permit; 4.2.3. Inspect your construction site, including any construction support activity areas covered by this permit (see Part 1.3.c) and any stormwater controls installed and maintained at the site; and 4.2.4. Sample or monitor for the purpose of ensuring compliance. Page 32 of 60 Construction General Permit (CGP) 5. CORRECTIVE ACTIONS. 5.1. "CORRECTIVE ACTIONS" DEFINED. Corrective actions are actions you take in compliance with this Part to: • Repair, modify, or replace any stormwater control used at the site; • Clean up and properly dispose of spills, releases, or other deposits; or • Remedy a permit violation. 5.2. REQUIREMENTS FOR TAKING CORRECTIVE ACTION. You must complete the following corrective actions in accordance with the deadlines specified in this Part. In all circumstances, you must immediately take all reasonable steps to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational, including cleaning up any contaminated surfaces so that the material will not discharge in subsequent storm events. Note: In this context, the term "immediately"requires construction operators to, on the some day a condition requiring corrective action is found, take all reasonable steps to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational. However, if the problem is identified at a time in the work day when it is too late to initiative corrective action, the initiation of corrective action must begin on the following work day. 5.2.1. For any of the following conditions on your site,you must install a new or modified control and make it operational, or complete the repair, by no later than 7 calendar days from the time of discovery. If it is infeasible to complete the installation or repair within 7 calendar days, you must document in your records why it is infeasible to complete the installation or repair within the 7 calendar day timeframe and document your schedule for installing the stormwater controls) and making it operational as soon as practicable after the 7-day timeframe. 5.2.1.1 A required stormwater control was never installed,was installed incorrectly, or not in accordance with the requirements in Parts 2 and/or 3; or 5.2.1.2 You become aware that the stormwater controls you have installed and are maintaining are not effective enough for the discharge to meet applicable water quality standards or applicable requirements in Part 3.1. In this case,you must notify your EPA Regional Office by the end of the next work day. You are required to submit your notification through EPA's electronic NOI system, or "eNO1", at w�nr✓.epa.c ov'r7 des!cgpenoi; or 5.2.1.3 One of the prohibited discharges in Part 2.3.1 is occurring or has occurred. 5.2.2. Where your corrective actions result in changes to any of the stormwater controls or procedures documented in your SWPPP,you must modify your SWPPP accordingly within 7 calendar days of completing corrective action work. 5.3. CORRECTIVE ACTION REQUIRED BY EPA. You must comply with any corrective actions required by EPA as a result of permit violations found during an inspection carried out under Part 4.2. 5.4. CORRECTIVE ACTION REPORT. For each corrective action taken in accordance with this Part, you must complete a corrective action report,which includes the applicable information in Parts 5.4.1 and 5.4.2. Note that these reports must be maintained in your records but do not need to be provided to EPA except upon request. Page 33 of 60 Construction General Permit (CGP) 5.4.1. Within 24 hours of discovering the occurrence of one of the triggering conditions in Part 5.2.1 at your site,you must complete a report of the following: 5.4.1.1 Which condition was identified at your site; 5.4.1.2 The nature of the condition identified; and 5.4.1.3 The date and time of the condition identified and how it was identified. 5.4.2. Within 7 calendar days of discovering the occurrence of one of the triggering conditions in Part 5.2.1 at your site, you must complete a report of the following: 5.4.2.1 Any follow-up actions taken to review the design, installation, and maintenance of stormwater controls, including the dates such actions occurred; 5.4.2.2 A summary of stormwater control modifications taken or to be taken, including a schedule of activities necessary to implement changes, and the date the modifications are completed or expected to be completed; and 5.4.2.3 Notice of whether SWPPP modifications are required as a result of the condition identified or corrective action. 5.4.3. Signature Requirements. Each corrective action report must be signed and certified in accordance with Appendix I, Part 1.11 of this permit. 5.4.4. Recordkeeping Requirements. You are required to keep a current copy of all corrective action reports at the site or at an easily accessible location, so that it can be made available at the time of an onsite inspection or upon request by EPA. For purposes of this permit,your corrective action reports may be kept electronically if the records are: 5.4.4.1 In a format that can be read in a similar manner as a paper record; 5.4.4.2 Legally dependable with no less evidentiary value than their paper equivalent; and 5.4.4.3 Accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be, if the records were stored in paper form. Note: See Section IX.1.7 of the Fact Sheet for a discussion on ways to ensure that electronic records satisfy this requirement. See Appendix I, Part 1.11.5 for requirements relating to electronic signature of these documents. All corrective action reports completed for this Part must be retained for at least 3 years from the date that your permit coverage expires or is terminated. Page 34 of 60 Construction General Permit (CGP) 6. STAFF TRAINING REQUIREMENTS. Prior to the commencement of earth-disturbing activities or pollutant-generating activities, whichever occurs first,you must ensure that the following personnel understand the requirements of this permit and their specific responsibilities with respect to those requirements: • Personnel who are responsible for the design, installation, maintenance, and/or repair of stormwater controls (including pollution prevention measures); • Personnel responsible for the application and storage of treatment chemicals (if applicable); • Personnel who are responsible for conducting inspections as required in Part 4.1.1; and • Personnel who are responsible for taking corrective actions as required in Part 5. Notes: (1) If the person requiring training is a new employee, who starts after you commence earth-disturbing or pollutant-generating activities, you must ensure that this person has the proper understanding as required above prior to assuming particular responsibilities related to compliance with this permit. (2) For emergency-related construction activities, the requirement to train personnel prior to commencement of earth-disturbing activities does not apply, however, such personnel must have the required training prior to NO] submission. You are responsible for ensuring that all activities on the site comply with the requirements of this permit. You are not required to provide or document formal training for subcontractors or other outside service providers, but you must ensure that such personnel understand any requirements of the permit that may be affected by the work they are subcontracted to perform. At a minimum, personnel must be trained to understand the following if related to the scope of their job duties (e.g., only personnel responsible for conducting inspections need to understand how to conduct inspections): • The location of all stormwater controls on the site required by this permit, and how they are to be maintained; • The proper procedures to follow with respect to the permit's pollution prevention requirements; and • When and how to conduct inspections, record applicable findings, and take corrective actions. Page 35 of 60 Construction General Permit (CGP) 7. STORMWATER POLLUTION PREVENTION PLAN (SWPPP). 7.1. GENERAL REQUIREMENTS. 7.1.1. Requirement to Develop a SWPPP Prior to Submitting Your NOI. All operators associated with a construction project to be covered under this permit must develop a SWPPP. Note: You have the option of developing a group SWPPP where you are one of several operators who will be engaged in construction activities at your site. For instance, if both the owner and the general contractor of the construction site are permitted, the owner may be the party responsible for SWPPP development, and the general contractor can choose to use this some SWPPP, as long as the SWPPP addresses the general contractor's scope of construction work and obligations under this permit. You are required to develop your site's SWPPP prior to submitting your NOI. At a minimum, your SWPPP must include the information required in Part 7.2 and as specified in other parts of the permit. 21 You must also update the SWPPP as required in Part 7.4. Note: If your project is an "existing project" (see Part 1.4.2.b) or if you are a new operator of an existing project" (see Part 1.4.2.c), and it is infeasible for you to comply with a specific requirement in this Part or in Parts 2.1, and 2.3.3 through 2.3.5 (except for Parts 2.3.3.1, 2.3.3.2b, 2.3.3.3c.i, and 2.3.3.4) because (1) the provision was not part of the permit you were previously covered under(i.e., the 2003 or 2008 CGP), and(2) because you are prevented from compliance due to the nature or location of earth disturbances that commenced prior to February 16, 2012, or because you are unable to comply with the requirement due to the manner in which stormwater controls have already been installed or were already designed prior to February 16,2012, you are required to include documentation of the reasons why it is infeasible for you to meet the specific requirement, and then you may be waived from complying with this requirement. You must include a separate justification why it is infeasible for you to meet each of the applicable requirements. If you prepared a SWPPP for coverage under a previous version of this NPDES permit, you must review and update your SWPPP to ensure that this permit's requirements are addressed prior to submitting your NOI. 7.2. SWPPP CONTENTS. Your SWPPP must include the following information, at a minimum. 7.2.1. Stormwater Team. Each operator, or group of multiple operators, must assemble a "stormwater team," which is responsible for overseeing the development of the SWPPP, any later modifications to it, and for compliance with the requirements in this permit. The SWPPP must identify the personnel (by name or position) that are part of the stormwater team, as well as their individual responsibilities. Each member of the stormwater team must have ready access to an electronic or paper copy of applicable portions of this permit, the most updated copy of your SWPPP, and other relevant documents or information that must be kept with the SWPPP. 7.2.2. Nature of Construction Activities. The SWPPP must describe the nature of your construction activities, including the size of the property (in acres) and the total area expected to be disturbed by the construction <, The SWPPP does not establish the effluent limits that apply to your site's discharges;these limits are established in this permit in Parts 2 and 3. Page 36 of 60 Construction General Permit (CGP) activities (in acres), construction support activity areas covered by this permit (see Part 1.3.c), and the maximum area expected to be disturbed at any one time. 7.2.3. Emergency-Related Projects. If you are conducting earth-disturbing activities in response to a public emergency (see Part 1.2), you must document the cause of the public emergency (e.g., natural disaster, extreme flooding conditions, etc.), information substantiating its occurrence (e.g., state disaster declaration or similar state or local declaration), and a description of the construction necessary to reestablish effected public services. 7.2.4. Identification of Other Site Operators. The SWPPP must include a list of all other operators who will be engaged in construction activities at your site, and the areas of the site over which each operator has control. 7.2.5. Sequence and Estimated Dates of Construction Activities. The SWPPP must include a description of the intended sequence of construction activities, including a schedule of the estimated start dates and the duration of the activity, for the following activities: 7.2.5.1 Installation of stormwater control measures, and when they will be made operational, including an explanation of how the sequence and schedule for installation of stormwater control measures complies with Part 2.1.1.3a and of any departures from manufacturer specifications pursuant to Part 2.1.1.3b; 7.2.5.2 Commencement and duration of earth-disturbing activities, including clearing and grubbing, mass grading,site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization; 7.2.5.3 Cessation, temporarily or permanently, of construction activities on the site, or in designated portions of the site; 7.2.5.4 Final or temporary stabilization of areas of exposed soil. The dates for stabilization must reflect the applicable deadlines to which you are subject in Part 2.2.1; and 7.2.5.5 Removal of temporary stormwater conveyances/channels and other stormwater control measures, removal of construction equipment and vehicles, and cessation of any pollutant-generating activities. Note: If plans change due to unforeseen circumstances or for other reasons, the requirement to describe the sequence and estimated dates of construction activities is not meant to "lock in"the operator to meeting these projections. When departures from initial projections are necessary, this should be documented in the SWPPP itself or in associated records, as appropriate. 7.2.6. Site Map. The SWPPP must include a legible site map, or series of maps, showing the following features of your project: Note: Included in the project site are any construction support activities covered by this permit (see Part 1.1c). 7.2.6.1 Boundaries of the property and of the locations where construction activities will occur, including: Page 37 of 60 Construction General Permit (CGP) a. Locations where earth-disturbing activities will occur, noting any phasing of construction activities; b. Approximate slopes before and after major grading activities. Note areas of steep slopes, as defined in Appendix A; C. Locations where sediment,soil, or other construction materials will be stockpiled; d. Locations of any crossings of surface waters; e. Designated points on the site where vehicles will exit onto paved roads; f. Locations of structures and other impervious surfaces upon completion of construction; and g. Locations of construction support activity areas covered by this permit (see Part 1.3.c). 7.2.6.2 Locations of all surface waters, including wetlands, that exist within or in the immediate vicinity of the site. Indicate which waterbodies are listed as impaired, and which are identified by your state, tribe, or EPA as Tier 2,Tier 2.5, or Tier 3 waters; 7.2.6.3 The boundary lines of any natural buffers provided consistent with Part 2.1.2.1 a; 7.2.6.4 Areas of federally-listed critical habitat for endangered or threatened species; 7.2.6.5 Topography of the site, existing vegetative cover (e.g., forest, pasture, pavement, structures), and drainage pattern(s) of stormwater and authorized non-stormwater flow onto, over, and from the site property before and after major grading activities; 7.2.6.6 Stormwater and allowable non-stormwater discharge locations, including: a. Locations of any storm drain inlets on the site and in the immediate vicinity of the site; and Note: The requirement to show storm drain inlets in the immediate vicinity of the site on your site map only applies to those inlets that are easily identifiable from your site or from a publicly accessible area immediately adjacent to your site. b. Locations where stormwater or allowable non-stormwater will be discharged to surface waters (including wetlands) on or near the site. 7.2.6.7 Locations of all potential pollutant-generating activities identified in Part 7.2.7; 7.2.6.8 Locations of stormwater control measures; and 7.2.6.9 Locations where polymers, flocculants, or other treatment chemicals will be used and stored. 7.2.7. Construction Site Pollutants. The SWPPP must include the following: 7.2.7.1 A list and description of all the pollutant-generating activities22 on your site. 22 Examples of pollutant-generating activities include, but are not limited to:paving operations;concrete, paint, and stucco washout and waste disposal;solid waste storage and disposal; and dewatering operations. Page 38 of 60 Construction General Permit (CGP) 7.2.7.2 For each pollutant-generating activity, an inventory of pollutants or pollutant constituents (e.g., sediment, fertilizers and/or pesticides, points, solvents, fuels) associated with that activity,which could be exposed to rainfall, or snowmelt, and could be discharged from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges. You must also document any departures from the manufacturer's specifications for applying fertilizers containing nitrogen and phosphorus, as required in Part 2.3.5.1. 7.2.8. Non-Stormwater Discharges. The SWPPP must also identify all sources of allowable non-stormwater discharges listed in Part 1.3.d. 7.2.9. Buffer Documentation. If you are required to comply with Part 2.1.2.1 because a surface water is located within 50 feet of your project's earth disturbances,you must describe which compliance alternative you have selected for your site, and comply with any additional requirements to provide documentation in Part 2.1.2.1. 7.2.10. Description of Stormwater Control Measures. 7.2.10.1 Stormwater Control Measures to be Used During Construction Activity. The SWPPP must describe all stormwater control measures that are or will be installed and maintained at your site to meet the requirements of Part 2. For each stormwater control measure,you must document: a. Information on the type of stormwater control measure to be installed and maintained, including design information; b. What specific sediment controls will be installed and made operational prior to conducting earth-disturbing activities in any given portion of your site to meet the requirement of Part 2.1.2.2a; C. For exit points on your site, document stabilization techniques you will use and any additional controls that are planned to remove sediment prior to vehicle exit consistent with Part 2.1.2.3; and d. For linear projects,where you have determined that the use of perimeter controls in portions of the site is impracticable, document why you believe this to be the case (see Part 2.1.2.2a). 7.2.10.2 Use of Treatment Chemicals, If you will use polymers, flocculants, or other treatment chemicals at your site, the SWPPP must include: a. A listing of all soil types23 that are expected to be exposed during construction and that will be discharged to locations where chemicals will be applied. Also include a listing of soil types expected to be found in fill material to be used in these same areas, to the extent you have this information prior to construction. b. A listing of all treatment chemicals to be used at the site, and why the selection of these chemicals is suited to the soil characteristics of your site; 23 Information on soils may be obtained at http://websoilsurvey.nres.usda.aov/app/. Page 39 of 60 Construction General Permit (CGP) C. If you have been authorized by your applicable EPA Regional Office to use cationic treatment chemicals, include the specific controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards; d. The dosage of all treatment chemicals you will use at the site or the methodology you will use to determine dosage; e. Information from any applicable Material Safety Data Sheets (MSDS); f. Schematic drawings of any chemically-enhanced stormwater controls or chemical treatment systems to be used for application of the treatment chemicals; g. A description of how chemicals will be stored consistent with Part 2.1.3.3b; h. References to applicable state or local requirements affecting the use of treatment chemicals, and copies of applicable manufacturer's specifications regarding the use of your specific treatment chemicals and/or chemical treatment systems;and i. A description of the training that personnel who handle and apply chemicals have received prior to permit coverage, or will receive prior to use of the treatment chemicals at your site. 7.2.10.3 Stabilization Practices. The SWPPP must describe the specific vegetative and/or non-vegetative practices that will be used to comply with the requirements in Part 2.2,including: a. If you will be complying with the stabilization deadlines specified in Part 2.2.1.3a,you must indicate in your SWPPP the beginning and ending dates of the seasonally dry period and your site conditions; and b. If you will be complying with the stabilization deadlines specified in Part 2.2.1.3b,you must document the circumstances that prevent you from meeting the deadlines specified in Parts 2.2.1.1 and/or 2.2.1.2. 7.2.11. Pollution Prevention Procedures. 7.2.11.1 Spill Prevention and Response Procedures. The SWPPP must describe procedures that you will follow to prevent and respond to spills and leaks consistent with Part 2.3, including: a. Procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases. Identify the name or position of the employee(s) responsible for detection and response of spills or leaks; and b. Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies where a leak,spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity consistent with Part 2.3.4 and established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302, occurs during a 24-hour period. Contact information must be in locations that are readily accessible and available. You may also reference the existence of Spill Prevention Control and Countermeasure (SPCC) plans developed for the construction activity under Part 311 of the CWA, or spill control programs otherwise required Page 40 of 60 Construction General Permit (CGP) by an NPDES permit for the construction activity, provided that you keep a copy of that other plan onsite. Note: Even if you already have an SPCC or other spill prevention plan in existence, your plans will only be considered adequate if they meet all of the requirements of this Part, either as part of your existing plan or supplemented as part of the SWPPP. 7.2.11.2 Waste Management Procedures. The SWPPP must describe procedures for how you will handle and dispose of all wastes generated at your site, including, but not limited to, clearing and demolition debris, sediment removed from the site, construction and domestic waste, hazardous or toxic waste, and sanitary waste. 7.2.12. Procedures for Inspection,Maintenance, and Corrective Action. The SWPPP must describe the procedures you will follow for maintaining your stormwater control measures, conducting site inspections, and, where necessary, taking corrective actions, in accordance with Part 2.1.1.4, Part 2.3.2, Part 4, and Part 5 of the permit. The following information must also be included in your SWPPP: 7.2.12.1 Personnel responsible for conducting inspections; 7.2.12.2 The inspection schedule you will be following,which is based on whether your site is subject to Part 4.1.2 or Part 4.1.3, and whether your site qualifies for any of the allowances for reduced inspection frequencies in Part 4.1.4. If you will be conducting inspections in accordance with the inspection schedule in Part 4.1.2.2 or Part 4.1.3, the location of the rain gauge on your site or the address of the weather station you will be using to obtain rainfall data; 7.2.12.3 If you will be reducing your inspection frequency in accordance with Part 4.1.4.2, the beginning and ending dates of the seasonally-defined and period for your area or the valid period of drought. If you will be reducing your inspection frequency in accordance with Part 4.1.4.3, the beginning and ending dates of frozen conditions on your site; and 7.2.12.4 Any inspection or maintenance checklists or other forms that will be used. 7.2.13. Staff Training. The SWPPP must include documentation that the required personnel were trained in accordance with Part 6. 7.2.14. Documentation of Compliance with Other Federal Requirements. 7.2.14.1 Endangered Species Act. The SWPPP must include documentation supporting your determination with respect to Part 1.1.e and Appendix D. 7.2.14.2 Historic Properties. The SWPPP must include documentation required by Appendix E in relation to potential impacts to historic properties. 7.2.14.3 Safe Drinking Water Act Underground Injection Control (UIC) Requirements for Certain Subsurface Stormwater Controls. If you are using any of the following stormwater controls at your site, as they are described below, you must document any contact you have had with the applicable state agency or EPA Regional Office responsible for implementing the requirements for underground injection wells in the Safe Drinking Water Act and EPA's implementing regulations at 40 CFR Parts 144-147.Such controls would generally be considered Class V UIC wells: Page 41 of 60 Construction General Permit (CGP) a. Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system); b. Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow; and C. Drywells,seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system). Note: For state UIC program contacts, refer to the following EPA website: h ttp://water.e pa.gov/type lgro and water/uic/whereyo ulive.cfm. 7.2.15. SWPPP Certification. You must sign and date your SWPPP in accordance with Appendix I, Part 1.11. 7.2.16. Post-Authorization Additions to the SWPPP. Once you are notified of your coverage under this permit, you must include the following documents as part of your SWPPP: 7.2.16.1 A copy of your NOI submitted to EPA along with any correspondence exchanged between you and EPA related to coverage under this permit; 7.2.16.2 A copy of the acknowledgment letter you receive from the NOI Processing Center or eNOI system assigning your permit tracking number; 7.2.16.3 A copy of this permit (an electronic copy easily available to the stormwater team is also acceptable). 7.3. ON-SITE AVAILABILITY OF YOUR SWPPP. You are required to keep a current copy of your SWPPP at the site or at an easily accessible location so that it can be made available at the time of an on-site inspection or upon request by EPA; a state, tribal, or local agency approving stormwater management plans; the operator of a storm sewer system receiving discharges from the site; or representatives of the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS). EPA may provide access to portions of your SWPPP to a member of the public upon request. Confidential Business Information (CBI) will be withheld from the public, but may not be withheld from EPA, USFWS, or NMFS. Note: Information covered by a claim of confidentiality will be disclosed by EPA only to the extent of, and by means of, the procedures set forth in 40 CFR Part 2, Subpart B. In general,submitted information protected by a business confidentiality claim may be disclosed to other employees, officers, or authorized representatives of the United States concerned with implementing the CWA. The authorized representatives,including employees of other executive branch agencies, may review CBI during the course of reviewing draft regulations. If an onsite location is unavailable to keep the SWPPP when no personnel are present, notice of the plan's location must be posted near the main entrance of your construction site. Page 42 of 60 Construction General Permit (CGP) 7.4. REQUIRED SWPPP MODIFICATIONS. 7.4.1. List of Conditions Requiring SWPPP Modification. You must modify your SWPPP, including the site map(s), in response to any of the following conditions: 7.4.1.1 Whenever new operators become active in construction activities on your site, or you make changes to your construction plans, sformwater control measures, pollution prevention measures, or other activities at your site that are no longer accurately reflected in your SWPPP. This includes changes made in response to corrective actions triggered under Part 5. You do not need to modify your SWPPP if the estimated dates in Part 7.2.5 change during the course of construction; 7.4.1.2 To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; 7.4.1.3 If inspections or investigations by site staff, or by local, state, tribal, or federal officials determine that SWPPP modifications are necessary for compliance with this permit; 7.4.1.4 Where EPA determines it is necessary to impose additional requirements on your discharge, the following must be included in your SWPPP: a. A copy of any correspondence describing such requirements; and b. A description of the sformwater control measures that will be used to meet such requirements. 7.4.1.5 To reflect any revisions to applicable federal, state, tribal, or local requirements that affect the sformwater control measures implemented at the site; and 7.4.1.6 If applicable, if a change in chemical treatment systems or chemically- enhanced sformwater control is made, including use of a different treatment chemical, different dosage rate, or different area of application. 7.4.2. Deadlines for SWPPP Modifications. You must complete required revisions to the SWPPP within 7 calendar days following the occurrence of any of the conditions listed in Part 7.4.1. 7.4.3. SWPPP Modification Records. You are required to maintain records showing the dates of all SWPPP modifications. The records must include the name of the person authorizing each change (see Part 7.2.15 above) and a brief summary of all changes. 7.4.4. Certification Requirements. All modifications made to the SWPPP consistent with Part 7.4 must be authorized by a person identified in Appendix I, Part 1.1 l.b. 7.4.5. Required Notice to Other Operators. Upon determining that a modification to your SWPPP is required, if there are multiple operators covered under this permit,you must immediately notify any operators who may be impacted by the change to the SWPPP. Page 43 of 60 Construction General Permit (CGP) 8. HOW TO TERMINATE COVERAGE. Until you terminate coverage under this permit, you are required to comply with all conditions and effluent limitations in the permit. To terminate permit coverage,you must submit to EPA a complete and accurate Notice of Termination (NOT),which certifies that you have met the requirements for terminating in Part 8. 8.1. MINIMUM INFORMATION REQUIRED IN NOT. You will be required to provide the following in your NOT: 8.1.1. NPDES permit tracking number provided by EPA when you received coverage under this permit; 8.1.2. Basis for submission of the NOT (see Part 8.2); 8.1.3. Operator contact information; 8.1.4. Name of project and address (or a description of location if no street address is available); and 8.1.5. NOT certification. 8.2. CONDITIONS FOR TERMINATING PERMIT COVERAGE. You may terminate permit coverage only if one of the following conditions occurs at your site: 8.2.1. You have completed all earth-disturbing activities at your site and, if applicable, construction support activities covered by this permit(see Part 1.3.c), and you have met the following requirements: 8.2.1.1 For any areas that (1) were disturbed during construction, (2) are not covered over by permanent structures, and (3) over which you had control during the construction activities, you have met the requirements for final vegetative or non-vegetative stabilization in Part 2.2.2; 8.2.1.2 You have removed and properly disposed of all construction materials,waste and waste handling devices, and have removed all equipment and vehicles that were used during construction, unless intended for long-term use following your termination of permit coverage; 8.2.1.3 You have removed all stormwater controls that were installed and maintained during construction, except those that are intended for long-term use following your termination of permit coverage or those that are biodegradable; and 8.2.1.4 You have removed all potential pollutants and pollutant-generating activities associated with construction, unless needed for long-term use following your termination of permit coverage; or 8.2.2. You have transferred control of all areas of the site for which you are responsible under this permit to another operator, and that operator has submitted an NOI and obtained coverage under this permit; or 8.2.3. Coverage under an individual or alternative general NPDES permit has been obtained. 8.3. HOW TO SUBMIT YOUR NOT. You are required to use EPA's electronic NOI system, or"eNOI system", to prepare and submit your NOT. The electronic NOT form you are required to complete is found at www.e_pa.aovZnpdes/storniwater/car)enoi. You will use your NOI tracking number(i.e., the EPA number you were assigned upon authorization under the permit) to upload the Page 44 of 60 Construction General Permit (CGP) fillable NOT form,which will ensure that EPA properly records your termination of coverage. If you have a problem with the use of the eNO1 system, contact the EPA Regional Office that corresponds to the location of your site. If you are given approval by the EPA Regional Office to use a paper NOT, you must complete the form in Appendix K. 8.4. DEADLINE FOR SUBMITTING NOTE. You must submit your NOT within 30 calendar days after any one of the triggering conditions in Part 8.2 occur. 8.5. EFFECTIVE DATE OF TERMINATION OF COVERAGE. Your authorization to discharge under this permit terminates at midnight of the calendar day that a complete NOT is processed and posted on EPA's website (v��rrv✓.�:��a ovLn des/sfornj�uaterlc�oarch). Page 45 of 60 Construction General Permit (CGP) 9. PERMIT CONDITIONS APPLICABLE TO SPECIFIC STATES, INDIAN COUNTRY LANDS, OR TERRITORIES The provisions in this Part provide modifications or additions to the applicable conditions of this permit to reflect specific additional conditions required as part of the state or tribal CWA Section 401 certification process, or the Coastal Zone Management Act (CZMA) certification process, or as otherwise established by the permitting authority. The specific additional revisions and requirements only apply to activities in those specific states, Indian country, and areas in certain states subject to construction projects by Federal Operators. States, Indian country, and areas subject to construction by Federal Operators not included in this Part do not have any modifications or additions to the applicable conditions of this permit 9.1. Region 1 9.1.1. MAR120000: Commonwealth of Massachusetts (except Indian country). 9.1.1.1 You must comply with the Massachusetts Clean Waters Act (Ch.21,ss.26-53). 9.1.1.2 You must comply with the conditions in 314 CMR 4.00-Massachusetts Surface Water Quality Standards. 9.1.1.3 You must comply with the conditions in 314 CMR 3.00-Massachusetts Surface Water Discharge Permit Program. 9.1.1.4 You must comply with the Wetlands Protection Act (Ch. 131 s.40) and its regulations, 310 CMR 10.00 and any Order of Conditions issued by a Conservation Commission or a Superseding Order of Conditions issued by the Massachusetts Department of Environmental Protection. 9.1.1.5 You must comply with the Massachusetts Storm Water Performance Standards, as prescribed by state regulations promulgated under the authority of the Massachusetts Clean Waters Act, MGL Ch.21,ss 26-53 and the Wetlands Protection Act, Ch. 131, s. 40. 9.1.1.6 You must comply with the conditions in 314 CMR 9.00-Water Quality Certification for Discharges of Dredged or Fill Material, Dredging, and Dredged Material Disposal in Waters of the United States within the Commonwealth. 9.1.1.7 You must comply with the Massachusetts Endangered Species Act (MESA), MGL Ch. 313A and regulations at 321 CMR 10.00 and any actions undertaken to comply with this stormwater general permit shall not result in non-compliance with the MESA. 9.1.1.8 Activities covered under this general permit shall not interfere with the implementation of mosquito control work conducted in accordance with Chapter 252 including s. 5A thereunder and MassDEP Guideline Number BRP GOl-02, West Nile Virus Application of Pesticides to Wetland Resource Areas and Buffer Zones, and Public Water Supplies. 9.1.1.9 The Department may request a copy of the Stormwater Pollution Prevention Plan (SWPPP) and the permittee is required to submit the SWPPP to the Department within 14 days of such request. The Department may conduct an inspection of any facility covered by this permit to ensure compliance with state law requirements, including state water quality standards.The Department may enforce its certification conditions. Page 46 of 60 Construction General Permit (CGP) 9.1.1.10 The Department may require the permit holder to perform wafer quality monitoring during the permit term if monitoring is necessary for the protection of public health or the environment as designated under the authority at 314 CMR 3.00. 9.1.1.11 The Department may require the permit holder to provide measurable verification of the effectiveness of Best Management Practices (BMPs) and other control measures used in the stormwater management program, including water quality monitoring. 9.1.1.12 The Department has determined that compliance with this permit does not protect the permit holder from enforcement actions deemed necessary by the Department under its associated regulations to address an imminent threat to public health or a significant adverse environmental impact which results in a violation of the Massachusetts Clean Wafers Act, Ch.21, ss.26-53. 9.1.1.13 The Department reserves the right to modify this 401 Water Quality Certification if any changes, modifications, or deletions are made to this general permit. In addition, the Department reserves the right to add and/or alter the terms and conditions of this 401 Water Quality Certification to carry out its responsibilities during the term of this general permit with respect to water quality, including any revisions to 314 CMR 4.00, Massachusetts Surface Water Quality Standards. 9.1.1.14 Should any violation of the Massachusetts Surface Water Quality Standards, 314 CMR 4.00, or the conditions of this 401 Wafer Quality Certification occur, the Department will direct the permit holder fo correct the violation(s).The Department has the right to take any action as authorized by the General Laws of the Commonwealth to address the violation(s) of this permit or the Massachusetts Clean Waters Act and the regulations promulgated thereunder.Substantial civil and criminal penalties are authorized under MGL Ch. 21, s.42 for discharging into Masachusetts' waters in violation of an order or permit issued by this Department.This 401 Wafer Quality Certification does not relieve the permit holder of the duty to comply with other applicable Massachusetts statutes and regulations. 9.1.2. NHR120000: State of New Hampshire. 9.1.2.1 If you disturb 100,000 square feet or more of contiguous area,you must also apply for an Alteration of Terrain (AoT) permit from DES pursuant to RSA 485- A:17 and Env-Ws 1500.This requirement also applies to a lower disturbance threshold of 50,000 square feet or more when construction occurs within the protected shoreline under the Shoreland Water Quality Protection Act (see RSA 483-B and Env-Ws 1400). A permit application must also be filed if your project disturbs an area of greater than 2,500 square feet, is within 50 feet of any surface water, and has a flow path of 50 feet or longer disturbing a grade of 25 percent or greater. Project sites with disturbances smaller than those discussed above, that have the potential to adversely affect state surface waters, are subject to the conditions of an AoT General Permit by Rule. 9.1.2.2 You must determine that any excavation dewatering discharges are not contaminated before they will be authorized as an allowable non- stormwater discharge under this permit (see Part 1.3.d).The water is considered uncontaminated if there is no groundwater contamination within 1,000 feet of the source of the groundwater to be treated and discharged. Page 47 of 60 Construction General Permit Information on groundwater contamination can be generated over the Internet via the NHIDES web site ot the DneSfopWeb Geographic Information System ot . |fitis determined that the groundwater tobedewo1eredis near o /emediohonor other waste site you must apply for the RemedintionGeneral Permit (see bjtpjLvj 9.12.3 You must treat any uncontaminated excavation devvoterng discharges os necessary to remove suspended solids and turbidity.The discharges must be sampled oto |ncof ion prior tV mixing with stormwo|eruf least once per week during weeks when discharges occur.Samples must be analyzed for total suspended solids (TS3) and must meet monthly average and daily maximum TSS limits ofJO milligrams per liter (mg/L) and lUOmg/L' respectively.7SS (o.ko. Residue, Nonfi|terob|e) sampling and analysis must bo performed in accordance with Tables |8 and Uin40CFRl36.3 (see: Records ur any sampling and analysis must be maintained and kept with 1heSVVPPP for o| least three years after final site stabilization. 9.1.2.4 Construction site owners and operators must consider opportunities for post- construction groundvvotorrochor0eodngin5|tnztionbedmonogemen| practices (Bk4Pd during site design and preparation of the stnnnvvuter pollution prevention plan (5VVPPP). |fyour construction site isino town that is required to obtain coverage under the NPDES General Permit for discharges from Municipal 3epunz1e Storm Sewer Systems (kxS4) you may be required to use such practices.The SVYPPP must include o description of any on-site infiltration that will be installed oso post-construction stonnvvofer management measure or reasons for not employing such measures such as 1) The facility is located in a wellhead protection area as defined in RSA 485- C:2; or 2) The facility is located in an area where groundwater has been reclassified toGA/\' GA| orGA2 pursuant to RSA 485-C and Env-Ws 42O; or3) Any areas that would be exempt from the groundwater recharge requirements contained in Env-Ws 1507.04(e)' including all land uses or activities considered toboo ''High-|oodArea" (neoEnv-VVq 1502.26). For design considerations for infiltration measures see Volume || uf the N8 Manual.Stormwater 9.1.2.5 Appendix F contains o list of Tier 2' or high quality waters. Although 1 here bnn official list of tier 2waters, if can be assumed that all NH surface vvoton are tier 2 for turbidity unless l) the surface wafer that you are proposing fo discharge into is listed as impaired for turbidity in the states listing of impaired waters (see Surface Water Quality Watershed Report Cards ot or2) sampling upstream of the proposed discharge location shows turbidity values greater than lUNTU. /\single grab sample collected during dry weather (no precipitation within 48 hours) is acceptable. 9.1.2.6 To ensure compliance with RSA 48J-C' RSA 4OJ-A' RSA 485-A:l3' |(o)' Env-VVq l700 and Env-YYq382' the following information may be requested byNHDES. This information must be kept on site unless you receive o written request from NHDE3 that itb*sent 10 the address shown in Part 9.l.27. u. A site map required in Part 7.2.6'showing the type and location ufall poot-cond/uction infiltration 8MPs utilized at the facility or the reason(s) why none were installed; Page 48of6O Construction General Permit (CGP) b. A list of all non-stormwater discharges that occur at the facility, including their source locations and the control measures being used (see Part 1.3.d). C. Records of sampling and analysis of TSS required for construction dewatering discharges (see Part 9.1.2.3). 9.1.2.7 All required or requested documents must be sent to: NH Department of Environmental Services, Wastewater Engineering Bureau, Permits & Compliance Section P.O. Box 95 Concord, NH 03302-0095 9.1.2.8 When NHDES determines that additional wafer quality certification requirements are necessary to protect water quality, it may require individual discharges to meet additional conditions to obtain or continue coverage under the CGP. Any such conditions must be supplied to the permittee in writing. Any required pollutant loading analyses and any designs for structural best management practices necessary to protect water quality must be prepared by a civil or sanitary engineer registered in New Hampshire. 9.2. Region 4 9.2.1. FLR120001: Indian country within the State of Florida. 9.2.1.1 Seminole Tribe of Florida.The following conditions apply only for discharges on federal trust lands of the Seminole Tribe of Florida (Big Cypress, Brighton, Hollywood, Immokalee, and Tampa Reservations): a. Any discharges into waters of the Seminole Tribe of Florida shall not cause an exceedance in Turbidity of 29 NTU above natural background conditions. b. Unless otherwise specified by previous permits or criteria, a storm event of three (3) day duration and twenty five (25) year return frequency shall be used in computing off-site discharge on Seminole Lands as agreed upon in the Water Rights Compact agreement attached to Public Law 100-228 (December 31, 1987),Seminole Indian Land Claims Settlement Act of 1987. c. The Seminole Tribe of Florida accepts a 20' X 20' stabilization at entry/exit points. 9.3. Region 5 9.3.1. MIR120001: Indian country within the State of Michigan. Projects on Indian country within the State of Michigan are not eligible for coverage under this permit. Contact EPA Region 5 for an individual permit application. 9.3.2. MNR120001: Indian country within the State of Minnesota. Projects on Indian country within the State of Minnesota are not eligible for coverage under this permit. Contact EPA Region 5 for an individual permit application. 9.3.3. WIR120001: Indian country within the State of Wisconsin, except the Sokaogon Chippewa (Mole Lake) Community. Projects in Indian country within the State of Wisconsin, are not eligible for coverage under this permit. Contact EPA Region 5 for an individual permit application. Page 49 of 60 Construction General Permit (CGP) 9.4. Region 6 9.4.1. NMR120000: State of New Mexico, except Indian country. 9.4.1.1 In addition to all other provisions of this permit, operators who intend to obtain authorization under this permit for all new and existing stormwater discharges must satisfy the following condition: The SWPPP must include site-specific interim and permanent stabilization, managerial, and structural solids, erosion, and sediment control best management practices (BMPs) and/or other controls that are designed to prevent to the maximum extent practicable an increase in the sediment yield and flow velocity from pre-construction, pre-development conditions to assure that applicable standards in 20.6.4 NMAC, including the antidegradation policy, or waste load allocations (WI-As) are met. This requirement applies to discharges both during construction and after construction operations have been completed. The SWPPP must identify, and document the rationale for selecting these BMPs and/or other controls. The SWPPP must also describe design specifications, construction specifications, maintenance schedules (including a long term maintenance plan), criteria for inspections, and expected performance and longevity of these BMPs. BMP selection must be made based on the use of appropriate soil loss prediction models (e.g., SEDCAD 4.0, RUSLE,SEDIMOT Il, MULTISED, etc.), or equivalent, generally accepted (by professional erosion control specialists),soil loss prediction tools.The operator(s) must demonstrate, and include documentation in the SWPPP, that implementation of the site- specific practices will assure that the applicable standards or WI-As are met, and will result in sediment yields and flow velocities that, to the maximum extent practicable,will not be greater than the sediment yield levels and flow velocities from pre-construction, pre-development conditions. The SWPPP must be prepared in accordance with good engineering practices by qualified (e.g., CPESC certified, engineers with appropriate training, etc.) erosion control specialists familiar with the use of soil loss prediction models and design of erosion and sediment control systems based on these models (or equivalent soil loss prediction tools). Qualifications of the preparer (e.g., professional certifications, description of appropriate training) must be documented in the SWPPP.The operators) must design, implement, and maintain BMPs in the manner specified in the SWPPP. 9.4.1.2 Operators are not eligible to obtain authorization under this permit for all new and existing stormwater discharges to outstanding national resource waters (ONRWs) (also referred to as "Tier 3" waters). 9.4.1.3 The criteria for final stabilization in Part 2.2.2.1 a is a "uniform vegetation (e.g., evenly distributed without large bare areas),which provides 70 percent or more of the density of coverage that was provided by vegetation prior to commencing earth-disturbing activities." The adjustment to allow for less than 100% native vegetative cover (e.g., 50% native vegetative cover x 70 %=35%) is acceptable. 9.4.1.4 Permittees can only use the criteria for final stabilization in Part 2.2.2.1 b ("The area you have seeded or planted must within 3 years provide established vegetation that covers 70 percent or more of the density of vegetation prior to commencing earth-disturbing activities; and in addition to seeding or planting the area to be vegetatively stabilized, to the extent necessary to Page 50 of 60 Construction General Permit (CGP) prevent erosion on the seeded or planted area, you must select, design, and install non-vegetative erosion controls that provide cover for at least 3 years without active maintenance by you") as a method for final vegetative stabilization for purposes of filing a Notice of Termination (NOT) under the following conditions: If this option is selected,you must notify NMED at the address listed in Part 9.4.1.5 at the time the NOT is submitted to EPA.The information to be submitted includes: • A copy of the NOT; • Contact information, including individual name or title, address, and phone number for the party responsible for implementing the final stabilization measures; and • The date that the permanent vegetative stabilization practice was implemented and the projected timeframe that the 70% native vegetative cover requirements are expected to be met. (Note that if more than three years is required to establish 70 percent of the natural vegetative cover, this technique cannot be used or cited for fulfillment of the final stabilization requirement-you remain responsible for establishment of final stabilization). NMED also requires that operators periodically (minimum once/year) inspect and properly maintain the area until the criteria for final stabilization, as specified in Part 2.2 of the CGP, have been met. Operators must prepare an inspection report documenting the findings of these inspections and signed in accordance with Appendix I, Part 1.11.This inspection record must be retained along with the SWPPP for three years after the NOT is submitted for the site and additionally submitted to NMED at the address listed in Part 9.4.1.5.The inspections at a minimum must include the following: • Observations of all areas of the site disturbed by construction activity; • Best Management Practices (BMPs)/post-construction stormwater controls must be observed to ensure they are effective; • An assessment of the status of vegetative re-establishment; and • Corrective actions required to ensure vegetative success within three years, and control of pollutants in stormwater runoff from the site, including implementation dates. 9.4.1.5 Copies of all documents submitted to EPA in non-electronic format must be sent to the following address: Program Manager Point Source Regulation Section Surface Water Quality Bureau New Mexico Environment Department P.O. Box 5469 Santa Fe, New Mexico 87502 Page 51 of 60 Construction General Permit (CGP) 9.4.2. NMR120001: Indian country within the State of New Mexico. 9.4.2.1 Pueblo of Sandia.The following conditions apply only to discharges on the Pueblo of Sandia Reservation: a. Copies of all Notices of Intent submitted to the EPA must also be sent concurrently to the Pueblo of Sandia at the following address. Discharges are not authorized by this permit unless an accurate and complete NOI has been submitted to the Pueblo of Sandia. Regular U.S. Delivery Mail: Pueblo of Sandia Environment Department Attention:Water Quality Manager 481 Sandia Loop Bernalillo, New Mexico 87004 b. The Pueblo of Sandia will not allow the Rainfall Erosivity Waivers (see Appendix C) to be granted for any small construction activities. c. The Stormwater Pollution Prevention Plan (SWPPP) must be available to the Pueblo of Sandia Environment either electronically or hard copy upon request for review.The SWPPP must be made available at least fourteen (14) days before construction begins.The fourteen (14) day period will give Tribal staff time to become familiar with the project site, prepare for construction inspections, and determine compliance with the Pueblo of Sandia Water Quality Standards. Failure to provide a SWPPP to the Pueblo of Sandia may result in denial of the discharge or construction delay. d. An "Authorization to Proceed Letter" with site specific mitigation, site and project requirements will be sent out to the permittee when a review of the NOI and SWPPP is completed by the Pueblo of Sandia Environment Department.This approval will allow the construction to proceed if all applicable requirements are met. e. Before submitting a Notice of Termination (NOT), permittees must clearly demonstrate to the Pueblo of Sandia Environment Department though a site visit or documentation that requirements for site stabilization have been met and any temporary erosion control structures have been removed. A short letter stating the stabilization requirements have been met will be sent to the permittee to add to the permittees NOT submission to EPA. f. Copies of all NOT submitted to the EPA must also be sent concurrently to the Pueblo of Sandia at the following address: Regular U.S. Delivery Mail: Pueblo of Sandia Environment Department Attention: Water Quality Manager 481 Sandia Loop Bernalillo, New Mexico 87004 9.4.3. OKR12000F: Discharges in the State of Oklahoma that are not under the authority of the Oklahoma Department of Environmental Quality, including activities associated with oil and gas exploration, drilling, operations, and pipelines (includes SIC Groups 13 and 46, Page 52 of 60 Construction General Permit (CGP) and SIC codes 492 and 5171), and point source discharges associated with agricultural production,services, and silviculture (includes SIC Groups 01, 02, 07, 08,09). In accordance with Section 303 of the Clean Water Act and Oklahoma's Water Quality Standards (OAC 785: 45): 9.4.3.1 For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Big Lee Creek or any water or watershed designated "ORW" (Outstanding Resource Water) in Oklahoma's Water Quality Standards, this permit may only be used to authorize discharges from temporary construction activities. Certification is denied for any on-going activities such as sand and gravel mining or any mineral mining. 9.4.3.2 For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Big Lee Creek or any water or watershed designated "ORW" (Outstanding Resource Water) in Oklahoma's Water Quality Standards, certification is denied for any discharges originating from support activities, including concrete and asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, or borrow areas. 9.5. Region 8 9.5.1. MTR120001: Indian country within the State of Montana 9.5.1.1 The Confederated Salish and Kootenai Tribes of the Flathead Nation.The following conditions apply only to discharges on the Confederated Salish and Kootenai Tribes of the Flathead Nation Reservation: a. Permittees must send the Stormwater Pollution Prevention Plan (SWPPP) to the Tribes at least 30 days before construction starts. b. Before submitting the Notice of Termination (NOT), permittees must clearly demonstrate to an appointed tribal staff person during an on- site inspection that requirements for site stabilization have been met. c. The permittee must send a copy of the Notice of Intent (NOI) and the Notice of Termination (NOT) to the tribes. d. Permittees may submit their SWPPPs and NOTs electronically to d1ntt`o-cskf.g . Written NOI's, SWPPPs and NOT's may be mailed to: Clint Folden, Water Quality Regulatory Specialist Confederated Salish and Kootenai Tribes Natural Resources Department P.O. Box 278 Pablo, MT 59855 9.5.1.2 Fort Peck Tribes.The following conditions apply only to discharges on the Fort Peck Reservation: Permittees must notify the Fort Peck Office of Environmental Protection (OEP) two weeks prior to commencing construction. Page 53 of 60 Construction General Permit (CGP) 9.6. Region 9 9.6.1. AZR120001: Indian country within the State of Arizona. 9.6.1.1 Hualapai Tribal Lands. The following condition applies only for discharges on the Hualapai Reservation: All notices of intent for proposed stormwater discharges under the CGP and all pollution prevention plans for stormwater discharges on Hualapai Tribal lands shall be submitted to Water Resources Program through the Tribal Chairman for review and approval, P.O. Box 179, Peach Springs, AZ 86434. 9.6.2. CAR120001: Indian country within the State of California. 9.6.2.1 Big Pine Paiute Tribe of the Owens Valley. Big Pine Tribal Water Quality Standards Section VII(e): If a proposed action has the possibility to adversely affect the water quality of Big Pine Creek, an application must be filed with the Tribal Environmental Office.The application must describe the action proposed and its effects on the creek, how this information was derived, and a justification for the action. Upon satisfying these requirements, the Tribal Environmental Office will recommend or not recommend this proposal to be considered by the Tribal Council.Tribal Council will make a determination whether to consider the proposal further. If the Tribal Council wishes to consider the application further, the public participation process will take place (see paragraph VII(d)). The Tribal Council has the sole authority in permitting degradation to Big Pine Creek. If the Tribal Council makes the decision to allow degradation, they will submit their decision to the USEPA for review and approval. 9.6.3. GUR120000:The Island of Guam. Permittees must adhere with imposed conditions for the project, in accordance with section 307(c)(1), of the Coastal Zone Management Act, 15 CFR part 930. 9.6.4. MPR120000: Commonwealth of the Northern Mariana Islands (CNMI). 9.6.4.1 An Earthmoving and Erosion Control Permit must be obtained from DEQ prior to any construction activity covered under the NPDES General Permit. 9.6.4.2 All conditions and requirements set forth in the United States Environmental Protection Agency (USEPA), National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges from Construction Activities must be complied with. 9.6.4.3 A stormwater pollution prevention plan (SW PPP) for stormwater discharges from construction activities must be approved by the Director of DEQ prior to submission of the Notice of Intent (NOI). 9.6.4.4 A NOI to be covered by the General Permit for Discharges from Construction Activities must be submitted to DEQ and USEPA, Region IX, in the form prescribed by USEPA, accompanied by a SWPPP approval letter from DEQ. 9.6.4.5 The NOI must be postmarked fourteen (14) calendar days prior to any stormwater discharges and a copy is submitted to the Director of DEQ no later than seven (7) calendar days prior to any stormwater discharges. 9.6.4.6 Copies of all monitoring reports required by the NPDES General Permit are submitted to DEQ. 9.6.4.7 In accordance with Section 10.3(h) and (i) of the CNMI Water Quality Standards, DEQ reserves the right to deny coverage under this permit and Page 54 of 60 Construction General Permit (CGP) require submittal of an application for an individual NPDES permit based on review of the NOI or other information made available to the Director. 9.6.5. NVR120001: Indian country within the State of Nevada. 9.6.5.1 Pyramid Lake Paiute Tribe.The following conditions apply only for discharges on the Pyramid Lake Paiute Reservation: a. A SWPPP for stormwater discharges from project construction activities must be submitted to, and approved by, the PLPT Environmental Department director, prior to the submission of a Notice of Intent (NO] or eNO1) to EPA. b. The applicant is to submit a hard copy of the Notice of Intent (NOI or eNO1) and a draft or final copy of the Stormwater Pollution Prevention Plan (SWPPP) by U.S. Mail to the Pyramid Lake Environmental Department at the address below: Pyramid Lake Tribe Environmental Department P.O. Box 256 Nixon, NV 89424 c. The applicant is to concurrently submit to the PLPT Environmental Department, hard copies of any other forms submitted to the EPA, including waivers, reporting, and Notice of Termination (NOT). 9.7. Region 10 9.7.1. IDR120000:The State of Idaho, except those located on Indian country. Projects in the State of Idaho, except those located on Indian country, are not eligible for coverage under this permit. Contact EPA Region 10 for an individual permit application. 9.7.2. ORR120001: Indian country within the State of Oregon. 9.7.2.1 Confederated Tribes of the Umatilla Indian Reservation.The following conditions apply only to discharges on the Umatilla Indian Reservation: a. The operator shall be responsible for achieving compliance with the Confederated Tribes of the Umatilla Indian Reservations (CTUIR) Water Quality Standards. b. The operator shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the CTUIR Water Resources Program at the address below, at the same time it is submitted to EPA. c. The operator shall be responsible for submitting all Stormwater Pollution Prevention Plans (SWPPP) required under this permit to the CTUIR Water Resources Program for review and determination that the SWPPP is sufficient to meet Tribal Water Quality Standards, prior to the beginning of any discharge activities taking place. d. The operator shall be responsible for reporting an exceedance to Tribal Water Quality Standards to the CTUIR Water Resources Program at the same time it is reported to EPA. Confederated Tribes of the Umatilla Indian Reservation Water Resources Program 46411 Timine Way Pendleton, OR 97801 Page 55 of 60 Construction General Permit (CGP) e. The CTUIR Tribal Historic Preservation Office (THPO) requests copies of each NOI which will define whether or not the undertaking has the potential to affect historic properties, and if so, define the undertaking's area of potential effect (APE). f. The THPO must be provided 30 days to comment on the APE as defined in the permit application. g. If the project is an undertaking, a cultural resource investigation must occur. All fieldwork must be conducted by qualified personnel (as outlined by the Secretary of Interior's Standards and Guidelines; http://wVvw. s.aovlhistor I1y ocal-Ic�w/arch s#rds O,him) and documented using Oregon Reporting Standards (t' 'Ito ov oreaon �avJOPRD�NCD/ARCNlarcl puk�sandlinks shtml). The resulting report must be submitted to the THPO and the THOP must concur with the findings and recommendations before any ground disturbing work can occur.The THPO requires 30 days to review all reports. h. The operator must obtain THPO concurrence in writing. If historic properties are present, this written concurrence will outline measures to be taken to prevent or mitigate effects to historic properties. i. For more information regarding the specifics of the cultural resources process, see 36 CFR Part 800. Confederated Tribes of the Umatilla Indian Reservation Cultural Resources Protection Program Tribal Historic Preservation Office 46411 Timine Way Pendleton, OR 97801 9.7.2.2 Confederated Tribes of the Warm Springs Reservation of Oregon.The following conditions apply only for discharges on the Warm Springs Reservation: a. All activities covered by this NPDES general permit occurring within a designated riparian buffer zone as established in Ordinance 74 (Integrated Resource Management Plan or IRMP) must be reviewed, approved and permitted through the Tribe's Hydraulic Permit Application process,including payment of any applicable fees. b. All activities covered by this NPDES permit must follow all applicable land management and resource conservation requirements specified in the IRMP. C. Operators of activities covered by this NPDES general permit must submit a Storm Water Pollution Prevention Plan to the Tribe's Water Control Board at the following address for approval at least 30 days prior to beginning construction activity: Chair, Warm Springs Water Control Board P.O. Box C Warm Springs, Oregon 97761 d. The operator shall be responsible for achieving compliance with the Water Quality Standards of the Confederated Tribes of the Warm Springs Reservation of Oregon.The operator shall be responsible for Page 56 of 60 Construction General Permit (CGP) reporting an exceedance to Tribal Water Quality Standards to the Water Control Board at the address above. e. The operator shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the CTWS, Branch of Natural Resources,Tribal Environmental Office at the address above, at the same time it is submitted to EPA. f. The CTWS Tribal Historic Preservation Officer (THPO) requests copies of each NOI which will define whether or not the undertaking has the potential to affect historic properties, and if so, define the undertaking's area of potential effect (APE). g. The THPO must be provided 30 days to comment on the APE as defined in the permit application. h. If the project is an undertaking, a cultural resource investigation must occur. All fieldwork must be conducted by qualified personnel (as outlined by the Secretary of Interior's Standards and Guidelines; riti p.//www.nr�s.c�o�histor f_local-Eav�/arch sfnds 0 hfrn) and documented using Oregon Reporting Standards (hItp:(/e ay.are� ov CF'R�JIICC} ARCH/arch �ubsandlirLks.shtr-n1). The resulting report must be submitted to the THPO and the THOP must concur with the findings and recommendations before any ground disturbing work can occur.The THPO requires 30 days to review all reports. i. The operator must obtain THPO concurrence in writing. If historic properties are present, this written concurrence will outline measures to be taken to prevent or mitigate effects to historic properties. j. For more information regarding the specifics of the cultural resources process, see 36 CFR Part 800. 9.7.3. WAR12000F: Areas in the State of Washington, except those located on Indian country, subject to construction by Federal Operators. Areas in the State of Washington, except those located on Indian country, subject to construction by Federal Operators are not eligible for coverage under this permit. Contact EPA Region 10 for an individual permit application. 9.7.4. WAR120001: Indian country within the State of Washington 9.7.4.1 Kalispel Tribe. The following conditions apply only for discharges on the Kalispel Reservation: a. The operator shall be responsible for achieving compliance with the Kalispel Tribe's Water Quality Standards, and; b. The operator shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the Kalispel Tribe Natural Resources Department (KNRD) at the same time as it is submitted to the EPA, and; c. The operator shall submit all Storm Water Pollution Prevention Plans (SWPPP) to KNRD thirty (30) days prior to beginning any discharge activities for review, and; d. The operator shall be responsible for reporting any exceedance of Tribal Water Quality Standards to KNRD at the same time it is reported to EPA, and; Page 57 of 60 Construction General Permit (CGP) e. Prior to any land disturbing activities on the Kalispel Indian Reservation and its dependent communities, the operator shall attain a cultural resource clearance letter from KNRD. f. All tribal correspondence pertaining to the General Permit for Discharges from Construction Activities shall be sent to: Kalispel Tribe Natural Resources Department Water Resources Program PO Box 39 Usk, WA 99180 9.7.4.2 Lummi Nation. The following conditions apply only for discharges on the Lummi Reservation: a. Pursuant to Lummi Code of Laws (LCL) 17.05.020(a), the operator must also obtain a land use permit from the Lummi Planning Department as provided in Title 15 of the Lummi Code of Laws and regulations adopted thereunder. b. Pursuant to LCL 17.05.020(a), each operator shall develop and submit a Stormwater Pollution Prevention Plan to the Lummi Water Resources Division for review and approval by the Water Resources Manager prior to beginning any discharge activities. C. Pursuant to LCL Title 17, each operator shall be responsible for achieving compliance with the Water Quality Standards for Surface Waters of the Lummi Indian Reservation (Lummi Administrative Regulations [LAR] 17 LAR 07.010 together with supplements and amendments thereto). d. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) to the Lummi Water Resources Division at the same time it is submitted electronically to the Environmental Protection Agency (EPA) and shall provide the Lummi Water Resources Division the acknowledgement of receipt of the NOI from the EPA and the associated NPDES tracking number provided by the EPA within 7 calendar days of receipt by EPA. e. Each operator shall submit a signed hard copy of the Notice of Termination (NOT) to the Lummi Water Resources Division at the same time it is submitted electronically to the EPA and shall provide the Lummi Water Resources Division the EPA acknowledgement of receipt of the NOT. f. Stormwater Pollution Prevention Plans, Notice of intent, Notice of Termination and associated correspondence with the EPA shall be submitted to: Lummi Natural Resources Department ATTN: Water Resources Manager 2616 Kwina Road Bellingham, WA 98226-9298 g. Please see the Lummi Nation website (www.lummi-nsn,gov) and/or the Lummi Natural Resources Department website ( ft : Innr.lur-nmi- nsnmov/Lumr-r iWebsite/website,pifp?PagelD=53) to review a copy of Title 17 of the Lummi Code of Laws, associated regulations, and the references upon which the conditions identified above are based. Page 58 of 60 Construction General Permit (CGP) 9.7.4.3 Makah Tribe.The following conditions apply only for discharges on the Makah Reservation: a. The operator shall be responsible for achieving compliance with the Makah Tribe's Water Quality Standards. b. The operator shall submit a Storm Water Pollution Prevention Plan to the Makah Tribe Water Quality Program and Makah Fisheries Habitat Division for review and approval at least thirty (30) days prior to beginning any discharge activities. c. The operator shall submit a copy of the Notice of Intent to the Makah Tribe Water Quality Program and Makah Fisheries Habitat Division at the same time it is submitted to EPA. d. Storm Water Pollution Prevention Plans and Notices of Intent shall be submitted to: Ray Colby Makah Tribal Water Quality Water Quality Specialist (360) 645-3162 colby.ray@centurytel.net PO Box 115 Neah Bay, WA 98357 9.7.4.4 Puyallup Tribe of Indians. The following conditions apply only for discharges on the Puyallup Reservation: a. Each permittee shall be responsible for achieving compliance with the Puyallup Tribe's Water Quality Standards, including antidegradation provisions. The Puyallup Natural Resources Department will conduct an antidegradation review for permitted activities that have the potential to lower water quality.The antidegradation review will be consistent with the Tribe's Antidegradation Implementation Procedures. b. The permittee shall be responsible for meeting any additional permit requirements imposed by EPA necessary to comply with the Puyallup Tribe's antidegradation policies if the discharge point is located within 1 linear mile upstream of waters designated by the Tribe. C. Each permittee shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the Puyallup tribal Natural Resources Department at the address listed below at the same time it is submitted to EPA. Puyallup Tribe of Indians 3009 E. Portland Avenue Tacoma, WA 98404 ATTN: Natural Resources Department- Bill Sullivan and Char Naylor d. All supporting documentation and certifications in the NOI related to coverage under the general permit for Endangered Species Act purposes shall be submitted to Bill Sullivan and Char Naylor in the Puyallup Tribal Natural Resources Department for review. e. If EPA requires coverage under an individual or alternative permit, the permittee shall submit a copy of the permit to Bill Sullivan and Char Page 59 of 60 Construction General Permit (CGP) Naylor in the Puyallup Tribal Natural Resources Department at the address listed above. f. The permittee shall submit all stormwater pollution prevention plans to Bill Sullivan and Char Naylor in the Puyallup Tribal Natural Resources Department for review and approval prior to beginning any activities resulting in a discharge to tribal waters. g. The permittee shall conduct benchmark monitoring for turbidity and nutrients, complying with Section 3 monitoring requirements. h. The permittee shall notify Bill Sullivan and Char Naylor prior to conducting inspections at construction sites generating stormwater discharged to tribal waters. Page 60 of 60 Construction General Permit (CGP) Appendix A - Definitions and Acronyms Definitions "Action Area" -all areas to be affected directly or indirectly by the federal action and not merely the immediate area involved in the action. See 50 CFR 402. For the purposes of this permit and for application of the Endangered Species Act requirements, the following areas are included in the definition of action area: • The areas on the construction site where stormwater discharges originate and flow toward the point of discharge into the receiving waters (including areas where excavation, site development, or other ground disturbance activities occur) and the immediate vicinity. (Example: Where bald eagles nest in a tree that is on or bordering a construction site and could be disturbed by the construction activity or where grading causes stormwater to flow into a small wetland or other habitat that is on the site that contains listed species.) • The areas where stormwater discharges flow from the construction site to the point of discharge into receiving waters. (Example:Where stormwater flows into a ditch, swale, or gully that leads to receiving waters and where listed species (such as listed amphibians) are found in the ditch, swale, or gully.) • The areas where stormwater from construction activities discharge into receiving waters and the areas in the immediate vicinity of the point of discharge. (Example:Where stormwater from construction activities discharges into a stream segment that is known to harbor listed aquatic species.) • The areas where stormwater controls will be constructed and operated, including any areas where stormwater flows to and from the stormwater controls. (Example: Where a stormwater retention pond would be built.) • The areas upstream and/or downstream from the stormwater discharge into a stream segment that may be affected by these discharges. (Example:Where sediment discharged to a receiving stream settles downstream and impacts a breeding area of a listed aquatic species.) "Agricultural Land" -cropland, grassland, rangeland, pasture, and other agricultural land, on which agricultural and forest-related products or livestock are produced and resource concerns may be addressed. Agricultural lands include cropped woodland, marshes, incidental areas included in the agricultural operation, and other types of agricultural land used for the production of livestock. "Antidegradation Policy" or "Antidegradafion Requirements" -the water quality standards regulation that requires States and Tribes to establish a three-tiered antidegradation program: 1. Tier 1 maintains and protects existing uses and water quality conditions necessary to support such uses. An existing use can be established by demonstrating that fishing, swimming, or other uses have actually occurred since November 28, 1975, or that the water quality is suitable to allow such uses to occur. Where an existing use is established, it must be protected even if it is not listed in the water quality standards as a designated use. Tier 1 requirements are applicable to all surface waters. 2. Tier 2 maintains and protects"high quality"waters--water bodies where existing conditions are better than necessary to support CWA § 101(a)(2) "fishable/swimmable" Page A-1 of 13 Construction General Permit (CGP) uses. Water quality can be lowered in such waters. However, State and Tribal Tier 2 programs identify procedures that must be followed and questions that must be answered before a reduction in water quality can be allowed. In no case may water quality be lowered to a level which would interfere with existing or designated uses. 3. Tier 3 maintains and protects water quality in outstanding national resource waters (ONRWs). Except for certain temporary changes,water quality cannot be lowered in such waters. ONRWs generally include the highest quality waters of the United States. However, the ONRW classification also offers special protection for waters of exceptional ecological significance, i.e., those which are important, unique, or sensitive ecologically. Decisions regarding which water bodies qualify to be ONRWs are made by States and authorized Indian Tribes. "Arid Areas"-areas with an average annual rainfall of 0 to 10 inches. "Bank" (e.g., stream bank or river bank) -the rising ground bordering the channel of a water of the U.S. "Bluff" -a steep headland, promontory, riverbank, or cliff. "Borrow Areas"-the areas where materials are dug for use as fill, either onsite or off-site. "Bypass"-the intentional diversion of waste streams from any portion of a treatment facility.See 40 CFR 122.41(m)(1)(i). "Cationic Treatment Chemical"- polymers, flocculants, or other chemicals that contain an overall positive charge. Among other things, they are used to reduce turbidity in stormwater discharges by chemically bonding to the overall negative charge of suspended silts and other soil materials and causing them to bind together and settle out. Common examples of cationic treatment chemicals are chitosan and cationic PAM. "Commencement of Earth-Disturbing Activities" -the initial disturbance of soils (or 'breaking ground') associated with clearing, grading, or excavating activities or other construction-related activities (e.g., stockpiling of fill material). "Commencement of Pollutant-Generating Activities"-at construction sites (for the purposes of this permit) occurs in any of the following circumstances: • Clearing, grubbing, grading, and excavation has begun; • Raw materials related to your construction activity,such as building materials or products, landscape materials,fertilizers, pesticides, herbicides, detergents, fuels, oils, or other chemicals have been placed at your site; • Use of authorized non-stormwater for washout activities, or dewatering activities, have begun; or • Any other activity has begun that causes the generation of or the potential generation of pollutants. "Construction Activities"-earth-disturbing activities, such as the clearing, grading, and excavation of land. "Construction and Development Effluent Limitations and New Source Performance Standards" (C&D Rule)-as published in 40 CFR § 450 is the regulation requiring effluent limitations guidelines Page A-2 of 13 Construction General Permit (CGP) (ELG's) and new source performance standards (NSPS) for controlling the discharge of pollutants from construction sites. "Construction Site"-the land or water area where construction activities will occur and where stormwater controls will be installed and maintained. The construction site includes construction support activities,which may be located at a different part of the property from where the primary construction activity will take place, or on a different piece of property altogether. The construction site is often a smaller subset of the lot or parcel within which the project is taking place. "Construction Support Activities"-a construction-related activity that specifically supports the construction activity and involves earth disturbance or pollutant-generating activities of its own, and can include activities associated with concrete or asphalt batch plants, equipment staging yards, materials storage areas, excavated material disposal areas, and borrow areas. "Construction Waste"-discarded material (such as packaging materials, scrap construction materials, masonry products, timber, steel, pipe, and electrical cuttings, plastics, and styrofoam). "Conveyance Channel"-a temporary or permanent waterway designed and installed to safely convey stormwater flow within and out of a construction site. "Corrective Action"-for the purposes of the permit, any action taken to (1) repair, modify, or replace any stormwater control used at the site; (2) clean up and dispose of spills, releases, or other deposits found on the site; and (3) remedy a permit violation. "Critical Habitat"-as defined in the Endangered Species Act at 16 U.S.C. 1531 for a threatened or endangered species, (i) the specific areas within the geographical area occupied by the species, at the time it is listed in accordance with the provisions of section 4 of the Endangered Species Act, on which are found those physical or biological features essential to the conservation of the species and which may require special management considerations or protection; and (ii) specific areas outside the geographical area occupied by the species at the time it is listed in accordance with the provisions of section 4 of the Endangered Species Act, upon a determination by the Secretary that such areas are essential for the conservation of the species. "CWA"-the Clean Water Act or the Federal Water Pollution Control Act, 33 U.S.C. section 1251 et seq. "Dewatering"-the act of draining rainwater and/or groundwater from building foundations, vaults, and trenches. "Discharge"-when used without qualification, means the "discharge of a pollutant." "Discharge of a Pollutant"-any addition of any "pollutant" or combination of pollutants to "waters of the United States" from any "point source," or any addition of any pollutant or combination of pollutants to the waters of the "contiguous zone" or the ocean from any point source other than a vessel or other floating craft which is being used as a means of transportation. This includes additions of pollutants into waters of the United States from:surface runoff which is collected or channeled by man; discharges through pipes,sewers, or other conveyances, leading into privately owned treatment works. See 40 CFR 122.2. "Discharge Point"-for the purposes of this permit, the location where collected and concentrated stormwater flows are discharged from the construction site. Page A-3 of 13 Construction General Permit (CGP) "Discharge-Related Activity"-activities that cause, contribute to, or result in stormwater and allowable non-stormwater point source discharges, and measures such as the siting, construction, and operation of stormwater controls to control, reduce, or prevent pollutants from being discharged. "Discharge to an Impaired Water"-for the purposes of this permit, a discharge to an impaired water occurs if the first water of the U.S. to which you discharge is identified by a State,Tribe, or EPA pursuant to Section 303(d) of the Clean Water Act as not meeting an applicable water quality standard, or is included in an EPA-approved or established total maximum daily load (TMDL). For discharges that enter a storm sewer system prior to discharge, the water offhe U.S. to which you discharge is the first water of the U.S. that receives the stormwater discharge from the storm sewer system. "Domestic Waste"-for the purposes of this permit, typical household trash, garbage or rubbish items generated by construction activities. "Drainageway"-an open linear depression,whether constructed or natural, that functions for the collection and drainage of surface water. "Drought-Stricken Area" -for the purposes of this permit, an area in which the National Oceanic and Atomospheric Administration's U.S. Seasonal Drought Outlook indicates for the period during which the construction will occur that any of the following conditions are likely: (1) "Drought to persist or intensify", (2) "Drought ongoing,some improvement", (3) "Drought likely to improve, impacts ease", or (4) "Drought development likely". See l�fiip:/1�rJvrw.c�c.r�cep.rioaca.govjpro��cts/expert assessrnenfilseasr�n dro�gl�t.c�if. "Earth-Disturbing Activity" or "Land-Disturbing Activity"-actions taken to alter the existing vegetation and/or underlying soil of a site, such as clearing, grading, site preparation (e.g., excavating, cutting, and filling), soil compaction, and movement and stockpiling of top soils. "Effective Operating Condition"-for the purposes of this permit, a stormwater control is kept in effective operating condition if it has been implemented and maintained in such a manner that it is working as designed to minimize pollutant discharges. "Effluent Limitations"-for the purposes of this permit, any of the Part 2 or Part 3 requirements. "Effluent Limitations Guideline" (ELG)-defined in 40 CFR § 122.2 as a regulation published by the Administrator under section 304(b) of CWA to adopt or revise effluent limitations. "Electronic Notice of Intent" (eNO1) -EPA's online system for submitting electronic Construction General Permit forms. "Eligible"-for the purposes of this permit, refers to stormwater and allowable non-stormwater discharges that are authorized for coverage under this general permit. "Emergency-Related Project"-a project initiated in response to a public emergency (e.g., natural disaster, disruption in essential public services), for which the related work requires immediate authorization to avoid imminent endangerment to human health or the environment, or to reestablish essential public services. "Endangered Species"-defined in the Endangered Species Act at 16 U.S.C. 1531 as any species which is in danger of extinction throughout all or a significant portion of its range other than a species of the Class Insecta determined by the Secretary to constitute a pest whose Page A-4 of 13 Construction General Permit (CGP) protection under the provisions of this Act would present an overwhelming and overriding risk to man. "Excursion"-a measured value that exceeds a specified limit. "Existing Project"-a construction project that commenced construction activities prior to February 15, 2012. "Exit Points"-any points of egress from the construction site to be used by vehicles and equipment during construction activities. "Exposed Soils"-for the purposes of this permit,soils that as a result of earth-disturbing activities are left open to the elements. "Federal Operator"-an entity that meets the definition of "Operator" in this permit and is either any department, agency or instrumentality of the executive, legislative, and judicial branches of the Federal government of the United States, or another entity,such as a private contractor, performing construction activity for any such department, agency, or instrumentality. "Final Stabilization"-on areas not covered by permanent structures, either (1) vegetation has been established, or for and or semi-arid areas,will be established that provides a uniform (e.g., evenly distributed,without large bare areas) perennial vegetative cover with a density of 70 percent of the natural background vegetative cover, or (2) non-vegetative stabilization methods have been implemented to provide effective cover for exposed portions of the site. "Hazardous Materials" or "Hazardous Substances" or"Hazardous or Toxic Waste"-for the purposes of this permit, any liquid, solid, or contained gas that contain properties that are dangerous or potentially harmful to human health or the environment. See also 40 CFR §261.2. "Historic Property" -as defined in the National Historic Preservation Act regulations means any prehistoric or historic district, site, building,structure, or object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria. "Impaired Water" or "Water Quality Impaired Water" or"Water Quality Limited Segment" -for the purposes of this permit,waters identified as impaired on the CWA Section 303(d) list, or waters with an EPA-approved or established TMDL. Your construction site will be considered to discharge to an impaired water if the first water of the U.S. to which you discharge is identified by a state, tribe, or EPA pursuant to Section 303(d) of the CWA as not meeting an applicable water quality standard, or is included in an EPA-approved or established total maximum daily load (TMDL). For discharges that enter a storm sewer system prior to discharge, the first water of the U.S. to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system. "Impervious Surface"-for the purpose of this permit, any land surface with a low or no capacity for soil infiltration including, but not limited to, pavement, sidewalks, parking areas and driveways, packed gravel or soil, or rooftops. "Indian Country" or"Indian Country Lands"-defined at 40 CFR §122.2 as: Page A-5 of 13 C'onstri ctian General Permit (CGP) 1. All land within the limits of any Indian reservation under the jurisdiction of the United States Government, notwithstanding the issuance of any patent, and, including rights-of- way running through the reservation; 2. All dependent Indian communities with the borders of the United States whether within the originally or subsequently acquired territory thereof, and whether within or without the limits of a state; and 3. All Indian allotments, the Indian titles to which have not been extinguished, including rights-of-ways running through the same. "Infeasible"-for the purpose of this permit, infeasible means not technologically possible or not economically practicable and achievable in light of best industry practices. EPA notes that it does not intend for any permit requirement to conflict with state water rights law. "Install" or "Installation"-when used in connection with stormwater controls, to connect or set in position stormwater controls to make them operational. "Intermittent (or Seasonal) Stream"-one which flows at certain times of the year when groundwater provides water for stream flow, as well as during and immediately after some precipitation events or snowmelt. "Jar test"-a test designed to simulate full-scale coagulation/flocculation/sedimentation water treatment processes by taking into account the possible conditions. "Landward" -positioned or located away from a waterbody, and towards the land. "Level Spreader"-a temporary stormwater control used to spread stormwater flow uniformly over the ground surface as sheet flow to prevent concentrated, erosive flows from occurring. "Linear Project"-includes the construction of roads, bridges, conduits, substructures, pipelines, sewer lines, towers, poles, cables,wires, connectors, switching, regulating and transforming equipment and associated ancillary facilities in a long, narrow area. "Minimize" -to reduce and/or eliminate to the extent achievable using stormwater controls that are technologically available and economically practicable and achievable in light of best industry practices. "Municipal Separate Storm Sewer System" or"MS4"-defined at 40 CFR §122.26(b)(8) as a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains): l. Owned and operated by a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to State law) having jurisdiction over disposal of sewage, industrial wastes,stormwater, or other wastes, including special districts under State law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 208 of the CWA that discharges to waters of the United States; 2. Designed or used for collecting or conveying stormwater; 3. Which is not a combined sewer; and 4. Which is not part of a Publicly Owned Treatment Works (POTW) as defined at 40 CFR §122.2. Page A-6 of 13 Construction General Permit (CGP) "National Pollutant Discharge Elimination System" (NPDES) -defined at 40 CFR §122.2 as the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements, under sections 307, 402, 318, and 405 of CWA. The term includes an `approved program.' "Native Topsoil"-the uppermost layer of naturally occurring soil for a particular area, and is often rich in organic matter, biological activity, and nutrients. "Native Vegetation"-the species of plants that have developed for a particular region or ecosystem and are considered endemic to that region or ecosystem. "Natural Buffer" -for the purposes of this permit, an area of undisturbed natural cover surrounding surface waters within which construction activities are restricted. Natural cover includes the vegetation, exposed rock, or barren ground that exists prior to commencement of earth-disturbing activities. "Natural Vegetation"-vegetation that occurs spontaneously without regular management, maintenance or species introductions, removals, and that generally has a strong component of native species. "New Operator of a New or Existing Project"-an operator that through transfer of ownership and/or operation replaces the operator of an already permitted construction project. "New Project"-a construction project that commences construction activities on or after February 15. "New Source"-for the purpose of this permit, a construction project that commenced construction activities after February 1, 2010. "New Source Performance Standards (NSPS)"-for the purposes of this permit, NSPS are technology-based standards that apply to construction sites that are new sources under 40 CFR 450.24. "Non-Stormwater Discharges"-discharges that do not originate from storm events. They can include, but are not limited to, discharges of process water, air conditioner condensate, non- contact cooling water, vehicle wash water,sanitary wastes, concrete washout water, paint wash water, irrigation water, or pipe testing water. "Non-Turbid"-a discharge that does not cause or contribute to an exceedence of turbidity- related water quality standards. "Notice of Intent" (NOI)-the form (electronic or paper) required for authorization of coverage under the Construction General Permit. "Notice of Termination" (NOT)-the form (electronic or paper) required for terminating coverage under the Construction General Permit. "Operational"-for the purpose of this permit, Stormwater controls are made "operational" when they have been installed and implemented, are functioning as designed, and are properly maintained. Page A-7 of 13 Construction General Permit (CGP) "Operator"-for the purpose of this permit and in the context of stormwater discharges associated with construction activity, any party associated with a construction project that meets either of the following two criteria: 1. The party has operational control over construction plans and specifications,including the ability to make modifications to those plans and specifications; or 2. The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions (e.g., they are authorized to direct workers at a site to carry out activities required by the permit). This definition is provided to inform permittees of EPA's interpretation of how the regulatory definitions of "owner or operator" and "facility or activity" are applied to discharges of stormwater associated with construction activity. "Ordinary High Water Mark" -the line on the shore established by fluctuations of water and indicated by physical characteristics such as a clear, natural line impressed on the bank, shelving, changes in the character of soil, destruction of terrestrial vegetation, and/or the presence of litter and debris. "Outfall"-see "Discharge Point." "Permitting Authority"-for the purposes of this permit, EPA, a Regional Administrator of EPA, or an authorized representative. "Point(s) of Discharge" -see "Discharge Point." "Point Source"-any discernible, confined, and discrete conveyance,including but not limited to, any pipe, ditch, channel, tunnel, conduit,well, discrete fissure, container, rolling stock concentrated animal feeding operation, landfill leachate collection system, vessel or other floating craft from which pollutants are or may be discharged. This term does not include return flows from irrigated agriculture or agricultural stormwater runoff. "Pollutant" -defined at 40 CFR §122.2. A partial listing from this definition includes:dredged spoil, solid waste, sewage, garbage, sewage sludge, chemical wastes, biological materials, heat,wrecked or discarded equipment, rock,sand, cellar dirt, and industrial or municipal waste. "Pollutant-Generating Activities" -at construction sites (for the purposes of this permit), those activities that lead to or could lead to the generation of pollutants, either as a result of earth- disturbance or a related support activity. Some of the types of pollutants that are typically found at construction sites are: • sediment; • nutrients; • heavy metals; • pesticides and herbicides; • oil and grease; • bacteria and viruses; • trash, debris, and solids; • treatment polymers; and • any other toxic chemicals. Page A-8 of 13 Construction General Permit (CGP) "Pollution Prevention Measures"-stormwater controls designed to reduce or eliminate the addition of pollutants to construction site discharges through analysis of pollutant sources, implementation of proper handling/disposal practices, employee education, and other actions. "Polymers"-for the purposes of this permit, coagulants and flocculants used to control erosion on soil or to enhance the sediment removal capabilities of sediment traps or basins. Common construction site polymers include polyacrylamide (PAM), chitosan, alum, polyaluminum chloride, and gypsum. "Prohibited Discharges"-discharges that are not allowed under this permit, including: l. Wastewater from washout of concrete; 2. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Soaps or solvents used in vehicle and equipment washing; 5. Toxic or hazardous substances from a spill or other release; and 6. Waste, garbage, floatable debris, construction debris, and sanitary waste from pollutant- generating activities. "Provisionally Covered Under this Permit"-for the purposes of this permit, EPA provides temporary coverage under this permit for emergency-related projects prior to receipt of a complete and accurate NOL Discharges from earth-disturbing activities associated with the emergency-related projects are subject to the terms and conditions of the permit during the period of temporary coverage. "Receiving Water"-a "Water of the United States" as defined in 40 CFR §122.2 into which the regulated stormwater discharges. "Run-On"-sources of stormwater that drain from land located upslope or upstream from the regulated site in question. "Semi-Arid Areas"-areas with an average annual rainfall of 10 to 20 inches. "Site"-for construction activities, the land or water area where earth-disturbing activities take place, including construction support activities. "Small Construction Activity"-defined at 40 CFR §122.26(b)(15) and incorporated here by reference. A small construction activity includes clearing, grading, and excavating resulting in a land disturbance that will disturb equal to or greater than one (1) acre and less than five (5) acres of land or will disturb less than one (1) acre of total land area but is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one (1) acre and less than five (5) acres. Small construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the site. "Small Residential Lot"-for the purpose of this permit, a lot being developed for residential purposes that will disturb less than 1 acre of land, but is part of a larger residential project that will ultimately disturb greater than or equal to 1 acre. Page A-9 of 13 Constructinn General Permit 1CCP1 "Snowmelt"-the conversion of snow into overland stormwater and groundwater flow as a result of warmer temperatures. "Spill"-for the purpose of this permit, the release of a hazardous or toxic substance from its container or containment. "Stabilization" -the use of vegetative and/or non-vegetative cover to prevent erosion and sediment loss in areas exposed through the construction process. "Steep Slopes" -where a state,Tribe, local government, or industry technical manual (e.g., stormwater BMP manual) has defined what is to be considered a "steep slope", this permit's definition automatically adopts that definition. Where no such definition exists, steep slopes are automatically defined as those that are 15 percent or greater in grade. "Storm Sewer System"-a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) designed or used for collecting or conveying stormwater. "Stormwater"-stormwater runoff, snow melt runoff, and surface runoff and drainage. "Stormwater Control Measure" -refers to any stormwater control, BMP,or other method (including narrative effluent limitations) used to prevent or reduce the discharge of pollutants to waters of the United States. "Stormwater Controls"-see "Stormwater Control measure." "Stormwater Discharge Associated with Construction Activity"-as used in this permit, a discharge of pollutants in stormwater to waters of the United States from areas where land- disturbing activities (e.g., clearing, grading, or excavation) occur, or where construction materials or equipment storage or maintenance (e.g., fill piles, borrow area, concrete truck chute washdown,fueling), or other industrial stormwater directly related to the construction process (e.g., concrete or asphalt batch plants), are located. "Stormwater Inlet"-a structure placed below grade to conduct water used to collect stormwater runoff for conveyance purposes. "Stormwater Team"-the group of individuals responsible for oversight of the development and modifications of the SWPPP, and oversight of compliance with the permit requirements. The individuals on the "Stormwater Team" must be identified in the SWPPP. "Storm Event"-a precipitation event that results in a measurable amount of precipitation. "Storm Sewer"-a system of pipes (separate from sanitary sewers) that carries stormwater runoff from buildings and land surfaces. "Subcontractor" -for the purposes of this permit, an individual or company that takes a portion of a contract from the general contractor or from another subcontractor. "Surface Water"-a "Water of the United States" as defined in 40 CFR §122.2. "SWPPP" (Stormwater Pollution Prevention Plan) -a site-specific,written document that, among other things: (1) identifies potential sources of stormwater pollution at the construction site; (2) describes stormwater control measures to reduce or eliminate pollutants in stormwater Page A-10 of 13 Construction General Permit (CGP) discharges from the construction site; and (3) identifies procedures the operator will implement to comply with the terms and conditions of this general permit. "Temporary Stabilization"-a condition where exposed soils or disturbed areas are provided a temporary vegetative and/or non-vegetative protective cover to prevent erosion and sediment loss. Temporary stabilization may include temporary seeding, geotextiles, mulches, and other techniques to reduce or eliminate erosion until either final stabilization can be achieved or until further construction activities take place to re-disturb this area. "Thawing Conditions" -for the purposes of this permit, thawing conditions are expected based on the historical likelihood of two or more days with daytime temperatures greater than 32°F.This date can be determined by looking at historical weather data. Note: the estimation of thawing conditions is for planning purposes only. During construction the permittee will be required to conduct site inspections based upon actual conditions (i.e., if thawing conditions occur sooner than expected, the permittee will be required to conduct inspections at the regular frequency). "Threatened Species"-defined in the Endangered Species Act at 16 U.S.C. 1531 as any species which is likely to become an endangered species within the foreseeable future throughout all or a significant portion of its range. "Tier 2 Waters"-for antidegradation purposes, pursuant to 40 CFR 131.12(a)(2), those waters thatare characterized as having water quality that exceeds the levels necessary to support propagation of fish,shellfish, and wildlife and recreation in and on the water. "Tier 2.5 Waters"-for antidegradation purposes, those waters designated by States or Tribes as requiring a level of protection equal to and above that given to Tier 2 waters, but less than that given Tier 3 waters. Some States have special requirements for these waters. "Tier 3 Waters"-for antidegradation purposes, pursuant to 40 CFR 131.12(a)(3),Tier 3 waters are identified by states as having high quality wafers constituting an Outstanding Natural Resource Water (ONRW), such as waters of National Parks and State Parks,wildlife refuges, and waters of exceptional recreational or ecological significance. "Total Maximum Daily Load" or"TMDL"-the sum of the individual wasteload allocations (WLAs) for point sources and load allocations (LAs) for nonpoint sources and natural background. If receiving water has only one point source discharger, the TMDL is the sum of that point source WLA plus the LAs for any nonpoint sources of pollution and natural background sources, tributaries, or adjacent segments. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. "Toxic Waste"-see "Hazardous Materials." "Turbidity"-a condition of water quality characterized by the presence of suspended solids and/or organic material. "Uncontaminated Discharge"-a discharge that does not cause or contribute to an exceedence of applicable water quality standards. "Upland" -the dry land area above and `landward' of the ordinary high water mark. "Upset"-Upset means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond your reasonable control. An upset does not include noncompliance to the extent caused by Page A-1 1 of 13 Construction General Permit (CGP) operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. See 40 CFR 122.41(n)(1). "Water-Dependent Structures"-structures or facilities that are required to be located directly adjacent to a waterbody or wetland, such as a marina, pier, boat ramp, etc. "Water Quality Standards" -defined in 40 CFR § 131.3, and are provisions of State or Federal law which consist of a designated use or uses for the waters of the United States,water quality criteria for such waters based upon such uses, and an antidegradation policy to protect high- quality waters. Water quality standards protect the public health or welfare, enhance the quality of water and serve the purposes of the Act. "Waters of the United States"-defined at 40 CFR §122.2 as: 1. All waters which are currently used, or were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide; 2. All interstate waters, including interstate wetlands; 3. All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats,wetlands, sloughs, prairie potholes,wet meadows, playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters: a. Which are or could be used by interstate or foreign travelers for recreational or other purposes; b. From which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or c. Which are used or could be used or could be used for industrial purposes by industries in interstate commerce; 4. All impoundments of waters otherwise defined as waters of the United States under this definition; 5. Tributaries of waters identified in paragraphs (1) through (4) of this definition; 6. The territorial sea; and 7. Wetlands adjacent to waters (other than waters that are themselves wetlands) identified in paragraphs (1) through (6) of this definition. Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of CWA (other than cooling ponds as defined in 40 CFR 423.11 (m) which also meet the criteria of this definition) are not waters of the United States.This exclusion applies only to manmade bodies of water which neither were originally created in waters of the United States (such as disposal area in wetlands) nor resulted from the impoundment of waters of the United States. Waters of the United States do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other federal agency, for the purposes of the Clean Water Act, the final authority regarding Clean Water Act jurisdiction remains with EPA. In applying this definition, EPA will consider applicable Court cases and current guidance. "Wetland"-those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, Page A-12 of 13 Construction General Permit (CGP) a prevalence of vegetation typically adapted for life in saturated soil conditions.Wetlands generally include swamps, marshes, bogs, and similar areas. On-site evaluations are typically required to confirm the presence and boundaries of wetlands. "Work day"-for the purposes of this permit, a work day is a calendar day on which construction activities will take place. Acronyms C&D-Construction & Development CGP-Construction General Permit CFR-Code of Federal Regulations CWA- Clean Water Act eNOI-Electronic Notice of Intent EPA- United States Environmental Protection Agency ESA- Endangered Species Act FWS- United States Fish and Wildlife Service MS4-Municipal Separate Storm Sewer System MSGP-Mufti-Sector General Permit NMFS- United States National Marine Fisheries Service NOI- Notice of Intent NOT-Notice of Termination NPDES- National Pollutant Discharge Elimination System NRC- National Response Center NRCS-National Resources Conservation Service POTW-Publicly Owned Treatment Works SPCC-Spill Prevention Control and Countermeasure SWPPP-Stormwater Pollution Prevention Plan TMDL-Total Maximum Daily Load USGS- United States Geological Survey WQS-Water Quality Standard Page A-13 of 13 Construction General Permit (CGP) Appendix B - Permit Areas Eligible for Coverage Permit coverage for stormwater discharges from construction activity occurring within the following areas is provided by legally separate and distinctly numbered permits: B.1 EPA Region 1: CT,MA,ME, NH, RI,VT US EPA, Region 01 Office of Ecosystem Protection NPDES Stormwater Program 5 Post Office Square Boston, MA 02109-3912 The States of Connecticut,Maine, Rhode Island,and Vermont are the NPDES Permitting Authority for the majority of discharges within their respective states. Permit No. Areas of Coverage/Where EPA is Permittinq Authority CTR120001 Indian country within the State of Connecticut MAR120000 Commonwealth of Massachusetts (except Indian country) MAR120001 Indian country within the State of Massachusetts NHR120000 State of New Hampshire RIR120001 Indian country within the State of Rhode Island VTR12000F Areas in the State of Vermont subject to construction by a Federal Operator B.2 EPA Region 2: NJ, NY, PR,VI For NJ, NY, and VI: US EPA, Region 02 NPDES Stormwater Program 290 Broadway, 24th Floor New York, NY 10007-1866 For PR: US EPA, Region 02 Caribbean Environmental Protection Division NPDES Stormwater Program 1492 Ponce de Leon Ave Central Europa Building,Suite 417 San Juan, PR 00907-4127 The State of New York is the NPDES Permitting Authority for the majority of discharges within its state.The State of New Jersey and the Virgin Islands are the NPDES Permitting Authority for all discharges within their respective states. Permit No. Areas of Coverage/Where EPA is Permitting Authority NYR120001 Indian country within the State of New York PRR120000 Commonwealth of Puerto Rico Page B-1 of 5 Construction General Permit (CGP) B.3 EPA Region 3: DE, DC,MD, PA,VA,WV US EPA, Region 03 NPDES Stormwater Program 1650 Arch St Philadelphia, PA 19103 The State of Delaware is the NPDES Permitting Authority for the majority of discharges within its state.Maryland, Pennsylvania, Virginia,and West Virginia are the NPDES Permitting Authority for all discharges within their respective states. Permit No. Areas of Coverage/Where EPA is Permitting Authority DCR120000 District of Columbia DER12000F Areas in the State of Delaware subject to construction by a Federal Operator B.4 EPA Region 4: AL, FL, GA, KY,MS, NC,SC,TN US EPA, Region 04 Water Protection Division NPDES Stormwater Program 61 Forsyth St SW Atlanta, GA 30303-3104 The States of Alabama, Florida,Mississippi,and North Carolina are the NPDES Permitting Authority for the majority of discharges within their respective States. EPA Region 4 is the NPDES Permitting Authority for all Indian country lands within any other Region 4 State except Catawba lands in South Carolina. Permit No. Areas of Coverage/Where EPA is Permitting Authority ALR120001 Indian country within the State of Alabama FLR120001 Indian country within the State of Florida MSR120001 Indian country within the State of Mississippi NCR120001 Indian country within the State of North Carolina RE4120001 Indian country within any other Region 4 State (except Catawba lands in South Carolina) B.5 EPA Region 5: IL, IN,MI,MN, OH,WI US EPA, Region 05 NPDES &Technical Support NPDES Stormwater Program 77 W Jackson Blvd (WN-16J) Chicago, IL 60604-3507 The States of Michigan, Minnesota, and Wisconsin are the NPDES Permitting Authority for the majority of discharges within their respective states.The States of Illinois, Indiana, and Ohio are the NPDES Permitting Authorities for all discharges within their respective states. Page B-2 of 5 Construction General Permit (CGP) Permit No. Areas of Coverage/Where EPA is Permitting Authority MIR120001 Indian country within the State of Michigan MNR120001 Indian country within the State of Minnesota,except the Fond Du Lac Band and Grand Portage Band of Lake Superior Chippewa WIR120001 Indian country within the State of Wisconsin, except the Bad River, Lac Du Flambeau and Sokaogon Chippewa (Mole Lake) Community B.6 EPA Region 6: AR, LA, OK,TX, NM(except see Region 9 for Navajo lands,and see Region 8 for Ute Mountain Reservation lands) US EPA, Region 06 NPDES Stormwater Program 1445 Ross Ave,Suite 1200 Dallas,TX 75202-2733 The States of Louisiana, Oklahoma, and Texas are the NPDES Permitting Authority for the majority of discharges within their respective state.The State of Arkansas is the NPDES Permitting Authority for all discharges within its respective state. Permit No. Areas of Coverage/Where EPA is Permitting Authority LAR120001 Indian country within the State of Louisiana NMR120000 State of New Mexico,except Indian country NMR120001 Indian country within the State of New Mexico, except Navajo Reservation Lands that are covered under Arizona permit AZR100001 and Ute Mountain Reservation Lands that are covered under Colorado permit CORI00001. 0KR120001 Indian country within the State of Oklahoma OKRI2000F Discharges in the State of Oklahoma that are not under the authority of the Oklahoma Department of Environmental Quality,including activities associated with oil and gas exploration,drilling, operations, and pipelines (includes SIC Groups 13 and 46, and SIC codes 492 and 5171), and point source discharges associated with agricultural production, services,and silviculture (includes SIC Groups 01,02, 07,08,09). TXR12000F Discharges in the State of Texas that are not under the authority of the Texas Commission on Environmental Quality(formerly TNRCC),including activities associated with the exploration, development,or production of oil or gas or geothermal resources, including transportation of crude oil or natural gas by pipeline. TXR120001 Indian country within the State of Texas B.7 EPA Region 7: IA, KS,MO, NE(except see Region 8 for Pine Ridge Reservation Lands) US EPA, Region 07 NPDES Stormwater Program 901 N 5th St Kansas City, KS 66101 The States of Iowa, Kansas,and Nebraska are the NPDES Permitting Authority for the majority of discharges within their respective states.The State of Missouri is the NPDES Permitting Authority for all discharges within its state. Page B-3 of 5 Construction General Permit (CGP) Permit No. Areas of Coverage/Where EPA is Permitting Authority IAR120001 Indian country within the State of Iowa KSR120001 Indian country within the State of Kansas NER120001 Indian country within the State of Nebraska,except Pine Ridge Reservation lands (see Region 8) B.8 EPA Region 8: CO,MT, ND,SD,WY, UT(except see Region 9 for Goshute Reservation and Navajo Reservation Lands),the Ute Mountain Reservation in NM,and the Pine Ridge Reservation in NE. US EPA, Region 08 NPDES Stormwater Program 999 18th St,Suite 300 (EPR-EP) Denver, CO 80202-2466 The States of Colorado, Montana, North Dakota,South Dakota, Utah, and Wyoming are the NPDES Permitting Authority for the majority of discharges within their respective states. Permit No. Areas of Coverage/Where EPA is Permitting Authority COR12000F Areas in the State of Colorado, except those located on Indian country, subject to construction activity by a Federal Operator COR120001 Indian country within the State of Colorado,as well as the portion of the Ute Mountain Reservation located in New Mexico MTR120001 Indian country within the State of Montana NDR120001 Indian country within the State of North Dakota,as well as that portion of the Standing Rock Reservation located in South Dakota (except for the portion of the lands within the former boundaries of the Lake Traverse Reservation which is covered under South Dakota permit SDR100001 listed below) SDR120001 Indian country within the State of South Dakota, as well as the portion of the Pine Ridge Reservation located in Nebraska and the portion of the lands within the former boundaries of the Lake Traverse Reservation located in North Dakota (except for the Standing Rock Reservation which is covered under North Dakota permit NDR100001 listed above) UTR120001 Indian country within the State of Utah, except Goshute and Navajo Reservation lands (see Region 9) WYR720001 Indian country within the State of Wyoming B.9 EPA Region 9: CA, HI, NV, Guam,American Samoa,the Commonwealth of the Northern Mariana Islands,the Goshute Reservation in UT and NV,the Navajo Reservation in UT, NM, and AZ,the Duck Valley Reservation in ID,and the Fort McDermitt Reservation in OR. US EPA, Region 09 NPDES Stormwater Program 75 Hawthorne St San Francisco, CA 94105-3901 The States of Arizona, California and Nevada are the NPDES Permitting Authority for the majority of discharges within their respective states.The State of Hawaii is the NPDES Permitting Authority for all discharges within its state. Page B-4 of 5 Construction General Permit (CGP) Permit No. Areas of Coverage/Where EPA is Permitting Authority ASR120000 Island of American Samoa AZR120001 Indian country within the State of Arizona, as well as Navajo Reservation lands in New Mexico and Utah CAR120001 Indian country within the State of California GUR120000 Island of Guam JAR120000 Johnston Atoll MPR120000 Commonwealth of the Northern Mariana Islands MWR120000 Midway Island and Wake Island NVR120001 Indian country within the State of Nevada, as well as the Duck Valley Reservation in Idaho,the Fort McDermitt Reservation in Oregon and the Goshute Reservation in Utah B.10 EPA Region 10:AK,WA, ID(except see Region 9 for Duck Valley Reservation Lands),and OR(except see Region 9 for Fort McDermitt Reservation). US EPA, Region 10 NPDES Stormwater Program 1200 6th Ave (OW-130) Seattle, WA 981 01-1 1 28 Phone: (206) 553-6650 The States of Oregon and Washington are the NPDES Permitting Authority for the majority of discharges within their respective states. Permit No. Areas of Coverage/Where EPA is Permitting Authority AKR120001 Indian country within the State of Alaska AKR12-000F Areas in the the Denali National Park and Preserve subject to construction by a Federal Operator IDR120000 State of Idaho, except Indian country[COVERAGE NOT YET AVAILABLE] IDR120001 Indian country within the State of Idaho,except Duck Valley Reservation lands (see Region 9) ORRI20001 Indian country within the State of Oregon, except Fort McDermitt Reservation lands (see Region 9) WAR12000F Areas in the State of Washington,except those located on Indian country,subject to construction activity by a Federal Operator [COVERAGE NOT YET AVAILABLE] WAR120001 Indian country within the State of Washington Page B-5 of 5 Construction General Permit (CGP) Appendix C - Small Construction Waivers and Instructions These waivers are only available to stormwater discharges associated with small construction activities (i.e., 1-5 acres). As the operator of a small construction activity, you may be able to qualify for a waiver in lieu of needing to obtain coverage under this general permit based on: (A) a low rainfall erosivity factor, (B) a TMDL analysis, or (C) an equivalent analysis that determines allocations for small construction sites are not needed. Each operator, otherwise needing permit coverage, must notify EPA of its intention for a waiver. It is the responsibility of those individuals wishing to obtain a waiver from coverage under this general permit to submit a complete and accurate waiver certification as described below. Where the operator changes or another is added during the construction project, the new operator must also submit a waiver certification to be waived. C.1 Rainfall Erosivity Waiver Under this scenario the small construction project's rainfall erosivity factor calculation ("R" in the Revised Universal Soil Loss Equation) is less than 5 during the period of construction activity. The operator must certify to EPA that construction activity will occur only when the rainfall erosivity factor is less than 5. The period of construction activity begins at initial earth disturbance and ends with final stabilization. Where vegetation will be used for final stabilization, the date of installation of a stabilization practice that will provide interim non-vegetative stabilization can be used for the end of the construction period, provided the operator commits (as a condition of waiver eligibility) to periodically inspect and properly maintain the area until the criteria for final stabilization as defined in the construction general permit have been met. If use of this interim stabilization eligibility condition was relied on to qualify for the waiver, signature on the waiver with its certification statement constitutes acceptance of and commitment to complete the final stabilization process. The operator must submit a waiver certification to EPA prior to commencing construction activities. Note:The rainfall erosivity factor"R"is determined in accordance with Chapter 2 of Agriculture Handbook Number 703, Predicting Soil Erosion by Water:A Guide to Conservation Planning With the Revised Universal Soil Loss Equation (RUSLE), pages 21-64, dated January 1997,United States Department of Agriculture (USDA), Agricultural Research Service. EPA has developed an online rainfall erosivity calculator to help small construction sites determine potential eligibility for the rainfall erosivity waiver. You can access the calculator from EPA's website at;wwnr.er�o.c�ov/npdes/sforrnwater lew. The R factor can easily be calculated by using the construction site latitude/longitude or address and estimated start and end dates of construction. This calculator may also be useful in determining the time periods during which construction activity could be waived from permit coverage. You may find that moving your construction activity by a few weeks or expediting site stabilization will allow you to qualify for the waiver. Use this online calculator or the Construction Rainfall Erosivity Waiver Fact Sheet (�y�a.gov/npdes phs/fact3-1, (if) to assist in determining the R Factor for your small construction site. Page C-1 of 4 Construction General Permit (CGP) If you are the operator of the construction activity and eligible for a waiver based on low erosivity potential, you can submit a rainfall erosivity waiver electronically via EPA's eNOI system (www.eDa.gov/nDdeslc enoi) or provide the following information on the waiver certification form in order to be waived from permitting requirements: 1. Name, address and telephone number of the construction site operator(s); 2. Name (or other identifier), address, county or similar governmental subdivision, and latitude/longitude of the construction project or site; 3. Estimated construction start and completion (i.e., final stabilization) dates, and total acreage (to the nearest quarter acre) to be disturbed; 4. The rainfall erosivity factor calculation that applies to the active construction phase at your project site; and 5. A statement,signed and dated by an authorized representative as provided in Appendix I,Subsection I.1 1,which certifies that the construction activity will take place during a period when the value of the rainfall erosivity factor is less than five. You can access the waiver certification form from EPA's website at: (i tt�/(wv w ea�co_v/r r�des �l�s/constriction v giver forf). Paper copies of the form must be sent to one of the addresses listed in Part CA of this section. Note: If the R factor is 5 or greater, you cannot apply for the rainfall erosivity waiver, and must apply for NPDES permit coverage, unless you qualify for the Water Quality Waiver as described in section B below. If your small construction project continues beyond the projected completion date given on the waiver certification,you must recalculate the rainfall erosivity factor for the new project duration. If the R factor is below five (5),you must update all applicable information on the waiver certification and retain a copy of the revised waiver as part of your records. The new waiver certification must be submitted prior to the projected completion date listed on the original waiver form to assure your exemption from permitting requirements is uninterrupted. If the new R factor is 5 or above, you must obtain NPDES permit coverage. C.2 TMDL Waiver This waiver is available if EPA has established or approved a TMDL that addresses the pollutants) of concern for the impaired water and has determined that controls on stormwater discharges from small construction activity are not needed to protect water quality. The pollutant(s) of concern include sediment (such as total suspended solids, turbidity or siltation) and any other pollutant that has been identified as a cause of impairment of any water body that will receive a discharge from the construction activity. Information on TMDLs that have been established or approved by EPA is available from EPA online at Lift p:/Lwww.epa.govJowow/ttndl/ and from state and tribal water quality agencies. If you are the operator of the construction activity and eligible for a waiver based on compliance with an EPA-established or approved TMDL,you must provide the following information on the Waiver Certification form in order to be waived from permitting requirements: 1. Name, address and telephone number of the construction site operator(s); 2. Name (or other identifier), address, county or similar governmental subdivision, and latitude/longitude of the construction project or site; Page C-2 of 4 Construction General Permit (CGP) 3. Estimated construction start and completion (i.e., final stabilization) dates, and total acreage (to the nearest quarter acre) to be disturbed; 4. The name of the waterbody(s) that would be receiving stormwater discharges from your construction project; 5. The name and approval date of the TMDL; 6. A statement, signed and dated by an authorized representative as provided in Appendix I, Subsection 1.11, that certifies that the construction activity will take place and that the stormwater discharges will occur,within the drainage area addressed by the TMDL. C.3 Equivalent Analysis Waiver This waiver is available for non-impaired waters only. The operator can develop an equivalent analysis that determines allocations for his/her small construction site for the pollutant(s) of concern or determines that such allocations are not needed to protect water quality. This waiver requires a small construction operator to develop an equivalent analysis based on existing in-stream concentrations, expected growth in pollutant concentrations from all sources, and a margin of safety. If you are a construction operator who wants to use this waiver, you must develop your equivalent analysis and provide the following information to be waived from permitting requirements: l. Name, address and telephone number of the construction site operator(s); 2. Name (or other identifier), address, county or similar governmental subdivision, and latitude/longitude of the construction project or site; 3. Estimated construction start and completion (i.e., final stabilization) dates, and total acreage (to the nearest quarter acre) to be disturbed; 4. The name of the waterbody(s) that would be receiving stormwater discharges from your construction project; 5. Your equivalent analysis; 6. A statement,signed and dated by an authorized representative as provided in Appendix I,Subsection I.1 1, that certifies that the construction activity will take place and that the stormwater discharges will occur, within the drainage area addressed by the equivalent analysis. CA Waiver Deadlines and Submissions l. Waiver certifications must be submitted prior to commencement of construction activities. 2. If you submit a TMDL or equivalent analysis waiver request,you are not waived until EPA approves your request. As such, you may not commence construction activities until receipt of approval from EPA. 3. Late Notifications: Operators are not prohibited from submitting waiver certifications after initiating clearing, grading, excavation activities, or other construction activities. The Agency reserves the right to take enforcement for any unpermitted discharges that occur between the time construction commenced and waiver authorization is granted. Page C-3 of 4 Construction General Permit (CGP) Submittal of a waiver certification is an optional alternative to obtaining permit coverage for discharges of stormwater associated with small construction activity, provided you qualify for the waiver. Any discharge of stormwater associated with small construction activity not covered by either a permit or a waiver may be considered an unpermitted discharge under the Clean Water Act. As mentioned above, EPA reserves the right to take enforcement for any unpermitted discharges that occur between the time construction commenced and either discharge authorization is granted or a complete and accurate waiver certification is submitted. EPA may notify any operator covered by a waiver that they must apply for a permit. EPA may notify any operator who has been in non-compliance with a waiver that they may no longer use the waiver for future projects. Any member of the public may petition EPA to take action under this provision by submitting written notice along with supporting justification. Complete and accurate Rainfall Erosivity waiver certifications not otherwise submitted electronically via EPA's eNO1 system (www.epa.goy desJccIpenoi) must be sent to one of the following addresses: Regular U.S. Mail Delivery EPA Stormwater Notice Processing Center Mail Code 4203M U.S. EPA 1200 Pennsylvania Avenue, NW Washington, DC 20460 Overnight/Express Mail Delivery EPA Stormwater Notice Processing Center Room 7420 U.S. EPA 1201 Constitution Avenue, NW Washington, DC 20004 Complete and accurate TMDL or equivalent analysis waiver requests must be sent to the applicable EPA Region office specified in Appendix B. Page C-4 of 4 Construction General Permit (CGP) Appendix D - Endangered Species Act Requirements The purpose of this guidance is to assist you in complying with the requirements in Part 1.1.e of the permit requiring you to demonstrate that you meet one of the criteria listed in this appendix with respect to the protection of any and all species that are federally-listed as endangered or threatened under the Endangered Species Act (ESA) or of habitat that is federally-designated as "critical habitat" under the ESA in order to be eligible for coverage under this permit. This guidance provides you information on the following: • Section DA: ESA Eligibility Criteria • Section D.2: Guidance for Determining Which ESA Criteria Applies DA ESA Eligibility Criteria You must certify in your NOI that you meet one of the eligibility criteria listed below in order to be eligible for coverage under this permit. You must also specify in the NOI the basis for your selection of the applicable eligibility criterion. Note: (1) Regardless of the criterion selected,you must provide documentation in your SWPPP that is sufficient to support your determination that you satisfy the requirements of the particular criterion. (2) While coordination between you and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service (together, the "Services") is not necessarily required in all cases, EPA encourages you to coordinate with the Services and to do so early in the planning process prior to submitting your NOI. Criterion A. No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of this permit. Criterion B. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse of NPDES permit coverage in the other operator's certification. By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NOI form. Page D-1 of 7 Construction General Permit (CGP) Criterion C. Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification,you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with your NOI. Criterion D. Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion E. Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either: i. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or ii. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion F. Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally-listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. You must comply with any applicable terms, conditions, or other requirements developed in the process of meeting the eligibility criteria in this section to remain eligible for coverage under this permit. Documentation of these requirements must be kept as part of your SWPPP (see Part 7.2.14.1). Page D-2 of 7 Construction General Permit (CGP) D.2 Guidance for Determining Which Criterion Applies Part 1.1.5 of the permit requires that you meet one of the six criteria listed above in order to be eligible for coverage under the permit. You must follow the procedures in Steps 1 through 6 to determine the ESA criterion under which your site is eligible for permit coverage. D.2.1 Step 1 - Determine if Your Discharges and Discharge-Related Activities Were Already Addressed in Another Operator's Valid Certification that Included Your Action Area. • If your discharges and discharge-related activities were already addressed in another operator's valid certification that included your action area (e.g., a general contractor or developer may have completed and filed an NO] for the entire action area with the necessary ESA certifications (Criterion A, C, D, E, or F)), you may select eligibility Criterion B on your Notice of Intent form. By certifying eligibility under Criterion B, you must comply with any terms and conditions imposed under the eligibility requirements of Criterion A, C, D, E, or F to ensure that your discharges and discharge-related activities are protective of listed species and/or critical habitat. Note: If you are unable to meet these eligibility requirements, then you may either establish eligibility under one of the other criterion, or you may consider applying to EPA for an individual permit. Under Criterion B, you must provide documentation in your SWPPP of any of these terms and conditions, as well as the other operator's basis for establishing eligibility. You must also provide a description of the basis for your selection of Criterion B on your NO] form, including the eligibility criterion (A, C, D, E, or F) that was certified to by the previous operator, and must provide the Tracking Number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under criterion C, you must provide the documentation required in the NOI for criterion C, namely: 1) what federally listed species and/or designated habitat are located in your "action area"; and 2) what is the distance between your site and the listed species or designated critical habitat (in miles). • If discharges and discharge-related activities from your site were not addressed in another operator's valid certification that included your action area, you must follow the applicable procedures in Steps 2 through 5 below. D.2.2 Step 2 - Determine if Listed Threatened or Endangered Species or their Designated Critical Habitat(s) are Likely to Occur in your Site's Action Area You must determine, to the best of your knowledge,whether species listed as either threatened or endangered, or their critical habitat(s) (see definitions of these terms in Appendix A), are located in your site's action area.To make this determination,you should first determine if listed species and/or critical habitat are expected to exist in your county or township.The local offices of the U.S. Fish and Wildlife Service (FWS), National Marine Fisheries Service (NMFS), and State or Tribal Heritage Centers often maintain lists of federally listed endangered or threatened species on their internet sites. For FWS Page D-3 of 7 Construction General Permit terrestrial and aquatic species information, you can use FWS' on-line mapping fool, the Information, Planning, and Consultation (|P/\C) System, located ot Note: To determine the field office that corresponds 10 your project site, visit and (under the left|oba for "RoAions"). In most cases, species and/or critical habitat lists allow you to determine if any such species or habitat exists in your county urtownship. You can also find critical habitat designations and associated requirements ot5UCFR Parts l7 and 226. . " If there are listed species andlor critical habitat in your county or township,you should contact your local RWS' Nk4FS' or State or Tribal Heritage Center to determine if the listed species are known to exist in your action area and if any critical habitat areas have been designated that overlap your action area. o |f your local FWS' NMB' orl|oteur Tribal Heht age Center indicotesthat these species and/or critical habitat could exist in your action area,you must: = Dn one or more ofihefollowing: ° Conduct visual inspections.This method may bo particularly suitable for construction sites that are smaller in size or located in non-natural settings such oshighly urbanized areas or industrial parks where there is little orno natural habitat, ur for construction activities that discharge directly info municipal dormvvotorcollection systems. ° Conduct oformal biological survey. |n some cases, particularly for larger construction sites with extensive stormwoterdischorgeo' biological surveys may be an appropriate way tu assess whet her species are located in fho action area and whether there are likely tobeadverse effects io such species. Biological surveys are frequently performed by environmental consulting firms. Abio|ngico| survey may in some cases bo useful 1u conduct in conjunction with Steps Two,Three, or Four ofthese instructions. ° U required, conduct un environmental assessment under the National Environmental Policy Act (NEPA). Some construction activities might require review under NEP/\for specific reasons, such us federal funding Vr other federal involvement in the project. Note: Coverage under the CGP does not trigger such o review for individual pnojocts/si|os. EPA has complied with NEPAin the issuance uf the CGP. and Page D4of7 Construction General Permit (CGP) ® Follow the instructions in Steps 3-5 below, as applicable. Note that many but not all measures imposed to protect listed species under these steps will also protect critical habitat.Thus, meeting the eligibility requirements of this CGP may require measures to protect critical habitat that are separate from those to protect listed species. • If there are no listed species in your county or township and no critical habitat areas in your action area, you may check eligibility criterion A on your NOI form. You must also provide a description of the basis for the criterion selected on your NOI form and provide documentation supporting the criterion selected in your SWPPP. D.2.3 Step 3 - Determine if the Construction Activity's Discharges or Discharge-Related Activities Are Likely to Adversely Affect Listed Threatened or Endangered Species or Designated Critical Habitat If in Step 2 you determine based on communication with your local FWS, NMFS, or State or Tribal Heritage Center, or other determination, that listed species and/or critical habitat could exist in your action area,you must next assess whether your discharges or discharge-related activities are likely to adversely affect listed threatened or endangered species or designated critical habitat. Potential adverse effects from discharges and discharge-related activities include: • Hydrological.Stormwater discharges may cause siltation, sedimentation or induce other changes in receiving waters such as temperature,salinity or pH. These effects will vary with the amount of sformwafer discharged and the volume and condition of the receiving wafer. Where a stormwater discharge constitutes a minute portion of the total volume of the receiving wafer, adverse hydrological effects are less likely. Construction activity itself may also alter drainage patterns on a site where construction occurs that can impact listed species or critical habitat. • Habitat. Excavation,site development, grading, and other surface disturbance activities from construction activities, including the installation or placement of stormwater controls, may adversely affect listed species or their habitat. Stormwater may drain or inundate listed species habitat. • Toxicity. In some cases, pollutants in stormwater may have toxic effects on listed species. The scope of effects to consider will vary with each site. If you are having difficulty determining whether your project is likely to adversely affect listed species or critical habitat, or one of the Services has already raised concerns to you,you should contact the appropriate office of the FWS, NMFS or Natural Heritage Center for assistance. • If adverse effects to listed threatened or endangered species or their critical habitat are not likely, then you may select eligibility criterion C on the NOI form. You must provide the following specific information on your NOI form: 1) what federally listed species and/or designated habitat are located in your"action area"; and 2) what is the distance between your site and the listed species or Page D-5 of 7 Construction General Permit (CGP) designated critical habitat (in miles). You must also provide a copy of your site map with your NOI. • If adverse effects to listed threatened or endangered species or their critical habitat are likely, you must follow Step 4 below. D.2.4 Step 4 - Determine if Measures Can Be Implemented to Avoid Adverse Effects If you make a preliminary determination in Step 3 that adverse effects from your construction activity's discharges or discharge-related activities are likely to occur,you can still receive coverage under eligibility criterion C of the CGP if appropriate measures are undertaken to avoid or eliminate the likelihood of adverse effects prior to applying for CGP coverage. These measures may involve relatively simple changes to construction activities such as re-routing a stormwater discharge to bypass an area where species are located, relocating stormwater controls, or by modifying the "footprint" of the construction activity. If you are unable to ascertain which measures to implement to avoid the likelihood of adverse effects,you must coordinate or enter into consultation with the FWS and/or NMFS, in which case you would not be eligible for coverage under eligibility criterion C, but may instead be eligible for coverage under eligibility criterion D, E, or F (described in more detail in Step 5). • If you are able to install and implement appropriate measures to avoid the likelihood of adverse effects, then you may check eligibility criterion C on the NOI form. The measures you adopt to avoid or eliminate adverse affects must be implemented for the duration of the construction project and your coverage under the CGP. You must also provide a description of the basis for the criterion selected , and the following specific information on your NOI form: 1) what federally listed species and/or designated habitat are located in your"action area"; and 2) what is the distance between your site and the listed species or designated critical habitat (in miles). • If you cannot ascertain which measures to implement to avoid the likelihood of adverse effects,you must follow the procedures in Step 5. D.2.5 Step 5 - Determine if the Eligibility Requirements of Criterion D, E, or F Can Be Met If in Step 4 you cannot ascertain which measures to implement to avoid the likelihood of adverse effects, you must contact the FWS and/or NMFS.You may still be eligible for CGP coverage if any likely adverse effects can be addressed through meeting criterion D, E, or F. • Criterion D: You have coordinated with the Services and have addressed the effects of your site's discharges on federally-listed threatened or endangered species and federally-designated critical habitat,which resulted in a written concurrence from the relevant Service(s) that your site's discharges are not likely to adversely affect listed species or critical habitat. If you have met the requirements of criterion D, you may select eligibility criterion D on the NOI form. You must provide a description of the basis for the criterion selected on your NOI form and must include copies of the correspondence between you and the applicable Service in your SWPPP. Page D-6 of 7 Construction General Permit (CGP) • Criterion E: Formal or informal ESA section 7 consultation is performed with the FWS and/or NMFS and that consultation addresses the effects of your discharges and discharge-related activities on federally-listed and threatened species and designated critical habitat. In order to be eligible for coverage under this permit, consultation must result in a "no jeopardy opinion" or a written concurrence by the Service(s) on a finding that your stormwater discharge(s) and stormwater discharge-related activities are not likely to adversely affect listed species or critical habitat (For more information on consultation, see 50 CFR §402). If you receive a "jeopardy opinion," you may continue to work with the FWS and/or NMFS and your permitting authority to modify your project so that it will not jeopardize listed species or designated critical habitat. Note that most consultations are accomplished through informal consultation. When conducting informal ESA section 7 consultation as a non-federal representative, you must follow the procedures found in 50 CFR Part 402 of the ESA regulations. You must notify FWS and/or NMFS of your intention and agreement to conduct consultation as a non-federal representative. Consultation may occur in the context of another federal action at the construction site (e.g.,where ESA section 7 consultation was performed for issuance of a wetlands dredge and fill permit for the project or where a NEPA review is performed for the project that incorporates a section 7 consultation). Any terms and conditions developed through consultations to protect listed species and critical habitat must be incorporated into the SWPPP. As noted above, operators may, if they wish, initiate consultation with the Services at Step Four. Whether ESA section 7 consultation must be performed with either the FWS, NMFS or both Services depends on the listed species that may be affected by the operator's activity. In general, NMFS has jurisdiction over marine, estuarine, and anadromous species. Operators should also be aware that while formal section 7 consultation provides protection from incidental takings liability, informal consultation does not. If you have met the requirements of criterion E, you may select eligibility criterion E on the NOI form. You must provide a description of the basis for the criterion selected on your NOI form and must include copies of the correspondence between yourself and the Services in your SWPPP. • Criterion F: Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and that authorization addresses the effects of your discharge(s) and discharge-related activities on federally-listed species and designated critical habitat. You must follow FWS and/or NMFS procedures when applying for an ESA Section 10 permit (see 50 CFR §17.22(b)(1) for FWS and §222.22 for NMFS). Application instructions for section 10 permits for FWS and NMFS can be obtained by accessing the FWS and NMFS websites (hffp://www.fws.gov and http://www.nmfs.noaa.gov) or by contacting the appropriate FWS and NMFS regional office. If you have met the requirements of criterion F, you may select eligibility criterion F on the NOI form. You must provide a description of the basis for the criterion selected on your NOI form and must include copies of the correspondence between yourself and the Services in your SWPPP. Page D-7 of 7 Construction General Permit (CGP) Appendix E-Historic Property Screening Process Background Section 106 of the National Historic Preservation Act (NHPA) requires Federal agencies to take into account the effects of Federal "undertakings", such as the issuance of this permit, on historic properties that are either listed on, or eligible for listing on, the National Register of Historic Places. To address any issues relating to historic properties in connection with the issuance of Key Terms this permit, EPA has developed the screening process in this appendix that enables Historic property-prehistoric or historic districts,sites, buildings,structures,or objects that are included in construction operators to appropriately or eligible for inclusion in the National Register of consider the potential impacts, if any, of their Historic Places,including artifacts,records,and installation of stormwater controls on historic remains that are related to and located within such properties and to determine whether actions properties can be taken, if applicable, to mitigate any SHPO-The State Historic Preservation Officer for a such impacts. Although the coverages of particular state individual construction sites under this permit do not constitute separate Federal undertakings, THPO or Tribal representative-The Tribal Historic the screening process in this appendix provides Preservation Officer for a particular Tribe or,if there is an appropriate site-specific means of no THPO,the representative designated by such Tribe for NHPA purposes addressing historic property issues in connection with EPA's issuance of the permit. Instructions for All Construction Operators You are required to follow the screening process in this appendix to determine if your installation of stormwater controls on your site has the potential to cause effects to historic properties, and whether or not you need to contact your SHPO,THPO, or other tribal representative for further information. You may not submit your NOI until you have completed this screening process.The following four steps describe how applicants can meet the historic property requirements under this permit: Steel Are you installing any stormwater controls that require subsurface earth disturbance? The first step of the screening process is to determine if you will install stormwater controls that cause subsurface earth disturbance. The installation of the following types of stormwater controls require subsurface earth disturbance: • Dikes • Berms • Catch Basins • Ponds • Ditches • Trenches • Culverts • Channels • Perimeter Drains Page E-1 of 4 Construction General Permit (CGP) • Swales Note: This list is not intended to be exhaustive. Other stormwater controls that are not on this list may involve earth-disturbing activities and must also be examined for the potential to affect historic properties. Note:You are only required to consider earth-disturbing activities related to the installation of stormwater controls in the NHPA screening process. You are not reqired to conside other earth-disturbing activities a the site. If you are installing one of the above stormwater controls or another type of control that requires subsurface earth disturbance, your project has the potential to have an effect on historic properties. If this is the case, then you must proceed to Step 2. If you are not installing one of the above stormwater controls or another type of control that requires subsurface earth disturbance, then you may indicate this on your NOI, and no further screening is necessary. During the 14-day waiting period after submitting your NOI, the SHPO, THPO, or other tribal representative may request that EPA hold up authorization based on concerns about potential adverse impacts to historic properties. EPA will evaluate any such request and notify you if any additional measures to address adverse impacts to historic properties are necessary. Step 2 Have prior professional cultural resource surveys or other evaluations determined that historic properties do not exist, or have prior disturbances precluded the existence of historic properties? If you are installing a stormwater control that requires subsurface earth disturbance, you must next determine if it has already been determined that no historic properties exist on your site based on prior professional cultural resource surveys or other evaluations, or that the existence of historic properties has been precluded because of prior earth disturbances. If prior to your project it has already been determined that no historic properties exist at your site based on available information, including information that may be provided by your applicable SHPO,THPO, or other tribal representative, then you may indicate this on your NOI, and no further screening steps are necessary. Similarly, if earth disturbances that have occurred prior to your project have eliminated the possibility that historic properties exist on your site, you may indicate this on your NOI, and no further screening steps are necessary. After submitting your NOI, and during the 14-day waiting period, the SHPO, THPO, or other tribal representative may request that EPA hold up authorization based on concerns about potential adverse impacts to historic properties. EPA will evaluate any such request and notify you if any additional measures to address adverse impacts to historic properties are necessary. If neither of these circumstances exists for your project,you must proceed to Step 3. Step 3 If you are installing any stormwater controls that require subsurface earth disturbance, you must determine if these activities will have an effect on historic properties. If your answer to the questions in Steps 1 and 2 is "no", then you must assess whether your earth-disturbing activities related to the installation of stormwater controls will have an effect on historic properties. This assessment may be based on historical sources, knowledge of the area, an assessment of the types of earth-disturbing activities you are engaging in, considerations of Page E-2 of 4 Con struction General Permit (CGPj any controls and/or management practices you will adopt to ensure that your stormwater control-related earth-disturbing activities will not have an effect on historic properties, and any other relevant factors. If you determine based on this assessment that earth disturbances related to the installation of yous stormwater controls will not cause effects to historic properties, you may indicate this on your NO[, and document the basis for your determinatioin in your SWPPP and no further screening steps are necessary. In this case you must also attach a copy of your site map to your NOI. After submitting your NOI, and during the 14-day waiting period, the SHPO,THPO, or other tribal representative may request that EPA hold up authorization based on concerns about potential adverse impacts to historic properties. EPA will evaluate any such request and notify you if any additional measures to address adverse impacts to historic properties are necessary. If none of the circumstances in Steps 1-3 exist for your project, you must proceed to Step 4. Step 4: If you are installing any stormwater controls that require subsurface earth disturbance and you have not satisfied the conditions in Steps 1-3, you must contact and consult with the appropriate historic preservation authorities. Where you are installing stormwater controls that require subsurface earth disturbance, and you cannot determine in Step 3 that these activities will not have effects on historic properties, then you must contact the relevant SHPO,THPO, or other tribal representative to request their views as to the likelihood that historic properties are potentially present on your site and may be impacted by the installation of these controls. Note: Addresses for SHPOs and THPOs may be found on the Advisory Council on Historic Preservation's website (www.achp.gov/programs.htm/). In instances where a Tribe does not have a THPO you should contact the appropriate Tribal government office designated by the Tribe for this purpose when responding to this permit eligibility condition. You must submit the following minimum information in order to properly initiate your request for information: 1. Project name (i.e., the name or title most commonly associated with your project); 2. A narrative description of the project; 3. Name, address, phone and fax number, and email address (if available) of the operator; 4. Most recent U.S. Geological Survey (USGS) map section (7.5 minute quadrangle) showing actual project location and boundaries clearly indicated; and 5. Sections of SWPPP site map (see Part 7.2.6) that show locations where stormwater controls that will cause subsurface earth disturbance will be installed (see Step 1). Without submitting this minimum information, you will not have been considered to have properly initiated your request. You will need to provide the SHPO,THPO, or other tribal representative a minimum ofl5 calendar days after they receive these materials to respond to your request for information about your project. You are advised to get a receipt from the post office or other carrier confirming the date on which your letter was received. Page E-3 of 4 Construction General Permit (CGP) If you do not receive a response withinl5 calendar days after receipt by the SHPO,THPO, or other tribal representative of your request, then you may indicate this on your NOI, and no further screening steps are necessary. Or, if the applicable SHPO, THPO, or other tribal representative responds to your request with an indication that no historic properties will be affected by the installation of stormwater controls at your site, then you may indicate this on your NOI, and no further screening steps are necessary. After submitting your NOI, and during the 14-day waiting period, the SHPO,THPO, or other tribal representative may request that EPA hold up authorization based on concerns about potential adverse impacts to historic properties. EPA will evaluate any such request and notify you if any additional measures to address adverse impacts to historic properties are necessary. If within 15 calendar days of receipt of your request the applicable SHPO,THPO, or other tribal representative responds with a request for additional information or for further consultation regarding appropriate measures for treatment or mitigation of effects on historic properties caused by the installation of stormwater controls on your site,you must comply with this request and proceed to Step 5. Step 5: Consultation with your applicable SHPO, THPO, or other tribal representative. If,following your discussions with the appropriate historic preservation authorities in Step 4, the applicable SHPO,THPO, or other tribal represenative requests additional information or further consultation, you must respond with such information or to consult to determine impacts to historic properties that may be caused by the installation of stormwater controls on your site and appropriate measures for treatment or mitigation of such impacts. If as a result of your discussions with the applicable SHPO,THPO, or tribal representative, you enter into, and comply with, a written agreement regarding treatment and/or mitigation of impacts on your site, then you may indicate this on your NOI, and no further screening steps are necessary. If, however, agreement on an appropriate treatment or mitigation plan cannot be reached between you and the SHPO,THPO, or other tribal representative within 30 days of your response to the SHPO,THPO, or other tribal representative's request for additional information or further consultation, you may submit your NOI, but you must indicate that you have not negotiated measures to avoid or mitigate such effects. You must also include in your SWPPP the following documentation: 1. Copies of any written correspondence between you and the SHPO,THPO, or other tribal representative; and 2. A description of any significant remaining disagreements as to mitigation measures between you and the SHPO,THPO, or other tribal representative. After submitting your NOI, and during the 14-day waiting period, the SHPO, THPO, ACHP or other tribal representative may request that EPA place a hold on authorization based upon concerns regarding potential adverse effects to historic properties. EPA, in coordination with the ACHP, will evaluate any such request and notify you if any additional measures to address adverse effects to historic properties are necessary. Page E-4 of 4 1.. CoiisiiuCtiori General Permit (CG"r) Appendix F - List of Tier 3, Tier 2, and Tier 2.5 Waters EPA's CGP has special requirements for discharges to waters designated by a state or tribe as Tier 2/2.5 or Tier 3 for antidegradation purposes under 40 CFR 131.12(a). See Parts 1.2.3 and 3.3. The list below is provided as a resource for operators who must determine whether they discharge to a Tier 2/2.5 or Tier 3 water. Only Tier 2/2.5 or Tier 3 waters specifically identified by a water quality standard authority (e.g., a state, territory, or tribe) are identified in the table below. Many authorities evaluate the existing and protected quality of the receiving water on a pollutant-by-pollutant basis and determine whether water quality is better than the applicable criteria that would be affected by a new discharge or an increase in an existing discharge of the pollutant. In instances where water quality is better, the authority may choose to allow lower water quality,where lower water quality is determined to be necessary to support important social and economic development. Permittees are not required to identify those waters which are evaluated on an individual basis. Permit Areas of Coverage/Where EPA Is Permitting Authority Number MAR100000 Commonwealth of Massachusetts, except Indian Country lands Tier 2 and Tier 2.5 waters are identified and listed in 314 CMR 4.06 Basin Classification. (314 CMR 4 can be found at DEP's web page at htfp://www.mass,qov/deQ/service/regulationsl314cnar34.r�df) Tier 2 Tier 2 waters are listed on a parameter-by-parameter basis. Tier 2.5 Tier 2.5 waters are listed as "outstanding resource waters" on the website: hftr)://www.mass.aov/deo/wa ler/laws/tblfia,odf NHR100000 State of New Hampshire Tier 2/2.5 There is no list of Tier 2/Tier 2.5 waters. New dischargers should contact Ken Edwardson at Kerineth.Edwardson@des.nh.gov. Tier 3 Env-Ws 1708.05(a) Surface waters of national forests and surface waters designated as "natural" under RSA 483:7-a, I shall be considered outstanding resource waters (ORW). "Natural waters" are listed at http-!L,, v✓\,,,✓.aencourt.state.ntr.us/rsalhtrr1LL483/483-15.htm. Surface waters of national forests are not included in an official list. For further questions, new dischargers should contact Thelma Murphy (EPA Region 1's stormwafer coordinator) at rnurDh y.ty helma,,AeDa.aov. PRR 100000 Commonwealth of Puerto Rico Tier 3 Tier III waters are those which are classified as either Class SA or Class SE. Class SA waters are defined as"Coastal waters and estuarine waters of high quality and/or exceptional ecological or recreational value whose existing characteristics shall not be altered, except by natural causes, in order to preserve the existing natural phenomena." Class SA waters include bioluminiscent lagoons and bays such as La Parguera and Monsio Jose on the Southern Coast, Bahia de Mosquito in Vieques, and any other coastal or estuarine waters of exceptional quality of high ecological value or recreational which may be designated by Puerto Rico, through Resolution, as requiring this classification for protection of the waters. Class SE waters are defined Page F-1 of 5 Construction General Permit (CGP) Permit Areas of Coverage/Where EPA Is Permitting Authority Number as"Surface waters and wetlands of exceptional ecological value, whose existing characteristics should not be altered in order to preserve the existing natural phenomena." Class SE waters include Laguna Tortuguero, Laguna Cartagena and any other surface water bodies of exceptional ecological value as may be designated by Puerto Rico through Resolution. DCR100000 District of Columbia Tier 2/2.5 Rock Creek and its tributaries and Battery Kemble Creek and its tributaries are considered Special Waters of the District of Columbia (SWDC) under its antidegradation program. MNR100001 Fond du Lac Band of MN Chippewa Tier 3 Six lakes are presently identified as Tier 3: (1) Dead Fish, (2) Jaskari, (3) Miller (Mud), (4) Perch, (5) Rice Portage, (6) Wild Rice. Grand Portage Band of MN Chippewa Tier 2/2.5 All waters, not already classified as Tier 3, are high quality Tier 2 waters. (see Grand Portage Reservation Water Quality Standards, Section VI &VII, Pages 14-16). Tier 3 "The portion of Lake Superior north of latitude 47 degrees, 57 minutes, 13 seconds, east of Hat Point, south of the Minnesota-Ontario boundary, and west of the Minnesota-Michigan boundary." (see Section VII, Page 16). WIR100001 Lac du Flambeau Band of the Lake Superior Chippewa Tier 2 All named waters, including wetlands, not specified under an antidegradation classification. Tier 2.5 Bills Lake, Birch Lake, Bobidosh Lake, Bog Lake (SE SE Sec.31, T40NR6E), Bolton Lake, Broken Bow Lake, Chewalah Lake, Clear Lake (Sec.2,T39NR4E), Corn Great, Great, Corn Lake, Little "Least/Lesser", Crawling Stone Lake, Big, Crawling Stone Lake, Little, Crescent Lake, Crooked Lake, Big, David Lake, Ellerson Lake, Middle, Ellerson Lake, West, Elsie Lake"Boundary Lake", Fat Lake, Fence Lake, Gresham Creek, Green Lake (NW NW Sec. 19,T41 R6E), Grey Lake, Gunlock Lake, Haskell Lake, Headflyer Lake (Sec. 19,T41 NRSE), Highway Lake (NW NW Sec. 19,T41 NRSE), Horsehead Lake (SE SW Sec. 9, T40NR5E), Hutton's Creek, Ike Walton Lake, Lily Lake (SE SW Sec.35,T40NR5E), Little Ten Lake, Lodge Lake 1. Rice" (NW NW Sec. 8, T41 NR6E), Lucy Lake, Mindys Lake (Sec. 8,T40NR5E), Minette Lake, Mitten Lake, Monk's Lake (Sec. 13, T40NR5E), Moving Cloud Lake, Mud Creek, Muskesin Lake, Patterson Lake, Placid Twin Lake (North), Placid Twin Lake (South), Plummer Lake, Poupart Lake, Prairie Lake (NE SW Sec. 13, T40NR4E), Raven Lake, Ross Allen Lake, Sand Lake, Little,Scott Lake (Sec.22,T40N, R4E), Shishebogama Lake,Signal Lake, Snort Lake (Sec.5,T41 N, R6E), Spring Lake"Jerms", Squirrel Lake, Statenaker Lake "Hollow", Stearns Lake"Hourglass",Sugarbush "Hidden Lake" (NW NW Sec. 17, T41 NRSE), Sugarbush Creek, Sugarbush Lake, Little,Sugarbush Lake, Lower, Sugarbush Lake, Middle, Sugarbush Lake, Upper,Sunfish Lake,Tippecanoe Lake, Tomahawk River,To-To Tom Lake,Toulish Lake,Trout River, Warrior Lake, White Sand Lake, Whitefish Lake Page F-2 of 5 Cal Istruction Gel leral Permit (--k-7 Permit Areas of Coverage/Where EPA Is Permitting Authority Number "Cattail Lake" (Sec. 34, T40N5R), Wishow Lake, Wyandock Lake Tier 3 Bear River (1 st bridge to Reservation boundary), Big Springs (Sec.25, T40NR4E), Black Lake, Cranberry Lake, Doud Lake, Eagle Lake, Gene Lake, Johnson Springs, Little Trout Lake, Lost Lake (Sect. 1,T41 NR4E), Mishonagon Creek, Munnomin (Jesse, Duck) Lake, Negani (Hegani) Lake, Reservation Line Lake, Spring Creek, Tank Lake, Thomas Lake, Wild Rice Lake, Zee Lake NMR100000 State of New Mexico Tier 3 (1) Rio Santa Barbara, including the west, middle and east forks from their headwaters downstream to the boundary of the Pecos Wilderness; and (2) the waters within the United States forest service Valle Vidal special management unit including: (a) Rio Costilla, including Comanche, La Cueva, Fernandez, Chuckwagon, Little Costilla, Holman, Gold, Grassy, LaBelle and Vidal creeks, from their headwaters downstream to the boundary of the United States forest service Valle Vidal special management unit; (b) Middle Ponil creek, including the waters of Greenwood Canyon, from their headwaters downstream to the boundary of the Elliott S. Barker wildlife management area; (c) Shuree lakes; (d) North Ponil creek, including McCrystal and Seally Canyon creeks, from their headwaters downstream to the boundary of the United States forest service Valle Vidal special management unit; and (e) Leandro creek from its headwaters downstream to the boundary of the United States forest service Valle Vidal special management unit. (3) the named perennial surface waters of the state, identified in Subparagraph (a) below, located within United States department of agriculture forest service wilderness. Wilderness are those lands designated by the United States congress as wilderness pursuant to the Wilderness Act. Wilderness areas included in this designation are the Aldo Leopold wilderness, Apache Kid wilderness, Blue Range wilderness, Chama River Canyon wilderness, Cruces Basin wilderness, Dome wilderness, Gila wilderness, Latir Peak wilderness, Pecos wilderness, San Pedro Parks wilderness, Wheeler Peak wilderness, and White Mountain wilderness. (a) The following waters are designated in the Rio Grande basin: (i) in the Aldo Leopold wilderness: Byers Run, Circle Seven creek, Flower canyon, Holden Prong, Indian canyon, Las Animas creek, Mud Spring canyon, North Fork Palomas creek, North Seco creek, Pretty canyon,Sids Prong,South Animas canyon, Victorio Park canyon, Water canyon; (ii) in the Apache Kid wilderness Indian creek and Smith canyon; (iii) in the Chama River Canyon wilderness: Chavez canyon, Ojitos canyon, Rio Chama; (iv) in the Cruces Basin wilderness: Beaver creek, Cruces creek, Diablo creek, Escondido creek, Lobo creek, Osha creek; (v) in the Dome wilderness: Capulin creek, Medio creek, Sanchez Page F-3 of 5 Construction General Permit (CGP) Permit Areas of Coverage/Where EPA Is Permitting Authority Number canyon/creek; (vi) in the Latir Peak wilderness: Bull creek, Bull Creek lake, Heart lake, Lagunitas Fork, Lake Fork creek, Rito del Medio, Rito Primero, West Latir creek; (vii) in the Pecos wilderness: Agua Sarca, Hidden lake, Horseshoe lake (Alamitos), Jose Vigil lake, Nambe lake, Nat lake IV, No Fish lake, North Fork Rio Quemado, Rinconada, Rio Capulin, Rio de las Trampas (Trampas creek), Rio de Truchas, Rio Frijoles, Rio Medio, Rio Molino, Rio Nambe, Rio San Leonardo, Rito con Agua, Rito Gallina, Rito Jaroso, Rito Quemado, San Leonardo lake, Santa Fe lake, Santa Fe river, Serpent lake, South Fork Rio Quemado,Trampas lake (East),Trampas lake (West); (viii) in the San Pedro Parks wilderness: Agua Sarca, Canon Madera, Cave creek, Cecilia Canyon creek, Clear creek (North SPP), Clear creek (South SPP), Corralitos creek, Dove creek, Jose Miguel creek, La Jara creek, Oso creek, Rio Capulin, Rio de las Vacas, Rio Gallina, Rio Puerco de Chama, Rito Anastacio East, Rito Anastacio West, Rito de las Palomas, Rito de las Perchas, Rito de los Pinos, Rito de los Utes, Rito Leche, Rito Redondo, Rito Resumidero, San Gregorio lake; (ix) in the Wheeler Peak wilderness: Black Copper canyon, East Fork Red river, Elk lake, Horseshoe lake, Lost lake,Sawmill creek,South Fork lake,South Fork Rio Hondo, Williams lake. (b) The following waters are designated in the Pecos River basin: (i) in the Pecos wilderness: Albright creek, Bear creek, Beatty creek, Beaver creek, Carpenter creek, Cascade canyon, Cave creek, El Porvenir creek, Hollinger creek, Holy Ghost creek, Horsethief creek, Jack's creek, Jarosa canyon/creek, Johnson lake, Lake Katherine, Lost Bear lake, Noisy brook, Panchuela creek, Pecos Baldy lake, Pecos river, Rio Mora, Rio Valdez, Rito Azul, Rito de los Chimayosos, Rito de los Esteros, Rito del Oso, Rito del Padre, Rito las Trampas, Rito Maestas, Rito Oscuro, Rito Perro, Rito Sebadilloses, South Fork Bear creek, South Fork Rito Azul, Spirit lake, Stewart lake,Truchas lake (North),Truchas lake (South), Winsor creek; (ii) in the White Mountain wilderness: Argentina creek, Aspen creek, Bonito creek, Little Bonito creek, Mills canyon/creek, Rodamaker creek, South Fork Rio Bonito,Turkey canyon/creek. (c) The following waters are designated in the Gila River basin: (i) in the Aldo Leopold wilderness: Aspen canyon, Black Canyon creek, Bonner canyon, Burnt canyon, Diamond creek, Falls canyon, Fisherman canyon, Running Water canyon, South Diamond creek; (ii) in the Gila wilderness: Apache creek, Black Canyon creek, Brush canyon, Canyon creek, Chicken Coop canyon, Clear creek, Cooper canyon, Cow creek, Cub creek, Diamond creek, East Fork Gila river, Gila river, Gilita creek, Indian creek, Iron creek, Langstroth canyon, Lilley canyon, Little creek, Little Turkey creek, Lookout canyon, McKenna creek, Middle Fork Gila river, Miller Spring canyon, Mogollon creek, Panther canyon, Prior creek, Rain creek, Raw Meat creek, Rocky canyon, Sacaton creek, Sapillo creek, Sheep Corral canyon, Skeleton canyon,Squaw creek, Sycamore canyon,Trail canyon,Trail creek,Trout creek,Turkey creek,Turkey Feather creek,Turnbo canyon, Page F-4 of 5 Construction General Permit (CGP) Permit Areas of Coverage/Where EPA Is Permitting Authority Number West Fork Gila river, West Fork Mogollon creek, White creek, Willow creek, Woodrow canyon. (d) The following waters are designated in the Canadian River basin: in the Pecos wilderness Daily creek, Johns canyon, Middle Fork Lake of Rio de la Casa, Middle Fork Rio de la Casa, North Fork Lake of Rio de la Casa, Rito de Gascon, Rito San Jose,Sapello river,South Fork Rio de la Casa, Sparks creek (Manuelitas creek). (e) The following waters are designated in the San Francisco River basin: (i) in the Blue Range wilderness: Pueblo creek; (ii) in the Gila wilderness: Big Dry creek, Lipsey canyon, Little Dry creek, Little Whitewater creek,South Fork Whitewater creek, Spider creek, Spruce creek, Whitewater creek. (f) The following waters are designated in the Mimbres Closed basin:in the Aldo Leopold wilderness Corral canyon, Mimbres river, North Fork Mimbres river, South Fork Mimbres river. (g) The following waters are designated in the Tularosa Closed basin: in the White Mountain wilderness Indian creek, Nogal Arroyo,Three Rivers. (h) The wetlands designated are identified on the maps and list of wetlands within United States forest service wilderness areas designated as outstanding national resource waters published at the New Mexico state library and available on the department's website. Page F-5 of 5 Construction General Permit (CGP) Appendix G - Buffer Guidance. The purpose of this guidance is to assist you in complying with the requirements in Part 2.1.2.1 of the permit regarding the establishment of natural buffers or equivalent sediment controls. This guidance is organized as follows: G.1 Sites That Are Required to Comply with Part 2.1.2.1 .........................................................................2 G.l.1 Step 1 - Determine if Your Site is Within 50 Feet of a Surface Water.....................................2 G.1.2 Step 2- Determine if Any Exceptions to the Requirements in Part 2.1.2.1 Apply...............3 G.2 COMPLIANCE ALTERNATIVES GUIDANCE............................................................................................4 G.2.1 Guidance for Providing and Maintaining Natural Buffers......................................................4 G.2.1.1 Buffer Width Measurement....................................................................................................5 G.2.1.2 Limits to Disturbance Within the Buffer................................................................................7 G.2.1.3 Discharges to the Buffer.........................................................................................................7 G.2.1.4 SWPPP Documentation ..........................................................................................................8 G.2.2 Guidance for Providing the Equivalent Sediment Reduction as the 50-foot Buffer..........8 G.2.2.1 Determine Whether it is Feasible to Provide a Reduced Buffer.....................................8 G.2.2.2 Design Controls That Provide Equivalent Sediment Reduction as 50-foot Buffer.......9 a. Step 1 - Estimate the Sediment Reduction from the 50-foot Buffer................................10 b. Step 2- Design Controls That Match the Sediment Removal Efficiency of the 50-foot Buffer..............................................................................................................................1 1 G.2.3 Small Residential Lot Compliance Alternatives......................................................................13 G.2.3.1 Step 1 - Determine if You are Eligible for the Small Residential Lot Compliance Alternatives.............................................................................................................................13 G.2.3.2 Step 2-Implement the Requirements of the Small Residential Lot Compliance AlternativeSelected .............................................................................................................13 a. Small Residential Lot Compliance Alternative 1 .................................................................13 b. Small Residential Lot Compliance Alternative 2.................................................................14 G-1 of 24 Construction General Permit (CGP) G.1 Sites That Are Required to Comply with Part 2.1.2.1 The purpose of this part is to help you determine if the requirements in Part 2.1.2.1 apply to your site. G.1.1 Step 1 - Determine if Your Site is Within 50 Feet of a Surface Water Part 2.1.2.1 applies to you only if your earth-disturbing activities will occur within 50 feet of a surface water that receives stormwater discharges from your site. Figure G- 1 illustrates when a site would be required to comply with the requirements in Part 2.1.2.1 due to their proximity to a surface water. If the surface water is not located within 50 feet of the earth-disturbing activities, Part 2.1.2.1 does not apply. Figure G - 1. Example of earth-disturbing activities within 50 feet of a surface water. I Area of Surface Water . � ' Earth'disturbance y Buffer sr s If you determine that your earth-disturbing activities will occur within 50 feet of a surface water that receives stormwater discharges from your site, the requirements in Part 2.1.2.1 apply, except for certain circumstances that are described in Step 2. Note that where some natural buffer exists but portions of the area within 50 feet of the surface water are occupied by preexisting development disturbances, or if a portion of area within 50 feet of the surface water is owned by another party and is not under your control, the buffer requirements in Part 2.1.2.1 still apply, but with some allowances. G-2of24 Construction General Permit (CGP) Clarity about how to implement the compliance alternatives for these situations is provided in G.2.1.2 and G.2.2.2 below. Note that EPA does not consider designed stormwater control features (e.g., stormwater conveyance channels, storm drain inlets, stormwater basins) that direct storm water to surface waters more than 50 feet from the disturbance to constitute surface waters for the purposes of determining if the buffer requirements apply. G.1.2 Step 2 - Determine if Any Exceptions to the Requirements in Part 2.1.2.1 Apply The following exceptions apply to the requirements in Part 2.1.2.1: • If there is no discharge of stormwater to surface waters through the area between the disturbed portions of the site and any surface waters located within 50 feet of your site,you are not required to comply with the requirements in this Part.This includes situations where you have implemented controls measures, such as a berm or other barrier, that will prevent such discharges. • Where no natural buffer exists due to preexisting development disturbances (e.g., structures, impervious surfaces) that occurred prior to the initiation of planning for the current development of the site,you are not required to comply with the requirements in this Part. Where some natural buffer exists but portions of the area within 50 feet of the surface water are occupied by preexisting development disturbances, you are required to comply with the requirements in this Part. For the purposes of calculating the sediment load reduction for either compliance alternative 2 or 3 below, you are not expected to compensate for the reduction in buffer function that would have resulted from the area covered by these preexisting disturbances. Clarity about how to implement the compliance alternatives for these situations is provided in G.2.1.2 and G.2.2.2 below. If during your project, you will disturb any portion of these preexisting disturbances, the area removed will be deducted from the area treated as natural buffer. • For"linear construction projects" (see Appendix A),you are not required to comply with this requirement if site constraints (e.g., limited right-of-way) prevent you from complying with the requirements of the alternatives in Part 2.1.2.1 a, provided that, to the extent practicable,you limit disturbances within 50 feet of the surface water and/or you provide supplemental erosion and sediment controls to treat stormwater discharges from earth disturbances within 50 feet of the surface water. You must also document in your SWPPP your rationale for why it is infeasible for you to comply with the requirements in Part 2.1.2.1 a, and describe any buffer width retained and/or supplemental erosion and sediment controls installed. • For"small residential lot" construction (i.e., a lot being developed for residential purposes that will disturb less than 1 acre of land, but is part of a larger residential project that will ultimately disturb greater than or equal to 1 acre), you have the option of complying with the requirements in Part G.2.3 of this appendix. • The following disturbances within 50 feet of a surface water are exempt from the requirements in this Part: - Construction approved under a CWA Section 404 permit; or G-3of24 v,vnsiruction General Permit (CGP) - Construction of a water-dependent structure or water access areas (e.g., pier, boat ramp, trail). Note that you must document in your SWPPP if any disturbances related to any of the above exceptions occurs within the buffer area on your site. G.2 COMPLIANCE ALTERNATIVES GUIDANCE If in Part G.1 of this guidance you determine that the buffer requirements apply to your site,you have three compliance alternatives from which you can choose: 1. Provide and maintain a 50-foot buffer undisturbed natural buffer (Part 2.1.2.1aJ);I or 2. Provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls,which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer (Part 2.1.2.1 a.ii);] or 3. If it is infeasible to provide and maintain an undisturbed natural buffer of any size, you must implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer (Part 2.1.2.1 aJii).1 The compliance alternative selected above must be maintained throughout the duration of permit coverage. The following provides detailed guidance for how you can comply with each of the compliance alternatives. Part G.2.1 below provides guidance on how to provide and maintain natural buffers consistent with the alternatives 1 and 2, above. Part G.2.2 below provides guidance on how to comply with the requirement to provide a 50-foot buffer equivalent through erosion and sediment controls consistent with alternatives 2 and 3, above. G.2.1 Guidance for Providing and Maintaining Natural Buffers The following guidance is intended to assist you in complying with the requirements to provide and maintain a natural buffer during construction. This part of the guidance applies to you if you choose either alternative 1 (50-foot buffer) or alternative 2 (a buffer of< 50 feet supplemented by additional erosion and sediment controls that achieve the equivalent sediment load reduction as the 50-foot buffer), or if you are providing a buffer in compliance with one of the small residential lot compliance alternatives in Part G.2.3 below. For the compliance alternatives in i and 2, you are not required to enhance the quality of the vegetation that already exists in the buffer, or provide vegetation if none exists(e.g., and and semi-arid areas). You only need to retain and protect from disturbance the natural buffer that existed prior to the commencement of construction. Any preexisting structures or impervious surfaces are allowed in the natural buffer provided you retain and protect from disturbance the natural buffer area outside the preexisting disturbance. Similarly, for alternatives 2 and 3, you are required to implement and maintain sediment controls that achieve the sediment load reduction equivalent to the undisturbed natural buffer that existed on the site prior to the commencement of construction. In determining equivalent sediment load reductions, you may consider naturally non-vegetated areas and prior disturbances. See Part G.2.2 of this Appendix for a discussion of how to determine equivalent reductions. G-4 of 24 Construction General Permit (CGP) G.2.1.1 Buffer Width Measurement Where you are retaining a buffer of any size, the buffer should be measured perpendicularly from any of the following points,whichever is further landward from the water: l. The ordinary high water mark of the water body, defined as the line on the shore established by fluctuations of water and indicated by physical characteristics such as a clear, natural line impressed on the bank, shelving, changes in the character of soil, destruction of terrestrial vegetation, and/or the presence of litter and debris; or 2. The edge of the stream or river bank, bluff, or cliff, whichever is applicable. Refer to Figure G-2 and Figure G-3. You may find that specifically measuring these points is challenging if the flow path of the surface water changes frequently, thereby causing the measurement line for the buffer to fluctuate continuously along the path of the waterbody. Where this is the case, EPA suggests that rather than measuring each change or deviation along the wafer's edge, it may be easier to select regular intervals from which to conduct your measurement. For instance, you may elect to conduct your buffer measurement every 5 to 10 feet along the length of the water. Additionally, note that if earth-disturbing activities will take place on both sides of a surface water that flows through your site, to the extent that you are establishing a buffer around this water, it must be established on both sides. For example, if you choose alternative 1 above, and your project calls for disturbances on both sides of a small stream, you would need to retain the full 50 feet of buffer on both sides of the water. However, if your construction activities will only occur on one side of the stream, you would only need to retain the 50-foot buffer on the side of the stream where the earth- disturbance will occur. G-5 of 24 Consfrucfion General Permit (CGP) Figure G - 2.This image shows buffer measurement from the ordinary high water mark of the water body, as indicated by a clear natural line impressed on the bank,shelving, changes in the character of the soil, destruction of terrestrial vegetation, and/or the presence of litter/debris. Surface Water B fifer `. ._ f � u�er'"" Ordinary Ordinary high water mark high water mark Figure G - 3.This image shows buffer measurement from the edge of the bank, bluff, or cliff, whichever is applicable. F Edge of bank/bluff Miff ButEer s^----- ufer Surface Water G-6of24 Construction General Permit (CGP) G.2.1.2 Limits to Disturbance Within the Buffer You are considered to be in compliance with this requirement if you retain and protect from construction activities the natural buffer that existed prior to the commencement of construction. If the buffer area contains no vegetation prior to the commencement of construction (e.g., sand or rocky surface), you are not required to plant any additional vegetation. As noted above, any preexisting structures or impervious surfaces are allowed in the buffer provided you retain and protect from disturbance the vegetation in the buffer outside the preexisting disturbance. To ensure that the water quality protection benefits of the buffer are retained during construction, you are prohibited from conducting any earth-disturbing activities within the buffer during permit coverage. In furtherance of this requirement, prior to commencing earth-disturbing activities on your site, you must delineate, and clearly mark off,with flags, tape, or a similar marking device, the buffer area on your site. The purpose of this requirement is to make the buffer area clearly visible to the people working on your site so that unintended disturbances are avoided. While you are not required to enhance the quality of the vegetation that already exists within the buffer, you are encouraged to do so where such improvements will enhance the water quality protection benefits of the buffer. (Note that any disturbances within the buffer related to buffer enhancement are permitted and do not constitute construction disturbances.) For instance, you may want to consider targeted plantings where limited vegetation exists, or replacement of existing vegetation where invasive or noxious plant species (see httr)://Dlants.usda.aov/lava/noxious Driver) have taken over. In the case of invasive or noxious species, you may want to remove and replace them with a diversity of native trees,shrubs, and herbaceous plants that are well-adapted to the climatic, soil, and hydrologic conditions on the site. You are also encouraged to limit the removal of naturally deposited leaf litter,woody debris, and other biomass, as this material contributes to the ability of the buffer to retain water and filter pollutants. If a portion of the buffer area adjacent to the surface water is owned by another party and is not under your control,you are only required to retain and protect from construction activities the portion of the buffer area that is under your control. For example, if you elect alternative 1 above (provide and maintain a 50-foot buffer), but 10 feet of land immediately adjacent to the surface water is owned by a different party than the land on which your construction activities are taking place and you do not have control over that land, you must only retain and protect from construction activities the 40-foot buffer area that occurs on the property on which your construction activities are taking place. EPA would consider you to be in compliance with this requirement regardless of the activities that are taking place in the 10-foot area that is owned by a different party than the land on which your construction activities are taking place that you have no control over. G.2.1.3 Discharges to the Buffer You must ensure that all discharges from the area of earth disturbance to the natural buffer are first treated by the site's erosion and sediment controls (for example, you must comply with the Part 2.1.2.2 requirement to establish sediment controls around the downslope perimeter of your site disturbances), and if necessary to prevent erosion caused by stormwater flows within the buffer, you must use velocity dissipation devices. The purpose of this requirement is to decrease the rate of stormwater flow and G-7 of 24 Construction General Permit (CGP) encourage infiltration so that the pollutant filtering functions of the buffer will be achieved.To comply with this requirement, construction operators typically will use devices that physically dissipate stormwater flows so that the discharge entering the buffer is spread out and slowed down. G.2.1.4 SWPPP Documentation You are required to document in your SWPPP the natural buffer width that is retained. For example, if you are complying with alternative 1,you must specify in your SWPPP that you are providing a 50-foot buffer. Or, if you will be complying with alternative 2, you must document the reduced width of the buffer you will be retaining (and you must also comply with the requirements in Part 2.1.2.1 c fo describe the erosion and sediment controls you will use to achieve an equivalent sediment reduction, as described in Part G.2.2 below). Note that you must also show any buffers on your site plan in your SWPPP consistent with Part 7.2.6.3. Additionally, if any disturbances related to the exceptions in Part 2.1.2.1 e occur within the buffer area,you must document this in the SWPPP. G.2.2 Guidance for Providing the Equivalent Sediment Reduction as the 50-foot Buffer If you are selecting Alternative 2 (provide and maintain a buffer that is less than 50 feet that is supplemented by additional erosion and sediment controls that, together, achieve the equivalent sediment load reduction as the 50-foot buffer) or Alternative 3 (implement erosion and sediment controls that achieve the equivalent sediment load reduction as the 50-foot buffer), the following guidance is intended to assist you in demonstrating that you will achieve the equivalent sediment reduction as the 50-foot buffer. G.2.2.1 Determine Whether it is Feasible to Provide a Reduced Buffer EPA recognizes that there will be a number of situations in which it will be infeasible to provide and maintain a buffer of any width. While some of these situations may exempt you from the buffer requirement entirely (see G.1.2), if you do not qualify for one of these exemptions, there still may be conditions or circumstances at your site that make it infeasible to provide a natural buffer. For example, there may be sites where a significant portion of the property on which the earth-disturbing activities will occur is located within the buffer area, thereby precluding the retention of natural buffer areas. EPA believes there are likely to be other examples of situations that make if infeasible to provide any buffer area. Therefore, in choosing between the 2 different compliance alternatives (Alternative 2 or 3), you should only elect to comply with Alternative 2 if it is feasible for you to retain any natural buffer on your site. (Note: For any buffer width retained,you are required to comply with the requirements in Part G.2.1, above, concerning the retention of vegetation and restricting earth disturbances.) Similarly, if you determine that it is infeasible to provide a natural buffer of any size during construction, you should elect to comply with Alternative 3. After making this determination, you should proceed to Part G.2.2.2 to determine how to provide controls that, together with any buffer areas that is being retained, if applicable,will achieve an equivalent sediment load reduction as the 50-foot buffer. G-8 of 24 Construction General Permit (CGP) G.2.2.2 Design Controls That Provide Equivalent Sediment Reduction as 50-foot Buffer You must next determine what additional controls must be implemented on your site that, alone or in combination with any retained natural buffer, achieve a reduction in sediment equivalent to that achieved by a 50-foot buffer. Note that if only a portion of the natural buffer is less than 50 feet, you are only required to implement erosion and sediment controls that achieve the sediment load reduction equivalent to the 50-foot buffer for discharges through that area. You would not be required to provide treatment of stormwater discharges that flow through 50 feet or more of natural buffer. See Figure G-4. Figure G - 4 Example of how to comply with the requirement to provide the equivalent sediment reduction when only a portion of your earth-disturbances discharge to a buffer of less than 50- feet. Discharges through this Surface e area are required to be treated to water provide the equivalent sediment 'w reduction as the 50-foot buffer, Discharges through this area are f not required to be treated to provide the equivalent sediment ° fr reduction as the 50-foot buffer since the 50-foot buffer is provided r ., r Area o Earth Disturbance y To comply with this requirement,you are required to do the following: Step] - Estimate the sediment reduction expected from your site if you had retained a 50-foot natural buffer; Step 2 - Design controls that alone or in combination with any width of buffer retained achieve the equivalent sediment removal efficiency as that expected from the 50-foot buffer; and Step 3 - Document in your SWPPP how your controls will achieve the equivalent sediment removal efficiency of the 50-foot buffer. G-9 of 24 Construction General Permit (CGP) Guidelines to help you work through these requirements are provided below. a. Step 1 - Estimate the Sediment Reduction from the 50-foot Buffer In order to design controls that match the sediment removal efficiency of a 50- foot buffer,you first need to know what this efficiency is for your site. The sediment removal efficiencies of natural buffers vary according to a number of site-specific factors, including precipitation, soil type, land cover, slope length, width, steepness, and the types of sediment controls used to reduce the discharge of sediment prior to the buffer. EPA has simplified this calculation by developing buffer performance tables covering a range of vegetation and soil types for the areas covered by the CGP. See Attachment 1,Tables G-8 through G- 15. Note: buffer performance values in Tables G-8 through G- 15 represent the percent of sediment captured through the use of perimeter controls (e.g., silt fences) and 50-foot buffers at disturbed sites of fixed proportions and slopes.2 Using Tables G-8 through G- 15 (see Attachment 1), you can determine the sediment removal efficiency of a 50-foot buffer for your geographic area by matching the vegetative cover type that best describes your buffer area and the type of soils that predominate at your site. For example, if your site is located in Massachusetts (Table G-9), and your buffer vegetation corresponds most closely with that of tall fescue grass, and the soil type at your site is best typified as sand, your site's sediment removal efficiency would be 81 percent. In this step, you should choose the vegetation type in the tables that most closely matches the vegetation that would exist naturally in the buffer area on your site regardless of the condition of the buffer. However, because you are not required to plant any additional vegetation in the buffer area, in determining what controls are necessary to meet this sediment removal equivalency in Step 2 below,you will be able to take credit for this area as a fully vegetated "natural buffer." Similarly, if a portion of the buffer area adjacent to the surface water is owned by another party and is not under your control, you can treat the area of land not 2 EPA used the following when developing the buffer performance tables: • The sediment removal efficiencies are based on the U.S.Department of Agriculture's RUSLE2("Revised Universal Soil Loss Equation 2") model for slope profiles using a 100-foot long denuded slopes. • Sediment removal was defined as the annual sediment delivered at the downstream end of the 50-foot natural buffer(tons/yr/acre) divided by the annual yield from denuded area (tons/yr/acre). • As perimeter controls are also required by the CGP,sediment removal is in part a function of the reduction due to a perimeter control(i.e.,silt fence) located between the disturbed portion of the site and the upstream edge of the natural buffer and flow traveling through a 50-foot buffer of undisturbed natural vegetation. • It was assumed that construction sites have a relatively uniform slope without topographic features that accelerate the concentration for erosive flows. • It was assumed that vegetation has been removed from the disturbed portion of the site and a combination of cuts and fills have resulted in a smooth soil surface with limited retention of near-surface root mass To represent the influence of soil, EPA analyzed 11 general soil texture classifications in its evaluation of buffer performance. To represent different types of buffer vegetation, EPA evaluated 4 or more common vegetative types for each state/territory covered under the permit.For each vegetation type evaluated, EPA considered only permanent, non-grazed and non-harvested vegetation,on the assumption that a natural buffer adjacent to the surface water will typically be undisturbed. EPA also evaluated slope steepness and found that sediment removal efficiencies present in Tables G-8 through G-15 are achievable for slopes that are less than nine percent. G-10of24 Construction General Permit (CGP) under control as having the equivalent vegetative cover and soil type that predominates on the portion of the property on which your construction activities are occurring. For example, if your earth-disturbances occur within 50 feet of a surface water, but the 10 feet of land immediately adjacent to the surface water is owned by a different party than the land on which your construction activities are taking place and you do not have control over that land, you can treat the 10 foot area adjacent to the stream as having the equivalent soil and vegetation type as predominates in the 40 foot area under your control. You would then make the some assumption in Step 2 for purposes of determining the equivalent sediment removal. Alternatively, you may do your own calculation of the effectiveness of the 50-foot buffer based upon your site-specific conditions, and may use this number as your sediment removal equivalency standard to meet instead of using Tables G-8 through G- 15.This calculation must be documented in your SWPPP. b. Step 2 - Design Controls That Match the Sediment Removal Efficiency of the 50- foot Buffer Once you have determined the estimated sediment removal efficiency of a 50- foot buffer for your site in Step 1, you will be required to select stormwater controls that will provide an equivalent sediment load reductions. These controls can include the installation of a single designed control, such as a sediment pond, additional perimeter controls, or other type of device. Alternatively, you may elect to install a combination of stormwater controls and to retain some amount of a buffer. Whichever control(s) you select, you must demonstrate in your SWPPP that the controls will provide at a minimum the same sediment removal capabilities as the 50-foot buffer (Step 1).You are allowed to take credit for the removal efficiencies of your required perimeter controls in your calculation of equivalency, because these were included in calculating the buffer removal efficiencies in tables G-8 through G- 15. (Note: You are reminded that the controls must be kept in effective operating condition until you have completed final stabilization on the disturbed portions of the site discharging to the surface water.) To make the determination that your controls and/or buffer area achieve an equivalent sediment load reduction as the 50-foot buffer, you will need to use a model or other type of calculator. As mentioned above, there are a variety of models available that can be used to support your calculation, including USDA's RUSLE-series programs and the WEPP erosion model, SEDCAD,SEDIMOT, or other models. A couple of examples are provided in Attachment 3 to help illustrate how this determination could be made. If you are retaining a buffer of less than 50 feet, you may take credit for the removal that will occur from the reduced buffer and only need to provide additional controls to make up the difference between the removal efficiency of a 50 foot buffer and the removal efficiency of the narrower buffer. For example, if you are retaining a 30 foot buffer,you can account for the sediment removal provided by the 30-foot buffer retained, and you will only need to design controls to make up for the additional removal provided by the 20-foot of buffer that is not being provided.To do this, you would plug the width of the buffer that is G-1 1 of 24 Construction General Permit (CGP) retained into RUSLE or another model, along with other stormwater controls that will together achieve a sediment reduction equivalent to a natural 50-foot buffer. As described in Step 1 above, you can take credit for the area you have retained as a "natural buffer" as being fully vegetated, regardless of the condition of the buffer area. For example, if your earth-disturbances occur 30 feet from a surface water, but the 10 feet of land immediately adjacent to the surface water is owned by a different party than the land on which your construction activities are taking place and you do not have control over that land, you can treat the 10-foot area as a natural buffer, regardless of the activities that are taking place in the area. Therefore, you can assume (for purposes of your equivalency calculation) that your site is providing the sediment removal equivalent of a 30-foot buffer, and you will only need to design controls to make up for the additional removal provided by the 20- foot of buffer that is not being provided. c. Step 3 - Document How Site-Specific Controls Will Achieve the Sediment Removal Efficiency of the 50-foot Buffer In Steps 1 and 2,you determined both the expected sediment removal efficiency of a 50-foot buffer at your site, and you used this number as a performance standard to design controls to be installed at your site,which alone or in combination with any retained natural buffer, achieves the expected sediment removal efficiency of a 50-foot buffer at your site. The final step is to document in your SWPPP the information you relied on to calculate the equivalent sediment reduction as an undisturbed natural buffer. EPA will consider your documentation to be sufficient if it generally meets the following: - For Step 1, refer to the table in Attachment 1 that you used to derive your estimated 50-foot buffer sediment removal efficiency performance. Include information about the buffer vegetation and soil type that predominate at your site,which you used to select the sediment load reduction value in Tables G-8 through G- 15. Or, if you conducted a site-specific calculation for sediment removal efficiency, provide the specific removal efficiency, and the information you relied on to make your site-specific calculation. - For Step 2: (1) Specify the model you used to estimate sediment load reductions from your site; and (2) the results of calculations showing how your controls will meet or exceed the sediment removal efficiency from Step 1. If you choose Alternative 3, you must also include in your SWPPP a description of why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size. G-12of24 Construction General Permit G.2.3 Small Residential Lot Compliance Alternatives |n this part of Appendix G' EPA /--------------------------------------/ provides additional | � small residential lot is o |n1 or grouping of lots / compliance alternatives for being developed for residential purposes that will / / operators of small residential disturb less than l ucn* of land, but that is part of o | lots. In accordance with port ! larger residential project that will ultimately disturb ' 2].2Je.k\ operators ofsmall ! greater than or equal |o l acre. / residential lots who donot �-------------------------------------/ provide a 50-foot buffer are not required to make the demonstration outlined in Part G2.22. Instead, qualifying operators can comply with the buffer requirement by choosing to implement a set of traditional sediment and erosion controls from the menu of practices provided in Part G.2.J2. EPA has developed two different alternatives for compliance. The following steps describe how o small residential lot operator would achieve compliance with these 2 alternatives. G.2.3.1 Step 7 -Dete/m/ne if You are Eligible for the 3nno0 Residential Lot Compliance Alternatives In order to be eligible for the small residential lot compliance alternatives, the following conditions must bemet: o. The |otorgrno[ ingof|otsmoeb1hode5nitionof "smoUpesidentio| |nt"; ond b. The operator must comply with all other requirements in Part 2.1.2.1, including: i Ensure that all discharges from the area of earth disturbance to the natural buffer are first treated by the site's erosion and sediment controls, and use velocity dissipation devices if necessary f o prevent erosion caused by stormwater wif hin the buffer; ii Document in the SWPPP the natural buffer width retained on the property, and show the buffer boundary on your site plan; and iii Delineate, and clearly murk off'with Dogs' tope' or other similar marking device' all no|ono| buffer areas. G.2.3.2 Step 2-Implement the Requirements of the Small Residential Lot Compliance Alternative Selected You must next choose from one of two small residential lot compliance alternatives and implement the dornnvvo1ercontrol practices associated with that alternative. Not*: The compliance o|t*mo1ivss provided below are not mandatory. Operators of small residential lots can alternatively choose to comply with the any of the options that are available to other sites in Part 2.l.2.lu' described in Parts G2.l and G.2.2in this appendix. o. Small Residential Lot Compliance Alternative I Alternative I is a straightforward tiered-technology approach that specifies the controls that a small residential lot must implement based on the buffer widf h retained. To achieve compliance with Alternative l' you must implement the G l3of24 Construction General Permit (CGP) controls specified in Table G- 1 based on the buffer width to be retained.See footnote 3, below, for a description of the controls you must implement. For example, if you are an operator of a small residential lot that will be retaining a 35-foot buffer and you choose Small Residential Lot Compliance Alternative 1, you must implement double perimeter controls between earth disturbances and the surface water. In addition to implementing the applicable control,you must also document in your SWPPP how you will comply with Alternative 1. Table G - 1. Alternative 1 Requirements3 Retain 50-foot Buffer Retain<50 and >30 foot Buffer Retain:5 30 foot Buffer No Additional Requirements Double Perimeter Controls Double Perimeter Controls and 7-Day Site Stabilization b. Small Residential Lot Compliance Alternative 2 Alternative 2 specifies the controls that a builder of a small lot must implement based on both the buffer width retained and their risk of sediment discharge. By incorporating the sediment risk, this approach may result in the implementation of controls that are more appropriate for the site's specific conditions. Step 1 -Determine Your Site's Sediment Risk Level To meet the requirements of Alternative 2, you must first determine your site's sediment discharge "risk level" based on the site's slope, location, and soil type. To help you to determine your site's sediment risk level, EPA has developed five different tables for different slope conditions. You must select the table that most closely corresponds to your site's average slope. For example, if your site's average slope is 7 percent, you would use Table G-4 to determine your site's sediment risk. After you determine which table applies to your site, you must then use the table to determine the "risk level" (e.g., "low", "moderate", or "high") that corresponds to your site's location and predominant soil type.4 For example, based on Table G-3, a site located in New Hampshire with a 4 percent average slope and with predominately sandy clay loam soils would fall into the "moderate"risk level. 3 Description of Additional Controls Applicable to Small Residential Lot Compliance Alternatives 1 and 2: • No Additional Requirements:If you implement a buffer of 50 feet or greater,then you are not subject to any additional requirements.Note that you are required to install perimeter controls between the disturbed portions of your site and the buffer in accordance with Part 2.1.2.2. • Double Perimeter Control:In addition to the reduced buffer width retained on your site,you must provide a double row of perimeter controls between the disturbed portion of your site and the surface water spaced a minimum of 5 feet apart. • Double Perimeter Control and 7-Day Site Stabilization:In addition to the reduced buffer width retained on your site and the perimeter control implemented in accordance with Part 2.1.2.2,you must provide a double row of perimeter controls between the disturbed portion of your site and the surface water spaced a minimum of 5 feet apart, and you are required to complete the stabilization activities specified in Parts 2.2.1.2a and/or 2.2.1.2b within 7 calendar days of the temporary or permanent cessation of earth-disturbing activities. 4 One source for determining your site's predominant soil type is the USDA's Web Soil Survey located at http://websoilsurvey.nrcs.us a.gov/aQQ/WebSoilSurvey.aspx. G-14of24 Construction General Permit (CGP) Table G - 2. Risk Levels for Sites with Average Slopes of<_3 Percent Soil Type Sandy Clay Loam, Loamy Loam,Silt, Silty Clay Loam or Sand or Silty Sandy Loam or Location Clay Clay-Loam Sand Clay Silt Loam Guam Moderate Moderate Moderate Moderate High Puerto Rico Moderate Moderate Moderate Moderate Highi Virgin Islands Lc Moderate L?w Moderate Moderate American Samoa Moderate Moderate Moderate Moderate High Massachusetts and New Hampshire �� Low Moderate Lqw Moderate Idaho Lahr Lav f tV Low Low New Mexico at )oiv ovu ,. , Low ashington D.C. f otr Moderate Lcrwov ,--:-„ Moderate Table G - 3. Risk Levels for Sites with Average Slopes of> 3 Percent and <_6 Percent Soil Type Sandy Clay Loam, Loamy Loam,Silt, Silty Clay Loam or Sand or Silty Sandy Loam or Location Clay Clay-Loam Sand Clay Silt Loam Guam Moderate Moderate Moderate Moderate High; Puerto Rico Moderate Moderate Moderate Moderate High Virgin Islands Moderate Moderate Moderate Moderate High American Samoa High High Moderate High High Massachusetts and New Hampshire Moderate Moderate L Moderate High Idaho 77 -77-77- New Mexico Lov, > ..,.. w ... Lo+ Moderate Washington D.C. Moderate Moderate Moderate Moderate High; G-15of24 Construction General Permit (CGP) Table G - 4. Risk Levels for Sites with Average Slopes of> 6 Percent and<_ 9 Percent Soil Type Sandy Clay Loam, Loamy Loam,Silt, Silty Clay Loam Sand or Silty Sandy Loam Location Clay or Clay-Loam Sand Clay or Silt Loam Guam Moderate High Moderate High High Puerto Rico Moderate High Moderate Moderate High Virgin Islands Moderate Moderate Moderate Moderate High American Samoa High High High High High Massachusetts and New Hampshire Moderate Moderate Moderate Moderate High Idaho Levu Low,; low Lcutir> Lovs New Mexico Moderate Washington D.C. Moderate Moderate Moderate Moderate High Table G - 5. Risk Levels for Sites with Average Slopes of > 9 Percent and <_ 15 Percent Soil Type Sandy Clay Silty Clay Loam, Loamy Loam, Silt, Loam or Clay- Sand or Silty Sandy Loam Location Clay Loam Sand Clay or Silt Loam Guam High High High High High Puerto Rico High High High High High Virgin Islands Moderate High Moderate High High American Samoa High High High High High Massachusetts and New Hampshire Moderate Moderate Moderate Moderate High Idaho "� LbwLou�r. � Low:.�� �Lou, � ;.. �1Low New Mexico Low Moderate lou ::1 Moderate Moderate Washington D.C. Moderate High 'Moderate Moderate High G-16of24 Construction General Permit (CGP) Table G - 6. Risk Levels for Sites with Average Slopes of> 15 Percent Soil oil iI Type Type Sandy Clay Silty Clay Loam, Loamy Loam,Silt, Loam or Clay- Sand or Silty Sandy Loam Location Clay Loam Sand Clay or Silt Loam Guam High High High High High Puerto Rico High High High High High Virgin Islands High High High High High American Samoa High High High High High Massachusetts and New High High Moderate High High Hampshire Idaho li 1e 1 Moderate New Mexico Moderate Moderate Moderate Moderate High Washington D.C. High High Moderate High High Step 2-Determine Which Additional Controls Apply Once you determine your site's "risk level", you must next determine the additional controls you need to implement on your site, based on the width of buffer you plan to retain. Table G-7 specifies the requirements that apply based on the "risk level" and buffer width retained. See footnote 3, above, for a description of the additional controls that are required. For example, if you are the operator of a small residential lot that falls into the "moderate"risk level, and you decide to retain a 20-foot buffer, using Table G-7 you would determine that you need to implement double perimeter controls to achieve compliance with Part 2.1.2.1. You must also document in your SW PPP your compliance with Alternative 2. Table G - 7. Alternative 2 RequirementS2 Risk Level Based Retain>50' Retain <50' and Retain 530' an'd Retailn:S, 10' ,on Estimated Soil Buffer >30' Buffer >1 0' Buffer Buffer Erosion Low Risk No Additional No Additional Double Perimeter Double Perimeter Requirements Requirements Control Control Moderate Risk No Additional Double Perimeter Double Perimeter Double Perimeter Requirements Control Control Control and 7- Day Site Stabilization High Risk No Additional Double Perimeter Double Perimeter Double Perimeter Requirements Control Control and 7- Control and 7- Day Site Day Site Stabilization Stabilization G-17 of 24 'Construction Genera l Peri i ii t (CGP) ATTACHMENT 1 Sediment Removal Efficiency Tables5 EPA recognizes that very high removal efficiencies, even where theoretically achievable by a 50-foot buffer, may be very difficult to achieve in practice using alternative controls. Therefore in the tables below, EPA has limited the removal efficiencies to a maximum of 90%. Efficiencies that were calculated at greater than 90%are shown as 90%, and this is the minimum percent removal that must be achieved by alternative controls. Table G - 8. Estimated 50-foot Buffer Performance in Idaho* Estimated 7.Sediment Removal Sandy Clay Silty Clay Loam, Loam,Slit, Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation— Clay Clay-Loam Sand or Silty Clay or Silt Loam Tall Fescue Grass 42 52 44 48 85 Medium-density Weeds 28 30 28 26 60 Low-density Warm-season Native Bunchgrass(i.e. 25 26 24 24 55 Grama Grass) Northern Mixed Prairie Grass 28 30 28 26 50 Northern Range Cold Desert 28 28 24 26 50 Shrubs *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation Table G - 9. Estimated 50-foot Buffer Performance in Massachusetts and New Hampshire* Estimated%Sediment Removal Sandy Clay Silty Clay Loam,, loam,Silt, Loam or Loamy Sand Sandy Loam' Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Warm-season Grass(i.e., 79 90 90 90 90 Switchgrass, Lemongrass) , Cool-season Dense Grass (Kentucky Bluegrass,Smooth 78 90 90 90 90 Bromegrass,Timothy) Tall Fescue Grass 76 90 81 89 90 Medium-density Weeds 66 76 60 72 66 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation S The buffer performances were calculated based on a denuded slope upgradient of a 50-foot buffer and a perimeter controls,as perimeter controls are a standard requirement (see Part 2.1.2.2). G-18of24 Construction General Permit (CGP) Table G - 10. Estimated 50-foot Buffer Performance in New Mexico* Estimated%Sediment Removal Sandy Clay Silty,Clay Loam, Loam,Silt, Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Tall Fescue grass 71 85 80 86 90 Medium-density Weeds 56 73 55 66 78 Low-density Warm-season Native Bunchgrass(i.e., 53 70 51 62 67 Grama Grass) Southern Mixed Prairie Grass 53 71 52 63 50 Southern Range Cold Desert 56 73 55 65 53 Shrubs Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation Table G - 11. Estimated 50-foot Buffer Performance in Washington, DC* Estimated%Sediment Removal Sandy Clay Silty Clay , Loam, Loam,Silt, Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Warm-season Grass(i.e., 82 90 90 90 90 Switchgrass, Lemongrass) Cool-season Dense Grass (Kentucky Bluegrass,Smooth 81 90 90 90 90 Bromegrass,Timothy) Tall Fescue Grass 79 90 83 89 90 Medium-density Weeds 71 1 79 66 75 74 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation Table G - 12. Estimated 50-foot Buffer Performance in American Samoa* Estimated%Sediment Removal Sandy Clay Silty Clay Loam, Loam,Silt,' Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Bahiagrass(Permanent cover) 82 90 90 90 83 Warm-season Grass(i.e., 82 90 90 90 85 Switchgrass, Lemongrass) Dense Grass 82 90 90 90 83 Tall Fescue Grass 82 89 82 89 79 Medium-density Weeds 70 73 62 75 59 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation G-19of24 Ciol lstruction General (Permit iVGD� Table G - 13. Estimated 50-foot Buffer Performance in Guam* Estimated%Sediment Removal Sandy Clay Silty Clay Loam, Loam,Silt, Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** "Clay Clay-loam Sand or Silty Clay or Silt Loam Bahiagrass(Permanent 80 90 90 90 89 cover) Warm-season Grass(i.e., 80 90 90 90 90 Switchgrass, Lemongrass) Dense Grass` 79 90 90 90 89 Tall Fescue Grass 76 90 80 88 87 Medium-density Weeds 63 73 53 68 61 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation Table G - 14. Estimated 50-foot Buffer Performance in Puerto Rico* Estimated%Sediment Removal Sandy Clay Silty Clay Loam, Loam,Silt, Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Bahiagrass'(Permanent - 83 90 90 90 90 cover) Warm-season Grass(i.e., 83 90 90 90 90 Switchgrass,Lemongrass) Dense Grass 83 90 90 90 90 Tall Fescue Grass 82 90 84 90 89 Medium-density Weeds 72 1 78 65 1 76 64 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation Table G - 15. Estimated 50-foot Buffer Performance in Virgin Islands* Sandy Clay Silty Clay Loam, Loam,Silt,' Loam or Loamy Sand Sandy Loam Type of Buffer Vegetation** Clay Clay-Loam Sand or Silty Clay or Silt Loam Bahiagrass(Permanent 85 90 90 90 90 cover) Warm-season Grass(i.e.,' 86 90 90 90 90 Switchgrass, Lemongrass) Dense Grass 85 90 90 90 90 Tall Fescue Grass 85 90 88 90 89 Medium-density Weeds 75 77 71 78 63 *Applicable for sites with less than nine percent slope **Characterization focuses on the under-story vegetation G-20 of 24 Construction General Permit (CGP) ATTACHMENT 2 Using the Sediment Removal Efficiency Tables-Questions and Answers - What if my specific buffer vegetation is not represented in Tables G-8 through G- 15? Tables G-8 through G- 15 provide a wide range of factors affecting buffer performance; however, there may be instances where the specific buffer vegetation type on your site is not listed. If you do not see a description of the type of vegetation present at your site, you should choose the vegetation type that most closely matches the vegetation type on your site. You can contact your local Cooperative Extension Service Office (www,csrees.usda.aov/Extension) for assistance in determining the vegetation type in Tables G-8 through G- 15 that most closely matches your site-specific vegetation. - What if there is high variability in local soils? EPA recognizes that there may be a number of different soil type(s) on any given construction site. General soil information can be obtained from USDA soil survey reports (htt websoiisurvey.nres.usda.cov) or from individual site assessments performed by a certified soil expert. Tables G-8 through G- 15 present eleven generic soil texture classes, grouping individual textures where EPA has determined that performance is similar. If your site contains different soil texture classes, you should use the soil type that best approximates the predominant soil type at your site. - What if my site slope is greater than 9 percent after final grade is reached? As indicated in the buffer performance tables, the estimated sediment removal efficiencies are associated with disturbed slopes of up to 9 percent grade. Where your graded site has an average slope of greater than 9 percent,you should calculate a site-specific buffer performance. - How do I calculate my own estimates for sediment reduction at my specific site? If you determine that it is necessary to calculate your own sediment removal efficiency using site- specific conditions (e.g., slopes at your site are greater than 9 percent), you can do so by choosing from a range of available mathematical models that are available to facilitate this calculation, including USDA's RUSLE-series programs and the WEPP erosion model, SEDCAD, SEDIMOT, or other equivalent models. - What is my estimated buffer performance if my site location is not represented by Tables G- 8 through G- 15? If your site is located in an area not represented by Tables G-8 through G - 15, you should use the table that most closely approximates conditions at your site. You may also choose to conduct a site-specific calculation of the buffer performance. - What if only a portion of my site drains to the buffer area? If only a portion of your site drains to a surface water,where that water is within 50 feet of your construction activities,you are only required to meet the equivalency requirement for the stormwater flows corresponding to those portions of the site. See Example 2 below for an example of how this is expected to work. G-21 of 24 Consfrucfion General Permit (CGP) ATTACHMENT 3 Examples of How to Use the Sediment Removal Efficiency Tables Example 1. Comparatively Wet Location (7.5 acre site located in Massachusetts) The operator of a 7.5-acre construction site in Massachusetts has determined that it is infeasible to establish a buffer of any size on their site, and is now required to select and install controls that will achieve an equivalent sediment load reduction as that estimated in G-9 for their site conditions. The first step is to identify what percentage of eroded sediment is estimated to be retained from a 50-foot buffer. For this example, it is assumed that the site has a relatively uniform gentle slope (3 percent), so Table G-9 can be used to estimate the 50-foot buffer sediment load reduction. If the site's buffer vegetation is best typified by cool-season dense grass and the underlying soil is of a type best described as loamy sand, the 50-foot buffer is projected to capture 90 percent of eroded sediment from the construction site. The second step is to determine what sediment controls can be selected and installed in combination with the perimeter controls already required to be implemented at the site (see Part 2.1.2.2), which will achieve the 90 percent sediment removal efficiency from Table G-9. For this example, using the RUSLE2 profile model, it was determined that installing a pair of shallow- sloped diversion ditches to convey runoff to a well-designed and maintained sediment basin provides 99 percent sediment removal. Because the estimated sediment reduction is greater than the required 90 percent that a 50-foot buffer provides, the operator will have met the buffer requirements. See Figure G-5. The operator could also choose a different set of controls, as long as they achieve at least a 90 percent sediment removal efficiency. G-22 of 24 Construction General Permit (CGP) Figure G - 5. Example 1 -Equivalent Sediment Load Reductions at a 7.5 ac Site in MA. I 7.5 acres draining to buffer areas Swale Basin . ry Diversion Dike V. j Averageno f py distance=80feet / 19 Diversion Dike ���"`'°Surfa+ce water Example 2. Arid Location With Pre-existing Disturbances in the Natural Buffer(6.5 acre site located in New Mexico) An operator of a site in New Mexico determines that it is not practicable to provide a 50-foot buffer, but a 28-foot buffer can be provided. Because the operator will provide a buffer that is less than 50 feet, the operator must determine which controls, in combination with the 28-foot buffer, achieve a sediment load reduction equivalent to the 50-foot buffer. In this example, the project will disturb 6.5 acres of land, but only 1.5 acres of the total disturbed area drains to the buffer area. Within the 28-foot buffer area is a preexisting concrete walkway. Similar to Example 1, the equivalence analysis starts with Step 1 (Part G.2.2.2) with a review of the New Mexico buffer performance (Table G - 10). The operator determines that the predominate vegetation type in the buffer area is prairie grass and the soil type is similar to silt, and that the site is of a uniform, shallow slope (e.g.,3 percent grade). Although the operator will take credit for the disturbance caused by the concrete walkway as a natural buffer in Step 2, here the operator can treat the entire buffer area as being naturally vegetated with prairie grass. Based on this information, the operator refers to Table G- 10 to estimate that the 50-foot buffer would retain 50 percent of eroded soil. The second step is to determine, based on the 50 percent sediment removal efficiency found in Table G- 10, what sediment controls in combination with the 28-foot buffer area, can be G-23 of 24 Construction General PClm'l1l (CGP) implemented to reduce sediment loads by 50 percent or more.The operator does not have to account the reduction in buffer function caused by the preexisting walkway, and can take credit for the entire 28-foot buffer being fully vegetated in the analysis. For this example, using the RUSLE2 profile model, the operator determined that installing a fiber roll barrier between the silt fence (already required by Part 2.1.2.2) and the 28-foot buffer will achieve an estimated 84 percent sediment removal efficiency.See Figure G- 6. Note that this operator is subject to the requirement in Part 2.1.2.1 b.i to ensure that discharges through the silt fence,fiber roll barrier, and 28-foot buffer do not cause erosion within the buffer. The estimated sediment reduction is greater than the required 50 percent; therefore the operator will have met the buffer alternative requirement. Figure G - 6. Example 2-Equivalent Sediment Load Reductions at a 6.5 ac Site in NM. 1.5 acres draining to buffer areas Fiber Roll Barrier Silt Fence- 28 ft Vegetated Buffer , Concrete ., Walkway 4 F disc hlarge tnt© G-24 of 24 Construction General Permit (CGP) Appendix H -2-Year, 24-Hour Storm Frequencies Part 2.1.3.2 of the permit indicates that if you install a sediment basin, one of the design requirements is to provide storage for either (1) the calculated volume of runoff from a 2-year, 24-hour storm, or (2) 3,600 cubic feet per acre drained.This appendix is intended to provide a guide to permittees to determine the volume of precipitation associated with their local 2-year, 24-hour storm event. The permittee should start out by determining their local 2-year, 24-hour storm volume. The rainfall frequency atlases, technical papers, and the Precipitation Frequency Data Server (PFDS) developed by the National Oceanic and Atmospheric Administration's (NOAA) National Weather Service (NWS) serve as national standards for rainfall intensity at specified frequencies and durations in the United States. Operators of construction projects subject to the numeric effluent limits can use these standards to determine their local 2-year, 24-hour storm. Table H-1 identifies methods for determining precipitation frequency based on permit area. EPA notes that permittees may also use alternative peer-reviewed data sources not listed in Table H- 1 to determine the 2-year, 24-hour storm for their site. Table H -1 -Method to Determine Precipitation Frequency Based on Permit Area PERMIT AREA METHOD TO DETERMINE PRECIPITATION FREQUENCY District of Columbia PFDS; NOAA Atlas 14, Vol.2 Idaho NOAA Atlas 2, Vol. 5;Technical Paper 40 Massachusetts Technical Paper 40 New Hampshire Technical Paper 40 New Mexico PFDS;Technical Paper 40 Selected Pacific Islands PFDS;Technical Paper 40 Puerto Rico and the U.S Virgin Islands PFDS;Technical Paper 40 Other PFDS;Technical Paper 40; NOAA Atlas 2 or 14 How to Determine Your Local 2-year, 24-hour Storm Size Projects located in the District of Columbia, New Mexico, Puerto Rico, U.S. Virgin Islands, or Pacific Islands can use the PFDS at hffp://hdsc.nws.noaa.gov/hdsc/r)fds/index.hfml or use NOAA's Atlas 14 Volumes 2, 3, and 5, respectively at http Lv,/ww.n\Ns.noaa.c�ov/oh/hdsc/currenfpf.hfm to determine their precipitation frequency. The PFDS is an easy to use, point-and-click interface to official U.S. precipitation frequency estimates and intensities.The opening PFDS screen is a clickable map of the United States. Upon clicking on a state, a state-specific interface appears. From this page the user selects the following: • A location: Either via clicking on the map or manually entering a longitude/latitude coordinate; • Type of output: Depth-Duration Frequency (DDF) or Intensity-Duration-Frequency (IDF) • Units: millimeters or inches; and • Type of estimate: Point or areal. Page H-1 of 4 Construction General Permit Additionally, PFDS also serves as a tool for providing references and other information for other current precipitation frequency standards that are not yet updated. Projects located in the District ofColumbia, Puerto Rico' U.S. Virgin Islands, or Pacific Islands can use NOAA's /\t|os 14 Volumes 2'3' and 5' respectively at or access the PFDSuf fo determine their precipitation frequency. Projects located in Massachusetts and New Hampshire, or other areas not covered by the PFDS orN(]A/\ Atlases will need to usoTP40 to identify the precipitation frequency. TP-40provides o map of the continental U.S. for the 2-yeur, 24-hourrainfall. TP40 can be accessed o| (See also attached map of TP-40) Projects located in Idaho can use the NOAA Atlas 2, Vol. 5 to determine their precipitation frequency. NOTE: Precipitation Frequencies on the N{}AA Atlas 2' Vol. 5 are in tenths ufoninch and will have to be converted to inches to determine precipitation frequency. NOAA Atlas 2, Vol. 5 can bo accessed ot . (See also attached map of NOAA Atlas 2, Vol. 5) Page H-2of4 Chen 44 2-YEAR 24 HOUR RAINFALL(INCHES) u t s � ! r o � y —1, i` OIV.4 IVA r LI ' '4 \ ! '-t• t O 1s as � t n 5 .6 33 \ � i O C D L F D F� V C JL t C j 6 Q / 1 a ; —.,..e .....a u...• _. I_ —• U/ 'D Construction General Permit (CGP) 22 j" l 18 S \t 22 '18 2° (�Uj" 26 Figure 25 p 444 IA\n Ye �n,T2 TENTHS SO TL IALS OF 2CHR 24-HR PRECIPITATION IN t EN H OF AN I - / 1 26 eonA nrnns z,vm¢n,c v Pr¢Parea°v us D Dartmoor nr c¢r¢m¢ra¢ r»trrnuloc¢an,.aS-mt saner It Hy e l�T T2\ �fir} rlat¢n¢I Y)eather 5erv¢e,Otl,ce A Hytlrafopy l 3 1 SA,C _U.S.Dgi",¢nt of Apr<NtvrS soil Conserva:ian 5ery ce,Eng ncering D'v-sron vC�2�t S `zT t S 4v 2� yT2 � a 20 f < ` e� y t 24 6 j10`S� V ira4� -OK ��If< 4 (Ii ikl4Cm / ��Jz < 1�' flr 2 26{1Uij7s2 rid /' 20/ r[lti� �CiJ� rt$1L�11� T I 1 v 6 16 12° i �G� E � � ��/ �r�l�) ✓�1/��}l( ,�te r✓`T� �� /� 216 I� Ana �� g�,)e lr v n 2 �A � �'t�j r?\v J �a/114 ' z _ Ins �� � s�1e/ ( 2o->��✓t ` r��� r%vJ\�l(h Iz����i���J6��� �'7a i� a- 20\v`� /t i 2� fl���`ti✓�'4 �.74�4���,J4 A�1C�c22jl 7r' J {) Cr :, Ya ,z J2 64 al L I2, i2'12 -T4 W'"T"--- '4�C-'-1T 12`+ 112' 12-U2 —_. ."-Tz""'Y4 "T4 a r Page H-4 of 4 Construction General Permit (CGP) Appendix I - Standard Permit Conditions Standard permit conditions in Appendix 1 are consistent with the general permit provisions required under 40 CFR 122.41. 1.1 Duty To Comply. You must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application. 1.1.1 You must comply with effluent standards or prohibitions established under Section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards, even if the permit has not yet been modified to incorporate the requirement. 1.1.2 Penalties for Violations of Permit Conditions:The Director will adjust the civil and administrative penalties listed below in accordance with the Civil Monetary Penalty Inflation Adjustment Rule (61 FIR 252, December 31, 1996, pp. 69359-69366, as corrected in 62 FIR 54, March 20, 1997, pp.13514-13517) as mandated by the Debt Collection Improvement Act of 1996 for inflation on a periodic basis.This rule allows EPA's penalties to keep pace with inflation.The Agency is required to review its penalties at least once every 4 years thereafter and to adjust them as necessary for inflation according to a specified formula.The civil and administrative penalties following were adjusted for inflation starting in 1996. 1.1.2.1 Criminal Penalties. a. Negligent Violations.The CWA provides that any person who negligently violates permit conditions implementing Sections 301, 302, 306, 307, 308, 318, or 405 of the Act is subject to criminal penalties of not less than $2,500 nor more than $25,000 per day of violation, or imprisonment of not more than one year, or both. In the case of a second or subsequent conviction for a negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of violation or by imprisonment of not more than two years, or both. b. Knowing Violations. The CWA provides that any person who knowingly violates permit conditions implementing Sections 301, 302, 306, 307, 308, 318, or 405 of the Act is subject to a fine of not less than $5,000 nor more than $50,000 per day of violation, or by imprisonment for not more than 3 years, or both. In the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both. c. Knowing Endangerment. The CWA provides that any person who knowingly violates permit conditions implementing Sections 301,302, 306, 307, 308, 318, or 405 of the Act and who knows at that time that he or she is placing another person in imminent danger of death or serious bodily injury shall upon conviction be subject to a fine of not more than $250,000 or by imprisonment of not more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment violation, a person shall be subject to a fine of not more than$500,000 or by imprisonment of not more than 30 years, or both. An organization, as defined in Section 309(c)(3)(B)(iii) of the Act, shall, upon Pagel-] of 9 Construction 'General Permit (CGP) conviction of violating the imminent danger provision be subject to a fine of not more than $1,000,000 and can fined up to $2,000,000 for second or subsequent convictions. d. False Statement. The CWA provides that any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000, or by imprisonment for not more than 2 years, or both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both.The Act further provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or non-compliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than 6 months per violation, or by both. 1.1.2.2 Civil Penalties. The CWA provides that any person who violates a permit condition implementing Sections 301, 302, 306,307, 308, 318, or 405 of the Act is subject to a civil penalty not to exceed the maximum amounts authorized by Section 309(d) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. § 2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. § 3701 note) (currently $37,500 per day for each violation). 1.1.2.3 Administrative Penalties. The CWA provides that any person who violates a permit condition implementing Sections 301,302,306, 307, 308, 318, or 405 of the Act is subject to an administrative penalty, as follows a. Class I Penalty. Not to exceed the maximum amounts authorized by Section 309(g)(2)(A) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. § 2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. § 3701 note) (currently$16,000 per violation,with the maximum amount of any Class I penalty assessed not to exceed$37,500). b. Class II Penalty. Not to exceed the maximum amounts authorized by Section 309(g)(2)(B) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. § 2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. § 3701 note) (currently$1 1,000 per day for each day during which the violation continues,with the maximum amount of any Class II penalty not to exceed $177,500). 1.2 Duty to Reapply. If you wish to continue an activity regulated by this permit after the expiration date of this permit, you must apply for and obtain authorization as required by the new permit once EPA issues it. 1.3 Need to Halt or Reduce Activity Not a Defense. It shall not be a defense for you in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. Page 1-2 of 9 Construction General Permit (CGP) 1.4 Duty to Mitigate. You must take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health or the environment. 1.5 Proper Operation and Maintenance. You must at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) that are installed or used by you to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures.This provision requires the operation of backup or auxiliary facilities or similar systems which are installed by you only when the operation is necessary to achieve compliance with the conditions of this permit. 1.6 Permit Actions. This permit may be modified, revoked and reissued, or terminated for cause. Your filing of a request for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any permit condition. 1.7 Property Rights. This permit does not convey any property rights of any sort, or any exclusive privileges. 1.8 Duty to Provide Information. You must furnish to EPA or an authorized representative (including an authorized contractor acting as a representative of EPA),within a reasonable time, any information that EPA may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. You must also furnish to EPA or an authorized representative upon request, copies of records required to be kept by this permit. 1.9 Inspection and Entry. You must allow EPA or an authorized representative (including an authorized contractor acting as a representative of EPA), upon presentation of credentials and other documents as may be required by law, to: 1.9.1 Enter upon your premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit; 1.9.2 Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit; 1.9.3 Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and 1.9.4 Sample or monitor at reasonable times,for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. Page 1-3 of 9 Construction General Permit (CGP) 1.10 Monitoring and Records. 1.10.1 Samples and measurements taken for the purpose of monitoring must be representative of the volume and nature of the monitored activity. 1.10.2 You must retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least three years from the date the permit expires or the date the permittee's authorization is terminated.This period may be extended by request of EPA at any time. 1.10.3 Records of monitoring information must include: 1.10.3.1 The date, exact place, and time of sampling or measurements; 1.10.3.2 The individuals) who performed the sampling or measurements; 1.10.3.3 The date(s) analyses were performed 1.10.3.4 The individual(s) who performed the analyses; 1.10.3.5 The analytical techniques or methods used; and 1.10.3.6 The results of such analyses. 1.10.4 Monitoring must be conducted according to test procedures approved under 40 CFR Part 136, unless other test procedures have been specified in the permit. 1.10.5 The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000, or by imprisonment for not more than 2 years, or both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both. 1.11 Signatory Requirements. 1.11.1 All applications, including NOls, must be signed as follows: For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president,secretary, treasurer, or vice- president of the corporation in charge of a principal business function, or any other person who performs similar policy-or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. 1.11.1.2 For a partnership or sole proprietorship: By a general partner or the proprietor, respectively; or I.1 1.1.3 For a municipality,state, federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive Page 1-4 of 9 Construction General Permit (CGP) officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). 1.11.2 Your SWPPP, including changes to your SWPPP, inspection reports, and any other compliance documentation required under this permit, must be signed by a person described in Appendix I,Subsection 1.1 1.1 above or by a duly authorized representative of that person. A person is a duly authorized representative only if: 1.11.2.1 The authorization is made in writing by a person described in Appendix I,Subsection 1.11.1; 1.11.2.2 The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and 1.11.2.3 The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. 1.11.3 Changes to Authorization. If an authorization under Part 1.7 is no longer accurate because a different operator has responsibility for the overall operation of the construction site, a new NOI satisfying the requirements of Part 1.7 must be submitted to EPA. See Table 1 in Part 1.7.2 of the permit. However, if the only change that is occurring is a change in contact information or a change in the facility's address, the operator need only make a modification to the existing NOI submitted for authorization. 1.11.4 Any person signing documents in accordance with Appendix I, Subsections 1.1 1.1 or I.1 1.2 above must include the following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." 1.11.5 For persons signing documents electronically, in addition to meeting other applicable requirements in Appenidx I, Subsection I.1 1, such signatures must meet the same signature, authentication, and identity-proofing standards set forth at 40 CFR § 3.2000(b) for electronic reports (including robust second-factor authentication). 1.11.6 The CWA provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or non-compliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than 6 months per violation, or by both. 1.12 Reporting Requirements. 1.12.1 Planned changes. You must give notice to EPA as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when: Page 1-5 of 9 Construction General Permit (CGP) 1.12.1.1 The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 40 CFR 122.29(b); or 1.12.1.2 The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged.This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR 122.42(a)(1). 1.12.2 Anticipated noncompliance. You must give advance notice to EPA of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements. 1.12.3 Transfers.This permit is not transferable to any person except after notice to EPA.Where a facility wants to change the name of the permittee, the original permittee (the first owner or operators) must submit a Notice of Termination pursuant to Part 8. The new owner or operator must submit a Notice of Intent in accordance with Part 1.7 and Table 1. See also requirements in Appendix 1,Subsections I.1 1.1 and 1.11.2. 1.12.4 Monitoring reports. Monitoring results must be reported at the intervals specified elsewhere in this permit. 1.12.4.1 Monitoring results must be reported on a Discharge Monitoring Report (DMR) or forms provided or specified by EPA for reporting results of monitoring of sludge use or disposal practices. 1.12.4.2 If you monitor any pollutant more frequently than required by the permit using test procedures approved under 40 CFR Part 136 or, in the case of sludge use or disposal, approved under 40 CFR 136 unless otherwise specified in 40 CFR Part 503, or as specified in the permit, the results of this monitoring must be included in the calculation and reporting of the data submitted in the DMR or sludge reporting form specified by EPA. 1.12.5 Compliance schedules. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit must be submitted no later than 14 days following each schedule date. 1.12.6 Twenty-four hour reporting. In addition to reports required elsewhere in this permit: 1.12.6.1 You must report any noncompliance which may endanger health or the environment. Any information must be provided orally within 24 hours from the time you become aware of the circumstances. A written submission must also be provided within five days of the time you become aware of the circumstances.The written submission must contain a description of the noncompliance and its cause; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. 1.12.6.2 The following shall be included as information which must be reported within 24 hours under this paragraph. a. Any unanticipated bypass which exceeds any effluent limitation in the permit. (See 40 CFR 122.41(m)(3)(ii)) b. Any upset which exceeds any effluent limitation in the permit c. Violation of a maximum daily discharge limit for any numeric effluent limitation. (See 40 CFR 122.44(g).) 1.12.6.3 EPA may waive the written report on a case-by-case basis for reports under Appendix I, Subsection 1.12.6.2 if the oral report has been received within 24 hours. Page 1-6 of 9 Construction General Permit (CGP) 1.12.7 Other noncompliance.You must report all instances of noncompliance not reported under Appendix I, Subsections 1.12.4, 1.12.5, and 1.12.6, at the time monitoring reports are submitted.The reports must contain the information listed in Appendix 1, Subsection 1.12.6. 1.12.8 Other information. Where you become aware that you failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Permitting Authority, you must promptly submit such facts or information. 1.13 Bypass. 1.13.1 Definitions. 1.13.1.1 Bypass means the intentional diversion of waste streams from any portion of a treatment facility See 40 CFR 122.41 (m)(1)(i). 1.13.1.2 Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass.Severe property damage does not mean economic loss caused by delays in production.See 40 CFR 122.41 (m)(1)(ii). 1.13.2 Bypass not exceeding limitations. You may allow any bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation.These bypasses are not subject to the provisions of Appendix I, Subsections 1.13.3 and 1.13.4.See 40 CFR 122.41 (m)(2). 1.13.3 Notice. 1.13.3.1 Anticipated bypass. If you know in advance of the need for a bypass, you must submit prior notice, if possible at least ten days before the date of the bypass.See 40 CFR 122.41 (m)(3)(i). 1.13.3.2 Unanticipated bypass. You must submit notice of an unanticipated bypass as required in Appendix 1,Subsection 1.12.6 (24-hour notice). See 40 CFR 122.41(m)(3)(ii). 1.13.4 Prohibition of bypass.See 40 CFR 122.41 (m)(4). 1.13.4.1 Bypass is prohibited, and EPA may take enforcement action against you for bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime.This condition is not satisfied if adequate back- up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. You submitted notices as required under Appendix I, Subsection 1.13.3. 1.13.4.2 EPA may approve an anticipated bypass, after considering its adverse effects, if EPA determines that it will meet the three conditions listed above in Appendix 1, Subsection 1.13.4.1. Page 1-7 of 9 Consiruction General Permit (CGP) 1.14 Upset. 1.14.1 Definition. Upset means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond your reasonable control. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. See 40 CFR 122.41(n)(1). 1.14.2 Effect of an upset. An upset constitutes an affirmative defense to an action brought for noncompliance with such technology based permit effluent limitations if the requirements of Appendix I,Subsection 1.14.3 are met. No determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is final administrative action subject to judicial review.See 40 CFR 122.41(n)(2). 1.14.3 Conditions necessary for a demonstration of upset. See 40 CFR 122.41 (n)(3). A permittee who wishes to establish the affirmative defense of upset must demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: 1.14.3.1 An upset occurred and that you can identify the cause(s) of the upset; 1.14.3.2 The permitted facility was at the time being properly operated; and 1.14.3.3 You submitted notice of the upset as required in Appendix I,Subsection 1.12.6.2.b (24 hour notice). 1.14.3.4 You complied with any remedial measures required under Appendix I,Subsection 1.4. 1.14.4 Burden of proof. In any enforcement proceeding, you, as the one seeking to establish the occurrence of an upset, have the burden of proof.See 40 CFR 122.41(n)(4). 1.15 Retention of Records. Copies of the SWPPP and all documentation required by this permit, including records of all data used to complete the NOI to be covered by this permit, must be retained for at least three years from the date that permit coverage expires or is terminated.This period may be extended by request of EPA at any time. 1.16 Reopener Clause. 1.16.1 Procedures for modification or revocation. Permit modification or revocation will be conducted according to 40 CFR §122.62, §122.63, §122.64 and §124.5. 1.16.2 Water quality protection. If there is evidence indicating that the stormwater discharges authorized by this permit cause, have the reasonable potential to cause or contribute to an excursion above any applicable water quality standard,you may be required to obtain an individual permit in accordance with Part 1.7.5 of this permit, or the permit may be modified to include different limitations and/or requirements. 1.16.3 Timing of permit modification. EPA may elect to modify the permit prior to its expiration (rather than waiting for the new permit cycle) to comply with any new statutory or regulatory requirements, such as for effluent limitation guidelines that may be promulgated in the course of the current permit cycle. Page 1-8 of 9 Construction General Permit (CGP) 1.17 Severabilify. Invalidation of a portion of this permit does not necessarily render the whole permit invalid. EPA's intent is that the permit is to remain in effect to the extent possible; in the event that any part of this permit is invalidated, EPA will advise the regulated community as to the effect of such invalidation. Page 1-9 of 9 Construction General Permit (CGP) Appendix J - Notice of Intent (NOI) Form and Instructions Part 1.7.1 requires you to use the electronic NOI system, or"eNO1" system, to prepare and submit your NO1. However, if you are given approval by the EPA Regional Office to use a paper NOI form, and you elect to use it, you must complete and submit the following form. Page J-1 of 9 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Form Approved. NPDES OMB No.2040-0004 FORM ®`�� WOR STOTON,DC 20460 3510-9 NOTICE OF INTENT(NOI)FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER AN NPDES GENERAL PERMIT Submission of this Notice of Intent(NOI)constitutes notice that the operator identified in Section II of this form requests authorization to discharge pursuant to the NPDES Construction General Permit(CGP)permit number identified in Section I of this form.Submission of this NOI also constitutes notice that the operator identified in Section II of this form meets the eligibility requirements of Parts 1.1 and 1.2 of the CGP for the project identified in Section III of this form.Permit coverage is required prior to commencement of construction activity until you are eligible to terminate coverage as detailed in Part 8 of the CGP.To obtain authorization,you must submit a complete and accurate NOI form.Discharges are not authorized if your NOI is incomplete or inaccurate or if you were never eligible for permit coverage.Refer to the instructions at the end of this form. I.Approval to Use Paper NOI Form Have you been given approval from the Regional Office to use this paper NOI form*?❑YES ❑NO If yes,provide the reason you need to use this paper form,the name of the EPA Regional Office staff person who approved your use of this form,and the date of approval: Reason for using paper form: Name of EPA staff person: Date approval obtained: *Note:You are required to obtain approval from the applicable Regional Office prior to using this paper NOI form. II.Permit Information Tracking Number(EPA use Only): Permit Number: I I I I I I I I I I (see Appendix B of the CGP for the list of eligible permit numbers) III.Operator Information Name: I I ( ( I ( I I I I I I ( I ( ( I I I I I Phone: Ext. �� Fax(optional): E-mail: IRS Employer Identification Number(EIN): Point of Contact: First Name I I Middle Initial, Last Name: Mailing Address: Street: IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII City: ( I I I I I I I I I I ( I ( ( I I I I I I ( ( ( I ( State: Lu Zip Code: L I_J.L_LJ I�J J�tJ NOI Preparer(Complete if NOI was prepared by someone other than the certifier): Prepared by: First Name Middle Initial, Last Name: Organization: Phone: Ext. � Fax(optional): E-mail: IV.'Project/Site Information Project/Site Name: EPA Form 3510-9 Page 1 of 8 Project/Site Address: Street/Location: I I I I I I I I I I I I I J I I I I I City: State: M Zip Code: County or similar government subdivision: For the project/site for you are seeking permit coverage,provide the following information: Latitude/Longitude(Use one of three possible formats,and specify method): Latitude I_o N(degrees,minutes,seconds) Longitude 1. W(degrees,minutes,seconds) 2. N(degrees,minutes,decimal) 2. 'W(degrees,minutes,decimal) 3. N(degrees decimal) 3.---.----o W(degrees decimal) Latitude/Longitude Data Source: 0 U.S.G.S.topographic map El EPA web site El GPS El Other: If you used a U.S.G.S.topographic map,what was the scale? Horizontal Reference Datum; El NAD 27 El NAD 83 or WGS 84 0 Unknown Is your project/site located in Indian Country lands,or located on a property of religious or cultural significance to an Indian tribe? [I YES [I NO If yes,provide the name of the Indian tribe associated with the area of Indian country(including name of Indian reservation,if applicable),or if not in Indian country,provide the name of the Indian tribe associated with the property: Are you requesting coverage under this NOI as a"federal operator"as defined in Appendix A? El YES El NO Estimated Project Start Date: M/M/I I I I I Estimated Project Completion Date: M/m/1 I I I Estimated Area to be Disturbed(to the nearest quarter acre): I I I I M Have earth-disturbing activities commenced on your project/site? El YES El NO If yes,is your project an"emergency-related project? El YES EI NO Have stormwater discharges from your project/site been covered previously under an NPIDES permit? El YES 0 NO If yes,provide the Tracking Number ifyou had coverage under EPA's CGP or the NPIDES permit number ifyou had coverage under an EPA individual permit: V. Discharge Information Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System(MS4)?El YES El NO Are there any surface waters within 50 feet of your project's earth disturbances?El YES 0 NO Receiving Waters and Wetlands Information:(Attach a separate list if necessary) Provide the names of any impaired waters to which Provide the names of any waters to which you discharge you discharge and the pollutant(s)for which they for which there is an EPA approved or established TMDL, Provide the name(s)of the first are impaired the name of the TMDL,and the pollutant(s)for which there surface water that received is a TMDL stormwater directly from your Pollutant(s) site and/or from the MS4: Surface water name: Pollutant(s)causing the Surface water TMDL name: for which impairment: name: there is a TMDL: EPA Form 3510-9 Page 2 of 8 Impaired Waters Describe the methods you used to complete the above table: Are any of the surface waters to which you discharge designated by the state or tribal authority under its antidegradation policy as a Tier 2(or Tier 2.5)water (water quality exceeds levels necessary to support propagation of fish,shellfish,and wildlife and recreation in and on the water)or as a Tier 3 water (Outstanding Natural Resource Water)?(See Appendix F). ❑YES ❑NO If yes,name(s)of receiving water(s)and its designation(Tier 2,Tier 2.5 or Tier 3): VI.Chemical Treatment Information Will you use polymers,flocculants,or other treatment chemicals at your construction site?❑YES ❑NO If yes,will you use cationic treatment chemicals at your construction site*?❑YES ❑NO If yes,have you been authorized to use cationic treatment chemicals by your applicable EPA Regional Office in advance of filing your NOI*? ❑YES ❑NO If you have been authorized to use cationic treatment chemicals by your applicable EPA Regional Office,attach a copy of your authorization letter and include documentation of the appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. Please indicate the treatment chemicals that you will use: *Note:You are ineligible for coverage under this permit unless you notify your applicable EPA Regional Office in advance and the EPA office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. VI1.Stormwater Pollution Prevention Plan(SWPPP)Information Has the SWPPP been prepared in advance of filing this NOI? ❑YES ❑NO SWPPP Contact Information: First Name Middle Initial Last Name: Organization Name: Phone: Ext. Fax(optional): L J L.LJ E-mail: Vill. Endangered Species Protection Using the instructions in Appendix D of the CGP,under which criterion listed in Appendix D are you eligible for coverage under this permit(only check 1 box)? ❑A El El ❑D El ❑F Provide a brief summary of the basis for criterion selection listed in Appendix D(e.g.,communication with U.S.Fish and Wildlife Service or National Marine Fisheries Service,specific study): If you select criterion B,provide the Tracking Number from the other operator's notification of authorization under this permit: If you select criterion C,you must attach a copy of your site map(see Part 7.2.6 of the permit),and you must answer the following questions: What federally-listed species or federally-designated critical habitat are located in your"action area": What is the distance between your site and the listed species or critical habitat(miles): If you select criterion D,E,or F,attach copies of any letters or other communications between you and the U.S.Fish and Wildlife Service or National Marine Fisheries Service. EPA Form 3510-9 Page 3 of 8 M.Historic Preservation Are you installing any stormwater controls as described in Appendix E that require subsurface earth disturbance?(Appendix E,Step 1) ❑YES ❑NO If yes,have prior surveys or evaluations conducted on the site have already determined historic properties do not exist,or that prior disturbances have precluded the existence of historic properties? (Appendix E,Step 2) ❑YES ❑NO If no,have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties? (Appendix E,Step 3) ❑YES ❑NO If no,did the SHPO,THPO,or other tribal representative(whichever applies)respond to you within the 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? (Appendix E,Step 4) ❑YES ❑NO If yes,describe the nature of their response: ❑ Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions ❑ No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls ❑ Other: X.Certification Information I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. First Name I I I ( I III Middle Initial, Last Name: Ll Title: I I I I I I I I I I I I I I I I I I I I Signature: Date: M/I I I/I I I I I Email: ( ( I I I I I I LLL���WWW�I EPA Form 3510-9 Page 4 of 8 Instructions for Completing EPA Form 3510-9 Notice of Intent(NOI)for Storm Water Discharges Associated with Construction Activity Under an NPDES General Permit NPDES Form Date(2/16) This Form Replaces Form 3510-9(11/08) Form Approved OMB No.2040-0004 Who Must File an NOI Form Region 4:Alabama,Florida,Georgia,Kentucky,Mississippi,North Under the provisions of the Clean Water Act, as amended (33 Carolina,South Carolina,and Tennessee. U.S.C. 1251 et. seq.; the Act), federal law prohibits stormwater U.S.EPA Region 4 discharges from certain construction activities to waters of the Clean Water Act Enforcement Section U.S. unless that discharge is covered under a National Pollutant Water Programs Enforcement Branch Discharge Elimination System (NPDES) permit. Operator of Water Management Division construction sites where one or more acres are disturbed,smaller Atlanta Federal Center sites that are part of a larger common plan of development or 61 Forsyth Street SW sale where there is a cumulative disturbance of at least one Atlanta,GA 30303 acre, or any other site specifically designated by the Director, must submit an NOI to obtain coverage under on NPDES general Region Illinois,Indiana,Michigan,Minnesota,Ohio,and permit.Each person,firm,public organization,or any other entity Wisconsin. that meets either of the following criteria must file this form: (1) U.S.EPA Region 5 they have operational control over construction plans and Water Division specifications, including the ability to make modifications to NPDES Programs Branch those plans and specifications; or (2) they hove day-to-day 77 W.Jackson Blvd. operational control of those activities at the project necessary to Mail Code WN 16J ensure compliance with the permit conditions. If you have Chicago,IL 60604 questions about whether you need a NPDES stormwater permit, or if you need information to determine whether EPA or your Region 6:Arkansas,Louisiana,Oklahoma,Texas,and New state agency is the permitting authority, refer to Mexico(except see Region 9 for Navajo lands,and see Region 8 www_eoa.g wlnodes storm ater cgoo or telephone EPA's NOI for Ute Mountain Reservation lands). Processing Center at(866)352-7755. U.S.EPA Region 6 Where to File NOI Form Stormwater Coordinator Compliance Assurance and Enforcement Division (6EN-WC) Completed NOI forms must be sent to the Regional EPA Office EPA SW MSGP corresponding to the area where your construction site is P.O.Box 50625 located. The following is a list of Regional Office addresses: Dallas,TX 75205 Region 1:Connecticut,Massachusetts, New Hampshire,Rhode Region 7:Iowa,Kansas,Missouri,Nebraska. Island,and Vermont. U.S.EPA-Region 7 U.S.EPA Region 1 901 N.5th Street Office of Ecosystem Protection Kansas City, KS 66101 5 Post Office Square -CIP Boston,MA 02114 Region 8:Colorado,Montana,North Dakota,South Dakota, Wyoming,Utah(except see Region 9 for Goshute Reservation Region 2: New Jersey,New York,Puerto Rico,and Virgin Islands. and Navajo Reservation lands),the Ute Mountain Reservation in For Puerto Rico and the Virgin Islands: New Mexico,and the Pine Ridge Reservation in Nebraska. U.S.EPA Region 2 U.S.EPA Region 8 Caribbean Environmental Protection Division Stormwater Coordinator(8P-W-P) Environmental Management Branch 999 18th Street,Suite 300 Centro Europa Building Denver,CO 80202-2466 1492 Ponce de Leon Avenue,Suite 417 San Juan, PR 00907-4127 Region 9:Arizona,California,Hawaii,Nevada,Guam,American Samoa,the Commonwealth of the Northern Mariana Islands,the For New Jersey and New York: Goshute Reservation in Utah and Nevada,the Navajo U.S.EPA Region 2 Reservation in Utah,New Mexico,and Arizona,the Duck Valley Division of Environmental Planning and Protection Reservation in Idaho, Fort McDermitt Reservation in Oregon. 290 Broadway New York,NY 10007-1866 U.S.EPA Region 9 Water Management Division,WTR-5 Region 3: Delaware, District of Columbia,Maryland, Stormwater Coordinator Pennsylvania,Virginia,West Virginia. 75 Hawthorne Street U.S.EPA Region 3 San Francisco,CA 94105 Water Protection Division (3WP40) Region 10:Alaska,Idaho,Oregon(except see Region 9 for Fort Stormwater Coordinator McDermitt Reservation),Washington. 1650 Arch Street Philadelphia,PA 19103 U.S.EPA Region 10 Office of Water and Watersheds OWW-130 Stormwater Coordinator 1200 6th Avenue Seattle,WA 98101 EPA Form 3510-9 Page 5 of 8 Instructions for Completing EPA Form 3510-9 Notice of Intent(NOI)for Storm Water Discharges Associated with Construction Activity Under an NPDES General Permit NPDES Form Date(2/16) This Form Replaces Form 3510-9(11/08) Form Approved OMB No.2040-0004 Completing the Form facility can be determined in several different ways, including Obtain and read a copy of the 2012 Construction General through the use of global positioning system (GPS) receivers, U.S. Permit, viewable at n w.Pca'aov/nod�slstcrrnwa'er/c:a�. To Geological Survey (U.S.G.S.) topographic or quadrangle maps, complete this form, type or print uppercase letters, in the and EPA's web-based siting tools, among others. Refer to appropriate areas only. Please place each character between `^'ww.epa.gov/npdes/stormwater/cgp for further guidance on the marks (abbreviate if necessary to stay within the number of the use of these methodologies. For consistency, EPA requests characters allowed for each item). Use one space for breaks that measurements be taken from the approximate center of between words, but not for punctuation marks unless they are the construction site.Applicants must specify which method they needed to clarify your response. If you have any questions on used to determine latitude and longitude. If a U.S.G.S. this form, refer to www.� a.c ov r�des s�ormwatprlc� or topographic map is used, applicants are required to specify the telephone EPA's NOI Processing Center at (866) 352-7755. Please scale of the map used. If known, enter the horizontal reference submit the original document with signature in ink-do not send datum for your latitude and longitude. The horizontal reference a photocopied signature. datum used on USGS topographic maps is shown on the bottom Section 1.Approval to Use Paper NOI Form left corner of USGS topographic maps;it is also available for GPS receivers. If you use EPA's web siting tool, or if you are unsure of You must indicate whether you have been given approval by the horizontal reference datum for your site, please check the the EPA Regional Office to use a paper NOI. Note that you are "unknown"box. not authorized to use this paper NOI form unless the Regional Office has approved its use. Verbal approval from the Regional Indicate whether the project is in Indian country lands or located Office is sufficient. Where you have obtained approval to use on a property of religious or cultural significance to an Indian this form, indicate the reason you need to use this form, the tribe, and if so, provide the name of the Indian tribe associated name of the EPA Regional Office staff person who provided with the area of Indian country (including name of Indian approval for use of this form, and the date that approval was reservation,if applicable),or if not in Indian country, provide the provided. See wvvw.epa.aovirpdeslstc>rnr�ater/r_ontacts fora name of the Indian tribe associated with the property. list of EPA Regional Office contacts. Indicate whether you are seeking coverage under this permit as Section II. Permit Number a "federal operator"as defined in Ap pendix ppendix A. Provide the number of the permit under which you are applying Enter the estimated construction start and completion dates for coverage (see Appendix B of the general permit for the list of using four digits for the year (i.e., 10/06/2012). Indicate to the eligible permit numbers). nearest quarter acre the estimated area to be disturbed. Section III.Operator Information Indicate whether earth-disturbing activities have already Provide the legal name of the person, firm, public organization, commenced on your project/site. If earth-disturbing activities or any other entity that operates the project described in this have commenced on your site because stormwater discharges application. Refer to Appendix A of the permit for the definition from the site have been previously covered under a NPDES of "operator". Provide the employer identification number (EIN permit,you must provide the CGP Tracking Number or the NPDES from the Internal Revenue Service; IRS), also commonly referred permit number if coverage was under an individual permit. to as your taxpayer ID. If the applicant does not have an EIN Section V. Discharge Information enter "NA" in the space provided. Also provide a point of contact, the operator's mailing address, telephone number, fax Indicate whether discharges from the site will enter into a number (optional) and e-mail address (to be notified via e-mail municipal separate storm sewer system (MS4), as defined in of NOI approval when available). Correspondence for the NOI Appendix A. will be sent to this address. Also,indicate whether any surface waters(as defined in Appendix If the NOI was prepared by someone other than the certifier (for A)exist either on or within 50 feet from your site. Note that if"yes", example,if the NOI was prepared by the facility SWPPP contact you are required to comply with the requirement in Part 2.1.2.1 of or a consultant for the certifier's signature),include the full name, the permit to provide natural buffers or equivalent sediment organization, phone number and email address of the NOI controls. preparer. You must specify the names of any surface waters that receive Section IV. Project/Site Information stormwater directly from your site and/or from the MS4 to which you discharge. You must also specify the names of any surface Enter the official or legal name and complete street address, waters that you discharge to that are listed as "impaired" as including city,state,zip code, and county or similar government defined in Appendix A, including any waters for which there is an subdivision of the project or site. If the project or site lacks a approved or established TMDL, and the pollutants for which the street address, indicate the general location of the site (e.g., water is impaired or for which there is a TMDL.This information will Intersection of State Highways 61 and 34). Complete site be used to determine if the site discharges to an impaired information must be provided for permit coverage to be waterbody,which triggers additional requirements in Part 3.2.2 of granted. the permit. Applicants must specify which method they used to Provide the latitude and longitude of determine whether or not their site discharges to impaired waters. g your facility either in degrees, minutes, seconds; degrees, minutes, decimal; or Also,if a TMDL has been approved or established,identify the title or reference of the TMDL document. degrees decimal format. The latitude and longitude of your EPA Form 3510-9 Page 6 of 8 Instructions for Completing EPA Form 3510-9 Notice of Intent(NOI)for Storm Water Discharges Associated with Construction Activity Under an NPDES General Permit NPDES Form Date(2116) This Form Replaces Form 3510-9(11/08) Form Approved OMB No.2040-0004 Indicate whether discharges from the site will enter into a surface If criterion D, E, or F is selected, attach copies of any water that is designated as a Tier 2, Tier 2.5,or Tier 3 water. A list communications between you and the U.S. Fish and Wildlife of Tier 2, 2.5, and 3 waters is provided as Appendix F. If the Service and National Marine Fisheries Service. answer is "yes", name all waters designated as Tier 2,Tier 2.5, or Tier 3 to which the site will discharge. Section IX. Historic Preservation Section VI. Chemical Treatment Information Use the instructions in Appendix E to complete the questions on the NOI form regarding historic preservation. Indicate whether the site will use polymers, flocculants, or other treatment chemicals. Indicate whether the site will employ Section X.Certification Information cationic treatment chemicals. If the answer is "yes" to either All applications,including NOIs,must be signed as follows: question,indicate which chemical(s)you will use. Note that you are not eligible for coverage under this permit to use cationic For a corporation:By a responsible corporate officer.For the treatment chemicals unless you notify your applicable EPA purpose of this Section,a responsible corporate officer means: Regional Office in advance and the EPA office authorizes (i) a president, secretary, treasurer, or vice-president of the coverage under this permit after you have included appropriate corporation in charge of a principal business function, or any controls and implementation procedures designed to ensure other person who performs similar policy- or decision-making that your use of cationic treatment chemicals will not lead to a functions for the corporation, or(ii) the manager of one or more violation of water quality standards.If you have been authorized manufacturing, production, or operating facilities, provided, the to use cationic treatment chemicals by your applicable EPA manager is authorized to make management decisions which Regional Office, attach a copy of your authorization letter and govern the operation of the regulated facility including having include documentation of the appropriate controls and the explicit or implicit duty of making major capital investment implementation procedures designed to ensure that your use of recommendations, and initiating and directing other cationic treatment chemicals will not lead to a violation of water comprehensive measures to assure long-term environmental quality standards. Examples of cationic treatment chemicals compliance with environmental laws and regulations; the include,but are not limited to,cationic polyacrylamide (C-PAM), manager can ensure that the necessary systems are established PolyDADMAC (POLYDIALLYLDIMETHYLAMMONIUM CHLORIDE), or actions taken to gather complete and accurate information and chitosan. for permit application requirements;and where authority to sign Section VII. Stormwater Pollution Prevention Plan (SWPPP) documents has been assigned or delegated to the manager in Information accordance with corporate procedures. All sites eligible for coverage under this permit are required to For a partnership or sole proprietorship: By a general partner or prepare a SWPPP in advance of filing the NOI, in accordance the proprietor,respectively;or with Part 7. Indicate whether the SWPPP has been prepared in For a municipality, state, federal, or other public agency: By advance of filing the NOI. either a principal executive officer or ranking elected official.For Indicate the street, city, state, and zip code where the SWPPP purposes of this Part, a principal executive officer of a federal can be found. Indicate the contact information (name, agency includes (i) the chief executive officer of the agency,or organization, phone, fax (optional), and email) for the person (ii) a senior executive officer having responsibility for the overall who developed the SWPPP for this project. operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA).Include the name and title of the Section Vill. Endangered Species Information person signing the form and the date of signing.An unsigned or Using the instructions in Appendix D, indicate under which undated NOI form will not be considered eligible for permit criterion (i.e., A, B, C, D, E, or F) of the permit the applicant is coverage. eligible with regard to protection of federally listed endangered Modifying Your NOI and threatened species and designated critical habitat. A description of the basis for the criterion selected must also be If after submitting your NOI you need to correct or update any provided. fields on this NOI form, you may do so by submitting a paper modification form, which you can obtain at the following link: If criterion B is selected, provide the Tracking Number for the hitr��/,in,ww.eor.gov/nsdeslrubs cq� modifv.odf other operator who had previously certified their eligibility under criterion A, C, D, E, or F. The Tracking Number was assigned when the operator received coverage under this permit, and is included in the notice of authorization. If criterion C is selected,you must attach copies of your site map. See Part 7.2.6 of the permit for information about what is required to be in your site map. You must also specify the federally-listed species or federally-designated critical habitat thaI are located in the"action area"of the project,and provide the distance between the construction site and any listed endangered species or their critical habitat. EPA Form 3510-9 Page 7 of 8 Instructions for Completing EPA Form 3510-9 Notice of Intent(NOI)for Storm Water Discharges Associated with Construction Activity Under an NPDES General Permit NPDES Form Date(2/16) This Form Replaces Form 3510-9(11/08) Form Approved OMB No.2040-0004 Paperwork Reduction Act Notice Visit this website for mailing instruction: vw v.ep-) nv/npcesLs'( waterla �lic,�tion c.ov�ra e Public reporting burden for this application is estimated to average 3.7 hours.This estimate includes time for reviewing Visit this website for instructions on how to submit electronically: instructions,searching existing data sources,gathering and w: w_ei2a ov rLpdes sk rmwcter/ccLenoi maintaining the data needed,and completing and reviewing the collection of information.An agency may not conduct or sponsor, and a person is not required to respond to,a collection of information unless it displays a currently valid OMB control number. Send comments regarding the burden estimate,any other aspect of the collection of information,or suggestions for improving this form,including any suggestions which may increase or reduce this burden to:Chief,Information Policy Branch 2136,U.S. Environmental Protection,Agency, 1200 Pennsylvania Avenue, NW,Washington,D.C.20460.Include the OMB control number on any correspondence.Do not send the completed form to this address. EPA Form 3510-9 Page 8 of 8 Construction General Permit (CGP) Appendix K - Notice of Termination (NOT) Form and Instructions Part 8.3 requires you to use the electronic NOI system, or "eNOl" system, to prepare and submit your NOT. However,where your EPA Regional Office specifically authorizes you to use a paper NOT form, you are required to complete and submit the following form. Page K-1 of 3 NPDES UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Form Approved. �C� WASHINGTON,DC 20460 OMB No.2040-0004 FORM ���' 3510-13 NOTICE OF TERMINATION(NOT)FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER AN NPDES GENERAL PERMIT Submission of this Notice of Termination constitutes notice that the operator identified in Section II of this form is no longer authorized discharge pursuant to the NPDES Construction General Permit(CGP)from the site identified in Section III of this form.All necessary information must be included on this form.Refer to the instructions at the end of this form. I.Approval to Use Paper NOT Form Have you been given approval from the Regional Office to use this paper NOT form*?❑YES ❑NO *Note:You must have been given approval by the Regional Office prior to using this paper NOT form. II.Permit Information NPDES Stormwater General Permit Tracking Number: Reason for Termination(Check only one): ❑ You have completed earth-disturbing activities at your site,and you have met all other requirements in Part 8.2.1. ❑ Another operator has assumed control over all areas of the site and that operator has submitted an NOI and obtained coverage under the CGP. ❑ You have obtained coverage under an individual permit or another general NPDES permit addressing stormwater discharges from the construction site. III.Operator Information Name: I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IRS Employer Identification Number(EIN): Mailing Address: ��LLL���1IL�.LJJ Street: I I I I I I I I I I I I I ( I I I I I I City: State: M Zip Code: Phone: - - I I I I Ext. Fax(optional): l: E-mai I I I I I I I I I I I I ( I I I I I IV.Project/Site Information Project/Site Name: I I I I I I I I I I I I I I I I I I I I Project/Site Address: Street/Location: I I I I I I I ( I I I I I I I I I I I I City: I I I I I I I I I I I I I I I I I I I I I I I I I I I Stater Zip Code: LLL (JJ County or similar government subdivision: I I I I I I I I I I V.Certification Information I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief, true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. First Name, Ll Middle Initial, ( I I I I Last Name: Title: I I I I I I I I I I I I I I I I I I Signature: Date: I I I/ I I/ l Emai I I I I LJ_ LJJ l�W EPA Form 3510.13 Pagel of 2 Instructions for Completing EPA Form 3510-13 Notice of Termination(NOT)of Coverage Under an NPDES General Permit for Stormwater Discharges Associated with Construction Activity NPDES Form Date(2/16) This Form Replaces Form 3510-13(12/08) Form Approved OMB No.2040-0004 Who May File an NOT Form subdivision of the project or site.If the project or site lacks a street Permittees who are presently covered under the EPA-issued 2012 address, indicate the general location of the site (e.g., Construction General Permit (CGP) for Stormwater Discharges Intersection of State Highways 61 and 34). Complete site Associated with Construction Activity may submit an NOT form information must be provided for termination of permit coverage when: (1) earth-disturbing activities at the site are completed to be valid. and the conditions in Parts 8.2.1.1 thru 8.2.1.5 are met; or (2) the permittee has transferred all areas under its control to another Section V.Certification Information operator, and that operator has submitted and obtained All applications,including NOIs,must be signed as follows: coverage under this permit; or (3) the permittee has obtained coverage under a different NPDES permit for the same For a corporation: By a responsible corporate officer. For the discharges. purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the Completing the Form corporation in charge of a principal business function, or any Type or print, using uppercase letters, in the appropriate areas other person who performs similar policy-or decision-making only. Please place each character between the marks. functions for the corporation, or (ii) the manager of one or more Abbreviate if necessary to stay within the number of characters manufacturing, production, or operating facilities, provided, the allowed for each item. Use only one space for breaks between manager is authorized to make management decisions which words, but not for punctuation marks unless they are needed to govern the operation of the regulated facility including having clarify your response. If you have any questions about this form, the explicit or implicit duty of making major capital investment refer to ww ao or telephone recommendations, and initiating and directing other EPA's NOI Processing Center at (866) 352-7755. Please submit comprehensive measures to assure long-term environmental original document with signature in ink - do not send a compliance with environmental laws and regulations; the photocopied signature. manager can ensure that the necessary systems are established Section I.Approval to Use Paper NOT Form or actions taken to gather complete and accurate information You must indicate whether you have been given approval by the for permit application requirements; and where authority to sign EPA Regional Office to use a paper NOT. Note that you are not documents has been assigned or delegated to the manager in authorized to use this paper NOT form unless the Regional Office accordance with corporate procedures. has approved its use. For a partnership or sole proprietorship: By a general partner or Section II.Permit Number the proprietor,respectively;or Enter the existing NPDES Stormwater General Permit Tracking For a municipality, state, federal, or other public agency: By Number assigned to the project by EPA's Stormwater Notice either a principal executive officer or ranking elected official. For Processing Center. If you do not know the permit tracking purposes of this Part, a principal executive officer of a federal number, refer to htfp:Jv,,v, A,.ep�ovinrrdeslsiormv,/ ter/cgr> or agency includes (i) the chief executive officer of the agency, or contact EPA's NOI Processing Center at(866)352-7755. (ii) a senior executive officer having responsibility for the overall Indicate your reason for submitting this Notice of Termination by operations of a principal geographic unit of the agency (e.g., checking the appropriate box.Check only one: Regional Administrator of EPA). You have completed earth-disturbing activities at your site Include the name, title, and email address of the person signing and,if applicable, construction support activities covered by the form and the date of signing. An unsigned or undated NOT this permit (see Part 1.6.3) and you have met all other form will not be considered valid termination of permit coverage. requirements in Part 8.2.1. Paperwork Reduction Act Notice Another operator has assumed control over all areas of the Public reporting burden for this application is estimated to site and that operator has submitted an NOI and obtained average 0.5 hours per notice, including time for reviewing coverage under the CGP. instructions, searching existing data sources, gathering and You have obtained coverage under an individual permit or maintaining the data needed, and completing and reviewing another general NPDES permit addressing Stormwater the collection of information. An agency may not conduct or discharges from the construction site. sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control Section III.Operator Information number. Send comments regarding the burden estimate, any Provide the legal name of the person,firm,public organization,or other aspect of the collection of information, or suggestions for any other entity that operates the project described in this improving this form including any suggestions which may increase application and is covered by the permit tracking number or reduce this burden to: Chief, Information Policy Branch, 2136, identified in Section I. Refer to Appendix A of the permit for the U.S. Environmental Protection Agency, 1200 Pennsylvania definition of "operator". Provide the employer identification Avenue, NW,Washington, DC 20460.Include the OMB number on number (EIN from the Internal Revenue Service; IRS). If the any correspondence. Do not send the completed form to this applicant does not have an EIN enter "NA" in the space address. provided. Enter the complete mailing address, telephone Visit this website for mailing instruction: number, and email address of the operator. Optional: enter the fax number of the operator. w �a o, n _deslstorriGvaterlca licafion coverage Section IV. Project/Site Information Visit this website for instructions on how to submit electronically: Enter the official or legal name and complete street address, www.enagov/npoles stor,,-r�wa+er/c -eenoi including city, state, zip code, and county or similar government EPA Form 3510.13 Page 2 of 2 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH AN OVE , MA Appendix C-Copy of NO[ and EPA Authorization email EPA SWPPP Template, Version 1.0 Company: Dean Ellerton ATTN: Christian Huntress 1160 Great Pond Road North Andover MA 01845 Project/Site: Brooks School 1160 Great Pond Road North Andover MA 01845 Permit Tracking Number: MAR12AV48 You have been assigned as the certifying official for one or more 2012 Construction General Permit (CGP) Notices of Intent (NOI) for the project/site noted above. To certify and complete submission of your CGP NOI to EPA: 1) Login to your Central Data Exchange (CDX) Account at https://cdx.epa.gov/. If you do not have a CDX account, you will need to register a CDX account to the email address designated for the certifying official on the prepared NOI application. You will need to make sure that the eNOI:CGP program has been added to the account. 2) On the MY CDX Page, select the "eNOI:CGP" link (listed under available account profiles). 3) Click the "Load Application" button (if necessary). Select the Construction General Permit NOI link. 4) Click "Add Certification Key" in the frame on the left side of the page. 5)Copy the alpha-numeric Certification Key from this email (see below) and 6) Click the Add button. A confirmation message should be displayed showing that you have successfully added a record to your account to certify. 7) Click the "Home" link in the frame on the left side of the page. Click the permit number on the home page that you wish to review and certify. 8) Review the information provided on the application and choose an appropriate action at the bottom of the page. You will have an option to Cancel (Postpone), Reject, or Submit to EPA (Certify). If you obtained regional approval, and mailed in a hard copy paper application for processing, please disregard this email. Certification Key: bb857216-3602-4275-9efa-8c3daf01581 b If you have any questions, please call the EPA NOI Processing Center at 1-866-352-7755 (toll free) or send an email to not@avanticorporation.com. EPA NOI Processing Center Operated by Avanti Corporation 1200 Pennsylvania Ave., NW Mail Code: 4203M Washington, DC 20460 Stormwater Pollution Prevention Plan (SWPPP) ROOKS SCHOOL- NORTH A D VER, MA Appendix D-Copy of Inspection Form EPA SWPPP Template, Version 1.0 Storwater Construction Site Inspection Report General Information Project Name NPDES Tracking No. Location Date of Inspection Start/End Time Inspector's Name(s) Inspector's Title(s) Inspector's Contact Information Inspector's Qualifications Describe present phase of construction Type of Inspection: ❑Regular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑ Clear ❑Cloudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes ❑No If yes,describe: Are there any discharges at the time of inspection? ❑Yes ❑No If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your S WPPP on your site map and list them below (add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 ❑Yes ❑No ❑Yes ❑No 2 ❑Yes ❑No ❑Yes ❑No 3 ❑Yes ❑No ❑Yes ❑No 4 ❑Yes ❑No ❑Yes ❑No 5 ❑Yes ❑No ❑Yes ❑No 6 ❑Yes ❑No ❑Yes ❑No 7 ❑Yes ❑No ❑Yes ❑No g ❑Yes ❑No ❑Yes ❑No g ❑Yes ❑No ❑Yes ❑No 10 ❑Yes ❑No ❑Yes ❑No 11 ❑Yes ❑No ❑Yes ❑No 12 ❑Yes ❑No ❑Yes ❑No 13 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 ❑Yes ❑No ❑Yes ❑No 15 ❑Yes ❑No ❑Yes ❑No 16 ❑Yes ❑No ❑Yes ❑No 17 ❑Yes ❑No ❑Yes ❑No 18 ❑Yes ❑No ❑Yes ❑No 19 ❑Yes ❑No ❑Yes ❑No 20 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as neededfor conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and ❑Yes ❑No ❑Yes ❑No disturbed areas not actively being worked properly stabilized? 2 Are natural resource ❑Yes ❑No ❑Yes ❑No areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls ❑Yes ❑No ❑Yes ❑No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and ❑Yes ❑No ❑Yes ❑No receiving waters free of any sediment deposits? 5 Are storm drain inlets ❑Yes ❑No ❑Yes ❑No properly protected? 6 Is the construction exit ❑Yes ❑No ❑Yes ❑No preventing sediment from being tracked into the street? 7 Is trash/litter from work ❑Yes ❑No ❑Yes ❑No areas collected and placed in covered dumpsters? 8 Are washout facilities ❑Yes ❑No ❑Yes ❑No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 9 Are vehicle and ❑Yes ❑No ❑Yes ❑No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are ❑Yes ❑No ❑Yes ❑No potential stonnwater contaminants stored inside or under cover? 11 Are non-stonnwater ❑Yes ❑No ❑Yes ❑No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ❑No ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and title: Signature: Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Siormwaier Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVER, MA Appendix E-Copy of Corrective Action Form EPA SWPPP Template, Version 1.0 Section A-Initial Report(CGP Part 5.4.1) (Complete this section within 24 hours of discovering the condition that triggered corrective action Name of Project CGP Tracking No. Today's Date Date Problem First Discovered Time Problem First Discovered Name and Contact Information of Individual Completing this Form What site conditions triggered the requirement to conduct corrective action (check the box that applies): ❑ A required stormwater control was never installed,was installed incorrectly,or not in accordance with the requirements in Part 2 and/or 3 ❑ The stormwater controls that have been installed and maintained are not effective enough for the discharge to meet applicable water quality standards or applicable requirements in Part 3.1 of the permit ❑ A Part 2.3.1 prohibited discharge has occurred or is occurring ❑ EPA requires corrective action as a result of permit violations found during an EPA inspection carried out under Part 4.2 Provide a description of the problem: Deadline for completing corrective action (Enter date that is either: (1) no more than 7 calendar days after the date you discovered the problem, or(2) if it is infeasible to complete work within the first 7 days, enter the date that is as soon as practicable following the 7th day): If your estimated date of completion falls after the 7-day deadline,explain (1)why you believe it is infeasible to complete work within 7 days,and(2)why the date you have established for making the new or modified stormwater control operational is the soonest practicable timeframe: Section B-Corrective Action Progress (CGP Part 5.4.2) (Complete this section no later than 7 calendar days after discovering the condition that triggered corrective action Section B.1i-Why the Problem Occurred' Cause(s)of Problem How This Was Determined and the Date You Determined Add an additional sheet if necessary) the Cause 1. 1. 2. 2. Section B.2'-Stormwater Control Modifications to be Implemented to Correct the Problem List of Stormwater Control Modification(s) Date of SWPPP Update Notes Needed to Correct Problem Completion Necessary? Add an additional sheet if necessary) 1. ❑Yes []No If yes, provide date SWPPP modified: 2, ❑Yes ❑No If yes,provide date SWPPP modified: Page 1 of 2 Section C-Certification and Signature (CGP Part 5.4.3) Section C.1 -Certification and Signature by Contractor or Subcontractor "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." Signature of Contractor or Subcontractor: Date: Printed Name and Affiliation: Section C.2-Certification and Signature by Permittee "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." Signature of Permittee or "Duly Authorized Representative": Date: Printed Name and Affiliation: Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVFP, MA Appendix F-SWPPP Amendment Log No. Description of the Amendment Date of Amendment Prepared by Amendment [Name(s) and Title] EPA SWPPP Template, Version 1.0 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH ANDOVER, MA Appendix G-Subcontractor Certifications/Agreements SUBCONTRACTOR CERTIFICATION STORMWATER POLLUTION PREVENTION PLAN Project Number: Project Title: Operator(s): As a subcontractor, you are required to comply with the Stormwater Pollution Prevention Plan (SWPPP) for any work that you perform on-site. Any person or group who violates any condition of the SWPPP may be subject to substantial penalties or loss of contract. You are encouraged to advise each of your employees working on this project of the requirements of the SWPPP. A copy of the SWPPP is available for your review at the office trailer. Each subcontractor engaged in activities at the construction site that could impact stormwater must be identified and sign the following certification statement: I certify under the penalty of law that I have read and understand the terms and conditions of the SWPPP for the above designated project and agree to follow the practices described in the SWPPP. This certification is hereby signed in reference to the above named project: Company: Address: Telephone Number: Type of construction service to be provided: Signature: Title: Date: EPA SWPPP Template, Version 1.0 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-NORTH ANDOVER, M, Appendix H-Grading and Stabilization Activities log Date Description of Grading Activity Description of Stabilization Measure Date Grading Date When Grading and Location Activity"Ceased Stabilization Activity (Indicate Measures Initiated Temporary or Initiated Permanent EPA SWPPP Template, Version 1.0 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL- NORTH AN OVER, MA Appendix I- SWPPP Training Log Stormwater Pollution Prevention Training Log Project Name: Project Location: Instructor's Name(s): Instructor's Title(s): Course Location: Date: Course Length (hours): Stormwater Training Topic: (check as appropriate) ❑ Sediment and Erosion ❑ Emergency Procedures Controls ❑ Stabilization Controls ❑ Inspections/Corrective Actions ❑ Pollution Prevention Measures Specific Training Objective: Attendee Roster: (attach additional pages as necessary) No. Name of Attendee Company 1 2 3 4 5 6 7 8 EPA SWPPP Template, Version 1.0 Stormwater Pollution Prevention Plan (SWPPP) BROOKS SCHOOL-- NORTH AND OVER, MA Appendix J -Delegation of Authority Form Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state,zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in Appendix I of EPA's Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative" as set forth in Appendix I. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Company: Title: Signature: Date: EPA SWPPP Template, Version 1.0 m