HomeMy WebLinkAboutSeptic Install Full Repair - Correspondence - 432 SALEM STREET 11/17/2021 11/3/2021 Xfinity Connect 432 Salem Street-Installation Certification and As-Built plans Printout Stephen Casey <scasey@northandovel ma.gov> 11/2/2021 5:20 PM 432 Salem Street - Installation Certification and As-Built plans To Jack Sullivan <jacksulI53@comcast.net> • Liz Komisarek <arcoliz@comcast.net> Copy Toni Wolfenden <tolfenden@northandoverma.gov> Hi Jack and Liz, Attached please find the Installation certification. Tom will need to sign this form and have it scanned back to me, and then I can send it over to Jack to sign (or vice versa). Jack, once you have them finalized please submit 3 hard copies of the As-built plans to us for review. If either of you have any questions, please let me know. Best, Stephen Casey Jr. Health Inspector Town of North Andover All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law . Visit us online at www.northandoverma.gov. • Septic_Disposal_System_Installation_Certification_Wed_May_19_2021_12-22-32 (1) (1).pdf(373 KB) https://connect.x6nity.corrVappsuite/v=7.10.3-14.20210916.041640/print.htM?print_1635952985693 1/1 1 ,,;..:"4'A 7 f, ,: ._ .e .......�1±..�". i �iF+*x.� E'r��•b.���.rY'���3 i �t.�s�1`6. "n iita'�'i` `��t�� ..a .. s.:��"; '� _ v } r (.. �.... .._,�,�,,f. '.. 1:3t� =;.E •t ..,.. �. 1 �.£t1'3r:. .. ¢;:X.3 +'aiflilt�,.+. ..e- NORTHANDOVER Massachus Toni Wolfenden <twolfenden@northandoverma.gov> 432 Salem Street Construction Inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Nov 1, 2021 at 7:50 AM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> The construction inspection completed on Friday afternoon at this address identified some issues which need attention. 1. The septic tank/pump tank in the front yard was not watertight and had clean water infiltration, likely due to the very high water table in the yard and inadequate craftsmanship by the installer to prevent this 2. The force main in the rear yard septic tank was plumbed into the outlet end of the septic tank not the inlet end of the septic tank. There also was no Tee to divert the incoming water into the middle layer of the tank 3. The pump in the final pump chamber was not operational Report is attached. Let me know any questions. Dan Daniel Ottenheimer, PE President 0-4IL'L RIVER CONSULTING Ctrativr Solutions fur Land fX-velopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com Construction Notes -Mill River-432 Salem Street.docx 64 K NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 432 Salem Street Construction Inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Tue, Aug 31, 2021 at 4:52 PM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Report of construction inspection at 432 Salem Street is attached. A few small items are noted: • Pump and alarm not wired so could not be checked • D-box needs hydraulic cement and need to see flow to it once pump is live • Riser over effluent filter needs to be at finished grade Otherwise all looked good. They are going to start backfilling the leach field but keep the d-box open for further examination. Any questions, do let me know. Dan Daniel Ottenheimer, PE President ` MILL RIVER CONSULTING CI-CatiNC S011 MM Iirr t..uui DCVC10j)Mcrct 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com 432 Salem Street-Construction Inspection Form.docx 63K NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 432 Salem Street plan review 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Sep 29, 2021 at 7:30 AM To: "Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> We have completed our review of the design plan with the new pump and pump tank proposed for the front of the dwelling to bring the sewage into the rear where it ties into the main septic system. We believe this design complies with Title 5 and have crafted the attached approval letter for your use. Please let me know if there are any questions. Dan Daniel Ottenheimer, PE President fass MILL RIVER CONSULTING Cmattive Solutions fix lattcl Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com 432 Salem Street-Revised Plan approval letter.docx 76K NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 0 - FW: 432 Salem Street, North Andover 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Sep 15, 2021 at 12:19 PM To: 'Brian Lag rasse(blagrasse@northandoverma.gov)"<b lag rasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni- We reviewed the plan for 432 Salem Street which now has a pump unit proposed to be located in the front yard. Unfortunately there is some unclear information and likely some other issues which are not in compliance with the requirements in Title 5 for pumping to a septic tank. I sent the email below along to the design engineer. Just a heads up that it might end up being that they wish to seek a variance from Title 5. 1 will keep you posted if that ends up being the case. Please do let me know if you have any questions about this matter. Dan Daniel Ottenheimer, PE President 0�:MZLL RIVER CONSULTING Ouative Solutions for L-wid Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com From: Daniel Ottenheimer Sent: Wednesday, September 15, 2021 12:17 PM To: jacksu1153@comcast.net Subject: 432 Salem Street, North Andover Jack, The plan that was produced for 432 Salem Street which includes the pump tank in the front yard dated 8/31/21 was reviewed. A few items: • Unfortunately it does not seem as if the requirements for pumping to a septic tank in 310 CMR 15.229 are complied with. This is a poorly worded section of the code but basically part 1 needs to be complied with if<25% of the flow is being pumped as sewage, and parts 1 and 2 need to be complied with if more than 25% of the flow is being pumped as sewage. I am operating under the assumption that both part 1 and part 2 of that section apply since it seems the majority of the sewage from the house exist towards the front. If that is an incorrect assumption please do let me know. • There are three different pump models specified. Clarify which one is intended and then provide specifications for that pump (can be a separate cut sheet if desired). The pump selected will also determine if 229(1) (a)or(b)applies. • Comply with the tank standards at 15.229 (2) (b) [or seek a variance] • Provide power or emergency storage as indicated at 229 (2)(c) Any questions please do let me know. Dan Daniel Ottenheimer, PE President ems_ "'�: 41LL RIMER CONSULTING Qtat yr S(AU6011S for Land 6}MAOI)MCM 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Re: 432 Salem St North Andover MA - New pump chamber added 2 messages jacksull53@comcast.net<jacksuII53@comcast.net> Tue, Aug 31, 2021 at 8:42 AM To: Toni Wolfenden <twolfenden@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey<scasey@northandoverma.gov> Cc: cara broussard <carabroussard@yahoo.com>, Liz at ArcoExc<arcoliz@com cast.net>, "bruce4323@verizon.net" <bruce4323@verizon.net>, "sbroussard432@yahoo.com" <sbroussard432@yahoo.com> Stephen/Brian/Toni, I had to add a 500 gallon pump chamber in the front yard of this property since two bathrooms from this house discharge to a mystery tank out front that Arco found. This tank was not shown on any record plans but the owners told me they believed a tank was in the front yard (I noted this on the approved septic design plan previously submitted). So...Arco uncovered the front tank and since this house is on a slab the ability to re-route the internal plumbing to the rear is not an option. I have updated the approved septic plan to show a proposed 500 gallon conc. pump chamber, 2 inch pvc force main (to connect to the newly installed 1500 gallon conc. septic tank in the rear yard, provided a pump chamber detail with relevant elevations, provided a system profile on Sheet 1, added info. on the pump curve on Sheet 2, and added a note for the existing front tank to be pumped and decommissioned. I have attached the plans and I can upload to the permitting site...I wanted to see how many plan copies you will need and what the fee is (if any) for the review.. As you know the approved system to the rear has been installed by Arco...so this is the last step to complete this project. Liz...you can use this plan for pricing of the change... Thank you everyone.... Sullivan Engineering Group, LLC lack Sullivan P.O. Box 2004 Woburn, MA 01888 781-854-8644 •� Septic Plans_432 Salem_08302021.pdf 13389K Toni Wolfenden <twolfenden@northandoverma.gov> Tue, Aug 31, 2021 at4:07 PM To: "jacks ull53@comcast.net" <jacksu1153@com cast.net>, Brian LaGrasse <blagrasse@northandoverma.gov> Hi Jack, I will need 3 copies of the revised plan and a $125 check. Send the revised plan over through the Viewpoint/Open Gov and I will push it over to Dan O. Thanks so much and have a nice evening, Toni Toni K. Wolfenden Health Department Assistant 978-688-9540 [,, cid:image002.jpg@O1 CD02A1.85A49B40 [Quoted text hidden] image001.jpg 4K