Loading...
HomeMy WebLinkAbout242-1827, 60 Campbell Road OOC - Permits #242-1827 - 60 CAMPBELL ROAD 12/9/2021 4 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1827 WPA Form 5 — Order of Conditions MassDEP File# # Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DffOTransaction North Andover City/Town A. General Information Please note: North Andover this form ties 1. From, ---------- been modified Conservation Commission with added 2. This issuance is for space to a.M Order of Conditions b.1771 Amended Order of Conditions accommodate (check one): the Registry of Deeds 3. To: Applicant: Requirements Tate Sahagian ... ................... ...... a.First Name b. Last Name Important: When filling .............. out forms on c.Organization the 60 Campbell Road computer, d.Mailing Address use only the tab key to North Andover MA 01845 move your e.City/Town f.State g.Zip Code cursor-do not use the 4. Property Owner(if different from applicant): return key. ........................... VQ a. First Name b. Last Name --------------- c.Organization relrm . ...... .................................... .............. d.Mailing Address —--------------------------- e.City/Town f.State g.Zip Code 5. Project Location: 60 Campbell Road North Andover a. Street Address b.CitylTown Map 106B Lot 66 c.Assessors Map/Plat--Number- d. Parcel/Lot Number .......... Latitude and Longitude, if known: 42d64m0250s 71d05m6570s d.Latitude e.Longitude vipaform5.doc-rev 5/1812020 Page 1 of 13 4 Massachusetts Department of Environmental Protection Provided uyMammosp: Bureau of Resource Protection �/��{�iOD - � tlGDdS 243-1827 ����� � � Order � �� �.�~ m�n ^� Form � �� "������ ��o "����x�U��ons Massachusetts Wetlands Protection Act M.G.L. o. 131. G40 *osp Transaction# North Andover Ci(y[Tvwn A. General Information (cont.) O. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Northern Essex a.County b.Certificate Number(if registered land) 17075 179 c. Book d. Page r. Dates: September 1 Novembor22 2021 Deoember9 2021 a.Date Notice of Intent Filed b. Date Public Hearing Closed c. Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Plan to Accompany Notice f Intent 8OCampbell R ad Buffer Zone Restoration Plan Williamsa. Plan Title & Sparages Richard L. Williams, PE b. Prepared By c.Signed and Stamped by Nnvmmbor3. 2021 *to be further revised 111=20' per Special (� dib #36° e.8oa|° See attached list of all a d documents dplans [Additional P|oo or Document O. Date ------------------------ B~ Findings 1� Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that thaoxaaminvvhiohworkispx>pomedisaigniUoanth1thefoUowinginhsnantsVftheVVetlends Protection Act(the AcU. Check all that apply: a � 0 Prevention of �� Public � [l Land � �� � �� Pollution d � �� Protection of �B Private e� �J Fisheries � �� �� VVi|dUha Habitat g. 0 Groundwater Supply h. Storm DonnagaPrevention i. Z Flood Control Z This Commission hereby finds the project, ouproposed, is: (oheokoneofthefo||oxvingboxma) Approved subject to: o. E the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. %vpam=o.m°'rev m1mzmv Page zm1a 4 Massachusetts Department of Environmental Protection Provided byMasooFP: BUPe@UOf Resource Protection - Wetlands 242-1827 ����� � � Order � Conditions �mu �� Form ~, -- ���v�K�� ��n ��������U�8ons Massachusetts Wetlands Protection Act M.G.L. o. 131' §4O transaction# North Andover B. Findings (cont.) Denied because: b. [l the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project maynotgofomvardun|emsand until o new Notice ofIntent is submitted which provides measures which one adequate to protect the interests of the Act, and o final Order of Conditions is issued. /\ description of the performance standards which the proposed work cannot meet is attached to this Order. C. Fl the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until u revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as pmr31O G88R 10.05(6)(n). 3. H Buffer Zone Impacts: Shortest distance between limit of project 31 disturbance and the wetland resource area specified in 310 CyWR 10.02(l)0a\ ajin,arxeet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4 Bonk� ��l� � linear feet lb.linear feet �— c_li�����-- ��near feet-- 5. [l Bordering Vegetated Wetland o.square oa*t ;.oquamoeot r,square feet u.square feet O. Fl Land Under VVotorbodieaand a.square feet b.square feet o.square feet d.square feet Waterways r, Fl Bordering Land Subject toFlooding u.square lfeet — d.wnumre few Cubic Feet Flood Storage e-c����-- �����et -- 9.cubic feet h.�vm���-- 8. n Isolated Land Subject to Flooding m.square feet u.square feet Cubic Feet Flood Storage ,�,�»mi��-- ���v�����-- e.Cubic feet — f.cubic feet-- 8. 171 R|vedrontArea a.total sq.feet b.total sq.feet Sqftwithin 100ft c.square feet d,square feet e.square feet f.square feet Sqh between 188- 2OO8 g.square feet i�eooamf*at i.square feet j,square feet Nvpwmm .*n'rev w8/2.m Page 3mm 4 Massachusetts Department of Environmental Protection Provided by Masnosp: Bureau of Resource Protection - Wetlands 242-1827 ����� � � ���� � Conditions ��o �� Form ~� -- Order ��n ������v�D^Uons KAaeoechueet(oVVm\|mndnProtection Act W1.G.L. o. 131, §40 eo�pnanmmmion# North Andover cityrrown B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement io Designated � ��[l Indicate size under Land Under the Ocean below Areas ' 11. [l Land Under the Ocean m.square feet h.square feet 12 Indicate size under(�ogsha| Beaches and/or Coastal Dunes � �Fl� Barrier Beaches below 13. E] Coastal Beaches —yd -' yd a.square feet b.square feet c.nourishment a-.—n6ur'is'h"m en'-t' ou d 14, E� Coastal Dunes oud a.square feet b.square feet c. nourishment d. nourishment 15 Coastal � ���� a. linear feet -- linear fee t — 16. [l Rocky Intertidal Shores a.square feet b.square feet IT [l Salt Marshes a.square feet b.square feet G.square feet d.square feet 1& [l Land Under Salt ----- Ponds a.square feet b,Square feet 1V. F] Land Containing Shellfish a.square feet u.square feet o.square feet w.square feet zo. 171 Fish Runs Indicate size under Coastal 8onka. Inland Bank, Lend Under the Ocean, and/or inland Land Under VVobarbodiesand Waterways, above a.c/y dredged b.c/y dredged 21. Fj Land Subject to Coastal Storm a,square feet b.square feet Flowage oo. El Rive�ron�Armo -- -- e.total sq.feet o.mm/en.fee, Sqft within 1O0ft c.square feet d.square feet a.square feet f.square feet Sqh between 100' 2000 q.square feet h.square feet i.square feet j.square feet or°mrmo»='rev a1vmom Page^um 4 Massachusetts Department of Environmental Protection Provided hvmaoxoeP: 2421827 Bureau of ��esOU[C8Protection - V�efl@DdS - ����� � � Order � Conditions ��x ^� Form � — "������� ��u `������K�Uons Massachusetts Wetlands Protection Act K8.B.L. o. 131, §40 ^oep Transaction# North Andover � i B. Findings (OODt) °#23,|f the 23 Fl Restoration/Enhancement p«4o��for � �� the purpose of restoring or enhancing ~.Square fee`~'--` `.square feet~salt marsh wettand resource area 24. F1 straomCromm|ngbA: m addition m the square footage that °,x"m"v/of new stream crossings V xvm""/ "/ /"v/",v'veo'uve"mumuv.vwv has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Sactione.u.c (8\mV «' The fo||oxv|n0conditions are on|ya |io�b|�to ��pprov�� projects. m17.^�a� pp �'-^ Marsh)above, 1� Failure tuoom��with aUcondiUonostated herein, and vvhhoUns�bedsbdubesand other please enter ^ the additional regulatory measures, shall be deemed cause to revoke or modify this Order. amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury Knpr|vateprnpedynrinvonionofphvateh8hha. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, atata, or local etatutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either ofthe following apply: a. The work ina maintenance dredging project axprovidedforinthaAot; or b. The time for completion has been extended hom specified date more than three years, but less than five yea[s, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth asa special condition in this Order. o. |f the work is for aTest Project, this Order of Conditions shall be valid for no more than one year. 5. This Order may be extended by the issuing authority for one or more periods ofuptothree years each upon application to the issuing authority at least 30 days prior to the expiration date nf the Order. An Order nf Conditions for a Test Project moybeextendeUfornne additional year only upon written application by the applicant, subject to the provisions of 310 CIVIR 10.05(11)(f]I. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on unless extended in writing by the Department. 7. Any fill used in connection with this project ahaUbec|manfiN. AnyfiUuhaUoontoinnotuaeh, refuse, nubhiah, or debris, including but not limited to |umber, bhoka, plaster, wire, |ath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 4 Massachusetts Department mf Environmental Protection Provided byM^m»nEp: 242-1827 Bureau Of Resource pn]teCfioO - We[l8Ods ����� �� � Order � �� ��~�~ mmn ^� Form � — .���«�� ��x `����m�U�Uons Massachusetts Wetlands Protection Act W1.G.L. c. 131' 840 �— -- NorthAndover ityfTown C. Genera} Conditions Under Massachusetts Wetlands Protection Act 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has becorne final and then has been recorded in the Registry ofDeeds or the Land Court for the district in which the land is |noeted, within the chain of title of the affected property. In the case of naonnded land, the Final [)ndor shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon vYh|Vh the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped hy the Registry of Deeds, prior tn the commencement ofwork. 10. A sign shall be displayed at the site not less then two square feet nr more than three square feet in size bearing the words, "PNonsaohun*(tsDepurt0ontnfEnviron[meDts| P[otect|oD" [nr. ~K4assDEP"} "File Number 242-1827 ^ 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before KAaaaOEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (VVPA Form 8A) h)the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing ofa new Notice ofIntent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission nr Department for that evaluation. 18. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned bv this Order. °rm"nno,d" 'rev m1^mmo Page 6mm 4 Massachusetts Deo�rhn�ntof�nvirVnm���| �rm1 �t�n Provided hyMmwosp ' Bureau of Resource Protection - Wetlands242 -1827 ����� � � ���� � ^� �.�. ��x ^� Form � — .�u��� ��u ~������xUons Massachusetts Wetlands Protection Act K8.G.L. c. 131. Q40 'osp Transaction# North Andover C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 17. Prior tVthe start of work, and if the project involves work adjacent too Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 19. The work associated with this Order(the"Project") /1\ 171 io subject to the Massachusetts 8tornlmahsrStandards (2) Z in NOT subject to the Massachusetts StormxveterStandards |f the work |e subject twthe Storrnvvaier Standards,then the project imsubjaottnthe following conditions: a) All work, including site preparation, land disturbance, construction and nedava|npnnanL shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the ShormxvaterPollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit ay required byShormwahar Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPe) shall remain in place until the site ie fully stabilized. b\ No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified /n the Certification. For any construction period BK8Po intended tobeconverted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; fi. as-built final construction BMP plans are included, signed and stamped by a Registered Professional EnQinaar, certifying the site ie fully stabilized; X. any illicit discharges to the stormwater management system have been removed, as per the requirements ofShzrrnm/mterStandard 10; °r"m,nmu=^rev 51/eomn Page/m13 4 Massachusetts Department of Environmental Protection Provided by MassmEP: 242'1O27 Bureau of F�esOU[C8P[Ot8C�OO - \�/ef8DdG ����� � � Order � Conditions w�m m� Form � �- *����� ��n ��������Uons Massachusetts Wetlands Protection Act M.(S.L o. 131, 840 *oEpTrana*�iom# North Andover n­ C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) ix all post-construction ntormwebar BK8Pe are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BW1Ps is suitably established to withstand erosion. c> The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 18(e)) shall execute and submit to the issuing authority mn Operation and Maintenance Compliance Statement("0&K0 Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan (^()&[N Plan") and certifying the following: i) the (]&W1 Plan is oomo|eh*and will be implemented upon receipt of the Certificate of Compliance, and ii\ the future responsible parties shall be notified in writing of their ongoing |aQa| responsibility to operate and maintain the mhorn)wxahprmanagement BK8Psamd implement the Stnrmvvoter Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stnrmvvotar Report and, if applicable, the Shormvveha/ Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e\ Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BPNP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement ofrecord, acceptable to the issuing auihority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements ofConditions 18UlthrnuBh 18(k)vith respect to that BMP. Any failure ofthe proposed responsible party to implement the requirements of Conditions 18(f) through 18(h)with respect to that BPWPshall haa violation of the Order ofConditions or Certificate of Compliance. |n the case ofnhxrmvvotorBPNPm that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the sdorrnvwater BN1Pa. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. R The responsible party shall operate and maintain all mtormwoherBKAPm in 000Vrdmnne with the design plans, the O&M Plan, and the requirements of the Massachusetts ShzrmmoaterHandbooh. 4 Massachusetts Department uf Environmental Protection Provided uyMamooEp Bureau of Resource Protection - Wetlands 242-1827 ������ � � Order � �� x�~�~ �wm ^� Form � �~ .����� ��x ~�����U^Uons Massachusetts Wetlands Protection Act M.G.L. c. 131. 840 e m»ouui^ow North Andover C. General Conditions Under Massachusetts Wetlands Protection Act /CODt.\ g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the atornnwab*r management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal |ocod|on); 2. Make the maintenance log available toK4ounDEP and the Conservation Commission (~Comnniemion^) upon neqweetand 3. Allow members and agents of the yWamaDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. U The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k\ Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. |> Access for maintenance, repair, and/or replacement of BIMPs shall not be withheld. Any fencing constructed around shormvvaterBK8Ps shall include access gates and shall he at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): ' 20. For Test Projects aubiectto31OCK4R10.D5(11). theepp|ioantnhaUa|eoimp|ernentthe monitoring plan and the restoration plan submitted with the Notice of Intent. If the conservation commission or Department determines that the Test Project thraabanathe public health, safety or the environment, the applicant shall implement the removal plan submitted with the Notice of Intent or modify the project eadirec(edbytheoonoervotion commission ur the Department. 4 Massachusetts Department of Environmental Protection Provided uvma000ep: Bureau 0f Resource Protection - Wetlands 242-1927 ����� � � Order � Conditions ��n »� Form � — `��x��� ��m ~�����uDuUons Massachusetts Wetlands Protection Act W1.G.L. o. 131` §40 uosp Transaction# North Andover D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. |sa municipal wetlands bylaw or ordinance applicable? M Yes [] No 2. The North/\ndnvor hereby finds (check one that app|ion): Conservation Commission m 0 that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance orbylaw, apeuiUoo||y: 1. MUnicipal Ordinance or Bylaw 2.Citation _- Therefore, work on this project maymntgofonmandun|esnondunU| orovimgdNVUceof Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions |nissued. b. E that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: North A d Wetlands Protection Bylaw& Regulations Chap. 180 1Munioipm|Ord inmn000rBylaw ecsoq. J. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice nf Intent referenced above. 7o the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach m text donumenU: North Andover Conservation Commission di &Special Conditions "nafo"mo.dGc'rev^nWm" Page mum 4 Massachusetts Department of Environmental Protection Provided by MwsDEP: 242-l82? Bureau gf Resource Protection - Wetlands WPA Form 5 ~_ Order of Conditions Ma ssachusetts 131. 840 *ospTranoaction« North Andover cif Frr6w--n E. Signatures _ _�= This Order isvm|NforWh m unless otherwise aaospecial condition pursuant h/General Conditions#4.from the date missuance. 1 "a~.. ~ suance Please indicate the number of members who will sign this form. This Order must bo signed bya majority cf the Conservation Commission. z.Number mSigners TheOrd�rmust be mailed byce�i0ed mail �oummcoiptmqueehmd)or hand do|ivomdW the upp|ioenLA hhmU Department'^- -also -- n�m ^ mai|mdor'hand da\�eredat the same dmato the approp a epa if different muEnvironmentast be kmu\Office, Rmd��go�oho�c��. and the prope�yuwne� from applicant. | Printed Na � _`,__e Printed � | mon"wr Printed i Signature Printej Name ture Printed Name Printed Name Signature Fl by [� by certified mail, ��m �ce|� ^~ ' � requested, on (�� Date Page 1`mm | "paform5.moc'rev 5118/2020 4 Massachusetts Department mf Environmental Protection Provided uywaaooEFc Bureau of Resource Protection Wet lands 242'1827 ����� �� � ���� � �� «�.�. �mu �� Form =v -- ��uv���� ��n ������^�K^Uons Massachusetts Wetlands Protection Act M.G.Lc. 131, R40 eosp Transaction# North Andover ------- F~ Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject tnthis Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CIVIR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previoum participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which isbeing appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G,L. c, 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. °tp°*" 5.m='rev anmz02n Page 1uw1v 4 Massachusetts Department of Environmental Protection Provided byKassDEP: Bureau of Resource Protection - Wetlands 242-1827 ����� �� � Order � Conditions Lll� �mo �� Form .� �� ���~���� ��u ������vu��Nons Massachusetts Wetlands Protection Act K4.G.L. c. 131, §40 ensp Transaction# North Andover City/Town G. ReGord~ng Information Prior tn commencement of work, this Order of Conditions must be recorded in the Registry nf Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. in the case of recorded land, the Final Order oheU also be noted in the Registry's Grantor Index under the narne of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted bo the Conservation Commission listed below. North Andover onservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ---------- -------------'---'''----------'----------------------''-'------'--'-- T»: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project ot 60 Campbell R d 242-1827 roject Location MassDEP File Number Has been recorded at the Registry of Deeds of: Northern Essex County Book PoQu Tate 5oha i for: er and has been noted in the chain of title of the affected property in: 17075 179 In accordance with the Order nf Conditions issued on: 12-OS-21 |f recorded land, the instrument number identifying this transaction is: Instrument Number |f registered land, the document number identifying this transaction is: 60 Campbell Road #242-1827 Findings of Fact Current Project Site Conditions: The 1.03-acre project site currently consists of an existing single-family house constructed in 1975 associated driveway, deck, lawn, landscaping and utilities. The project site has been subject to previous wetland permitting with the North Andover Conservation Commission (NACC), which includes the following: Small Project Permit issued in July of 2021 for abandoning septic system and connection to Town sewer system. The NACC agrees with the delineation of the following wetland resource areas as reviewed in the field by the Conservation Administrator and reflected on the approved plan. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests in the Act and Bylaw. a. Bordering Vegetated Wetland (BVW)- Wetland Flags AlA - AM, Al - All (BVW straddles 60 & 80 Campbell Road) b. Bordering Vegetated Wetland (BVW) - Wetland Flags Bl - B8 (located across Campbell Road) c. 100-Foot Buffer Zone to BVW's d. The property at 60 Campbell does not lie within NHESP Priority Habitat, but 80 Campbell does e. The property does not lie within the 100-year floodplain f. The on-site resource areas do not contain certified or potential vernal pools based on NHESP mapping. Therefore, the NACC hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent/approved plans referenced below. To the extent that the followim,_ conditions modify or differ from the plans, specifications or other Proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 21. The proposed work governed under this NOI includes: raising the grade at the driveway shoulder by about 15to construct a 10' wide gravel driveway extension to be retained by a 1.5' boulder retaining wall. After-the-fact tree removal at the front street-side of the house, grading and proposed landscaping, outside the 25' NDZ' partially within the 50' NBZ, The existing stone in the backyard is proposed to be removed from the area and used as the base for the proposed driveway extension. 60 Camphd Road 02,12­1827 NIAUC hmfings& a;peckfl CmA6ow, 60 Cainpbell Road #242-1827 Construction of a permeable circular paver patio is also proposed off the existing deck, located outside 50' NBZ. A 10'x12' shed to be installed at the end of the driveway outside 50' NBZ. General restoration of lawn areas between the house and the top of slope. **NOTE: This property is also governed by an Enforcement Order, issued on October . . y 28, 2021, that requires restoration of the rear slope located on 60 &80 Campbell Road, by removing imported .fill to return to pre-existing grade, loam, replant with native shrub species and native seed mix, stabilize with biodegradable erosion control blankets and construction of a 2'x2' field stone wall at the top of the slope to be monumented with wetland markers. Any conditions in the Enforcement Order related to the slope restoration that are more restrictive than those found herein shall rule.** 22. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent and associated attachments filed by: Tate Sahagian 60 Campbell Road North Andover, MA 01845 Wetland/Engineering Consultant: Williams & Sparages, LLC c/o Thorsen Akerley 189 North Main Street, Suite 101 Middleton, MA 01949 Site Plan: "Plan to Accompany a Notice of Intent 60 Campbell Road, North Andover, MA - Buffer Zone Restoration Plan" Prepared by Williams &Sparages, signed and stamped by Richard Williams, PE Scale 1"=20' revision dated November 3, 2021 **To be further revised per Special. Condition #36 below" Other Documents: Division of Fisheries &Wildlife, NHESP Tracking No: 21-40547, dated October 20, 2021 -no adverse effect determination 23. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. (4)Con1pNH Road U?4).18D NACU 11�mfinlqs&Spc6al (,onchtioms Page 2 of 13 60 Cainpbell Road #242-1.827 24. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 25. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 26. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may require any information,measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 27. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinal-ices, by-laws or regulations. 28. The work aut1iorized hereunder shall be completed within three years from the date of tl-iis order. 29. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Sectio)i 8.3) of the North Aticlover Wetlai-id Regtilatims). 30. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 31. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot (25) o- 60 Campbell Roc ud Q42 �S27 NIA(V Fiind inus&S'pccinl Cuiidiplons 60 Campbell Road #242-1827 Disturbance Zone and a fifty fqot 5 No-Construction Zone shall be established from the edge of the adjacent wetland resource area. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 33, This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 34. The owners of the project and their successors in title agree that the Order does not in itself impose upon the Town any responsibility to maintain any proposed drainage system and that said.Town shall not be liable for any damage in the event of failure. By acceptance of this Order, the owners agree to indernrlify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. Maintenance of any drainage system, if accepted by the Town as part of a public way, becomes the responsibility of the Town. 35. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 36. Prior to any work or the pre-construction meeting, the plan shall be revised to depict a notation that the top of the upland side of the field stone wall at the top of the slope shall be not less than 2 feet above grade (the full exposed profile of the wall on the upland side shall be not less than 2 feet above grade). 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 38. This Order shall be recorded, in its entirety,by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected 60 a mriphe I'I Road 8242-Z 821 NIACC u-rndinps&, Spc6laf Cond fiom� 60 Campbell Road #242-1827 property. In the case of recorded land, the Final Order shall also be rioted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording inforination shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work, Any Order not recorded by the applicant before work commences may be recorded by the NACC,at the applicant's expense. 39. A check payable to the Town of North Andover shall be provided in the amount of two thousand five hundred dollars $2,500 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town`Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions, hereof,shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local Bylaw. 40. A sign, visible from the street, shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Mass. DEP #242-1,827." 41. No changes to the approved plan shall be implemented in the field until written approval has been granted by the NACC. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. 42. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 43. Wetland flagging on site shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. Such barriers shall be checked and replaced as necessary and shall be maintained until all construction is complete. 60 Cainpbd Road 042-d 82 7 NAC('Findings&Speckid(on&Oons oF H 60 Catiipbell Road #242-1827 44. 1 The existing row of staked 12" mulch sock (Filtrexx SiltSoxx or equivalent) shall remain properly installed between all construction areas and wetlands, and any additional sections of erosion control as shown on the plans approved and referenced herein and shall be installed and then inspected and approved by the NACC or its agent prior to the start of construction and shall remain intact until all. disturbed areas have been permanently stabilized to prevent erosion. All additional erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging frorn. the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 45. The applicant/contractor shall have on hand at pre-construction meeting, additional 50 feet of mulch sock and 3 rolls of 1.00%biodegradable erosion control blanketing (NO plastic netting allowed) and sufficient stakes for staking, both covered from the elements, and shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 46. The erosion controls shall serve as the limit of work. Workers should be informed that no use of ma'chinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond. this line at any time. 47. The applicant shall designate a Wetland Scientist(or other environmental professional as approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. This person shall be given the authority to stop construction for the purposes of correcting problems with erosion control. The Environmental Professional will immediately notify the Conservation agent of any matter that requires attention by the Commission or the agent. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 48. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains anstabilized, the applicant shall submit a written report with photographs from the "Erosion Control Monitor" to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection,, all 60 Cwnpbefl Ida ad 1124?-W7 NACC HIII�finys& Spvckfl(AmAcMion� 60 Campbell Road #242-1827 work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1/2" inch of rain or greater (24 hour event) to ensure that soils remain stable, and erosion controls are adequate and secure. 49. In accordance with the deadlines set by the October 28, 2021 Enforcement Order and prior to the issuance of a Certificate of Compliance, the top of the slope shall receive a 2'x2' fieldstone wall and six (6) wetland markers as depicted on the approved plan. This wall will demarcate the no disturb zone and shall receive wetland markers facing upland. Said markers shall incorporate the following text on their upland side: "Protected Wetland Resource Area". This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. Said markers are available for purchase in the Conservation Department at Town Hall. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. The stonewall and markers shall remain in place and posted. Markers shall be replaced as necessary in perpetuity. 50. Prior to any work commencing on-site, the applicant shall submit to the NACC or its Administrator for review and comment, a detailed work schedule/sequence of construction. 51. Prior to any work commencing on site, it is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals required for this project, and no work within the Commissions jurisdiction shall commence until all other state or local permits, approvals, and variances have been obtained. This is to ensure that impact to jurisdictional areas are avoided in the case that any such permit is denied or withheld for any period of time, thereby maintaining the integrity of the resource area or buffer zone until such time all approvals are granted. Note: The Building Permit shall have been applied for at the time of a pre- construction meeting with the Conservation Department, and Conservation Department sign off will not be granted until pre-construction conditions are satisfied. 52. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and 00 Camphe II Road 82d2 827 NACC kndhles&Spe6aN s G11146ons 111sy '7 of 13 .w 60 Cainpbell Road #242-1.827 shall be provided to the Conservation Department at least five (5) business days prior to the closing of said. land transaction. 53. Once these above mentioned pre-construction requirements are complete, the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor, erosion control monitor and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting (e.g. 72 hours). STORMWATER MANAGEMENT CONDITIONS 54. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Comn-iission. 55. Water quality in down gradient BVW's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURINGCONSTRUCTION 56. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence and can be a part of the weekly erosion control reports. 57. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, Lath, paper, cardboard, pipe, glass, processed glass aggregate, concrete, recycled 60 C ainphefl Road 41242 92 7 NACC Specl d Condi(lons 60 Campbell Road #242-1.827 concrete aggregate, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. Any fill imported to the site must be accompanied bra certificate of origin or an analysis certifying cleanliness - whichever is most applicable as determined.by the Conservation Commission or its staff. 58. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must be graded, loamed and seeded prior to November 1st of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 59. Associated pavement and roadways shall be swept at least weekly or as directed by the Erosion Control monitor, the Site Supervisor, Project Manager, or Conservation staff for as long as the site remains exposed and un-stabilized. If material is tracked beyond the construction entrance onto the adjacent roadway, it will be swept up daily. 60. The construction access for the project shall be swept daily to remove sediment deposited by construction vehicles accessing the site and avoid tracking on to public right of way. 61. All materials stockpiling area shall be outside the 100-Foot Buffer Zone or at a location and in a manner that will not result in erosion beyond. the limit of work into the buffer zone or wetland. At no time shall be stockpiling of soil or any other materials occur on the wet-land side of the erosion controls. 62. All waste generated by, or associated with, the construction activity shall be contained within the limit of work, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site, 1-lowever, no trash dumpsters will be allowed within 50 feet of the edge of IVW. 63. Cement trucks, if employed, shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 64. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 65. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 60 Cann I;A)A Roa�I Qd2-1927 Ffiadhig,,A,Speci d Cuadflons 11'02r 9 al 13 60 Campbell Road 9242-1827 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. [AFTER CONSTRUCTION 66, Pursuant to the October 28, 2021. Enforcement Order, the slope seeding and plantings shall receive proper watering to ensure germination and survival as weather conditions dictate. 67. Pursuant to the October 28, 2021 Enforcement Order, the slope seeding and plantings shall be monitored by a qualified wetland scientist for a period of 2 full growing seasons post installation. A yearly monitoring report shall be submitted to the Conservation Department documenting restoration planting areas and status of slope stability. 68. Pursuant to the October 28, 2021 Enforcement Order, once the second full growing season has concluded and final monitoring report received, the NACC will place this item on a subsequent agenda for review and discussion to ensure that all directives of this 2nd Amended EO have been executed to the Commission's satisfaction. 69. Pursuant to the required plantings as ordered by the October 28, 2021 Enforcement Order, the restored slope shall be left to naturalize, with no routine residential landscape maintenance to take place thereon. This condition is on-going beyond the issuance of a Certificate of Compliance. 70. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towns Wet-land protection Bylaw. 71. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 1.00 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town s Wetland Protection Bylaw and shall remain in perpetuity. 72. No sodium-based products shall be used for control of ice or snow within 100 feet of the wetland. 60 Canipbefl Road 1(242 H27 7"IA0 8"!�'pcciaf(Am('Ntims P�we �0 of 13 60 Cainpbell Road #242-1.827 73. There shall be no dumping of leaves, grass clippings, brush, or other debris into a wetland resource areas or the 25-foot No-Disturb Zone. This condition shall remain in perpetuity. 74. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done by loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 75. The use of coal tar-based pavement sealants is prohibited on the property, as they have been determined to contribute high levels of polycyclic aromatic hydrocarbons (PAI-Is) to stormwater runoff. This condition shall survive the Order of Conditions and shall run with the title of the property, 76. Upon approved site stabilization by Conservation staff and in accordance with the October 28, 2021. Enforcement Order, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded with appropriate seed mix. 77. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A - "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c, The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number, h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. Check, payable to the Town of North Andover,for Certificate of Compliance filing fee (inquire with Conservation Department for current fee rate). j. An "As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Con-a'nonwealth, for the public record. This plan will include: "As-Built" post-development elevations of all drainage & stormwater management structures constructed within 100 feet of any wetland resource area, 60 'mvpheH Roa td f)242-&Q7 NACC Filafilm-"s&SpecU CondiOuilv, 60 Cauipbell Road #242-1.827 "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw, Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions,fences, sheds, stone walls, pools, retaining walls, subsurface utilities and decks. A line showing the Iiinit of work and the extent of existing erosion control. devices. "Work" includes any disturbance of soils or vegetation. 78. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: 25No-Disturbance Zone and a 50' No-Construction Zone. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established Linder the local Bylaw (Condition #32); Resource Area Markers/Field Stone Wall (Condition #48); Discharge or spillage of pollutants (Condition #65); Restored slope to be left to naturalize (Condition #68)" Prohibition of underground fuels (Condition#70) Limitations on the use of fertilizers, herbicides, sodium based de-icing compounds and pesticides (Conditions #71. & 72); No dumping of leaves, grass clippings, brush, or other debris into a wetland resource areas or the 25-foot No-Disturb Zone (Condition #73). Prohibition of the use of coal tar based products for paving (Condition #75); ()0 Uamph:H V oad 8242.k 827 NAOIC Hudhi,�s 1( SpoJa�U(Qid tarn s _Pal�e Q aA u� 60 Campbell Road #242-1827 APPENDIX A - AFFIDAVIT 11 on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAS7'ONE BL 0 CK) I.. I am the (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP orNACC number) the North Andover Conservation Commission. &/or 2. 1 am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. 1 hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. 1 hereby affirm and acknowledge that on this-clay of 19 1 inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions........... are presently in compliance. (DEP File 5. 1 hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of----19 (Signature-authorized agent of applicant or owner) 60 OwqflMl Rw d Q42 R 82 7 NACC I imfitig�,&I SpLckd Omdi6mis P�,q,e G 3 qA'13