Loading...
HomeMy WebLinkAbout2016-04-05 Construction Phasing 1661 & 1665 GPR TKZ LLC 4 High Street, Suite 201 North Andover, MA 01845 978-852-4002 tzeke@comcast.net May 10, 2016 Jean Enright,Acting Town Planner North Andover Planning Department, and Jennifer Hughes, Conservation Administrator North Andover Conservation Department 1600 Osgood Street North Andover, MA 01845 Re: 1661 & 1665 Great Pond Road Construction Schedule Hi Jean and Jennifer, Pursuant to the decisions of record regarding these adjacent lots, below is the proposed construction schedule. May 2016: install erosion controls, prepare stone cleaning access pad beside 1665 driveway; excavate 1661 foundation June 2016: construct 1661 foundation, backfill/grade/stabilize July 2016: demolish 1665 residence, re-establish retaining walls and regrade for new residence; begin framing 1661; install utilities and driveway 1661, stabilize disturbed areas August 2016: construct 1665 foundation, backfill/grade/stabilize, begin 1665 framing September 2016: stabilize all disturbed site areas October 2016: complete construction 1661 November 2016: complete construction 1665; cleanup. Let me know of any questions or concerns. Sincerely, TA V Zahoruiko, Manager LLC