Loading...
HomeMy WebLinkAboutSprinkler Inspection Report - Inspection - 1070 OSGOOD STREET 11/8/2021 A.S.A.P. Sprinkler LLC SPRINKLER INSPECTION REPORT PAGE 1 6 Progress Ave. Unit #3 Tyngsboro, Ma. 01 ` Phone %78-649-4945 Fax 978-649-9445 Company Name .-- r /Y_ C- Contact ITA p P ' ! 4 f Street ��'-� Cit �- �.�'�' State . o Date of Trip Test Technician ,�>.''"" zi ;.. Date r owners Section(To be answered by owner or occupant) A. Explain any occupancy hazard changes since the previous inspection. R.Describe fire protection modifications made since the last inspection. f c- Describe any fires since the last inspection D. When was the system piping last checked for stoppage, corrosion or foreign material? ✓�-,% �pel�'� E. When was the dry-piping system last checked for proper pitch? 64"L[114._ u�" F.Are dry valves adequately protected from freezing? Inspector's Section(All responses reference current inspection) 1. GENERAL YES. NO ' a. Is the building occupied? >O# b.Are all systems in service? c. Is there a minimum of 18 in clearance between the top of storage and sprinkler deflector? d. In areas protected by wet system,does the building appear to he properly heated in all areas including blind attics and perimeter areas, where accesible? Do all exterior openings appear to be protected against freezing Z.CONTROL VALVES(See Item 14) XXXXXXXXX XXXXXXXXX a. Are all sprinkler system control valves and al€other valves in appropriate position? b.Are all control valves in the open position and locked, sealed or equipped with tamper? 3.WATER SUPPLIES(see item 14) XXXXXXXXX XXXXXXXXX a.Was a water flaw test of main drain made at the sprinkler riser? 4.TANKS, PUMPS, FIRE DEPARTMENT CONNECTIONS XXXXXXXXX XXXXXXXXX a.Are fire pumps, gravity tanks, reserviors and pressure tanks in good condition and maintained? b.Are FD connection in satisfactory condition,couplings free,caps in place&check valves tight? a Are they accessible and visible? 5.WET SYSTEMS(See item 13) XXXXXXXXX XXXXXXXXX a.Are cofd weather valves (OS&Y)in the appropriate open or closed position? b. Have anti-freeze system solutions been tested? f c.Were the antifreeze test results satisfactory? 6. DRY SYSTEMS(See Items 10-14) XXXXXXXXX XXXXXXXXX a. is the dry valve in service? b.Are the air pressure&priming water level in accordance with the manufacturers instructions? c.Were the antifreeze test results satisfactory? , d.Wire low points drained during the inspection? e. Did quick-opening devices operate satisfactory? { f. Did the dry valve trip properly during the trip pressure test? g. Did the heating equipment in the dry-pipe valve room operate at the time of inspection? 7. SPECIAL SYSTEMS{Sae item 16) XXXXXXXXX XXXXXXXXX a. Did the deluge or pre-action valves operate properly during testing? b. Did the heat-responsive devices operate properly during testing? c. Did the supervisory alarm service test satisfactory? S.ALARMS XXXXXXXXX XXXXXXXXX a. Did water motor and gong test satisfactory? " "i v+ - b. Did electric alarm test satisfactory? c. Did supervisory alarm service test satisfactory? 9, SPRINKLERS XXXXXXXXX XXXXXXXXX a.Are all sprinklers free from corrosion, loading or obstruction to spray discharge? b. Are sprinklers over 50 years old,thus requiring sample testing? c, is stock of spare sprinklers available? d. Does the interior condition of sprinkler system appear to he satisfactory e.Temperature. Are sprinklers of proper temperature rating for their location? A.S.A.P.Sprinkler LLC INSPECTION REPORT Page 2 6 Progress Ave. Unit#3 Tyngsboro,Ma.01879 Phone:978-649-4945 Fax 978-649-9445 Wet Systems No? Make and mode{? Dry Systems No? Make and model? ,' Special Systems No? Type? Make and Model Condition 10.Date dry-pipe valve trip tested(control valve partially open)_._,,,,,,,,, 11.Date dry-pipe valve trip tested(control valve fully open) 12.Date quick-opening device tested ? 13,Date deluge or preaction valve tested 14.See Control Valve Maintenance Table. Control Vaives Number Type Open Secured Closed Signs Abnormalities City Connection Control I Tank Control Pump Control Sectional Control System Control ) d, ,! r 5- Other Control Water Pressure? Tank, PSI Fire Pum1p %ICJ Water flow test? i6' (If none made WHY?) ) v rl 16,Heat Responsive Device Test Method i Type of Equipment Manufacturer ti Test Results: f Valve# A B C D EF Valve A E C D E__F Valve# A B I D E__,F Valve# A B C D E__F Valve# A B C D E_,_F Valve# A E C D E _F r Valve# A B C D r_TE__F Valve# A B C D E_ _,_,WF �144. Auxiliary Equipment:No? Type? E Location? Test Result? 17.Explain any"No"answers and comments: 5 18.Adjustments or corrections made during this inspection:_, ^„_?r• r F;„r„ 1 ' i fr- -° 19,Although Jese c ments are not the result of an engineering review,the following desirable improvements are recommended. ician 7r Licens j ._Cust Signature/date i Techns jr � I 7 Dry Pipe Valve / Pre-Action Test Report A.S.A.P. SPRINKLER, LLC 6 PROGRESS AVE., UNIT #3, TYNGSBORO, MA 01879 - 978-649-4945 - Fax: 978-649-9445 Company Name: 2 Contact: x A2 City: State: Street: "le Date of Trip Test: e Technician: Date: Note:Before any dry pipe valve is trip tested,the water supply line to it should be thoroughly flushed,the two inch drain below the valve should be opened wide,and water at full pressure should be discharged long enough to clear the pipe of any accumulation of scale or foreign material.The DRIP VALVE on the dry pipe valve should be checked before tripping the pipe valve to see that it is operating properly. i D kY:0 P SYSTM NO EM NO ���SYSTEM E VALVES SYST NO SYSTEM: NO Valve Serial 0 C, Manufacturer(Name) Valve Model 0 LA Valve Size Controlling(Location) Sprinklers(Numbers) Date Last Tap Tested? NOV ti Date Last Operated? Pressure(Air) Before Test(Water) Sizeflocation of Valve Was Gate Valve Opened Wide During Test Air(Air Pressure) Tripped(Water) At(rime) 3 L i If System Flooded,Time if Flooded Water Reached Test Opening Performance Valve CDnd Int of Body COO Moving Parts Rubber Facing i-A riAr Seats Reset? Did Alarms Operate @ Trip Test est All Low Poin Drains Blown Out? H2O Control Valve Open/Sealed Alarm Con.Valve Open/Sealed Quick Opening Devices Device Serial Number Manufacturer(Name) Type And Model Air Pressure In Upper Chamber Quick Opening Device Tripped at Performance Left In Sery Open/Sealed? Sprinkler Deficiency Report A.S.A.P. SPRINKLER, ENE 6 PROGRESS AVE., UNIT #3 Customer Name: TYNGSBORO, MA 01879 Address e� �,�a "';G,�, .r '✓ . l „ 978-649-4945 Fax: 978-649-9445 Telephone H°r�v Contact, „ SHIP DATE PURCHASE ORDER# SALES REPRESENTATIVE SHIP VIA TERMS TAX ID QTY. ITEM # DESCRIPTION UNIT PRICE TOTAL 4i ;%", 8 �� .c^,,1.. -,/ c-t 4.n ` , - ,�.-J!n .1 r ✓.,, & ( f 'es.�S CJi h r�] V`; 5 f iOv v,!1,UT L { r� rev) I `l r)6, --, ILL� lJ�� 't✓�,-n4•iG'n"fi .r f �s, � C� �.i r;. .�� �i Ir1 f'krt; �J1tt frr 777177) _I COMMENTS: SUB TOTAL _ TAX IMPAIRMENT MISCELLANEOUS NC=NON CRITICAL TOTAL R=RECOMMENDATION On this date, the above equipment was maintained in accordance with the procedures of the adopted editions of the NFPA, authority having jurisdiction,and the manufacturer's manual.These procedures were executed.with the results indicated above. Service.Technician Lic. No, — -° pate Time A.M. P.M, _ _—Customers Authorized Agent