Loading...
HomeMy WebLinkAboutSeptic Response Letter - Correspondence - 116 OGUNQUIT ROAD 4/15/2021 The Morin-Cameron GROUP, INC. April 12, 2021 NOEp��M�N� Mr. Brian J. LaGrasse 10WNOF 0V Director of Public Health 120 Main Street North Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan — Lot 3 - 116 Ogunquit Road Dear Brian: We are in receipt of your review of the septic design for the above referenced property dated March 10, 2021. On behalf of Peter Breen, The Morin-Cameron Group, Inc. has prepared the following responses to your comments. Please find enclosed 3 sets of the revised Sanitary Disposal System Design Plan for your review/approval. For convenience, the responses are numbered in the same order and correlate to the numbered comments in your letter: 1. The plan view (Sheet 1 of 2) has been revised to show benchmarks within 50-75 feet of the proposed facility. 2. The plan view (sheet 1 of 2) was revised to show a foundation drain with rip-rap outfall. 3. Note 16 was added to the General Notes (sheet 2 of 2) to read "THE BUILDING SEWER SHALL BE 4" PVC (SCH 40) PIPE WITH WATERTIGHT JOINTS LAID ON A COMPACT BASE IN A STRAIGHT LINE AT A CONTINUOUS GRADE WITH A MINIMUM SLOPE OF 1.0%". 4. Note 16 was added to the General Notes (sheet 2 of 2) to read "THE BUILDING SEWER SHALL BE 4" PVC WITH WATERTIGHT JOINTS LAID ON A COMPACT BASE IN A STRAIGHT LINE AT A CONTINUOUS GRADE WITH A MINIMUM SLOPE OF 1.0%". 5. Note 4 was added to the Septic Tank Detail to show "ACCESS RISERS BROUGHT TO FINAL GRADE SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS" (sheet 2 of 2). 6. Note 2 was added to the Septic Tank Detail to show "ALL JOINTS, PENETRATIONS, AND RISERS SHALL BE MADE WATERTIGHT(I.E.:TANK SHALL BE MADE WATERTIGHT)"and note 4 was added to the Distribution Box Detail to show "INLET AND OUTLET PIPE WALL PENETRATIONS AND RISERS SHALL BE MADE WATERTIGHT" (sheet 2 of 2). 7. Note 3 was added to the Distribution Box Detail to show "DISTRIBUTION BOX SHALL BE LAID ON A LEVEL COMPACT BASE AND ALL OUTLER INVERTS SHALL BE SET AT THE SAME ELEVATIONS" (sheet 2 of 2). CIVIL ENGINEERS • LAND SURVEYORS • ENVIRONMENTAL CONSULTANTS • LAND USE PLANNERS 66 Elm Street, Danvers, MA 01923 978.777.8586 FAX 978.774.3488 Providing Professional Services Since 1978 www.morincameron.com Mr. Brian LaGrasse April 12, 2021 Page 2 8. Additional soil testing was conducted in the proposed system areas on April 9, 2021 and witnessed by Dan Ottenheimer for the North Andover Board of Health. The test results have been added to sheet 1 of 2. The test results are consistent with the previous soil testing and no changes to the proposed system design was required. 9. The leach bed detail shows "9" LOAM AND SEED (MIN.)" over the pea stone in the Typical Cross Section and Typical Longitudinal Section (Sheet 2 of 2). 10. A Sand Fill Specification was provided on sheet 2 of 2. 11. The perforated pipe shown on the leach bed detail has been revised to show "ORIFICE SIZES TO BE BETWEEN 3/8" - 5/8" (Sheet 2 of 2). We trust these responses address your comments/concerns. If you have any additional questions, please do not hesitate to contact our office. Sincerely, THE MORIN-CAMERON GROUP, INC. John M. Morin, PE Principal JMM/kmm Attachments cc: Peter Breen X:\Breen,Peter\684\Docs\Lot 3\Lot 3 BOH\Lot 3 Response Comments.doa