HomeMy WebLinkAbout2021-10-13 Conservation Commission Minutes Page 1 of 8
Approved 1112212021
North Andover Conservation Commission Meeting Minutes
October 13,2021
Members Present: John T. Mabon, Sean F. McDonough, Louis A. Napoli, Chairman, Albert P.Manzi, Jr.,Vice
Chairman, and Joseph W. Lynch
Members Absent: Anthony Capachietti
Staff Members Present: Amy Maxner, Conservation Administrator,Taylor Andrews,Field Inspector
Meeting came to Order at: 7:02 p.m. Quorum Present.
Pledge of Allegiance
Acceptance of Minutes
• The minutes for the September 29,2021,meeting are not ready for review.
Notice of Intent(NOI)
242-1822,45 Cotuit Street(Seaport Homes LLC)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021,is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
Email from bosgood&rangereng.com requesting a continuance until 10127121
Notice of Intent(NOI)
242-1816,325 Johnson Street(Sparks)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021,is made by Mr. Lynch, seconded by Mr. Mabon.
• Vote 5-0,Unanimous.
Documents
Email from jacksull53kcomcast.net requesting a continuance until 10127121
Notice of Intent(NOI)
242-1826,175 Old Cart Way(Patel)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021, is made by Mr. Lynch, seconded by Mr. Mabon.
• Vote 5-0,Unanimous.
Documents
Email from dcowellkhancockassociates.com requesting a continuance until 10127121
Notice of Intent(NOI)
242-1787, 135 North Ramp Road(DeRosa)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021, is made by Mr. Mabon, seconded by Mr. McDonough.
• Vote 4-1 (In Favor: McDonough, Manzi, Mabon, Lynch, Abstained:Napoli).
Documents
Email from m miller(a)lawrencemunicipalairport.com requesting a continuance until 10127121
Notice of Intent(NOI)
242-1820,227 Berry Street(Brunette)
2021-10-13 Conservation Commission Minutes
Page 2 of 8
Approved 1112212021
• The Administrator states a revised plan was received. The plan depicts an in-kind replacement of the porch,
no increase into the 25-foot NDZ. A waiver request is no longer required since this is an in-kind replacement.
Plantings are shown on the plan within the area of the wetland that is currently being mowed as lawn. Photos
were provided to show the removal of the hot tub violation discussed at the previous meeting.
• Bob Prokop,Wetland Consulting Services and John Brunette,the homeowner are present for questions.
• A motion to close and issue in 21 days is made by Mr. McDonough, seconded by Mr. Manzi.
• Vote 5-0,Unanimous.
Documents
09-08-2021 Meeting Materials, 09-29-2021 Meeting Materials, 227 Berry St Supplemental info.10.12.21, Photo
Hot Tub Removed
Enforcement OrderNiolation
920 Johnson Street(Whitehead)
• The Administrator provides background on the Enforcement Order. All seven(7)wetland markers have been
installed; a couple of the markers will require slight adjustments. All offending materials have been removed
from the 25-foot NDZ. The Administrator recommends lifting the Enforcement Order.
• Thorsen Akerley,Williams& Sparages is present on behalf of the Applicant.
• A motion to lift the Enforcement Order is made by Mr. Lynch, seconded by Mr. Manzi.
• Vote 5-0,Unanimous.
Documents
920 Johnson-2nd Amended EO October 4, 2021, 920 Johnson-EO August 12, 2021
Notice of Intent(NOI)
242-1829,920 Johnson Street(Whitehead)
• The Administrator presents the proposal for the installation of an in-ground swimming pool with associated
patio. The proposed pool patio is 53-feet from the BVW. The Applicant is proposing to relocate the fence in
the backyard towards the front corner of the house. The stockpile and construction access is depicted on the
plan. The pool equipment is proposed to be located on the landward side of the pool. The wetland line was
previously reviewed under the RDA.
• Thorsen Akerley,Williams& Sparages is present on behalf of the Applicant.
• Mr. Lynch cautions the Applicant regarding the patio size given the proximity to the 50-foot NBZ.
• Mr.Napoli states if there are any changes to the plan Conservation Staff must be notified.
• Mr. Mabon confirms the raised garden beds have been removed.
• A motion to close and issue in 21 days is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
Abutters List 09 30 21, Certified-Return Receipts, Notice oflntent- 920 Johnson Street, Plan to Accompany a
Notice oflntent-920 Johnson Street
Notice of Intent(NOI)
242-1823,292 Candlestick Road(Billings)
• The Administrator provides background on the proposal.A revised plan has been submitted depicting a stone
wall to mark the 25-foot NDZ as requested by the NACC. Other changes include a proposed generator at the east
side of the house, outside the 50-foot NBZ.
• Thorsen Akerley,Williams& Sparages is present on behalf of the Applicant.
• Mr. Lynch confirms the Commission did not require action to be taken regarding the wooden platforin.
• The Administrator states the NACC did not require any action to be taken.
• A motion to close and issue in 21 days is made by Mr. Mabon, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
08-11-2021 Meeting Materials, 09-29-2021 Meeting Materials, 292 Candlestick Road-Revised NOI Plan, 292
Candlestick Road-Revised NOI 3
2021-10-13 Conservation Commission Minutes
Page 3 of 8
Approved 1112212021
Notice of Intent(NOI)
242-1828,290 Webster Woods Lane(Soucy)
• The Administrator presents the proposal for lawn expansion at the rear of the property. Approximately 180-s.f
of work is within the 100-foot Buffer Zone,work is approximately 69-feet from the BVW. The wetland line
was reviewed, and staff agreed with the delineation. Some grading is proposed within the existing lawn. No
fencing was proposed, stockpile and construction access is depicted on the plan.
• Thorsen Akerley,Williams& Sparages is present on behalf of the Applicant.
• Mr. Lynch confirms no impervious surfaces are proposed.
• The Administrator confirms the proposal is for pervious forested land converted to pervious lawn area.
• Jeffrey Soucy,the homeowner, states he understands adding impervious areas would require a follow-up
application.
• Mr. Manzi reminds the Applicant that all activities must stay outside the 50-foot NBZ.
• Mr. Mahon states all work must remain within the defined limit of work.
• A motion to close and issue in 21 days is made by Mr. Manzi, seconded by Mr. Mahon.
• Vote 5-0,Unanimous.
Documents
20211006_114317, Certified-Return Receipts, Notice oflntent-290 Webster Woods Lane, Plan to Accompany a
Notice oflntent-290 Webster Woods Lane
Notice of Intent(NOI) &Enforcement Order/Violation
242-1827,60 Campbell Road(Sahagian)
• The Administrator states the filing is a result of an Enforcement Order issued for the removal of trees and
grading for anticipated landscaping. She presents the proposal for restoration of the 25-foot NDZ. The current
erosion controls due to the EO must be maintained.
• Mr. Manzi questions if a restoration/replication area could be a pre-construction condition.
• The Administrator agrees conducting the restoration under an EO would be expedient, allowing the
Commission to permit the other amenities under the Order.
• Thorsen Akerley,Williams& Sparages states the Applicant has requested to stabilize the slope before winter.
• The Commission discusses the proposal and how to proceed.
• Mr.Napoli states the Commission typically requires a barrier to mark the 25-foot NDZ.
• Mr. Lynch notes it appears some of the disturbance is on an abutting property.
• The Administrator states that abutter is aware of the encroachment and has signed the NOI application.
• Mr. Akerley requests the NACC consider posts with wetland markers due to the planting plan proposed.
• The Commission agrees a physical barrier is required and discusses the location due to the slope. They agree
the Applicant must present a proposal for a low profile physical barrier at the top of the slope.
• The Administrator requests the proposed barrier not to create additional shade. The Administrator reviews the
recommendations made by the Field Inspector for slope restoration. Extra care is required to remove the fill
around the buried tree trunks.
• Mr. Lynch questions whether the trees will require wells around them.
• The Field Inspector recommends they carefully remove the fill by hand around the tree and drip line.
• Mr.Napoli questions whether they have spoken with Natural Heritage regarding the proposal.
• Mr. Akerley states they have been in contact with Natural Heritage and are waiting on their response.
• Mr. Lynch questions if there is any risk to the Resource Area if the site is left unstable.
• The Administrator states that there is no active erosion at this time, erosion controls are in place.
• The Commission discusses the Violation and agrees to draft an EO allowing the stabilization of the slope
subsequent to the approval of Natural Heritage.
• Mr. Akerley requests to continue to the next meeting.
• A motion to draft an Enforcement Order and stay the execution of the Enforcement Order pending release by
Natural Heritage is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
• A motion to continue to October 27, 2021, is made by Mr. Manzi, seconded by Mr. Lynch.
2021-10-13 Conservation Commission Minutes
Page 4 of 8
Approved 1112212021
• Vote 5-0,Unanimous.
NO]Documents
Certified-Return receipts, Notice oflntent- 60 Campbell Road, Plan to Accompany a Notice oflntent- 60
Campbell Road_R1, Plan to Accompany a Notice oflntent- 60 Campbell Road, WPA Signature Page (60&
80 Campbell Road)
EO Documents
09-08-2021 Meeting Materials, 09-29-2021 Meeting Materials
Request for Determination of Applicability
19 Commonwealth Avenue (Ascencio)
• The Administrator provides background on the proposal. The Applicant is seeking to install a new 336-s.f.
deck with stairs at the rear of the house. The deck will be supported by a combination of nine (9) footings and
attached to the corner of the house with lag bolts. Proposed work is located within the 200-foot Riverfront
Area to the Shawsheen River. The Field Inspector confirms the work is located 126-feet from the fringe BVW
to the Shawsheen. She recommends issuing a Negative Determination#3  with conditions.
• Maximo Guerrero,MACE Contracting is present on behalf of the Applicant.
• Erika Martin, an abutter, questions if the property line is depicted on the proposed plan.
• Mr. Guerrero states the proposed deck addition is on the right side of the house.
• Mr. Mabon would like the setback to the wetland documented as part of the RDA application.
• The Administrator states an aerial overview with measurements was included in the Small Project(NACC
#284)application. An aerial overview for the Small Project is presented for review.
• The Commission reviews the aerial photo and requests the graphic be annexed and part of the record drawing.
• 7:55 p.m. Mr. McDonough leaves the meeting.
• A motion to issue a Negative Determination#3  with conditions as recommended and amended(pre&
post inspections, excavated soils removed from site and graphic to be annexed)is made by Mr. Manzi,
seconded by Mr. Lynch.
• Vote 4-0,Unanimous.
Documents
Commonwealth 19 GIS Aerial, Commonwealth 19 RDA Plan, Commonwealth 19 RDA Plot Plan, RDA
Application with Supporting Materials 09 24 21
Abbreviated Notice of Resource Area Delineation
242-1824,177 Great Pond Road(Strecker)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021, is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 4-0,Unanimous.
Documents
Email from norseenvirontnental(a�verizon.net requesting a continuance until 10127121
Modification
242-1770,456 Summer Street(Carlstrom)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021, is made by Mr. Lynch, seconded by Mr. Manzi.
• Vote 4-0,Unanimous.
Documents
Email from norseenvironmentalkverizon.net requesting a continuance until 10127121
Modification
242-1821,217 Gray Street(M.P.Murphy Builders,LLC)
2021-10-13 Conservation Commission Minutes
Page 5 of 8
Approved 1112212021
• The Administrator provides background on the proposal. The Applicant recently obtained ZBA approval for
side setback relief for a proposed garage. They are requesting a Modification to allow the construction of the
garage, outside of the 50-foot NBZ.
• The Commission discusses the erosion controls which have been installed per the approved plan.
• Matt Murphy, M.P. Murphy Builders &Paul Miller,the homeowner, are present for questions.
• A motion to approve the Modification as proposed is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 4-0,Unanimous.
Documents
217 Gray St Modification App
Modification
242-1754,326 Campbell Road(Carolina Properties,LLC)
• The Administrator provides background on the proposal. The Applicant is seeking an after-the-fact
Modification for the installation of a patio which encroached into the 75-NBZ to suspected ephemeral pool.
Per the recommendation of the Administrator and Chairman,the Applicant engaged a wetland consultant to
investigate the water body for ephemeral pool function. A thorough analysis was conducted by William
Manuell of Wetlands&Land Management, confirming this is not an ephemeral pool as he found schools of
fish and provided other documentation that supports a pond habitat.
• Mr. Manzi requests that the evaluation be added to the record/decision.
• 8:03 p.m. Mr. McDonough rejoins the meeting.
• A motion to approve the after-the-fact Modification as proposed is made by Mr. Mabon, seconded by Mr.
Lynch.
• Vote 4-1 (In Favor: Mabon,Napoli, Manzi,Lynch,Abstained:McDonough).
Documents
2021-09-21_rnodification_after the fact,Application_Request for Modification,As-Built Campbell Rd, B. Manuell
Investigation Report on VP at 326 Campbell
Certificate of Compliance
242-1754,326 Campbell Road(Carolina Properties,LLC)
• The Administrator states the only outstanding issue was the patio which just received approval for an after-
the-fact Modification,the project is now eligible for a COC. The project has been completed and is in
compliance with the OOC.
• A motion to issue a full and final Certificate of Compliance is made by Mr. Lynch, seconded by Mr. Manzi.
• Vote 5-0,Unanimous.
Documents
2021-07-14 Requestfor Certificate of Compliance,As-Built Campbell Rd
Modification
242-1819,255 Stevens Street(Howlett)
• The Administrator provides background on the project. The Applicant is proposing to install a retaining wall
at the west end of the pool to retain the cut in slope and create a swale between the foot of the wall and the
pool to accommodate drainage. All of the proposed work is outside the 50-foot NBZ with some grading at
edge of the 50-foot NBZ. A cross section of the retaining wall has been provided. A pre-construction meeting
has been performed and erosion controls are in place.
• The Commission reviews the proposal.
• Matt Schweisberg,Wetland Strategies & Solutions, LLC is present for questions.
• A motion to approve the Modification as proposed is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
Mowlett.ModifieationReq.ConComm l 0.05.2021
Certificate of Compliance
2021-10-13 Conservation Commission Minutes
Page 6 of 8
Approved 1112212021
242-1739,Partial COC,Rea Street Subdivision(RDM,Rea Street LLC)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021,is made by Mr. Lynch, seconded by Mr. Mabon.
• Vote 5-0, Unanimous.
Documents
Email from bosgood&rangereng.coin requesting a continuance until 10127121
Certificate of Compliance
242-1755,Rea Street,Lots 4-7(RDM,Rea Street LLC)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 27, 2021,is made by Mr. Lynch, seconded by Mr. Mabon.
• Vote 5-0,Unanimous.
Documents
Email from bosgoodgrangereng.corn requesting a continuance until 10127121
Certificate of Compliance
242-1060,211 Boxford Street(Cronin)
• The Administrator provides background on the Order issued in April of 2001. An As-Built Plan, Certification
Letter and request for Certificate of Compliance were submitted in 2003. This request was never presented to
the NACC for approval. The project has been completed and is in compliance with the OOC.
• The Commission reviews the request.
• A motion to issue a full and final Certificate of Compliance is made by Mr. Mahon, seconded by Mr. Manzi.
• Vote 5-0,Unanimous.
Documents
As-Built Plan Rev 07 30 03, COC Request Letter 09 26 21, COC Request Materials 2003, Subsurface Septic
Disposal Plan 0129 02
Small Project
NACC#287,465 Rea Street (Hall/Levenberg)
• The Administrator presents the proposal for the rehabilitation of the lawn, and construction of a 136-s.f.
walkway. The proposed walkway is outside the 50-foot NBZ, and the lawn rehab is within the existing
footprint of the developed lawn area. The Administrator recommends approval of the project under Category
"L" requiring maintenance of existing erosion controls until fully stabilized and post construction inspection.
• The Commission reviews the proposal for the walkway and lawn rehabilitation.
• A motion to accept this as a Small Project"L"with conditions as recommended is made by Mr. McDonough,
seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
Small Project Application with.Supporting Materials 09 20 21
Small Project
NACC#288, 160 Bridle Path (Morgan)
• The Administrator presents the proposal for an in-kind deck replacement. Helical piles are proposed if the
deck is accessible to the helical machine, otherwise 12-inch sonotubes are proposed at a minimum depth of
48-inches. The deck is located on the opposite side of the house from the wetland. The Field Inspector
confirms the deck is approximately 70-feet from the BVW. The Administrator recommends approval of the
project under Category"B" requiring pre and post construction inspection and excavated soils be removed
from site.
• A motion to accept this as a Small Project`B"with conditions as recommended is made by Mr. McDonough,
seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
2021-10-13 Conservation Commission Minutes
Page 7 of 8
Approved 1112212021
20211005_121855, Small Project Application with Supporting Materials 09 20 21
Enforcement Order/Violation
64 Nutmeg Lane(Madsen)
• The Administrator states she researched the subdivision file(242-784)which received a complete COC. The
homeowners have secured the services of a wetland consultant and are moving forward with a new
delineation as directed. Some of the cutting occurred within the 25-foot NDZ.
• Mr.Napoli states the Enforcement Order needs to be cleaned up before an NOI can be filed.
• The Commission discusses the Enforcement Order and agrees they need to wait for the delineation.
• A motion to continue to October 27, 2021,is made by Mr. Manzi, seconded by Mr. McDonough.
• Vote 5-0,Unanimous.
Documents
09-29-2021 Meeting Materials
Enforcement Order/Violation
242-1692, 1210 Osgood Street(Princeton Properties Management/LIPT Osgood Street,LLC)
• The Administrator states the Applicant has requested a continuance.
• A motion to continue to October 19, 2021, is made by Mr. Manzi, seconded by Mr. Lynch.
• Vote 5-0,Unanimous.
Documents
Email from ibrown.princetonproperties.com requesting a continuance until 10119121
Enforcement Order/Violation
40 Flagship Drive(DWT Holdings,LLC)
• The Administrator states the Applicant is not present but plans to attend the meeting. She states she has
reached out to the Applicant to find out when the survey will be completed to make sure the basin bottom is
correct but received no response. The basin has been cleaned out and the control structure installed but not on-
line. The wetland consultant is getting ready to submit the Notice of Intent for the November 17th meeting.
Mr. Lynch states he believes that interim As-Built Plans are required before moving forward.
Mr.Napoli expresses concerns with allowing additional work to be performed without an OOC in place.
• 8:32 p.m. The discussion is tabled until the Applicant arrives.
• 8:47p.m. The discussion resumes.
William Linskey, DWT Holdings, LLC is present. He states they have GPS modeling built into the equipment
which runs off the CAD files. He offers to add stakes to the site so the Commission can see the elevations.
• The Commission discusses the Enforcement Order and agrees the Applicant has made great progress.
However,now that the property is jurisdictional a Notice of Intent must be submitted and an OOC issued and
satisfied before the foundation for the building will be considered. The NOI will also include restoration of
the stormwater management area and the downstream impacts and the restoration of the impacts.
• Mr. Linskey states without installing the foundation the top of the site cannot be stabilized before winter.
• A motion to continue to October 27, 2021,is made by Mr. Manzi, seconded by Mr. McDonough.
• Vote 5-0,Unanimous.
Documents
07-14-2021 Meeting Materials, 08-11-2021 Meeting Materials, 09-08-2021 Meeting Materials, 09-29-2021
Meeting Materials, 20211013_131701, 20211013_131916, 20211013_132045
Approval of 2022 Conservation Commission Calendar
• The Commission reviews the draft calendar with the Administrator.
• The Commission discusses the possibility of appointing a new member with no experience as an associate.
• Mr. Lynch states depending on how the bylaw is written associate members are allowed to participate in
discussion/debate and to vote when there is no other basis to form a quorum.
• Mr. Manzi directs the Administrator to review the MACC Handbook for reference.
• A motion to approve the calendar for 2022 is made by Mr. Manzi, seconded by Mr. McDonough.
2021-10-13 Conservation Commission Minutes
Page 8 of 8
Approved 1112212021
• Vote 5-0,Unanimous.
Documents
2022 Meeting Dates
General/New/Old Business
Watershed Update-Planning Department
• The Administrator presents the watershed update to the Commission. Existing Watershed Regulations do not
require major revisions, some updates include references, alternatives to de-icing and development of land
acquisition plan. Water sampling showed a general improvement since 1987. Stormwater BMPs with the
Watershed are suggested. Water sampling for the town requires some updates including annual audits to
ensure accuracy of the data.
• 8:41 p.m. Mr. Napoli leaves the meeting.
• The Commission discusses their concerns pertaining to pet waste and discharge by GLSD.
• 8:44 p.m. Mr. Napoli rejoins the meeting.
• Mr. Lynch expresses concerns that there is no discussion regarding phosphorus and nitrogen included in the
summary. The Administrator states that it has been addressed in the new recommended sampling guidelines.
Documents
Watershed Plan Update Memo, Watershed Plan Appendices, Watershed Plan Report Only
Adjournment
• A motion to adjourn at 9:03 p.m. is made by Mr. Manzi, seconded by Mr. McDonough.
• Vote 5-0 Unanimous.
2021-10-13 Conservation Commission Minutes