RE: Watershed Special Permit
1665 Great Pond Road
Dear Members of the Board:
As required by the Watershed Special Permit Notice of Decision, condition number 30, our office has
completed an as-built survey of the property for the project referenced above. Andover Consultants,
Inc. was not retained to conduct inspections during construction so the attached plan depicts site
features that were visible, or accessible fi-om,the surface, at the time of the survey only.
Based upon a comparison of the original design plan titled "Site Plan 1665 Great Pond Road Road",
dated March 28, 2017 and revised through May 25, 2017, prepared for TKZ LLC and the attached plan
titled "As-Built Plan 1665 Great Pond Road" dated July 25, 2018, prepared for TKZ, LLC and a field
inspection conducted on July 19, 2018, it is my opinion that the project was completed in substantial
compliance with the approved plan.
It should be noted that some site features depicted on the final approved plan which is referenced in the
"Notice of Decision Watershed District Special Pen-nit Modification"dated June 8t", 2017, were not
built. These site features primarily include a±1,150 sf proposed patio and a 24'xl4' proposed pool.
What was actually built more closely resembles the plan approved in the original "Notice of Decision
Watershed Special Permit" dated April 5, 2016 which includes a deck and walkway.
The following minor differences are noted for your reference:
• As described above, the pool and patio were not built, and instead a deck with hot tub was built
per original approved plan.
• The stone filter strip heading towards Great Pond Road was built wider than what was shown
on the approved plans, allowing for additional stormwater capture and recharge.
• The generator was moved from the side of the house to the rear along the existing retaining
wall.
On behalf of TKZ, LLC, we respectfully request that the Board release the performance bond being
hold for this project.
P-.N12V12-32',kw,tJcltrrsVOIS-07-26_NV5P M 901 Ccti sphaiceJ665.d�,
Civil Ehgineens, o I and 1`"h)rvey(xs, 0 Land Planner's
andover
constAtants
inc.
Please find attached two full sized and eight reduced sized copies of the as-built plan,
If you have any questions concerning this request, or require anything further, please feel free to
contact us at your convenience.
Sincerely,
ANDOVER CONSULTANTS, INC.
Dennis A. Griecci, P.E., LEED AP
Enclosures
Cc: TIU, LLC
P;\12\12-32'4�l'JtitcrSU0I8-07-26_WSP As Built Compfimcc_1663.d-
, ayo 95yq -'
NIP
LOT A
�1 29,345 S.F.
/
utkcH
/� „nj 1, ttrrPROPtiFf Y,\
DMK
F `
E%IS DUG 1 I f Y DWELLING
#1665 � urrl
LAM
91EA C046a W i4 --- -- -
MEN01 DRAW
�(11EH Y-TM)
/
y
' 100'eYN
ZON
UYdi E
( Slone -•.l n
PIPE(FND.) c / ��f u'eRoxiacAnar a E O S.B.(T71D.)
f z RexAaMDrT mres
NR3'45 43"V!
— — —
- —
5 EXIST.8'SENEi4 � —
FJOST.9JY1 S : S
T", e3 BENCH IAARK --5=0. 4
w.=Iasi
SPIKE IN D.P.g25 GREAT,..POND ROAD £psi. sup,
ELEY.=119.31 RIN=120.51 '.
INv.=114.27
IY� '
ANNUAL DEAN NECH
WATER(EL. 113.67) LA ��
r. ',��1� �' t1'vs
AND BANK GF LAKE -LAKE GOCHIGHENGK - A.
AS—BUILT PLAN
1665 GREAT POND ROAD
NORTH ANDOVER, MASS.
PREPARED FOR: TKZ LLC
LEGEND: DATE: JULY 25, 2018
SCALE: 1"=20'
EXISTING CONTOUR
3 s"co
EXISTING SEWER
=w EMIING WATER and0Ver F'
C9nsuItants a
--- ---<------ EXISTING FENCE
Inc.
1 Fost River Noce Dennis A. Griecci
hiothu an,
Moss, 01844 Reg. Prof. Engineer
0 20 40 60 80 Ft.
\\TSCLEENT\P\12\72-32\DNG\AS8ULT 1665.OWG 0 10 20 Meter