Loading...
HomeMy WebLinkAbout2018-02-20 Driveway Permit 203 Mill Road LDP TOWN OF NORTH A,NDOVER - DIVISION OF PUBLIC WORKS Permit to Connect a Driveway to the Town Right-of-Way Permit to be issued at each building permit signed This Permit only approves connection to the Town Right-of-Way and not the overall driveway design. Approval from Conservation or other Town Boards may be required. The pavement elevation of all driveway entrances must be at least 4 inches below the edge of the existing roadway's pavement at a distance of 6 feet from that edge of pavement into the roadway shoulder. Please legibly fill out the following Information completely (blue or black ink) Date of Application: 611E tg Owner: LUZ Address: Za A Phone: a�'Z- -I/)h Are Town trees involved Y /(3 Compliance with MGL Chapter 87 req ire Y /(N) Are Town Boards involved/ N If yes, w ' h Board(s) r Building Permit? Y / N u Copy of Permit attacked' ? Y N Approved Ian attached I ails su mitted? Y N pp p o I Z= / Driveway information New Z4 Existing New driveway sq ft Expansion sq ft Existing sq ft Can you show the location of water service shut off Y f N or N/A due to Well is in use Storm water runoff flows to the street right-of-way? Y / N Work to be done in right-of-way?C-Y-1)/ N If yes, describe Runoff mitigation (i.e, infiltration,grass areas, change grades,etc) provided?oy , N If yes, describe M- Oek'� Contractor Information: Name: Address: )f V9 Phone(s): _ 2 -n` 1 This portion to be filled out by the town Approved by: Date: r^oi� Final Inspection Date: Completed by: