Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 562 BOXFORD STREET 11/17/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 562 Boxford Street MAP: 105.C LOT: 3 INSTALLER: James Heider – 978-606-1435 DESIGNER: Christiansen & Sergi, Inc. 978-373-0310 PLAN DATE: 11/3/18 BOH APPROVAL DATE ON PLAN: 4/11/18 INSPECTIONS TANK INSPECTION: 1/28/2020 DATE OF BED BOTTOM INSPECTION: 11/19/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 2/5/20 DATE OF FINAL GRADE INSPECTION: 2/28/2020 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 2/5/20 – Benchmark transferred by contractor to side of house; needs confirmation from designer this is correct. SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) 24 inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: 2/5/20 - Effluent filter not brand indicated on design plan PUMP CHAMBER Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Separate on/off floats Drain hole in pressure line 24 inch cover at final grade installed over pump access port Water tightness of tank has been achieved by Visual testing Hydraulic cement around inlet & outlet Comments: CONTROL PANEL Alarm & Pump are on separate circuits Alarm sounds when float is tripped Location of control panel: basement Alarm signal located inside: basement Comments: 2/5/20 - Not in yet DISTRIBUTION-BOX Installed on stable stone base > or equal to 6” H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 2/5/20 - May not be H-20, hydraulic cement needed at pipe penetrations SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan - sand gravel 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan N/ARetaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 2/5/20 - 38’ L x 2’ W FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 123.65 HR = 4.87 HI = 128.52 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT N/A Septic Tank IN 6.28 119.55 Septic Tank OUT 6.55 119.30 Pump Chamber IN 6.57 119.20 Pump Chamber OUT 6.97 118.95 Distribution Box IN 1.43 126.96 Distribution Box OUT 1.43 126.79 Lateral 1 Begin 1.48 126.69 Lateral 1 End 1.66 125.68 Bottom of Bed/Chamber 3.06 125.50 2/5/20 – BM used = 123.65, bottom siding of existing house. Contractor reports he created this benchmark because previous one established by designer was on a tree in the middle of the soil absorption system. Designer needs to confirm accuracy of this benchmark.