HomeMy WebLinkAbout1995-05-23 Decision SPR NAMS Addition 495 Main Street nib� -#W* sy(20)days,
'nmv�et (MM date offiftalanappla decstm (i r
Jayvi JOYCE BRADSHAW
7own � few TOWN OFNORTH ANDOVER R NCLE,K
Any appeaANDOVER
l ali be filed M A S S A C ]aU S E T T S
within (20) days after the NAY
t MpHik '1
ate of filing of this Notice �r � 4 T��
in the Office of the Town
Clerk u,� „4�, - ,+-w
ATMs Copy-
/y. _ �t� &.,, NOTICE OF DECISION
v Town Clerk
Date. May 23., 1995. . . . . . . . . . . . . . . .
Date of Hearing Apr 18: May 16. 1995
DiNisco Design Partnership, Ltd.
Petition of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
W
North Andover Middle School 495 Main Street
Premisesaffected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Gft
Referring to the above petition for a special permit from the requirements
of the .� t And over .Zoning Bylaw..; Section 8.3 Site Plan Review . . . . . . . . . , . .
so as to par rot allow.for .the.constxuction .at: .an .addition .to .the .North .Andover
Middle School '.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After a public hearing given on the above date, the Planning Board voted
conditionally
to .appgQve . . . . . . . .the . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
a
based upon the following conditions:
CC: Director of Public Works
Building Inspector R�
Natural Resource/Land Use Planner
Health Sanitarian Signed Q
Assessors
Police Chief Rt h rd, ,A,.. Na qee l,,, Cha-ixAAA . . .
Fire Chief
Joseph Mahoney, "Vice Chairman
Applicant
. . . . . . . . . . . . . . . '
Engineer
File Richard Rowen, Clerk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interested Parties
Alison Lescarbeau
. . . . . . . . . . . . . . . . . . . . . . . .
John Simons
rd . . . . . . .
495 MAIN STREET MIDDLE SCHOOL ADDITION
Conditional Site Plan Review Approval
FINDINGS OF FACT:
The Planning Board makes the following findings regarding the
application of DiNisco Design Partnership, Ltd, 87 Summer Street,
Boston, MA 02110, dated March 24, 1995, for the construction of a
42, 000 square foot addition to the existing Middle School building
located on Main Street.
The Planning Board makes the following findings as required by
Section 10.31 of the Zoning Bylaw:
A. The specific site is an appropriate location for the addition
to the Middle School as the Middle School exists on the site;
B. The use as developed will not adversely affect the
neighborhood as the amount of tree clearing has been reduced
and the area of new construction will be screened from the
adjacent neighborhood;
C. There will be no nuisance or serious hazard to vehicles or
pedestrians;
D. Adequate and appropriate facilities will be provided for the
proper operation of the proposed use;
The Planning Board finds that the landscaping plan meets the
requirements of Section 8. 4 of the Zoning Bylaw;
The Planning Board makes the following findings under Section 8 . 35
of the Zoning Bylaw,
A. The site plan complies with all current Bylaw requirements;
B. The site plan has been submitted in accordance with the
regulations and procedures as outlined in this Section and
Section 10. 31;
C. The application requires approval from the Conservation
Commission;
D. The site plan generally complies with Town Bylaw requirements,
but requires minor changes in order to be completely in
compliance with the Town Bylaw Regulations;
therefore the Planning Board APPROVES this site plan review with
the following conditions:
SPECIAL CONDITIONS:
I. Prior to the endorsement of the plans by the Planning Board,
the applicant shall adhere to the following:
a. A full set of final plans including the revised 1. 1: 1
wetland replication planting plan and the revised parking
lot layout and tree-line for the rear lot adjacent to the
fields must be submitted to the Town Planner for review
within ninety days of filing the decision with the Town
Clerk.
The existing tree line to the rear of the property shall
remain. This will eliminate approximately 16 parking
spaces and will preserve approximately 18 feet of woods.
These 16 spaces shall be designated as future parking
spaces.
b. A bond in the amount of two thousand ($21000) dollars
shall be posted for the purpose of insuring that a final
as-built plan showing the location of all on-site
utilities, structures, curb cuts, parking spaces and
drainage facilities is submitted and for erosion control.
The bond is also in place to insure that the site is
constructed in accordance with the approved plan. This
bond shall be in the form of a check made out to the Town
of North Andover. This check will then be deposited into
an interest bearing escrow account.
C. A construction schedule shall be submitted to the
Planning Staff.
2 . Prior to any construction on site,
a. the applicant must mark the limit of clearing in the
field. The limit of clearing must be reviewed and
approved by the Planning Staff.
b. The site must have received all necessary permits and
approvals from the North Andover Conservation Commission.
3 . Prior to FORM U verification (Building Permit Issuance) :
a. The plans must be endorsed and three (3) copies of the"'.-
signed plans delivered to the Planning Staff.
This decision shall be recorded at the Essex North
Registry of Deeds and a recorded copy delivered to the
Planning Staff.
4. Prior to verification of the Certificate of occupancy:
a. The building must be constructed as presented to the
Planning Board and as shown on the following plan:
2
Plans titled: North Andover Middle School
North Andover, MA
TRC - Preliminary Submission
Prepared by: Dinisco Kretsch & Associates
87 Summer Street
Boston, MA 02110
Date: 22 March 1995
Sheets: A-17, A-18, A-19, A-20; dated Feb 10, 1995
b. The landscaping must planted as presented to the Planning
Board and as shown on the following plan:
Plans titled: North Andover Middle School
North Andover, MA
Prepared by: Dinisco Design Partnership
87 Summer Street
VG
Boston, MA 02110
Date: 3 May 1995 (to be further revised)
Sheet: L-3a Planting Plan - Wetland & Habitat
Replication Plan 1:1 Option "A"
C. The site shall be reviewed by the Planning Staff. Any
screening adjacent to Tavern Road as may be reasonably
required by the Planning Staff and/or Tree Warden will be
added at the applicant's expense. The Planning Board
will support the placement of a conservation restriction
on a portion of the remaining wooded area. __.._w.._.....---..
d. All artificial lighting used to illuminate the site shall
have underground wiring and shall be so arranged that all
direct rays from such lighting falls entirely within the
site and shall be shielded or recessed so as not to shine
upon abutting properties or streets. The site shall be
r� reviewed by the Planning Staff. Any changes to the
approved lighting plan as may be reasonably required by
the Planning Staff shall be made at the owner's expense.
Lighting shall be installed as shown on the following
plan:
Plans titled: North Andover Middle School
North Andover, MA
Prepared by: Dinisco Kretsch & Associates
87 Summer Street
Boston, MA 02110
Date: 11 April 1995, rev. 3 May 1995
Sheet: ES-1 Electrical Site Plan
e. All buildings shall have commercial fire sprinklers
installed in accordance with the North Andover Fire
Department requirements.
5. Prior to the final release of security:
3
a. A final as-built plan showing the location of all on-
site utilities, structures, curb cuts, parking spaces and
drainage facilities must 'be submitted to and accepted by
the Division of Public Works. The site must be
constructed according to the approved plans. This will
be 'determined by a majority vote of the Planning Board.
6. Any stockpiling of materials (dirt, wood construction
material, etc. ) must be shown on a plan, reviewed and approved
by the Planning Staff. Any approved piles must remain covered
at all times to minimize any dust problems that may occur with
adjacent properties. Any stock piles to remain for longer
than one week must be fenced off and covered.
7. The dumpster, as shown on Sheet L-2 of the approved plan, must
be enclosed entirely by a wooden stockade fence that must be
2 feet higher than the dumpster.
8 . Any further alteration of the tree line must be reviewed and
approved by the Planning Board.
9. Any plants, trees or shrubs that have been incorporated
into the Landscape Plan approved in this decision that
die within one year from the date of planting shall be
replaced by the applicant.
10. The contractor shall contact Dig Safe at least 72 hours
prior to commencing any excavation.
11. Gas, Telephone, Cable and Electric utilities shall be
installed as specified by the respective utility companies.
12. All catch basins shall be protected and maintained with hay
bales to prevent siltation into the drain lines during
construction.
13 . No open burning shall be done except as is permitted during
burning season under the Fire Department regulations.
14. No underground fuel storage shall be installed except as may
be allowed by Town Regulations.
15. No mechanical devices (ie: HVAC, vents, etc. . . ) which may be
visible from any surrounding roadways shall be placed on the
roof.
16. The provisions of this conditional approval shall apply to. and
be binding upon the applicant, its employees and all
successors and assigns in interest or control.
17. Any action by a Town Board, Commission, or Department which
requires changes in the plan or design of the building as
4
presented to the Planning Board, may be subject to
modification by the Planning Board.
18. Any revisions shall be submitted to the Town Planner for
review. If these revisions are deemed substantial, the
applicant must submit revised plans to the Planning Board for
approval.
19. This Special Permit approval shall lapse on
LsiAy_2-14 z7 _ (two years from the date permit granted)
unless substantial use or construction has commenced.
Substantial use or construction will be determined by a
majority vote of the Planning Board.
20. The following information shall be deemed part of the
decision:
a. Plans titled: North Andover Middle School.
North Andover, MA
a Prepared by: Dinisco Kretsch & Associates
87 Summer Street
Boston, MA 02110
Scale: as noted on each sheet
Sheets:
L-1 Site Survey - Existing Conditions
Plan
17 Jan 195, rev. 3 May 195
L-2a Site Plan - Proposed Construction
Plan Option "A" 1: 1.
3 May 1995 (to be revised)
L-3a Planting Plan - Wetland & Habitat
Replication Plan 1: 1 Option "A"
3 May 1995 (to be revised)
L-4 Site Traffic Plan
21 March 1995, rev.3 May 195
SU-1 Site Utility Plan - Proposed
Drainage Plan
5 April 195, rev. 3 May 195
ES-1 Electrical Site Plan
11 April 1995, rev. 3 May 1995
b. Plans titled: North Andover Middle School
North Andover, MA
TRC - Preliminary Submission
Prepared by: Dinisco. Kretsch & Associates
87 Summer Street
5
E
1
Boston, MA 02110
Date: 22 March 1995
Scale: as noted on each sheet
Sheets: A-17 Building Elevations
A-18 Building Elevations
A-19 Building Elevations
A--20 Building Elevations
C. North Andover Middle School
Stormwater Peak Flow Mitigation Report
Prepared For: DiNisco Design Partnership Limited
April, 1995
Prepared by: Montgomery Watson
d. North Andover Middle School
Wetland Drainage Calculations
Prepared for: DiNisco Design Partnership Limited
May, 1995
Prepared by: Montgomery Watson
cc: Director of Public Works
Building Inspector
Health Administrator
Assessors
Conservation Administrator
Planning Board
Police Chief
Fire Chief
Applicant
Engineer
File
middlesc.spr
6
Registry of Deeds
Horthern District of Essex County
Lawrence, MA 01840
01/31/96
DINISCB DESI6H PARTNERSHIP LTD AN
# 1 RK:tinle 0347 Type DECSN 13.00
inst 2M Copies 5.25
Postage 0.64
Total 18.89
d 2, Payment Cash 210.00
.3 chansae is 1
THANK YOU' Thomas J. Burke
Register of Deeds