Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 125 BOSTON STREET 11/23/2021 i . North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 125 Boston Street MAP: 107.13 LOT: 43 INSTALLER: James Morin 774-696-2246 DESIGNER: James Morin 774-696-2246 PLAN DATE: 07.02.2020 BOH APPROVAL DATE ON PLAN: 09.14.2020 INSPECTIONS TANK INSPECTION: 07.01.2021 S. Casey DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 7/29/21 and 8/6/21 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ® Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: 7/29/21 — Contractor reports the benchmark on the original design plan is not longer in existence. Used an existing grade shot near shed as benchmark and checked it against other undisturbed areas and it seemed relatively accurate. D. Ottenheimer SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan M Bottom of tank hole has 6" stone base ❑ Weep hole plugged ® 1500 gallon tank has been installed H-10 loading ® Monolithic tank construction ® Water tightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port (effluent filter) ® (2) 20" inch cover to within 6" of finish grade installed over one access port ® Boots at inlet & outlet Comments: 07.01.2021 S.Casey— 6" observed. 7/29/21 — Installed tank is two compartment configuration with an internal baffle and tee. Covers placed over inlet and outlet side. Pipe exiting tank is not at right angle, has boot, checked and it was a watertight connection.D. Ottenheimer DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ® 40 Mil HDPE barrier installed ❑ Laterals installed and ends connected to header (and vented if impervious material above) ❑ Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments: 7.6.2021 S. Casey size with over dig 34 x 22. 2 Loads of sand on site ok. SOIL ABSORPTION SYSTEM (Gravel-less Chambers) ® Brand and Model of Chamber: Cultec C4 ® Number of chambers per row: 3 ® Number of rows (trenches): 3 Comments: 7/29/21 —Visually observed settling at the chamber beds such that the center area was lower than ends. Confirmed through survey that was not level. Required installer to make level. D.Ottenheimer 8/6/21 — Checked four corners and two locations along middle of soil absorption system using survey equipment. Found them to be generally level, with the greatest area of discrepancy being 0.22' (2.6") between any two spots. This was a significant improvement over previous installation. Authorized backfill. D. Ottenheimer FINAL GRADE Loamed Seededl Cover per plan -- 2 cps �US�a� Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer [� As-Built Plan BM = 97.96 (e.g. at shed corner) H R = 7.54 HI = 105.50 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 6.07 99.10 99.27 Septic Tank IN 6.49 98.68 98.87 Septic Tank OUT 6.90 98.27 98.62 Distribution Box IN 8.82 96.35 96.62 Distribution Box OUT 9.03 96.14 96.25 Lateral 1 TOP Chamber beg 8.93 96.57 96.53 Lateral 1 TOP Chamber center 9.02 96.48 96.53 Lateral 1 TOP Chamber end 8.74 96.76 96.53 Lateral 1 INVERT to chamber 9.08 96.09 96.08 Lateral 2 Top Chamber be Lateral 2 Top Chamber center 9.13 96.37 96.53 Lateral 2 Top Chamber end Lateral 2 INVERT to chamber 9.18 95.99 96.08 Lateral 3 Top Chamber beg 8.93 96.57 96.53 Lateral 3 Top Chamber center 9.10 96.40 96.53 Lateral 3 Top Chamber end 8.82 96.68 96.53 Lateral 3 INVERT to chamber 9.18 95.99 96.08 SKETCH PLAN NORTH ANDOVER Massachuse►s Toni Wolfenden <twolfenden@northandoverma.gov> Construction inspection 125 Boston Street 3 messages Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:28 PM To: 'Brian Lagrasse (blagrasse@ north andoverma.gov)" <blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfende n @north andoverma.gov> Brian, Steve, Toni - Attached please find our inspection report for the second inspection performed at 125 Boston Street. The area of focus was the soil absorption system. I found the system was built much closer to level than the initial inspection and authorized backfill to occur. Please do let me know if you have any questions. Dan Daniel Ottenheimer, PE President AMEM Vf MILL RIVER CONSULTING Creative Sohttitnrs for land Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com Mill River Construction Notes - 125 Boston Street.doc 381 K Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:30 PM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> I fixed one date reference. Please use this version. Thanks [Quoted text hidden] c Mill River Construction Notes - 125 Boston Street.doc 381 K Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 3:32 PM To: 'Brian Lagrasse (blagrasse@ north andoverma.gov)"<blagrasse@northan dove rma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> You going to think I am a real dope, sorry. Please use this version as I put the wrong date in the last one I sent you. [Quoted text hidden] Mill River Construction Notes - 125 Boston Street.doc 381 K