Loading...
HomeMy WebLinkAbout2018-02-20 Monitoring Reports TKZ LLC 4 High Street, suite 201 North Andover, MA 01845 978-852-4002, tzeke@comcast.net June 12, 2018 Jennifer Hughes, Conservation Administrator, & Monica Gregoire, Town Planner Town of North Andover 120 Main Street North Andover, MA 01845 Re: Lots 1 A& I B Mill Road Pre-construction Conditions Prior to Site or and Construction, pursuant to DEP 242-1714 and Land Disturbance Permit Environmental Monitor will be Sullivan Engineering Group LLC, Box 2004, Woburn, MA 01888, 781-854-8644. Construction Sequencing Schedule: Week of June 11: Prepare stone access pads Install signage Install erosion controls/work limits Post bonds, submit final documents Pre-construction meeting at Site with Planning and Conservation Week of June 18: Tree removal Demolish/remove sheds Begin stone wall at 25' Buffer Zone, followed with signs/monuments Wetland Restoration work Week of June 25/July 2: Strip loam Start excavation and foundations Week of July 9: Backfill and grade site Starting Week of July 16: Construct homes September: Install Septic systems Grade, loam and seed disturbed areas October: Complete homes and clear site Sincerely, Thomas Zahoruiko, Manager, TKZ LLC Sullivan Engineering Group, LLC Clvll Engineers&Land Development Consultants Weekly Monitoring Report Week of July 9th, 2018 865 Johnson Street, North Andover (Lot lA + Lot 113) DEP File No.: 242-1714 Monitor: John(Jack) D. Sullivan, III P.E. Date of Inspection: July 13, 2018 @ 3:00 pm Weather: 80 degrees DEP 5iM Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging_ Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - First weekly inspection report - Erosion control was survey staked and in-place per plan - Construction entrances to both lots in place - Site have been cleared to limit of work - Foundation for Lot IA being excavated - Loose fieldstone wall mostly constructed along limit of work line - Temporary electric service in-place - No signs of site erosion....mostly a dry week - Site Photos: Seven(7) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net y m= y F� a �I I II lid i �Ili�i III �j I�i r,. F K u ry v rru �d we i i f 1� 2117 ------------- IN- r IF A JF- �i A' 4 . '� z r �{ 4 f � ate. AM 1 VOW Wo MW Ad Volz. , f � � n f q a A v y al— rw a r t e. ,a Q rim r= � �x,„�--� .: F � � -�. 3r� �: r� ..,'� �r F r � s j` a�v�P , � r✓'�; F { 17, W 19 may + 5 e r,= s � awn nA B b v M, a 3 aro^a t v..,. a y �n r , s _ r h r li Mffi r y. '-c z� K; r ,m, ra 4 �e v p � ,p a a , a 4 m a� f ram' a � Pu t 1 � w ------------------------ ,a ''14 - m-, yi y m +S d o r s u ew a N e tea; t- r 3 F. { 1. r r c� s r ONE AW .< Y P �s ^ a x IL m Nwlr- �. .. �. A, POT jg x p, t"n Ys 3� r i r s N w. �u a �1 0� , Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of July 23th 2018 Formerly #865 Johnson Street, North Andover (Lot 1A + Lot 1B) Lot lA - #185 Mill Road Lot 113 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: July 27, 2018 @ 9:00 am Weather: 82 degrees DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Site held up well this week to period of heavy rain; no signs of site erosion or silt transport - Foundation for Lot IA has been poured; contractor is installing footing drain and crushed stone in basement areas (See Photo 1 +2) - Crushed stone temporarily stockpile outside of foundation area is being placed along footing drain and future basement area(See Photo 3) - Construction entrance to Lot IA in good condition and being utilized by construction vehicles (See Photo#4) - New water service has been stubbed from the water main to the lot; curbstop installed(See Photo #5) - Erosion barrier in good condition throughout site; portion of barrier shown in Photo#6 - Foundation will be backfilled early next week - Lot 1B being used for temporary stockpile; late next week foundation for Lot 113 will be excavated - Site Photos: Six(6) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksull53@comcast.net r94 � i E ^ r 9 4 F Y u� , �a yy� �N { a , r n M � efi � s t, w , v n , .�2 I � w w a k s a. i w r z w w U r r r y � T r 9} I ate- , w, r g,i � I �a fi ,,. kCl Y r a ' A. ws p v� f x �1 X V N r a c„ � l v � r ✓ai o w � M � w ^ s -r. �:N J a� Wx f v `tee..��� �. .'"�'' _-� °'�:�`._ •,,, ..�.,, ': '�.v. ,��` ` :�;� � �1� r. y Al IN 1 , - 1 i f is .a u „ A a, v w} ' v u x k a P, e �r f F tie.. ,. .... ,. P y n-q "w v ar we e ; 71,i'll 45 cy Y r� ' MAW A } , e. a F s yF S` 2 u k yq8 iu KIT �tt r p e r > S, � � exf� k •�.. <E � �`e �.dxr 2 * 4 :� z Ee s I � AF k„ 1� h � t � �• t, t ,� ;a 6,> _.�. ixi V o m i i '�.` - � `�adz r''%" � � � f d,�`x,�' �`8�".P=€�`, � �� �:,�..�^ v � � ~•i 3, o� Ilk E c 4411 t'.. iON 1,4 IF I! f I AV M � a 4 jo Ej vt CA Wi ?. �N � - z t ^ S I a o^ !u E u� w 2 Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of July 30th, 2018 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 1 ) Lot lA - #185 Mill Road Lot 1B - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: August 2, 2018 @ 9:00 am Weather: 82 degrees/humid DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Wetland Flags IA-7A re-established in field; wooden grade stakes set and labeled - #185 Mill Road(Lot IA)has foundation being backfilled(Photo#1) - Water service has been stubbed to front lot line for Lot 1B (Photo 42) - Topsoil of Lot IB has been stripped and stockpiled(Photo#3) - Construction entrance to both lots in good condition(Photo#4) - Mill Road is clean, no silt or dirt carryover from site (Photo#5) - Area where invasives were removed on Lot IA is being monitored and any signs of knotweed growing back are being actively removed by hand(Photo#6) - Foundation for Lot 1B will be excavated next week - Site is in good condition; erosion control in good shape - Site Photos: Six (6) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net f h✓ �m a jai t ID r r z« �r a d a a d t u ��J r f r: s P. a , w P r oil FI TVA � r j 1 !w w „ r t „ s r > � � N 5 $. >o a; i s n 7 _ r T , r x. r,„ z �w i ,N n , hill AA d e µ T P r �a^ 9 t , _ G i r 3 �v L Ei�S � } IN PR s . " „ r a , p .n . . r$ m i or ni u m+ r w g sy- v x ft Jat a �,. m ur , ;. h w t r f � � J r'" n Tito t - e All a' t q � �' MBA ��� � � � i � � � �' �• �aa � IM 1 t' a: a u x - w�c o-, z nr' lr- Y, 4 d_. t i3lM r a r � d M w,.rK so ; 1' a a g s ; v. m v Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of August 6th, 2018 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 1B) Lot 1A - #185 Mill Road Lot 1B - #203 Mill Road DEP File No.: 242-1714 Monitor: John (Jack)D. Sullivan, III P.E. Date of Inspection: August 10, 2018 @ 5:00 pm Weather: 82 degrees/humid DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Foundation on Lot 1B (#203) has been formed and poured; Foundation As-built plan to be prepared the week of August 13ffi (See Photo#1 +#4) - Temporary soil stockpile for Lot 1B near Mill Road to be used for backfill of Lot 1B foundation (see Photo #2) - Lot I (#185) foundation has been fully backfilled(see Photo#3) - Mill Road is clean;no signs of any silt/mud carryover from site (see Photos 5+6) - Area where invasive species removed and plantings installed doing well (see Photos 7+8) - Siltation control in good condition throughout site - Site Photos: Eight(8) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net vM& j,ffl 77 A 1`7 ............... ME "mo," 4 "01 M, 411" llll� 'a" ok,fe W, ON", �v �A-W,' pl'- ,": A MR., IV- 1-01 Aa Al nUl-l--' A,- 'A, So 4 gg "'g" � f r as t r z y w� z. c � � t z 2- z� 'z 1 Y i3tzJn' � ?s 4 � 4 zsz s, 4 9 �. ry � s r� e Wo r � u a i �r a a Via � a . y z i y , SON yaw,MR i y ' 3 r' n, � 1 r � r z „ ._ r r ry ,E a w 1 !Aso � s* AM, MW � 5 Y „ z; „ r r µ z I TWA 1xv,"I also :.". �. m ' s } a b . f c , a " r, r� 1 a a 1c Y ry� + r u � bra p y re u 'x, T gin IBM MILAN Aws Ono TI&W Pin Cot too js if to: s yj :. y y r� Oak Q Mm VIA !' a 3 VAN f 5 i M , _ a � Y l r z tt v n a h a s F r � _ i s°w F.- a . , m Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of August 20th, 2018 Formerly 4865 Johnson Street, North Andover (Lot l + Lot 1 ) Lot 1A - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: August 24, 2018 @ 9:15 am Weather: 82 degrees/clear DEP Sign. Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Foundation for Lot 1B (#203)has been backfilled&basement stoned(See Photo#1) - Soil stockpile on Lot 1B shown near Mill Road - Mill Road shows no signs of silt/mud carryover from building sites (Photos 3 +4) - Framing underway on Lot IA (#185) (see Photo #5) - Planting area where invasive removed on Lot IA doing well (see Photo#7+8) - Erosion control throughout the site in good condition; no signs of silt buildup at barriers (see Photo #6) - Site Photos: Eight(8) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net 1I L £ I a y a is a �r 4 ` �: a .z a� a ` € * *r A vg wz TzaAi e y9 yi ;y + r Alf t 'a� 3 a r ➢ r 3 ""s e � n �� �" � a MA :. t � s a $ as 5{ {Q�{ 3 2 EV VI i IN 'Ilk r� x ti P +a NIN } � n f„ 7/ U�m✓ u MW s, 0� �a - - a m � � S rclotqw 1% Arm nub m ::4 9110, � w Sy �, tT -+ Y d ART TAN m i � u s = _ . w � V 'L ea.. y I pl t Vtl f �i4i' rI I i m R N 9 rbX ' Y � d son j �� � s r _ �z 3MRA _�" m« ma. x TKim i S ZVI ps"AnIOA;Iv QA ` TV MW W _ ... w �%Swq u _ V h,,# VA low Mor M - � loam 3 A. MO ART L <r lox.FIR, AK 01 s . i~ � k f yam... o. s s we, Orm J. Mi PIN X 10516 ' 5 W) Y",5' „ , ' s ^� ' S p-7 lot �a" c� Wk �. w .� f = a Y y r E p - s l� wow ARE .r gm Al so sm a Onis - k u ,, v 6 ' -00 #e" ir �' a A SWi rc �,� 0 i � s14 w Im go Q ot , ""' ``"fix '`mom m #; 2^ �`—XV , n tr b a � ye a r 77we � N •are a�' '., .m � y new OWN- 1 WWI 40 . -ate'`;„ 195 Y i M, V �. s y v r w m $y ~ s r Wo it, r : zr. Aj wTv w ate` ` fi Y Wt l d -~ a r 9' y am n ' x v uv . r c Or IZW low A. It A AM it L � r ' �i �. ,�" � � a Lu A Aso, WT ask 'A "j, pr P, "A' Ohl NOW,", 47%, Nu 4wjx 77'J AM 'fit l9xu S t '4 -. �zxzl r PER- 41 lk k k a t.. r t Z N � y Agl .`� Om . gz� sq 17 Y4 ��1 Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of August 27th, 2018 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 1 ) Lot 1A - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack) D. Sullivan,III P.E. Date of Inspection: August 31, 2018 @ 9:00 am Weather: 67 degrees/clear DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes—additional haybales available Bond: As required Field Notes: - Construction entrances in good condition; Mill Road shows no signs of mud/silt carryover(Photo 1&2) - Framing is well underway on#185 Mill Road(Photo 3) - Erosion control barriers in good condition; no signs of sediment buildup (Photos 4, 6, & 8) - Enhancement planting area in rear of Lot I where invasives have been removed doing well (Photo 5) - Lumber has been delivered for future framing of#203 Mill Road(Photo 7) - Site is in good condition - Site Photos: Eight(8) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net x � �I fl I J lu i �I IIVy, r, a w ..y _a VRI— pvq O r � ,..,.-.: h r q flux ,� I = x �F k y , 9 :- .. y 0 aqe a , ° >' OF— �a . Ml � Ar ib r V, n r i n I oil �s g ga t 5 a �r a XAw qld �R-1 m. a�' To a 7 s % � ".` a r t tip �Paua is 1 r q i li %9 � � ¢" L x0, IL It ff 'w R aay'k4 b � yg•�% qI` ' ��� 6s �� 41, 4 '�1 a ,� ov 41 j rx Al 23 Uo i P r aq a E44 em al .+� aIPA_ , . #sJ a ,rt% � a WK k, "MIA Will 31 Av �,t '+. t AA y � 4 a. s ttat,�, d�A. � r iVAR, > �' S a ' e ^t "'�a 4 �,� , : err 4� il i " i ra m a 00, jmwh v r � .. ot IS- s � za i „ z a .� P . A I l � x �z W. > z e �r e �m 1 ip x ' r g I n R � " d " E it n 8 ' s N �Y > y , " a s � �,. ui �I I „ f, a, y ' x ;ws n � A � au r c o. � F � � i a M w e � 7 � F , r N ✓ y ti �. I } Mum 2. '° ✓/ ✓, to IMF _ n , to ova :m N Ant u Von r� OM ry A. Know. Mw WE a "� y .✓ � . u,: r �M. .d. q n atti J i .¢I p` w. r' ,... w . 41 .. Zi " m V , zq r jv ., ZZ Al 44, t � y 3 a 9 Pf gs AQq 71 g r fit 4 # tt z I 4 y AWN "All, ME t £ �Y i R rz ' s � I 00 4 �r rt t� . k-l", ,,, £ atF 33 zn r s # Y ct.��b£ s s M a zas Sk£ # s' tg \ t s 3 f #� L r crs � a F l¢ Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of September 70th, 2018 Formerly #865 Johnson Street, North Andover (Lot 1A + Lot 1B) Lot 1A - #185 Mill Road Lot 1B - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack) D. Sullivan, III P.E. Date of Inspection: September 18, 2018 @ 11:00 am Weather: 68 degrees/heavy rain DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Site inspection took place during heavy rain event, with periods of flash flooding (1"-2"rain event forecasted) - Septic leaching field and septic tank area being prepared for#185 Mill - Site is holding up well to heavy rain; areas of ponding; no signs of erosion or sediment migration - Erosion control barriers in good condition. - Exterior frame of#203 Mill Road is completed - Site Photos: Seven (7) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net �� - �� ,�� a �;- �;°� 4+ __ �� �, �,. �. �:a, �. ,. >.; �, �� �. �, x<�:. ��, ,., ��� � �� ��� �. ;�a��' �c �g r.�,�.A' � �.. .. � � ;o�� � �' � �,�. -<� � s , �A -. .�,, �; � �7�� -� t � .y � �� r �. �� w� � e � �� h k � r.., �„�` ,c amp � ��,,�`�«�- �: �"Ord, ' ��" �"`�r- � � � � ,' � � °�W� u �.,: � ,' � � ;; :, � rF' � � r r -- ��� � � � y- .. ��« s � � �� �� f �, ., r � g w ✓` ',:� s �, �.,_ , " �,�, � �� �. ��_ �' �., x' �` r � �' . a, s,;: � �. � .. ,� � b �' �, a � . ��� � �', va:. � „�.: � �.�� � ,, �F "� ,. a. �. a �:- u �. N ry � �. r � m w s=.� �`� � �� � � � F � 4� �' �. � � w /u y r C .nay ..' '' `".'c< a u d �, „.. 'v �.. < r `?"` .,.,. ' .. :. E N s e. �� a > m N n �' .�,' a ;�. ,., r. .< e... v., µ➢ i -,c ,. .' ,�. '.vi^ y .. ." 4 r �. "* ` nr „. ., ✓ i i v' F �,r � ,i .... ,,..,� ... .o n ,.. ., � �' a w ,.✓' c .. .. � _, 'i., n P .,.. �., =x n ;. i. ' s.i �. .� `�. P„ r ..�, :� w �� o r, .� .. vd � ., � � U ,,. .i, .r"". <r T2 �. W is z too lot a a , F✓' w'.. , t „ a y r , n er' U ra= a r rr r. n. y e -v" r:. M x T, z V7 v w r a r �< Y wv n m y F Y 3?' r ,. V vk �T z v Y N w k r w� �v bmy a� 4N � a �€ w Y all 1, MOO z v , $^�� m, y a ��s• F �.,,.,"'.. .G 9 ;. V Ott ; x a f s a d ISE Yam WWI V, IT ffil Aq . .y s a c l" Qk �� , "' H m, v t u s A i I II Y e, s x w I , c Vnkmw mlar. a ik 4tl. JIF 'I 2 x, w� a Y r r � � ram' j i ' „z ,x w m A n p �M u z Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of October 29th, 2018 Formerly #865 Johnson Street, North Andover (Lot 1A + Lot 1B) Lot lA - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack) D. Sullivan, III P.E. Date of Inspection: November 7, 2018 @ 10:00 am Weather: 50 degrees/clear DEP Sign: Up & Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging_ Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Site inspection took place after 0.32"rain event on 11/6 - Septic leaching field being excavated at 203 Mill Road (Photo #1) - Erosion control barriers in good condition(Photo#2) - Site is not well draining from recent rain events, but no signs of erosion(Photo#3) - Front yard of 185 Mill Road is finished graded/loamed(Photo#4) - Rear yard of 185 Mill Road had concrete poured for deck footings (Photo #5) - Rear yard of 185 Mill Road has been rough graded(Photo#6) - Mill Road has no evidence of silt or mud carryover from site (Photo #7) - Site Photos: Seven (7) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net � xt ro� All IT �W71 ` MW .; IF Ilk yr v w. t j v� ���yvp,w,ll u�" N rkti a' y _ ., ' ,. ," " oilt WN . N `'' Y n / „� ""?` � YOU L ON, TK- do j�' I loft' -47 dw Im Jamb I ME- '. � a fi 5 c no W MAK Feb � t -1 i -13 lad v - y 0. vizsR3 etz` .9alm `� sE Ow Sk '. j Itu w-, It i Aw ,... q �kN,� <„R sou x too, E, my h h _ y i� .� a WK + e .n a� t� 1 a t I u ^ e ��r r mow. m f IM- ' ¢ One_ re ma ��.. Ya .¢40 wo i I be g , K .:. .r w . x w >„ �r ^ n r s w z �a PON q KN n PW Ja Ali 110 •y. A f. + {a<< R _ r a h , _ & X Y � r e ,. 1 Nns ism "'ON "WIN .......... owl ale r- H .......... AWA TM_ F r s x a afgi lw 0,4 I� r r n a 1y a, y � J Sullivan Engineering Group, LLC Clvrl Engineers&Land Development Consultants Weekly Monitoring Report Week of November 12t , 2018 Formerly #865 Johnson Street, North Andover (Lot 1A + Lot 1 ) Lot 1A - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: November 13, 2018 @ 10:00 am Weather: 45 degreesiheavy rain DEP Sign: Up & Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes—additional haybales available Bond: As required Field Notes: - Site inspection took place during 1 '+rain event - Site is very wet, areas of puddling, no signs of site erosion - Mill Road is clean(no evidence of silt or mud carryover from construction vehicles)—Photo#1 - Front yard of#185 is finished graded(same as last week)—Photo#2 - Site is in good condition; in various stages of construction and/or landscaping(Photos#3 +#8) - Rear yard of 185 Mill Road being finished graded/loamed; deck being built(Photo #4,#5,#7) - Erosion control barriers in good condition and working well (Photo#6) - Site Photos: Eight(8) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net ti I d �t s.. �, v -gym✓ Y . 9, r r Nz 3 I x. ON 4r n Cie A its, saw WIT IOU M, Qw- r� if Y M a a ;w j - z i r a a s W r � � r U r k; I � v Ui b ? s 9 m .. N. a N. „ m e f xl,Lm v+ w „ y.� m r a s i i' r 3 � v .. IM, d � 51 777, f 0 X e„ r r z a' <i w r a, x , ,,. �?omo f' vi �x i s x y, a 7 � n � J r 4 P w o, r s Mill, r � s P w � t x T . I J , i r h( x� v.. 3 � 4 y »z � A i r r , w a y � « q ^2 w n mi ^b i z c.� m .6 " ot old 177 "NOW i i t tt a r ; m-ya . � azF., .: 11 A 21" tee" a : ' �� r. 9 woo -mumyo­ -07 IV �''"" � ,� .. a- . a AF aR"a' 5' '- .y" »,y a ' k UNW 00 °R `,u, w Memo Asm � ." a �nOFa a If 01 h s r � 9 s � H r k� ro� r F N ^ R J, a a. a ' a ' n x v, a n r ' ..` AsfiN k a a' N: + u � r m r tl z a, n M p„. ,u T .d w w � w a v Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of November 26th, 2018 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 111) Lot lA - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack) D. Sullivan, III P.E. Date of Inspection: November 29, 2018 @ 11:00 am Weather: 40 degrees/clear DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Mill Road is clean; no sign of silt or mud carryover from the site (Photo#1) - Extremely wet November; beginning of week had moderate rainfall - Front yard of 185 Mill Road finished graded with haymulch on steeper slopes (Photo#2) - Rear yard of 185 Mill Road has been finished graded(Photo #3) - Enhancement planting area in rear yard of#185 Mill Road doing well (Photo#4 &#5) - Rear yard of#203 Mill Road is saturated but no signs of erosion or silt migration (Photo#6) - Erosion control barriers in good condition - Developer may be starting the septic leaching field at#203 this week Site Photos: Six (6) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net q y p o " ol 5 va s r° m #`s u w_ a u y p , Y a r L' t a y a t � u s=� o s e 40 F. M; alf 0s,k, a fi r , U. R d + Y s F P rv�p k� ¢t N „ b OR"O�w � t PS g.} V k x" AT i �. � r WC19W, oil" a ny P it a y. yay� ��• a, �; t l t `�� s +'' 4 �`@,��' 4�.� � �a, ?3 n �.��" aft y � e ` *8 t, b� r2_ _ too,I W An v � •..a�a;,szmb'I-rc.v� ... - � .� � � i' -.. ,..>7, ,y:: �k;. .� �€»"I. x 6 ��R, p� i. ,.� - r .�. &u' 0 t$'. .�' { v �s S� v� s_ „ n e� i c yy FI' Y w ry r I f ..a A t ! a. a� s t a 01 Ag� � a i -.: „, m OW xti �f M "Y g 6 Y °r R —Imp 44 AM a s s a o . µ, , _d u w _ z �a4 c l w r � � r " a v ro„ a M w pf ' 6Yg a * mm a ^ m a wW � r � � ,W e � r � n i W µ 1 ^ a r Y , n Tr m as; Sullivan Engineering Group, LLC Civil Engineers 8 Land Development Consultants Weekly Monitoring Report Week of December 3rd, 2018 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 111) Lot IA - #185 Mill Road Lot 1B - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: December 7, 2018 @ 9:00 am Weather: 30 degrees/clear DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - Septic system for#203 Mill Road is on-hold until the Spring of 2019 - The paved driveway for 185 Mill Road has crush stone drip edge in place (Photo #1) - Contractor has planted evergreen trees between#185 +#203 (Photo#2) - Mill Road is clean; no silt or mud carryover from the sites (Photo #3) - Rear yard of 185 Mill Road is stable (Photo#4) - Enhancement planting area to the rear of#185 Mill Road is in good condition(Photo#5) - Erosion control barriers in good condition and functioning well (Photo#6) - The driveway for#203 Mill Road has been paved(Photo#7) - Future deck area is being prepared to rear of#203 Mill, footings and crushed stone in place (Photo#8) Site Photos: Eight(8) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net s ^ 3 C $ xKA p � F c me Vo MNY 119 u i NO w' Jaw MM r � g „ fi n V s f y r �; ���' �.; � �,¢ ,, � � ��� �,� ,��� I � �� z�n _ � ,� � � �� � � � R ; , �� �� � � �� �. K a. ���,, �_ u� fir�. � � ����� f,'i 4 7 y f� �`�� � '� x „, i III,,, a "� n a .� ..i.:. ii �; b � x I� i �. w „' �a. � �� . � �, �, � � ��� ,.�. �-��'"z a � � f m"�< ti fi �� � �,, �a � � � � 7 d. ,�;�.,y��., .�., -, ,. r i �- >r„� s ,.. a , .rem,,,r,C%� -.�. � -� if s films- � a o tm A act- AVO N� H a t� rir ..was A .r� r a r � t �0r x r f r ,a a u r s. s � i a � u r w .q v u p �4 v � I Ty4, Jed t ot M v9' s u - 1� � r r' � s ,fin ay u a 4 w i x e. s s y«- a a< �r ac f a N. a a A � M M tr z M " A y„ F �^ ti E ^ S a v p s: r a s' q,. G. r n u, nzrP � w r. d } e, ;' ..` r� liS4 d y 5 #L .................. 7-7g, i 4 � �tit t s .t r r trtts 6� t � 4 n, c e F Ken »...., R .A a w a ^ r u,. h� w N k,. J,a�5'lv w� n L r, yi � r m y r � � 1 r w _ ✓� a .:, .:., rr'� a y�✓�'~ � �� �,� � `,��, ,�, � Asa z � �- �' ti r Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants Weekly Monitoring Report Week of December 31st, 2018 Formerly 4865 Johnson Street, North Andover (Lot lA + Lot 113) Lot lA - #185 Mill Road Lot 1 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: January 4, 2019 @ 9:00 am Weather: 40 degrees/clear DEP Sign: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - No outside work took place this week - Site is stable; ground is frozen; no signs of erosion - Erosion control barriers in good condition (See Photo#1) - Front and side yards of#203 Mill are stable (Photo#2 &#3) - Rear yard of#203 Mill is stable with erosion barrier in good condition(Photo #4) - General site in good condition; new owner has moved into #185 Mill; (Photo #5 &#6) Site Photos: Six (6) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net 3 k c w ,:!lil AD -�f " " m ..-"` „ w r f s s f kE v a x too Am smm— yj ... � � � ON 17 Now W OW, "R . ` ^' al rInyo,Jv,NO Own j SIR + s mm ' d $tom- -vial mv Pa. slF - & 17�'' €� hue R :,u.. „ eQ a s a u, } � x 1 e i IV, y ! 4 will a {ZL I I 1g_ liu � G x � 1 C� 4 3 n c` a ;<. a � a&� k gel im PKI NJ 17 A MY no JR r � WAN 71 MEN i w� � b ^ ? - � y r > ,� W ", " 3 n w� a, u m s to O � ' Mg31 UY r ZI ; x ,$r""W. AST k awn As s. r jilt F � y sMIS 1 . Ot PAT WW ., cOW �:. W— A ' � ,� ;, b „H `. 701, TO .� MA low AA" r EVE 04, > , f �4 Wml WNW in via w � ' ., � � �� �" ,. ���� � � � � �° �s s � n a � - �. :� �. .�.: ,. _. a- {� � �X .% ..r ear``" a,�"¢`r s ��� f n, �, � � , v ,a �. y . �- ti � �. ar . �� � �, �. ,,� ar .:„ s ;. tc y < .- „,,�, �,, c3i �.-r �, Q. a" ,,� � P.,. s r...; .`�,. � � ' �. x��, �..,. ti 5�,� a, P� m r? „ A n< -m e. Sullivan Engineering Group, LLC Civil Engineers S Land Development Consultants Weekly Monitoring Report Week of January 14th, 2019 Formerly #865 Johnson Street, North Andover (Lot lA + Lot 1B) Lot lA - #185 Mill Road Lot 113 - #203 Mill Road DEP File No.: 242-1714 Monitor: John(Jack)D. Sullivan, III P.E. Date of Inspection: January 15, 2019 @ 9:00 am Weather: 30 degrees/clear DEP SiMn: Up &Visible from street Order of Conditions recorded: Yes Construction Schedule: On-file Wetland flagging: Present in field Erosion Control: Installed in correct location Emergency Erosion Control: Yes additional haybales available Bond: As required Field Notes: - No outside work taking place this week - Front walkway area has been prepared for 4203 Mill (Photo#1) - Site in good condition; ground is frozen(Photo#2 +#6) - Mill Road is clean; no carryover of silt or mud to travelway(Photo #3) - Erosion control barrier in good condition (Photo#4+#5) Site Photos: Six(6) PO Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net