HomeMy WebLinkAbout- Correspondence - 116 OGUNQUIT ROAD 12/7/2021 „a
� `� Stephen Casey<scasey@northandoverma.gov>
116 Ogunquit Street
1 message
Stephen Casey <scasey@northandoverma.gov> Tue, Dec 7, 2021 at 12:44 PM
To: robertinnis@yahoo.com, Benjamin Osgood <bosgoodpe@gmail.com>
Bob and Ben,
The final grade inspection was completed today at 116 Ogunquit street. Currently a slope was noted and hay was spread
over areas of the existing grade. Bob will provide a letter between him and the homeowner noting the final grade will be
completed (i.e. seeded) in the spring.
In the meantime, I attached the installation certificate for both of you to sign. I will also need 3 hard copies of the as-built
plan submitted to our office. As a general note, we have found the mail has taken a little longer than normal so if there are
deadlines involved with closing it is recommended these are dropped off directly to us. Please ensure all areas of our as-
built checklist are noted on the as-built plans.
If you have any questions, please let me know.
Best,
Stephen Casey Jr.
Health Inspector
Town of North Andover
Septic_Disposal_System_Installation_Certification_Wed_May_19_2021_12-22-32 (1) (1) (1).pdf
273K