ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 1010 Johnson Street MAP: 107.A LOT: 0137
INSTALLER: James Boraczek— 978 479 5236 permit #62464
DESIGNER: James Kavanaugh —978-375-9781 septic plan submittal #57113 vp
PLAN DATE: 10.20.2020
BOH APPROVAL DATE ON PLAN: 01.21.2021
Note: This is a new permit as the original installer, Dean Dynan, was fired from
the job by the new homeowners. The old permit number for this project was
#59800.
INSPECTIONS
TANK INSPECTION: S. Casey— pump only 6.21.2021 (occurred on permit
#59800)
DATE OF BED BOTTOM INSPECTION: 9.23.21 — S. Casey
DATE OF FINAL CONSTRUCTION INSPECTION: 10-6-21 — D. Ottenheimer
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer
❑ Topography not appreciably altered
Comments: 10-6-21 — Scope of work for this installer was to remove the existing
soil absorption system and sand fill and re-built it and also make sure the pump
configuration is appropriate. All work seems correct. D. Ottenheimer
SEPTIC TANK
❑ Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
❑ Inlet tee installed, centered under access port
❑ Outlet tee installed, centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6" of finish grade
installed over one access port
❑ Hydraulic cement around inlet & outlet
Comments: 10/6/21 — Riser installed to grade over septic tank effluent filter. D.
Ottenheimer
PUMP CHAMBER
® Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon Pump Chamber installed
❑ H-10loading
❑ Monolithic tank construction
❑ Inlet tee installed, centered under access port
❑ Pump(s) installed on stable base
❑ Alarm float working
❑ Pump On/Off floats working
❑ Separate on/off floats
❑ Drain hole in pressure line
❑ cover at final grade installed over pump
access port
❑ Water tightness of tank has been achieved by
testing
❑ Hydraulic cement around inlet & outlet
Comments: 10/6/21 — Confirmed pump properly discharges to distribution box.
Installer reports floats were properly secured to float mast. D. Ottenheimer
CONTROLPANEL
❑ Alarm & Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel: basement
❑ Alarm signal located inside: basement
Comments:
DISTRIBUTION-BOX
❑ Installed on stable stone base
® H-20 D-Box
® Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
❑ Speed levelers provided (not required)
® Schedule 40 PVC Pipe
Comments: 10/6/21 — No issues identified with distribution box. D. Ottenheimer
SOIL ABSORPTION SYSTEM (General)
® Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan
® 40 Mil HDPE barrier installed
® Laterals installed and ends connected to
header and vented
® Elevations of laterals and chambers installed as on
approved plan
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments: Size was previously confirmed at original bottom of bed. New bottom
of bed is only to ensure all sand that did not meet Title 5 requirements was
removed, bed bottom was empty, and new sand was acceptable.
9.23.2021 All Sand removed, new load ok, Installer to dewater hole before
additional load of sand installed
10/6/21 — Soil absorption materials and elevations appear correct and
appropriate. D. Ottenheimer
FINAL GRADE
[� Loamed
L� Seeded 1
[� Cover per plan N`ry)
Comments:
DOC MENTS NEEDED
Certification of Installation Form submitted
By engineer and signed and dated by
Engineer and installer
As-Built Plan
BM = 100.00
HR = 1.88
HI = 101.88
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark
Building Sewer OUT
Septic Tank IN
Septic Tank OUT
Pump Chamber IN
Pump Chamber OUT
Distribution Box IN 3.37 98.18 98.12
Distribution Box OUT 3.55 98.00 97.95
Lateral 1 BEG 3.62 97.93 97.90
Lateral 1 END 3.99 97.56 97.55
Lateral 2 BEG 3.60 97.95 97.90
Lateral 2 END 4.01 97.54 97.55
Lateral 3 BEG 3.62 97.93 97.90
Lateral 3 END 4.01 97.54 97.55
NORTH nOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
1010 Johnson Street Construction Inspection
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Oct 6, 2021 at 1:35 PM
To: "Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Brian, Steve, Toni-
I am pleased to report all was found to be in fine condition at 1010 Johnson Street this morning. No issues were noted.
Construction Inspection form is attached.
Let me know any questions.
Thanks,
Dan
Daniel Ottenheimer, PE
President
�s
ff MILL RIVER CONSULTING
Ctrative Solutions far Land Development
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
Construction Notes - 1010 Johnson Street JIM BORACZEK.doc
381 K