ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 125 Boston Street MAP: 107.13 LOT: 43
INSTALLER: James Morin 774-696-2246
DESIGNER: James Morin 774-696-2246
PLAN DATE: 07.02.2020
BOH APPROVAL DATE ON PLAN: 09.14.2020
INSPECTIONS
TANK INSPECTION: 07.01.2021 S. Casey
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION: 7/29/21 and 8/6/21
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑ Contractor reports any changes to design plan
® Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments: 7/29/21 — Contractor reports the benchmark on the original design
plan is not longer in existence. Used an existing grade shot near shed as
benchmark and checked it against other undisturbed areas and it seemed
relatively accurate. D. Ottenheimer
SEPTIC TANK
® Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
M Bottom of tank hole has 6" stone base
❑ Weep hole plugged
® 1500 gallon tank has been installed
H-10 loading
® Monolithic tank construction
® Water tightness of tank has been achieved by
visual testing
® Inlet tee installed, centered under access port
® Outlet tee installed, centered under access port
(effluent filter)
® (2) 20" inch cover to within 6" of finish grade
installed over one access port
® Boots at inlet & outlet
Comments: 07.01.2021 S.Casey— 6" observed. 7/29/21 — Installed tank is two
compartment configuration with an internal baffle and tee. Covers placed over
inlet and outlet side. Pipe exiting tank is not at right angle, has boot, checked and
it was a watertight connection.D. Ottenheimer
DISTRIBUTION-BOX
❑ Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required)
® Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
® Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan
® 40 Mil HDPE barrier installed
❑ Laterals installed and ends connected to
header (and vented if impervious material
above)
❑ Elevations of laterals and chambers installed as on
approved plan
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments: 7.6.2021 S. Casey size with over dig 34 x 22. 2 Loads of sand on
site ok.
SOIL ABSORPTION SYSTEM (Gravel-less Chambers)
® Brand and Model of Chamber: Cultec C4
® Number of chambers per row: 3
® Number of rows (trenches): 3
Comments:
7/29/21 —Visually observed settling at the chamber beds such that the center
area was lower than ends. Confirmed through survey that was not level.
Required installer to make level. D.Ottenheimer
8/6/21 — Checked four corners and two locations along middle of soil absorption
system using survey equipment. Found them to be generally level, with the
greatest area of discrepancy being 0.22' (2.6") between any two spots. This was
a significant improvement over previous installation. Authorized backfill. D.
Ottenheimer
FINAL GRADE
Loamed
Seededl
Cover per plan -- 2 cps �US�a�
Comments:
DOCUMENTS NEEDED
Certification of Installation Form submitted
By engineer and signed and dated by
Engineer and installer
[� As-Built Plan
BM = 97.96 (e.g. at
shed corner)
H R = 7.54
HI = 105.50
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark
Building Sewer OUT 6.07 99.10 99.27
Septic Tank IN 6.49 98.68 98.87
Septic Tank OUT 6.90 98.27 98.62
Distribution Box IN 8.82 96.35 96.62
Distribution Box OUT 9.03 96.14 96.25
Lateral 1 TOP Chamber beg 8.93 96.57 96.53
Lateral 1 TOP Chamber center 9.02 96.48 96.53
Lateral 1 TOP Chamber end 8.74 96.76 96.53
Lateral 1 INVERT to chamber 9.08 96.09 96.08
Lateral 2 Top Chamber be
Lateral 2 Top Chamber center 9.13 96.37 96.53
Lateral 2 Top Chamber end
Lateral 2 INVERT to chamber 9.18 95.99 96.08
Lateral 3 Top Chamber beg 8.93 96.57 96.53
Lateral 3 Top Chamber center 9.10 96.40 96.53
Lateral 3 Top Chamber end 8.82 96.68 96.53
Lateral 3 INVERT to chamber 9.18 95.99 96.08
SKETCH PLAN
NORTH ANDOVER
Massachuse►s Toni Wolfenden <twolfenden@northandoverma.gov>
Construction inspection 125 Boston Street
3 messages
Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:28 PM
To: 'Brian Lagrasse (blagrasse@ north andoverma.gov)" <blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfende n @north andoverma.gov>
Brian, Steve, Toni -
Attached please find our inspection report for the second inspection performed at 125 Boston Street. The area of focus
was the soil absorption system. I found the system was built much closer to level than the initial inspection and
authorized backfill to occur.
Please do let me know if you have any questions.
Dan
Daniel Ottenheimer, PE
President
AMEM
Vf MILL RIVER CONSULTING
Creative Sohttitnrs for land Development
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
Mill River Construction Notes - 125 Boston Street.doc
381 K
Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:30 PM
To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
I fixed one date reference. Please use this version.
Thanks
[Quoted text hidden]
c Mill River Construction Notes - 125 Boston Street.doc
381 K
Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:32 PM
To: 'Brian Lagrasse (blagrasse@ north andoverma.gov)"<blagrasse@northan dove rma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
You going to think I am a real dope, sorry. Please use this version as I put the wrong date in the last one I sent you.
[Quoted text hidden]
Mill River Construction Notes - 125 Boston Street.doc
381 K